CN109139067A - A kind of underground chamber supporting construction of settlement monitoring early warning - Google Patents

A kind of underground chamber supporting construction of settlement monitoring early warning Download PDF

Info

Publication number
CN109139067A
CN109139067A CN201811220892.0A CN201811220892A CN109139067A CN 109139067 A CN109139067 A CN 109139067A CN 201811220892 A CN201811220892 A CN 201811220892A CN 109139067 A CN109139067 A CN 109139067A
Authority
CN
China
Prior art keywords
early warning
supporting construction
underground chamber
settlement monitoring
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811220892.0A
Other languages
Chinese (zh)
Inventor
陈在铁
徐磊
曹茂森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Shazhou Professional Institute of Technology
Original Assignee
Hohai University HHU
Shazhou Professional Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU, Shazhou Professional Institute of Technology filed Critical Hohai University HHU
Priority to CN201811220892.0A priority Critical patent/CN109139067A/en
Publication of CN109139067A publication Critical patent/CN109139067A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/46Telescopic props with load-measuring devices; with alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/50Component parts or details of props
    • E21D15/54Details of the ends of props

Abstract

The invention discloses a kind of underground chamber supporting construction of settlement monitoring early warning, it include: crossbeam, resilient stud and pedestal, the resilient stud is separately positioned on the lower section at crossbeam both ends, the pedestal is separately positioned on the bottom of resilient stud, the crossbeam bottom is provided with array sedimentation early warning component, the sedimentation early warning component respectively includes thread bush, adjust bolt, float plate and observation cylinder, two thread bush are arranged at intervals on crossbeam bottom, the float plate is located at below two thread bush, the adjusting bolt is each passed through float plate and is screwed in thread bush bottom, the observation cylinder is arranged in parallel in float plate bottom, colored solutions are poured into the observation cylinder, the level for observing cylinder is adjusted using screwing for bolt is adjusted.By the above-mentioned means, the underground chamber supporting construction of settlement monitoring early warning of the present invention, had not only increased the support to underground Mass Near The Top of Underground Cavity, but also sedimentation variation, lifting construction safety can be detected.

