CN109707426A - It is a kind of for monitoring the protective device and method of roadway bolt stress variation - Google Patents

It is a kind of for monitoring the protective device and method of roadway bolt stress variation Download PDF

Info

Publication number
CN109707426A
CN109707426A CN201910144672.2A CN201910144672A CN109707426A CN 109707426 A CN109707426 A CN 109707426A CN 201910144672 A CN201910144672 A CN 201910144672A CN 109707426 A CN109707426 A CN 109707426A
Authority
CN
China
Prior art keywords
anchor pole
spring
monitoring
pressure gauge
stop collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910144672.2A
Other languages
Chinese (zh)
Inventor
陈在铁
王威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shazhou Professional Institute of Technology
Yangzhou Polytechnic College Yangzhou Radio and TV University
Original Assignee
Shazhou Professional Institute of Technology
Yangzhou Polytechnic College Yangzhou Radio and TV University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shazhou Professional Institute of Technology, Yangzhou Polytechnic College Yangzhou Radio and TV University filed Critical Shazhou Professional Institute of Technology
Priority to CN201910144672.2A priority Critical patent/CN109707426A/en
Publication of CN109707426A publication Critical patent/CN109707426A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention discloses a kind of for monitoring the protective device and method of roadway bolt stress variation, protective device includes: sheath, spring and pressure gauge, external screw thread is provided on the free segment of the anchor pole, the stop collar in sheath is provided on the free segment of the anchor pole, the spring is set on the free segment of anchor pole and between fixed ring and stop collar, the pressure gauge is arranged in the medial surface of stop collar and carries out pressure monitoring to spring, sheath inner hole front end is provided with one section of internal screw thread, the protective ring with limit central spacer is provided on the internal screw thread, when free section length changes, pass through the reading difference of pressure gauge, it can be derived that the changing value of spring pressure.By the above-mentioned means, of the present invention, for monitoring the protective device and method of roadway bolt stress variation, maintenance convenience, the cost used is low, simple and reliable, for the stress monitoring of anchor poles all in tunnel, promotes Roadway Safety.

