CN109707411A - A kind of technique of tunnel grouting construction - Google Patents

A kind of technique of tunnel grouting construction Download PDF

Info

Publication number
CN109707411A
CN109707411A CN201910159014.0A CN201910159014A CN109707411A CN 109707411 A CN109707411 A CN 109707411A CN 201910159014 A CN201910159014 A CN 201910159014A CN 109707411 A CN109707411 A CN 109707411A
Authority
CN
China
Prior art keywords
tunnel
concrete
nothing
grouting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910159014.0A
Other languages
Chinese (zh)
Inventor
马栋
郭永忠
杨彦岭
汤明星
刘志科
宋青波
王刚
郭雷
朱晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201910159014.0A priority Critical patent/CN109707411A/en
Publication of CN109707411A publication Critical patent/CN109707411A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of techniques of tunnel grouting construction, are related to constructing tunnel field, and the situation slip casting that range is larger or depth of coming to nothing is deeper that mainly solves the problems, such as the larger preliminary bracing of water percolating capacity to come to nothing is difficult, specifically includes the following steps: the drainage of S1, pipe laying;S2, embedded Grouting Pipe;S3, concrete mixing;S4, concrete backfill after concrete mixing is good, carry out pumping backfill using delivery pump, and concrete is backfilled from low to high, primary backfill thickness≤50cm;S5, monitoring measurement, survey crew reinforces monitoring to tunnel arch top settlement, headroom change using total station, after slip casting, reinforces measuring first branch deformation monitoring using total station;S6, slip casting effect inspection;Construction method of the present invention is simple, and slip casting effect is good, comes to nothing the situation that range is larger or depth of coming to nothing is deeper, can accelerate construction progress for the larger preliminary bracing of water percolating capacity, and leakage, water burst is overcome to influence.