Description

A kind of underground chamber supporting construction of settlement monitoring early warning
Technical field
The present invention relates to construction engineering technical fields, more particularly to a kind of underground chamber supporting knot of settlement monitoring early warning Structure.
Background technique
The excavation of underground chamber destroys the equilibrium condition of primitive stress, causes surrounding soil or rock mass stress again Secondary distribution, and there is stress concentration phenomenon on cavern periphery.At this point, if the hole wall each point stress field of underground chamber is less than energy Lead to the critical value of soil or rock mass damage, then underground chamber is stable, otherwise underground chamber inner wall deformation will occurs very To phenomena such as slump.
The deformation and slump of underground chamber in order to prevent needs to carry out supporting in time.Continued excavation and ambient enviroment It influences, the structural stability of underground chamber is the sedimentation in variation, especially at the top of underground chamber, and common supporting knot Structure needs to improve there is no the effect of settlement monitoring early warning.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of underground chamber supporting construction of settlement monitoring early warning, over the ground Lower cavern is supported, and realizes the settlement monitoring at top.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: a kind of settlement monitoring early warning is provided Underground chamber supporting construction, comprising: crossbeam, resilient stud and pedestal, the resilient stud are separately positioned under crossbeam both ends Side, the pedestal are separately positioned on the bottom of resilient stud, and the crossbeam bottom is provided with array sedimentation early warning component, described heavy Drop early warning component respectively includes thread bush, adjusts bolt, float plate and observe cylinder, and two thread bush are arranged at intervals on crossbeam bottom Portion, the float plate are located at below two thread bush, and the adjusting bolt is each passed through float plate and is screwed in thread bush bottom, The observation cylinder is arranged in parallel in float plate bottom, pours into colored solutions in the observation cylinder, using screwing for bolt of adjusting Adjust the level of observation cylinder.
In a preferred embodiment of the present invention, the first positioning corresponding with resilient stud bottom is provided on the pedestal Set, the crossbeam bottom are provided with and the second positioning sleeve corresponding at the top of resilient stud.
In a preferred embodiment of the present invention, the resilient stud includes spring, the first hollow pipe and the second hollow pipe, The spring is arranged between the first hollow pipe and the second hollow pipe, be provided in first hollow pipe and the second hollow pipe with The corresponding baffle of spring.
It in a preferred embodiment of the present invention, further include alarm device, first hollow pipe side is provided under direction The frizzen of side, second hollow pipe side are provided with the switch of the alarm device below frizzen, the alarm device switch With alarm device linearly connected, second hollow pipe side is provided with scale corresponding with frizzen.
In a preferred embodiment of the present invention, the observation cylinder is transparent totally-enclosed glass straight tube.
In a preferred embodiment of the present invention, watermark line is axially provided in the observation cylinder outer circle.
In a preferred embodiment of the present invention, the bottom interval of the pedestal is provided with downwardly directed anti-skid stud.
In a preferred embodiment of the present invention, curved support plate is provided at the top of the crossbeam.
In a preferred embodiment of the present invention, through-hole is provided on the crossbeam in the width direction, between adjacent beams It is extended in through-hole and is attached using steel pipe.
In a preferred embodiment of the present invention, the crossbeam bottom, which is provided with to extend to, carries out steel pipe fastening in through-hole Bolt.
The beneficial effects of the present invention are: a kind of underground chamber supporting construction for settlement monitoring early warning that the present invention points out, peace In underground chamber, the support to underground Mass Near The Top of Underground Cavity is realized using crossbeam, and in subsequent inspection or work progress, it is right Colored solutions in observation cylinder are observed, and by the fluid change of colored solutions, monitor corresponding points referring to watermark line Sedimentation and differential settlement, meanwhile, using frizzen with sedimentation variation carry out settling amount observation, and sedimentation be more than early warning value When triggering alarm device switch, realize early warning, not only increased the support to underground Mass Near The Top of Underground Cavity, but can detect sedimentation change, promotion Working security.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is a kind of structural schematic diagram of one preferred embodiment of underground chamber supporting construction of settlement monitoring early warning of the present invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Referring to Fig. 1, the embodiment of the present invention includes:
A kind of underground chamber supporting construction of settlement monitoring early warning, comprising: crossbeam 9, resilient stud and pedestal 2, the elasticity are vertical Column is separately positioned on the lower section at 9 both ends of crossbeam, and the pedestal 2 is separately positioned on the bottom of resilient stud, the bottom of the pedestal 2 It is arranged at intervals with downwardly directed anti-skid stud 1, ground can be inserted in anti-skid stud 1, avoids the sliding of pedestal 2, and stability is high.
The top of the crossbeam 9 is provided with curved support plate 8.8 top arcuate cambered surface of curved support plate and Underground Tunnels ceiling Face structure is corresponding, and compactness is high, good to the supportive of underground Mass Near The Top of Underground Cavity.It is provided on the pedestal 2 and resilient stud bottom Corresponding first positioning sleeve 3,9 bottom of crossbeam are provided with the second positioning sleeve 7 corresponding with resilient stud top, and installation is just The fastening that screw carries out resilient stud is provided with outside benefit, the first positioning sleeve 3 and the second positioning sleeve 7.
9 bottom symmetrical of crossbeam is provided with 2 groups of sedimentation early warning components, and the sedimentation early warning component respectively includes thread bush 11, bolt 13, float plate 12 and observation cylinder 14, two thread bush 11 are adjusted and are arranged at intervals on 9 bottom of crossbeam, the float plate 12 Positioned at two 11 lower sections of thread bush, the adjusting bolt 13 is each passed through float plate 12 and is screwed in 11 bottom of thread bush, floats It is provided with waist hole corresponding with bolt 13 is adjusted on plate 12, facilitates the level for adjusting float plate 12.
The observation cylinder 14 is arranged in parallel in 12 bottom of float plate, pours into colored solutions in the observation cylinder 14, utilizes tune It saves screwing for bolt 13 and adjusts the level for observing cylinder 14.Underground chamber power supply in part is difficult, can not carry out for a long time electronics and set Standby power supply, and use observation cylinder 14 when being worked without electricity consumption, to good environmental adaptability.Axis in 14 outer circle of observation cylinder To being provided with watermark line, when underground chamber settles, it will usually have differential settlement so that the inclination of observation cylinder 14 and lose level, Colored solutions flow downwards, and watermark line and liquid level generate angle, may determine that the size of differential settlement according to angle.
The resilient stud includes spring 5, the first hollow pipe 6 and the second hollow pipe 4, and the setting of spring 5 is in the first sky Between heart pipe 6 and the second hollow pipe 4, it is provided with baffle corresponding with spring 5 in first hollow pipe 6 and the second hollow pipe 4, Spring 5 is limited.The guide rod concentric with spring 5 can also be set in second hollow pipe 4, promote the stability of spring 5, Spring 5 is played to the support force of underground Mass Near The Top of Underground Cavity, promotes underground chamber structural strength, lifting construction safety.
First hollow pipe, 6 side is provided with downwardly directed frizzen 15, and 4 side of the second hollow pipe is provided with Alarm device switch 16 positioned at 15 lower section of frizzen, the alarm device switch 16 and alarm device linearly connected, described second is hollow 4 side of pipe is provided with scale corresponding with frizzen 15.The observation cylinder 14 is transparent totally-enclosed glass straight tube, is facilitated coloured molten The observation of liquid avoids the loss of colored solutions.When sedimentation is excessive at the top of underground chamber, frizzen 15 connects with alarm device switch 16 Touch and trigger the work of alarm device, alarm device it is low in energy consumption, can be powered using power supply line or mobile power source.
Through-hole 10 is provided on the crossbeam 9 in the width direction, is extended in through-hole 10 between adjacent beams 9 using steel pipe It is attached, forms component, stability is high, and 9 bottom of crossbeam is provided with the spiral shell for extending in through-hole 10 and carrying out steel pipe fastening Bolt mounts and dismounts more convenient.
It, can be in conclusion a kind of underground chamber supporting construction for settlement monitoring early warning that the present invention points out, easy to assembly Underground Mass Near The Top of Underground Cavity is supported and is protected, and detects the top settling amount and differential settlement of underground chamber, carries out early warning protection, Improve the safety of construction.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (10)