Description

It is a kind of for monitoring the protective device and method of roadway bolt stress variation
Technical field
The present invention relates to anchor stress monitoring technical fields, more particularly to one kind for monitoring roadway bolt stress variation Protective device and method.
Background technique
Anchorage technology based on anchor pole has obtained in the engineerings such as side slope, foundation pit, mine, tunnel and underground engineering extensively General application.Using the anchorage technology of anchor pole, the mechanical characteristic of country rock can be changed, preferable supporting effect is obtained, bring Traditional support pattern incomparable technology and economic benefit, meanwhile, the anchorage technology of anchor pole also receives in well lane engineering Universal attention, and obtained quick development and be widely applied.
Different from side slope anchor pole, during mining mineral resource, Deep Roadway is in high-ground stress environment, and crustal stress is released After putting, tunnel surrounding rock body can generate moderate finite deformation, and roadway bolt will receive the metamorphosis of rock mass generation after crustal stress release. If surrouding rock deformation is excessive, higher tensile stress is generated inside anchor pole, this stress once exceeds the ultimate bearing capacity of anchor pole, Anchor pole destroys, and unstable phenomenon will occur for the country rock constrained.Therefore, the stress variation of real-time monitoring anchor pole is steady to country rock Fixed, tunnel safety has very important significance.
Since the anchoring of anchor pole has the concealment of height, in the inside of rock mass, this brings bolt action to test job Very big difficulty, discovery quality problems are difficult, and accident treatment is more difficult.There are two types of forms for currently used monitoring means:
1, directly anchor pole bearing capacity is monitored: bolt stress meter is set at anchor rod anchored end, pressure gauge is applied simultaneously with anchor pole Work is placed on inside rock mass, understands the stress of anchor pole by real-time monitoring to pressure gauge, and this method no doubt may be implemented pair The direct monitoring of rockbolt stress, but the working environment of pressure gauge is more severe, often in moist, the biggish ring of the temperature difference Border, these factors not only affect the accuracy of dynamometer, while also impacting to the durability of dynamometer, it is difficult to continue steady Fixed work can not be replaced, be repaired once pressure gauge failure is permanent damages;
2, it monitors the stress of termination point of anchor rod: by welding relevant device, realizing the load-bearing monitor to free section, this method Due to individually to increase relevant device, constructs cumbersome, involve great expense, and space is limited in mine working, increased equipment subtracts The use space for having lacked tunnel needs to improve.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of for monitoring the protective device of roadway bolt stress variation And method, carry out the real-time monitoring of roadway bolt stress variation, lifting construction, maintenance convenience and security protection effect.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: it provides a kind of for monitoring alley way anchor The protective device of stress in the bar variation, comprising: sheath, spring and pressure gauge are provided with external screw thread on the free segment of the anchor pole, institute It states sheath insertion tunnel inner wall and is concentrically located on the outside of the free segment of anchor pole, bore end is provided in the sheath matches with free segment The fixed ring of conjunction, is provided with the stop collar in sheath on the free segment of the anchor pole, the spring be set in anchor pole from By in section and between fixed ring and stop collar, the pressure gauge is arranged in the medial surface of stop collar and carries out pressure to spring Monitoring, sheath inner hole front end are provided with one section of internal screw thread, and the protective ring with limit central spacer is provided on the internal screw thread.
In a preferred embodiment of the present invention, screw thread corresponding with external screw thread is provided in the fixed ring and stop collar Hole.
In a preferred embodiment of the present invention, it is provided between spring and pressure gauge on the free segment of the anchor pole Gasket.
In a preferred embodiment of the present invention, the protective ring diameter of bore is greater than the free segment outside diameter of anchor pole.
In a preferred embodiment of the present invention, threading hole corresponding with pressure gauge is provided on the stop collar.
In a preferred embodiment of the present invention, the branch positioned at tunnel inner wall outside is provided on the free segment of the anchor pole Fagging and fastening nut.
In order to solve the above technical problems, another technical solution used in the present invention is: providing a kind of for monitoring tunnel The method of anchor stress variation, comprising the following steps:
(1) the anchoring section construction of anchor pole is carried out, grouting is fixed on tunnel inner wall depths;
(2) after anchoring section construction, by sheath rotary sleeve on the free segment of anchor pole, spring is put into inside sheath, and make Anchor pole runs through spring;
(3) spring end installs gasket, installs pressure gauge on the outside of gasket, then rotates installation stop collar again, realize pressure gauge Limit and the precommpression of spring;
(4) in tunnel, inner wall outside is positioned at the support plate of anchor pole end, and is screwed using fastening nut, so that anchor pole Reach design bearing capacity, the compressive deformation that spring generates makes pressure gauge generate reading, and pressure gauge is passed through the external calculating of route Machine is read out pressure count evidence;
(5) if the rock mass of tunnel inner wall expands deformation, stretching action is generated to anchor pole, the tensile stress of anchor pole increases, Free section generates elongation, and then spring extends, and the pressure that spring generates becomes smaller, and pressure gauge reading becomes smaller, after elongation Pressure gauge when installing with initial anchor pole reads difference, can be derived that the changing value of spring pressure, according to Hooke's law, asks The strain of spring out, this strain are the strain of free segment anchor pole, further according to the stress of anchor pole, the relationship of strain, can be found out The stress increment of anchor pole, conversely, using above-mentioned principle, can equally acquire the stress variation of anchor pole if rock mass is shunk, realize anchor The dynamic monitoring of stress in the bar.
In a preferred embodiment of the present invention, the spring is helical spring.
In a preferred embodiment of the present invention, the route of the pressure gauge is exported by the threading hole on stop collar.
In a preferred embodiment of the present invention, in step (3), after stop collar installation, protective ring is installed in sheath, prevents Retaining ring and stop collar keep certain gap, and when free section is extended to a certain extent, protective ring is contacted with stop collar, utilize Protective ring carries out the elongation limitation of stop collar in order to avoid breaking.
The beneficial effects of the present invention are: the present invention point out it is a kind of for monitoring the protective device of roadway bolt stress variation And method, it constructs easier, it is compact-sized, it is not take up lane space, sheath is strengthened to pressure gauge and free section Protection, avoids the problem of pressure gauge is damaged by environmental factor, extends the service life of device, and safeguards and replace Relatively convenient, the cost used is low, simple and reliable, and the stress monitoring of all anchor poles in tunnel can be used for coupled computer, is kept away Exempt from serious accident, promotes Roadway Safety.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is that the present invention is a kind of for monitoring the structural representation of one preferred embodiment of protective device of roadway bolt stress variation Figure.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Referring to Fig. 1, the embodiment of the present invention includes:
The protective device for being used to monitor roadway bolt stress variation as shown in Figure 1, comprising: sheath 2, spring 3 and pressure gauge 4, It is provided with external screw thread 5 on the free segment of the anchor pole 1, is provided with outside the inner wall of tunnel on the free segment end of the anchor pole 1 The support plate 10 and fastening nut 11 of side are supported the fixation of plate 10 and the stretching of anchor pole 1 using fastening nut 11.
The sheath 2 is embedded in tunnel inner wall and is concentrically located on the outside of the free segment of anchor pole 1, strengthens to 1 free segment of anchor pole Protection, bore end is provided with the fixed ring 6 with free segment cooperation in the sheath 2, is provided with and outer spiral shell in the fixed ring 6 The corresponding threaded hole of line facilitates the rotation of sheath 2 to install.
As shown in Figure 1, the stop collar 8 in sheath 2 is provided on the free segment of the anchor pole 1, in the stop collar 8 It is provided with threaded hole corresponding with external screw thread, rotation installation is more convenient.The spring 3 is set on the free segment of anchor pole 1 simultaneously Between fixed ring 6 and stop collar 8, the pressure gauge 4 is arranged in the medial surface of stop collar 8 and carries out pressure prison to spring It surveys, the gasket 7 being provided between spring 3 and pressure gauge 4 on the free segment of the anchor pole 1, gasket 7 makes pressure gauge 4 Stress more evenly, promotes 3 pressure monitoring data precision of spring.
Pressure gauge 4 is located in sheath 2, and sheath 2 reduces adverse effect of the environment to pressure gauge 4, before 2 inner hole of sheath End is provided with one section of internal screw thread, is threadedly coupled the protective ring 9 for being provided with and being spaced with stop collar 8 on the internal screw thread.The protection 9 diameter of bore of ring is greater than the free segment outside diameter of anchor pole 1, and in a certain range, protective ring 9 does not influence the free segment length of anchor pole 1 Degree variation, still, when the free segment elongation of anchor pole 1 is excessive, protective ring 9 contacts with stop collar 8 and avoids 1 free segment of anchor pole Continue the problem of extending and being broken.
Threading hole corresponding with pressure gauge 4 is provided on the stop collar 8, the route of pressure gauge 4 passes through on stop collar 8 Threading hole export, does not destroy the structure of sheath 2, convenient construction.
A method of for monitoring roadway bolt stress variation, comprising the following steps:
(1) the anchoring section construction for carrying out anchor pole 1, using cementing operations, is fixed on tunnel inner wall depths for the anchoring section of anchor pole 1;
(2) after anchoring section construction, 2 rotary sleeve of sheath is put into spring on the free segment of anchor pole 1 inside sheath 2, and make It obtains anchor pole 1 and runs through spring 3, spring 3 uses helical spring, utilizes the guiding of the progress spring 3 of anchor pole 1;
(3) gasket 7 is installed in 3 end of spring, installs pressure gauge 4 on the outside of gasket 7, then rotates installation stop collar 8 again, realizes pressure The limit of meter 4 and the precommpression of spring 3 after stop collar installation, install protective ring 9 in sheath, and protective ring and stop collar are kept Certain gap, when the free segment of anchor pole 1 is extended to a certain extent, protective ring 9 is contacted with stop collar 8, and protective ring 9 is utilized to carry out The elongation of stop collar 8 limits in order to avoid breaking, and improves design margin evaluation;
(4) in tunnel, inner wall outside is positioned at the support plate 10 of 1 end of anchor pole, and is screwed using fastening nut 11, makes It obtains anchor pole 1 and reaches design bearing capacity, the compressive deformation that spring 3 generates makes pressure gauge 4 generate reading, pressure gauge 4 is passed through line The external computer in road, to pressure count according to being read out, a computer can monitor the stress variation of several anchor poles 1 simultaneously, Reduce the cost of production;
(5) when the rock mass of tunnel inner wall expands deformation, stretching action is generated to anchor pole 1, the tensile stress of anchor pole increases, anchor pole Free segment generate elongation, then spring 3 extend, spring 3 generate pressure become smaller, pressure gauge reading becomes smaller, according to after elongation with Pressure gauge reading difference when initial anchor pole installs, can be derived that the changing value of spring pressure, according to Hooke's law, finds out The strain of spring, this strain are the strain of free segment anchor pole, further according to the stress of anchor pole, the relationship of strain, can find out anchor The stress increment of bar, conversely, using above-mentioned principle, can equally acquire the stress variation of anchor pole if rock mass is shunk, realize anchor pole The dynamic monitoring of stress, high sensitivity are at low cost.
In conclusion the present invention point out it is a kind of for monitoring the protective device and method of roadway bolt stress variation, body Small and exquisite, the convenient construction of product, durability is good, by indirect monitoring rock mass deformation, bolt deformation is translated into, thus according to anchor pole Stress strain curve, realize to the stress monitoring of anchor pole, be conducive to anchor pole of finding the problem in time, promote the use peace in tunnel Quan Xing.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (10)

1. a kind of for monitoring the protective device of roadway bolt stress variation, the stress monitoring and safety for anchor pole in tunnel are anti- Shield, the anchor pole include the free segment positioned at the anchoring section of tunnel inner wall depths and positioned at tunnel inner wall superficial, which is characterized in that Include: sheath, spring and pressure gauge, be provided with external screw thread on the free segment of the anchor pole, the sheath be embedded in tunnel inner wall and It is concentrically located on the outside of the free segment of anchor pole, bore end is provided with the fixed ring with free segment cooperation, the anchor pole in the sheath Free segment on be provided with the stop collar in sheath, the spring be set on the free segment of anchor pole and be located at fixed ring with Between stop collar, the pressure gauge is arranged in the medial surface of stop collar and carries out pressure monitoring to spring, before the sheath inner hole End is provided with one section of internal screw thread, and the protective ring with limit central spacer is provided on the internal screw thread.
2. according to claim 1 for monitoring the protective device of roadway bolt stress variation, which is characterized in that described solid Determine to be provided with threaded hole corresponding with external screw thread in ring and stop collar.
3. according to claim 1 for monitoring the protective device of roadway bolt stress variation, which is characterized in that the anchor The gasket being provided on the free segment of bar between spring and pressure gauge.
4. according to claim 1 for monitoring the protective device of roadway bolt stress variation, which is characterized in that described anti- Retaining ring diameter of bore is greater than the free segment outside diameter of anchor pole.
5. according to claim 1 for monitoring the protective device of roadway bolt stress variation, which is characterized in that the limit Threading hole corresponding with pressure gauge is provided on the ring of position.
6. according to claim 1 for monitoring the protective device of roadway bolt stress variation, which is characterized in that the anchor The support plate and fastening nut positioned at tunnel inner wall outside are provided on the free segment of bar.
It is any described for monitoring lane using claim 1 ~ 6 7. a kind of method for monitoring roadway bolt stress variation The protective device of road anchor stress variation, which comprises the following steps:
(1) the anchoring section construction of anchor pole is carried out, grouting is fixed on tunnel inner wall depths;
(2) after anchoring section construction, by sheath rotary sleeve on the free segment of anchor pole, spring is put into inside sheath, and make Anchor pole runs through spring;
(3) spring end installs gasket, installs pressure gauge on the outside of gasket, then rotates installation stop collar again, realize pressure gauge Limit and the precommpression of spring;
(4) in tunnel, inner wall outside is positioned at the support plate of anchor pole end, and is screwed using fastening nut, so that anchor pole Reach design bearing capacity, the compressive deformation that spring generates makes pressure gauge generate reading, and pressure gauge is passed through the external calculating of route Machine is read out pressure count evidence;
(5) if the rock mass of tunnel inner wall expands deformation, stretching action is generated to anchor pole, the tensile stress of anchor pole increases, Free section generates elongation, and then spring extends, and the pressure that spring generates becomes smaller, and pressure gauge reading becomes smaller, after elongation Pressure gauge when installing with initial anchor pole reads difference, can be derived that the changing value of spring pressure, according to Hooke's law, asks The strain of spring out, this strain are the strain of free segment anchor pole, further according to the stress of anchor pole, the relationship of strain, can be found out The stress increment of anchor pole, conversely, using above-mentioned principle, can equally acquire the stress variation of anchor pole if rock mass is shunk, realize anchor The dynamic monitoring of stress in the bar.
8. the method according to claim 7 for monitoring roadway bolt stress variation, which is characterized in that the spring is Helical spring.
9. the method according to claim 7 for monitoring roadway bolt stress variation, which is characterized in that the pressure gauge Route exported by threading hole on stop collar.
10. the method according to claim 7 for monitoring roadway bolt stress variation, which is characterized in that step (3) In, after stop collar installation, protective ring is installed in sheath, protective ring and stop collar keep certain gap, and free section is stretched When growing to a certain extent, protective ring is contacted with stop collar, carries out the elongation limitation of stop collar using protective ring in order to avoid breaking.
CN201910144672.2A 2019-02-27 2019-02-27 It is a kind of for monitoring the protective device and method of roadway bolt stress variation Withdrawn CN109707426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910144672.2A CN109707426A (en) 2019-02-27 2019-02-27 It is a kind of for monitoring the protective device and method of roadway bolt stress variation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910144672.2A CN109707426A (en) 2019-02-27 2019-02-27 It is a kind of for monitoring the protective device and method of roadway bolt stress variation

Publications (1)

Publication Number Publication Date
CN109707426A true CN109707426A (en) 2019-05-03

Family

ID=66265262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910144672.2A Withdrawn CN109707426A (en) 2019-02-27 2019-02-27 It is a kind of for monitoring the protective device and method of roadway bolt stress variation

Country Status (1)

Country Link
CN (1) CN109707426A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456787A (en) * 2020-04-20 2020-07-28 辽宁工程技术大学 Surrounding rock gradient deformation monitoring device based on scour prevention anchor cable and impact early warning method
CN111939422A (en) * 2020-08-13 2020-11-17 深圳市艾利特医疗科技有限公司 A rehabilitation device based on hearing training for autism children
CN113217053A (en) * 2021-05-14 2021-08-06 江苏科技大学 Self-adaptive large-deformation prestressed anchor rod

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456787A (en) * 2020-04-20 2020-07-28 辽宁工程技术大学 Surrounding rock gradient deformation monitoring device based on scour prevention anchor cable and impact early warning method
CN111939422A (en) * 2020-08-13 2020-11-17 深圳市艾利特医疗科技有限公司 A rehabilitation device based on hearing training for autism children
CN113217053A (en) * 2021-05-14 2021-08-06 江苏科技大学 Self-adaptive large-deformation prestressed anchor rod

Similar Documents

Publication Publication Date Title
CN109707426A (en) It is a kind of for monitoring the protective device and method of roadway bolt stress variation
CN104198097B (en) A kind of mine anchor rod axial force monitoring device and monitoring method
CN106285628B (en) It is a kind of to monitor the detection system and method developed without coal column gob side entry retaining floor crack
CN205301083U (en) Experimental auxiliary device of tunnel stock
CN107478719B (en) Structure and method for detecting post-grouting sleeve type steel bar joint by built-in vibration test method
CN205301084U (en) Experimental counter -force device is drawn to tunnel stock
CN102720515A (en) Fiber bragg grating prestress measurement anchor rod and application method thereof
CN106321001B (en) It is a kind of for monitoring the borehole anchorage structure and its construction method in floor rocks crack
CN210768812U (en) Tunnel lining concrete pressure detection device
CN102692351B (en) Test bed and application method thereof to testing mechanical properties of inclined bolt
US10976455B2 (en) Test system for microseismic test of rock mass fractures
CN209621353U (en) It is a kind of for monitoring the protective device of roadway bolt stress variation
CN206144498U (en) A drilling anchor structure for $monitoring bottom plate country rock crack
CN202693170U (en) Fiber Bragg grating pre-stressed force-measuring rock bolt
CN103046941B (en) Anchor cable yield device capable of realizing working load visualization
CN109139067A (en) A kind of underground chamber supporting construction of settlement monitoring early warning
Tao et al. Static pull testing of a new type of large deformation cable with constant resistance
CN204754985U (en) It lays protective apparatus to be used for tunnel radially to converge monitoring point and mounting tool thereof
KR101175622B1 (en) Ground anchor monitoring system
CN202673283U (en) Sidewall contact device
CN111852526B (en) Length-adjustable real-time monitoring anchor rod device
JPH095180A (en) Axial tension gauge
CN212159332U (en) Experimental leveling auxiliary device is drawn to stock
CN110715760B (en) Full-length bonding inclined anchor rod axial force monitoring device and experimental method
CN105067170A (en) Device and method for monitoring axial force of anchor rod by utilizing hammering acoustic method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190503