Description

A kind of technique of tunnel grouting construction
Technical field
The present invention relates to constructing tunnel field, the technique of specifically a kind of tunnel grouting construction.
Background technique
Tunnel is the engineering works being embedded in stratum, is a kind of form of human use's underground space.Tunnel can divide For traffic tunnel, Hydraulic Tunnel, municipal tunnel, mining tunnel, the structure in tunnel includes main building object and auxiliary device two Point.Main building object is made of barrel and portal, and auxiliary device includes that refuge chamber, fire fighting device, emergency communication and guarded drainage are set It applies, there are also special ventilation and lighting apparatus for major long tunnel, according to the length in tunnel: short tunnel (railway tunnel regulation: L≤ 500m;Vcehicular tunnel provides: L≤500m), (railway tunnel provides medium tunnel: 500 < L≤3000m;Vcehicular tunnel regulation: 500 < L≤1000m), long tunnel (railway tunnel regulation: 3000 < L≤10000m;Vcehicular tunnel provides 1000 < L≤3000m) and Super long tunnel (railway tunnel regulation: L > 10000m;Vcehicular tunnel regulation: L > 3000m) (according to JTGTD70-2010 vcehicular tunnel Design details regulation).
And in existing constructing tunnel, coming to nothing in face of the larger preliminary bracing of water percolating capacity, range is larger or depth of coming to nothing is deeper Situation, slip casting effect is poor, greatly reduces construction speed, is unfavorable for the work in later period, therefore proposes a kind of tunnel grouting construction Technique solve the above problems.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of technique of tunnel grouting construction Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of technique of tunnel grouting construction, for the larger preliminary bracing of water percolating capacity come to nothing range it is larger or come to nothing depth compared with Deep situation, specifically includes the following steps:
S1, pipe laying drainage;
S2, embedded Grouting Pipe;
S3, concrete mixing, fill concrete use C25 concrete or C25 gunite concrete, mix in mixing station concentration System;
S4, concrete backfill, survey crew reinforces tunnel arch top settlement, headroom change using total station in backfilling process Monitoring, prevent disposable slip casting it is too fast it is excessive lead to steel frame deformation, after same slip casting, using total station reinforce to first branch become Shape monitoring measurement;
S5, monitoring measurement;
S6, slip casting effect inspection.
As a further solution of the present invention: in step S1, specially for percolating water and the biggish place of water burst, burying Water-permeable pipe is drained, and permeable pipe diameter is 100mm, and installs water check valve, is drained to infiltration water.
As a further solution of the present invention: in step S2, specially range of coming to nothing is larger or depth higher depth of coming to nothing, Bury multiple Grouting Pipes, the diameter of Grouting Pipe is 140mm, it is provided with exhaust pipe between Grouting Pipe, air slit diameter 108mm, Exhaust pipe also serves as Grouting Pipe and observation tube uses, and Grouting Pipe connection must securely, and hoop-linked buckle is arranged in connector, prevents slip casting pipe fitting It falls off and hurts sb.'s feelings;When slip casting operation, operating personnel should use dust-proof apparatus and rubber gloves.
As a further solution of the present invention: in step S4, specially concrete backfill after concrete mixing is good, is used Delivery pump carries out pumping backfill, and concrete is backfilled from low to high, and no more than 50cm, when backfill pays attention to primary backfill thickness Observation.
As a further solution of the present invention: in step S6, after the completion of specially backfilling, using geological radar and hammering method It is detected, checks that slip casting effect, slip casting drilling machine and inspection hole answer packing closely knit using bore extracting core process when necessary.
Application of the technique of tunnel grouting construction as mentioned in constructing tunnel be as a further solution of the present invention:
Compared with prior art, the beneficial effects of the present invention are: construction method of the present invention is simple, slip casting effect is good, for The larger preliminary bracing of water percolating capacity is come to nothing the situation that range is larger or depth of coming to nothing is deeper, can be accelerated construction progress, overcome leakage, Water burst influences.
Detailed description of the invention
Fig. 1 is the schematic diagram of Grouting Pipe installation in the present invention.
Fig. 2 is Construction Principle schematic diagram of the invention.
In figure: 1- Grouting Pipe, 2- exhaust pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
Please refer to Fig. 1~2, in the embodiment of the present invention, a kind of technique of tunnel grouting construction, for water percolating capacity larger initial stage Supporting is come to nothing the situation that range is larger or depth of coming to nothing is deeper, and the specific method is as follows:
S1, pipe laying drainage, for percolating water and the biggish place of water burst, embedded water-permeable pipe is drained, permeable pipe diameter For 100mm, and water check valve is installed, infiltration water is drained;Furthermore injected hole is that drilling is embedded, according to the big cell of cavity areas It does not lay, position of continuously coming to nothing, circumferential spacing 1m, longitudinal pitch 0.8m;It independently comes to nothing smaller part position, once grouting is completed, empty The larger position in hole, preliminary bracing is come to nothing, and range is larger or depth higher depth of coming to nothing, and the gunite concrete for range of coming to nothing all is dug Place, at chisel after according to depth determinations come to nothing be using extension multilayer mesh sheet gunite concrete or single layer mesh sheet gunite concrete Method of disposal, until closely knit;
S2, or come to nothing depth higher depth larger in range of coming to nothing, bury four Grouting Pipes 1, and the diameter of Grouting Pipe 1 is 140mm, such as Fig. 1 are provided with exhaust pipe 2 between Grouting Pipe 1, and 2 diameter of exhaust pipe is 108mm, and exhaust pipe 2 also serves as Grouting Pipe and sight Examine pipe use;Grouting Pipe connection must securely, and hoop-linked buckle is arranged in connector, prevents Grouting Pipe Joint's falling off from hurting sb.'s feelings;When slip casting operation, Operating personnel should use dust-proof apparatus and rubber gloves;
S3, concrete mixing, fill concrete use C25 concrete or C25 gunite concrete, mix in mixing station concentration System;
S4, concrete backfill after concrete mixing is good, carry out pumping backfill using delivery pump, concrete from low to high into Row backfill, no more than 50cm, when backfill, pays attention to observing primary backfill thickness;
S5, monitoring measurement, survey crew reinforces prison to tunnel arch top settlement, headroom change using total station in backfilling process Control, prevent disposable slip casting it is too fast it is excessive lead to steel frame deformation, after same slip casting, using total station reinforce to first branch deform Monitoring measurement;Running check and cleaning Grouting Pipe, prevent from blocking, find the problem, should handle in time;
It after the completion of S6, backfill, is detected using geological radar and hammering method, when necessary using bore extracting core process to slip casting Effect is checked that slip casting drilling machine and inspection hole answer packing closely knit.
Embodiment 2
Please refer to Fig. 1~2, in the embodiment of the present invention, a kind of technique of tunnel grouting construction, for water percolating capacity larger initial stage Supporting is come to nothing the situation that range is larger or depth of coming to nothing is deeper, and the specific method is as follows:
S1, pipe laying drainage, for percolating water and the biggish place of water burst, embedded water-permeable pipe is drained, permeable pipe diameter For 100mm, and water check valve is installed, infiltration water is drained;Furthermore injected hole is that drilling is embedded, according to the big cell of cavity areas It does not lay, position of continuously coming to nothing, circumferential spacing 1m, longitudinal pitch 0.8m;It independently comes to nothing smaller part position, once grouting is completed, empty The larger position in hole, preliminary bracing is come to nothing, and range is larger or depth higher depth of coming to nothing, and the gunite concrete for range of coming to nothing all is dug Place, at chisel after according to depth determinations come to nothing be using extension multilayer mesh sheet gunite concrete or single layer mesh sheet gunite concrete Method of disposal, until closely knit;
S2, or come to nothing depth higher depth larger in range of coming to nothing, bury three Grouting Pipes 1, and the diameter of Grouting Pipe 1 is 140mm is provided with several exhaust pipes 2 between Grouting Pipe 1, and 2 diameter of exhaust pipe is 108mm, and exhaust pipe 2 also serves as Grouting Pipe and sight Examine pipe use;Grouting Pipe connection must securely, and hoop-linked buckle is arranged in connector, prevents Grouting Pipe Joint's falling off from hurting sb.'s feelings;When slip casting operation, Operating personnel should use dust-proof apparatus and rubber gloves;
S3, concrete mixing, fill concrete use C25 concrete or C25 gunite concrete, mix in mixing station concentration System;
S4, concrete backfill after concrete mixing is good, carry out pumping backfill using delivery pump, concrete from low to high into Row backfill, no more than 45cm, when backfill, pays attention to observing primary backfill thickness;
S5, monitoring measurement, survey crew reinforces prison to tunnel arch top settlement, headroom change using total station in backfilling process Control, prevent disposable slip casting it is too fast it is excessive lead to steel frame deformation, after same slip casting, using total station reinforce to first branch deform Monitoring measurement;Running check and cleaning Grouting Pipe, prevent from blocking, find the problem, should handle in time;
It after the completion of S6, backfill, is detected using geological radar and hammering method, when necessary using bore extracting core process to slip casting Effect is checked that slip casting drilling machine and inspection hole answer packing closely knit.
In addition, should be noted that following item when construction: drilling should be carried out strictly by given hole location;It is passed through in boring procedure Perseverance observes pore-creating trend, should be corrected in time when discovery has relatively large deviation;Platform should be first checked when drilling on platform Rigidity and stability, it is ensured that brill can be applied when no any security risk on platform;Peace should be carried out when drillhole height is excessively high Full protection measure;Notice that whether there is or not cracks on observation gunite concrete surface when fill concrete and slip casting, and implements measures to ensure that note Starch effect;Security protection articles should be worn when construction, and full-time security official is set and observes surrouding rock deformation situation at any time;Grouting Pipe 1 and when exhaust pipe embedded should be secured firmly on the inside of groove, pipeline should be connect well with water outlet, and the fast hard water of use expansion Mud is blocked;Place should be cleared up in time after the completion of fill concrete and slip casting operation;Used mechanical equipment is pressed It is required that playback, to meet the requirement of civilized construction.
Embodiment 3
Application of the technique of tunnel grouting construction as described in Example 1 in constructing tunnel.
The working principle of the invention is: embedded water-permeable pipe is discharged after being collected water flow, installation backfill Grouting Pipe 1, row Tracheae 2, backfill Grouting Pipe 1 use delivery pump pipe, and exhaust pipe 2 also serves as observation tube, and pump concrete is backfilled.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (8)

1. a kind of technique of tunnel grouting construction, coming to nothing for the larger preliminary bracing of water percolating capacity, range is larger or depth of coming to nothing is deeper The case where, which is characterized in that specifically includes the following steps:
S1, pipe laying drainage;
S2, embedded Grouting Pipe;
S3, concrete mixing;
S4, concrete backfill;
S5, monitoring measurement;
S6, slip casting effect inspection.
2. the technique of tunnel grouting according to claim 1 construction, which is characterized in that in step S1, for percolating water and The biggish place of water burst, embedded water-permeable pipe are drained, and permeable pipe diameter is 100mm, and installs water check valve, are carried out to infiltration water Drainage.
3. the technique of tunnel grouting according to claim 2 construction, which is characterized in that in step S2, come to nothing range compared with Big or depth higher depth of coming to nothing, is buried multiple Grouting Pipes (1), and the diameter of Grouting Pipe (1) is 140mm, and Grouting Pipe is arranged between (1) Have exhaust pipe (2), exhaust pipe (2) diameter is 108mm, and exhaust pipe (2) also serves as Grouting Pipe and observation tube uses.
4. the technique of tunnel grouting construction according to claim 3, which is characterized in that in step S3, fill concrete is adopted With C25 concrete or C25 gunite concrete, in mixing station centralized mixing.
5. the technique of tunnel grouting construction according to claim 4, which is characterized in that in step S4, concrete backfill is mixed After solidifying soil mixing is good, pumping backfill is carried out using delivery pump, concrete is backfilled from low to high, primary backfill thickness≤ 50cm。
6. the technique of tunnel grouting construction according to claim 5, which is characterized in that in step S5, surveyed in backfilling process Amount personnel reinforce monitoring to tunnel arch top settlement, headroom change using total station, after slip casting, are reinforced using total station to first Branch deformation monitoring measures.
7. the technique of tunnel grouting construction according to claim 6, which is characterized in that in step S6, after the completion of backfill, adopt It is detected, slip casting effect is checked using bore extracting core process, slip casting drilling machine and inspection hole with geological radar and hammering method Packing is closely knit.
8. application of the technique of tunnel grouting construction as claimed in claim 1 in constructing tunnel.
CN201910159014.0A 2019-03-04 2019-03-04 A kind of technique of tunnel grouting construction Pending CN109707411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910159014.0A CN109707411A (en) 2019-03-04 2019-03-04 A kind of technique of tunnel grouting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910159014.0A CN109707411A (en) 2019-03-04 2019-03-04 A kind of technique of tunnel grouting construction

Publications (1)

Publication Number Publication Date
CN109707411A true CN109707411A (en) 2019-05-03

Family

ID=66266127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910159014.0A Pending CN109707411A (en) 2019-03-04 2019-03-04 A kind of technique of tunnel grouting construction

Country Status (1)

Country Link
CN (1) CN109707411A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058864A (en) * 2019-11-29 2020-04-24 中铁九局集团第四工程有限公司 Tunnel vault lining rear cavity high-pressure grouting auxiliary device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1027402A1 (en) * 1982-03-31 1983-07-07 Горловский Филиал Донецкого Ордена Трудового Красного Знамени Политехнического Института Pneumatic forms for underground work
CN203488189U (en) * 2013-10-18 2014-03-19 四川省交通运输厅公路规划勘察设计研究院 Tunnel structure for emptying renovation
CN104033164A (en) * 2014-05-26 2014-09-10 江苏鼎泰工程材料有限公司 Method for solving disengagement and water seepage of internal arch of tunnel
CN108316950A (en) * 2018-03-18 2018-07-24 中铁十九局集团第三工程有限公司 Tunnel vault concrete belt mould backfills filling system and its grouting method
CN208380585U (en) * 2018-05-24 2019-01-15 中铁十九局集团第六工程有限公司 It can prevent the tunnel system that preliminary bracing outer wall comes to nothing
CN109404012A (en) * 2018-11-21 2019-03-01 中国电建集团成都勘测设计研究院有限公司 IV~VI grade of country rock is backbreak Tunnel method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1027402A1 (en) * 1982-03-31 1983-07-07 Горловский Филиал Донецкого Ордена Трудового Красного Знамени Политехнического Института Pneumatic forms for underground work
CN203488189U (en) * 2013-10-18 2014-03-19 四川省交通运输厅公路规划勘察设计研究院 Tunnel structure for emptying renovation
CN104033164A (en) * 2014-05-26 2014-09-10 江苏鼎泰工程材料有限公司 Method for solving disengagement and water seepage of internal arch of tunnel
CN108316950A (en) * 2018-03-18 2018-07-24 中铁十九局集团第三工程有限公司 Tunnel vault concrete belt mould backfills filling system and its grouting method
CN208380585U (en) * 2018-05-24 2019-01-15 中铁十九局集团第六工程有限公司 It can prevent the tunnel system that preliminary bracing outer wall comes to nothing
CN109404012A (en) * 2018-11-21 2019-03-01 中国电建集团成都勘测设计研究院有限公司 IV~VI grade of country rock is backbreak Tunnel method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
文轩: "隧道工程初期支护背后脱空预控措施及处理方案", 《豆丁网》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058864A (en) * 2019-11-29 2020-04-24 中铁九局集团第四工程有限公司 Tunnel vault lining rear cavity high-pressure grouting auxiliary device

Similar Documents

Publication Publication Date Title
CN106369223B (en) A kind of silt stratum pipe jacking construction method
CN101457853B (en) Non-digging tube-pulling construction method
Chen et al. Long rectangular box jacking project: a case study
CN111852485B (en) Construction method for shield tunnel downward-penetrating sensitive building group in shallow-buried weak stratum
CN103993603B (en) A kind of anchor pole churning back cover deep foundation ditch reversed construction method without dewatering operation
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN106122589B (en) A kind of earth pressure balance method
CN104074525A (en) Full-sectional grouting, rectangular horizontal freezing and pipe roof combined reinforcing structure and method
CN106050266A (en) Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN104631470A (en) Deep foundation pit combination retaining and protecting construction method for geology with high water level and large particle size sand gravel
CN106522235A (en) Narrow site deep foundation pit excavation supporting construction method
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN108412544B (en) Chemical dissolving and cleaning dredging method for crystal blockage of karst tunnel drainage system
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
CN108361466A (en) A kind of municipal pipeline maintenance construction technique
CN112127897A (en) Large-caliber directional grouting method for ultra-deep hole ground surface
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN109707411A (en) A kind of technique of tunnel grouting construction
CN109610427A (en) Karst foundation visits the slip casting construction method for filling that combination, slurries are controllable, monitor in real time
CN211008655U (en) Underpass subway supporting structure
CN104763431A (en) Novel shaft construction method
CN109577337A (en) The construction method of deep foundation ditch of flowing line
CN215169989U (en) Freezing system for reinforcing 60-meter-grade ultra-long distance communication channel by freezing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503

RJ01 Rejection of invention patent application after publication