1. a kind of underground chamber supporting construction of settlement monitoring early warning, comprising: crossbeam, resilient stud and pedestal, the elasticity are vertical Column is separately positioned on the lower section at crossbeam both ends, and the pedestal is separately positioned on the bottom of resilient stud, which is characterized in that the cross Beam bottom portion be provided with array sedimentation early warning component, the sedimentation early warning component respectively include thread bush, adjusting bolt, float plate and Cylinder is observed, two thread bush are arranged at intervals on crossbeam bottom, and the float plate is located at below two thread bush, the adjusting bolt It is each passed through float plate and is screwed in thread bush bottom, the observation cylinder is arranged in parallel in float plate bottom, in the observation cylinder Colored solutions are poured into, adjust the level for observing cylinder using screwing for bolt is adjusted.
2. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that on the pedestal It is provided with the first positioning sleeve corresponding with resilient stud bottom, the crossbeam bottom is provided with corresponding at the top of resilient stud the Two positioning sleeves.
3. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that the elasticity is vertical Column includes spring, the first hollow pipe and the second hollow pipe, and the spring is arranged between the first hollow pipe and the second hollow pipe, institute It states and is provided with baffle corresponding with spring in the first hollow pipe and the second hollow pipe.
4. the underground chamber supporting construction of settlement monitoring early warning according to claim 3, which is characterized in that further include alarm Device, first hollow pipe side are provided with downwardly directed frizzen, and second hollow pipe side, which is provided with, is located at triggering Alarm device switch below bar, alarm device switch and alarm device linearly connected, second hollow pipe side be provided with The corresponding scale of frizzen.
5. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that the observation cylinder For transparent totally-enclosed glass straight tube.
6. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that the observation cylinder Watermark line is axially provided in outer circle.
7. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that the pedestal Bottom interval is provided with downwardly directed anti-skid stud.
8. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that the crossbeam Top is provided with curved support plate.
9. the underground chamber supporting construction of settlement monitoring early warning according to claim 1, which is characterized in that on the crossbeam It is provided with through-hole in the width direction, is extended in through-hole and is attached using steel pipe between adjacent beams.
10. the underground chamber supporting construction of settlement monitoring early warning according to claim 9, which is characterized in that the crossbeam Bottom is provided with the bolt for extending in through-hole and carrying out steel pipe fastening.
CN201811220892.0A 2018-10-19 2018-10-19 A kind of underground chamber supporting construction of settlement monitoring early warning Pending CN109139067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811220892.0A CN109139067A (en) 2018-10-19 2018-10-19 A kind of underground chamber supporting construction of settlement monitoring early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811220892.0A CN109139067A (en) 2018-10-19 2018-10-19 A kind of underground chamber supporting construction of settlement monitoring early warning

Publications (1)

Publication Number Publication Date
CN109139067A true CN109139067A (en) 2019-01-04

Family

ID=64808866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811220892.0A Pending CN109139067A (en) 2018-10-19 2018-10-19 A kind of underground chamber supporting construction of settlement monitoring early warning

Country Status (1)

Country Link
CN (1) CN109139067A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110410126A (en) * 2019-07-20 2019-11-05 宿州市金鼎安全技术股份有限公司 A kind of Mine Safety in Production management system based on local area network
CN113123831A (en) * 2021-04-17 2021-07-16 深圳市赛欧菲照明科技有限公司 Mine road monitoring safety early warning lamp
CN114821973A (en) * 2022-05-05 2022-07-29 中国煤炭地质总局勘查研究总院 Coal mine goaf ground subsidence monitoring and early warning system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08277536A (en) * 1995-04-05 1996-10-22 Hakko Sangyo Kk Constructing method for concrete manufacture, concrete manufacture, and insert to be buried therein
CN201853327U (en) * 2010-11-19 2011-06-01 熊清远 Digital display sedimentation alarm
CN204225905U (en) * 2014-09-24 2015-03-25 衢州皇翔机电有限公司 A kind of drive safety support
CN104819005A (en) * 2015-04-24 2015-08-05 辽宁工程技术大学 Portable hydraulic roadway support
CN105737783A (en) * 2015-12-15 2016-07-06 重庆梅安森科技股份有限公司 Coal seam displacement settlement measuring device and system
CN205989161U (en) * 2016-08-24 2017-03-01 中车集团沈阳汽车车桥制造有限公司 Main reducing gear oil seal pressing special machine
CN208918563U (en) * 2018-10-19 2019-05-31 沙洲职业工学院 A kind of underground chamber supporting construction of settlement monitoring early warning

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08277536A (en) * 1995-04-05 1996-10-22 Hakko Sangyo Kk Constructing method for concrete manufacture, concrete manufacture, and insert to be buried therein
CN201853327U (en) * 2010-11-19 2011-06-01 熊清远 Digital display sedimentation alarm
CN204225905U (en) * 2014-09-24 2015-03-25 衢州皇翔机电有限公司 A kind of drive safety support
CN104819005A (en) * 2015-04-24 2015-08-05 辽宁工程技术大学 Portable hydraulic roadway support
CN105737783A (en) * 2015-12-15 2016-07-06 重庆梅安森科技股份有限公司 Coal seam displacement settlement measuring device and system
CN205989161U (en) * 2016-08-24 2017-03-01 中车集团沈阳汽车车桥制造有限公司 Main reducing gear oil seal pressing special machine
CN208918563U (en) * 2018-10-19 2019-05-31 沙洲职业工学院 A kind of underground chamber supporting construction of settlement monitoring early warning

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110410126A (en) * 2019-07-20 2019-11-05 宿州市金鼎安全技术股份有限公司 A kind of Mine Safety in Production management system based on local area network
CN110410126B (en) * 2019-07-20 2020-12-01 宿州市金鼎安全技术股份有限公司 Mine safety production management system based on local area network
CN113123831A (en) * 2021-04-17 2021-07-16 深圳市赛欧菲照明科技有限公司 Mine road monitoring safety early warning lamp
CN114821973A (en) * 2022-05-05 2022-07-29 中国煤炭地质总局勘查研究总院 Coal mine goaf ground subsidence monitoring and early warning system

Similar Documents

Publication Publication Date Title
CN109139067A (en) A kind of underground chamber supporting construction of settlement monitoring early warning
CN208918563U (en) A kind of underground chamber supporting construction of settlement monitoring early warning
CN103883333A (en) Large mechanical test system for combined adjustable constraint concrete arch frame
CN210893130U (en) Detection control device for slope angle of slope excavation
CN205482769U (en) Fixing device for displacement sensor
CN207300237U (en) The quick monitoring device of pier slope
CN203881339U (en) Detachable monitoring pier
CN210533494U (en) Water level monitoring device for hydraulic engineering
CN209132250U (en) A kind of gel preparation PH on-Line Monitor Device
CN201561729U (en) Concrete pole buried depth measuring device
CN205718968U (en) Scale-type laser orientation instrument
CN214666862U (en) Foundation ditch bank protection measuring device
CN210321880U (en) Foundation pit water level remote monitoring system
CN204228157U (en) A kind of pile sinking inclination measurement instrument apparatus
CN207764033U (en) Lower embedding type concrete component intensity Indirect testing device
CN207109880U (en) Exciting device and the in-service foundation pile integrity detection structure based on the exciting device
CN207419514U (en) A kind of gravity type flood control fan foundation structure
CN207622740U (en) A kind of tunnel survey reflex reflector
CN207378437U (en) A kind of Novel portable instrument of surveying and mapping stent
CN220057880U (en) Probe supporting device and touch detecting device
CN213296375U (en) Foundation pit steel support adjusting device and foundation pit steel support
CN214695186U (en) Measuring instrument for bridge construction
CN110108256A (en) Tower crane verticality real-time monitor and its application method
CN214843170U (en) Civil engineering uses portable measuring device
CN220602541U (en) Highway engineering drop distance detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination