CN109706845A - 钢管拱桥吊杆预留孔精确定位装置 - Google Patents

钢管拱桥吊杆预留孔精确定位装置 Download PDF

Info

Publication number
CN109706845A
CN109706845A CN201910148112.4A CN201910148112A CN109706845A CN 109706845 A CN109706845 A CN 109706845A CN 201910148112 A CN201910148112 A CN 201910148112A CN 109706845 A CN109706845 A CN 109706845A
Authority
CN
China
Prior art keywords
work
wirerope
open
reserved
preformed hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910148112.4A
Other languages
English (en)
Inventor
张生彦
杜逢春
陈晨
吴建国
李军昌
常小平
王增虎
汪凌云
赵昆蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201910148112.4A priority Critical patent/CN109706845A/zh
Publication of CN109706845A publication Critical patent/CN109706845A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种钢管拱桥吊杆预留孔精确定位装置,涉及桥梁工程定位装置技术领域。该钢管拱桥吊杆预留孔精确定位装置,包括依次穿过上预留透孔和下预留透孔中的钢丝绳,上预留透孔位于钢管拱上,下预留透孔位于梁面上,钢丝绳两端分别设于上预留透孔和下预留透孔的中心轴上,钢丝绳从下预留透孔穿出并连接张紧部,张紧部使钢丝绳保持张紧状态。本发明可在钢管拱预埋管和梁面预埋管对位过程中校正预留透孔的位置,提高安装精度和安装效率。

Description

钢管拱桥吊杆预留孔精确定位装置
技术领域
本发明涉及桥梁工程定位装置技术领域,特别是涉及一种钢管拱桥吊杆预留孔精确定位装置。
背景技术
桥梁结构包括钢管拱和梁面,二者通过吊杆连接。安装时,先移动钢管拱和梁面,钢管拱和梁面上均留有供吊杆穿过的透孔。
安装吊杆前需要预先固定钢管拱和梁面,然后用激光穿过对应的两透孔检查两透孔位置是否正确。若两透孔位置存在偏差,则需继续移动钢管或梁面进行调整。
现有技术是采用激光对位或全站仪准确测量,这种技术较适用于没有任何纵坡的直线段钢管拱桥,大多数情况下都是位于曲线地段且存在正拱斜置,采用激光对位或全站仪测量难度高,且精度不一保证。
发明内容
本发明所要解决的技术问题是,克服现有技术的缺点,提供一种钢管拱桥吊杆预留孔精确定位装置,可在钢管拱预埋管和梁面预埋管对位过程中校正预留透孔的位置,提高安装精度和安装效率。
为了解决以上技术问题,本发明提供一种钢管拱桥吊杆预留孔精确定位装置,包括依次穿过上预留透孔和下预留透孔中的钢丝绳,上预留透孔位于钢管拱上,下预留透孔位于梁面上,钢丝绳两端分别设于上预留透孔和下预留透孔的中心轴上,钢丝绳从下预留透孔穿出并连接张紧部,张紧部使钢丝绳保持张紧状态。
本发明进一步限定的技术方案是:上预留透孔顶端设有用于固定钢丝绳的钢管拱预留孔上端卡具,梁面预留管下端卡具上设有供钢丝绳穿过的定位环,钢管拱和梁面之间调整相对位置时,钢丝绳在钢管拱预留孔上端卡具和梁面预留管下端卡具之间的长度随之变化,且在张紧部的拉动下保持张紧状态。
本发明进一步设置为,张紧部包括张紧气缸,张紧气缸的输出端连接钢丝绳。
本发明进一步设置为,张紧气缸的输出端设有弹性件,弹性件连接钢丝绳。
本发明的另一目的在于提供一种应用上述任意方案的精确定位装置定位钢管拱和梁面的定位方法,
将一钢丝绳依次穿过上预留透孔和下预留透孔,分别固定于钢管拱上端与梁面下端,分别测量上预留透孔下口与下预留透孔上口的偏差,据此调整钢管拱位置,直至满足要求。
本发明的有益效果是:
(1)避免上预留透孔与下预留透孔空间位置偏差,造成刚性吊杆安装时偏位,最终导致吊杆张拉后受力不均,影响吊杆耐久性。
(2)在钢管拱安装时同步操作,同步量测。
(3)方便操作,定位精度高,且形象直观。
附图说明
图1为本发明的结构示意图;
其中:1、钢管拱预留孔上端卡具;2、钢丝绳;3、梁面预留管下端卡具;4、钢管拱;41、上预留透孔;5、梁面;51、下预留透孔;6、张紧部;61、张紧气缸。
具体实施方式
其中相同的零部件用相同的附图标记表示。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“底面”和“顶面”、“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。
实施例1:
本实施例提供的一种钢管拱桥吊杆预留孔精确定位装置,结构如图所示。
该钢管拱4桥吊杆预留孔精确定位装置,包括依次穿过上预留透孔41和下预留透孔51中的钢丝绳2,上预留透孔41位于钢管拱4上,下预留透孔51位于梁面5上,钢丝绳2两端分别设于上预留透孔41和下预留透孔51的中心轴上,钢丝绳2从下预留透孔51穿出并连接张紧部6,张紧部6使钢丝绳2保持张紧状态。
上预留透孔41顶端设有用于固定钢丝绳2的钢管拱预留孔上端卡具1,梁面预留管下端卡具3上设有供钢丝绳2穿过的定位环,钢管拱4和梁面5之间调整相对位置时,钢丝绳2在钢管拱预留孔上端卡具1和梁面预留管下端卡具3之间的长度随之变化,且在张紧部6的拉动下保持张紧状态。
张紧部6包括张紧气缸61,张紧气缸61的输出端连接钢丝绳2。张紧气缸61的输出端设有弹性件,弹性件连接钢丝绳2。
实施例2:
一种应用上述任意方案的精确定位装置定位钢管拱和梁面的方法,
将一钢丝绳2依次穿过上预留透孔41和下预留透孔51,分别固定于钢管拱4上端与梁面5下端,分别测量上预留透孔41下口与下预留透孔51上口的偏差,据此调整钢管拱4位置,直至满足要求。
本发明避免上预留透孔41与下预留透孔51空间位置偏差,造成刚性吊杆安装时偏位,最终导致吊杆张拉后受力不均,影响吊杆耐久性。在钢管拱4安装时同步操作,同步量测。方便操作,定位精度高,且形象直观。
除上述实施例外,本发明还可以有其他实施方式;凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。

Claims (5)

1.一种钢管拱桥吊杆预留孔精确定位装置,其特征在于:包括依次穿过上预留透孔(41)和下预留透孔(51)中的钢丝绳(2),所述上预留透孔(41)位于所述钢管拱(4)上,所述下预留透孔(51)位于所述梁面(5)上,所述钢丝绳(2)两端分别设于所述上预留透孔(41)和所述下预留透孔(51)的中心轴上,所述钢丝绳(2)从所述下预留透孔(51)穿出并连接张紧部(6),所述张紧部(6)使所述钢丝绳(2)保持张紧状态。
2.根据权利要求1所述的钢管拱桥吊杆预留孔精确定位装置,其特征在于:所述上预留透孔(41)顶端设有用于固定所述钢丝绳(2)的钢管拱预留孔上端卡具(1),所述梁面预留管下端卡具(3)上设有供所述钢丝绳(2)穿过的定位环(31),所述钢管拱(4)和所述梁面(5)之间调整相对位置时,所述钢丝绳(2)在所述钢管拱预留孔上端卡具(1)和所述梁面预留管下端卡具(3)之间的长度随之变化,且在所述张紧部(6)的拉动下保持张紧状态。
3.根据权利要求1或2所述的钢管拱桥吊杆预留孔精确定位装置,其特征在于:所述张紧部(6)包括张紧气缸(61),所述张紧气缸(61)的输出端连接所述钢丝绳(2)。
4.根据权利要求3所述的钢管拱桥吊杆预留孔精确定位装置,其特征在于:所述张紧气缸(61)的输出端设有弹性件,所述弹性件连接所述钢丝绳(2)。
5.一种应用权利要求1~4任意一项权利要求所述的精确定位装置定位钢管拱和梁面的定位方法,其特征在于,将一所述钢丝绳(2)依次穿过上预留透孔(41)和下预留透孔(51),分别固定于钢管拱(4)上端与梁面(5)下端,分别测量上预留透孔(41)下口与下预留透孔(51)上口的偏差,据此调整钢管拱(4)位置,直至满足要求。
CN201910148112.4A 2019-02-28 2019-02-28 钢管拱桥吊杆预留孔精确定位装置 Pending CN109706845A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910148112.4A CN109706845A (zh) 2019-02-28 2019-02-28 钢管拱桥吊杆预留孔精确定位装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910148112.4A CN109706845A (zh) 2019-02-28 2019-02-28 钢管拱桥吊杆预留孔精确定位装置

Publications (1)

Publication Number Publication Date
CN109706845A true CN109706845A (zh) 2019-05-03

Family

ID=66265253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910148112.4A Pending CN109706845A (zh) 2019-02-28 2019-02-28 钢管拱桥吊杆预留孔精确定位装置

Country Status (1)

Country Link
CN (1) CN109706845A (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019357A (ja) * 2002-06-19 2004-01-22 Mitsubishi Heavy Ind Ltd アーチ橋の架設工法及び装置
CN103046466A (zh) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 一种可检可换可调的拱桥吊杆体系及其施工方法
CN104047230A (zh) * 2014-06-26 2014-09-17 葛洲坝集团项目管理有限公司 下承式钢管拱混凝土简支梁系杆拱桥吊杆预埋管偏位的处理方法
CN104278641A (zh) * 2014-10-16 2015-01-14 中铁七局集团第三工程有限公司 系杆拱桥吊杆预埋孔对中装置及其对中方法
CN204418667U (zh) * 2015-01-19 2015-06-24 平煤神马建工集团有限公司土建处 一种红外线精确定位预留孔洞装置
CN204491418U (zh) * 2015-03-03 2015-07-22 中铁十局集团建筑工程有限公司 墩身支座垫石预留孔洞定位系统
CN104990544A (zh) * 2015-06-29 2015-10-21 常州安塔歌电子科技有限公司 基于光栅的单管塔绝对垂直度检测装置
CN108104155A (zh) * 2017-12-28 2018-06-01 平煤神马建工集团有限公司 一种直线式预埋螺栓快速安装装置
CN210262722U (zh) * 2019-02-28 2020-04-07 中铁二十一局集团第五工程有限公司 钢管拱桥吊杆预留孔精确定位装置

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019357A (ja) * 2002-06-19 2004-01-22 Mitsubishi Heavy Ind Ltd アーチ橋の架設工法及び装置
CN103046466A (zh) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 一种可检可换可调的拱桥吊杆体系及其施工方法
CN104047230A (zh) * 2014-06-26 2014-09-17 葛洲坝集团项目管理有限公司 下承式钢管拱混凝土简支梁系杆拱桥吊杆预埋管偏位的处理方法
CN104278641A (zh) * 2014-10-16 2015-01-14 中铁七局集团第三工程有限公司 系杆拱桥吊杆预埋孔对中装置及其对中方法
CN204418667U (zh) * 2015-01-19 2015-06-24 平煤神马建工集团有限公司土建处 一种红外线精确定位预留孔洞装置
CN204491418U (zh) * 2015-03-03 2015-07-22 中铁十局集团建筑工程有限公司 墩身支座垫石预留孔洞定位系统
CN104990544A (zh) * 2015-06-29 2015-10-21 常州安塔歌电子科技有限公司 基于光栅的单管塔绝对垂直度检测装置
CN108104155A (zh) * 2017-12-28 2018-06-01 平煤神马建工集团有限公司 一种直线式预埋螺栓快速安装装置
CN210262722U (zh) * 2019-02-28 2020-04-07 中铁二十一局集团第五工程有限公司 钢管拱桥吊杆预留孔精确定位装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张云廉: "电线电缆机械设备", 机械工业出版社, pages: 265 - 266 *

Similar Documents

Publication Publication Date Title
CN107090775B (zh) 一种满堂支架空间梁端索导管施工定位方法
CN111021253A (zh) 基于app系统和全站仪自动定位隧道锚锚固系统的施工方法
CN107764456B (zh) 测量系统、张拉系统和测量方法
CN210262722U (zh) 钢管拱桥吊杆预留孔精确定位装置
CN106767520A (zh) 一种悬索桥主缆线形测量仪
CN107386125B (zh) 一种自锚式悬索桥钢箱梁合拢的施工方法
CN105773610B (zh) 一种机器人校正装置
CN109706845A (zh) 钢管拱桥吊杆预留孔精确定位装置
CN106404420A (zh) 一种用于车辆碰撞试验的假人定位装置及其定位方法
CN110387820B (zh) 一种基于智能张拉系统的吊杆测控一体化施工方法
CN109137737B (zh) 索导管定位装置
CN108931237A (zh) 一种全站仪精确定位大型炉体框架柱垂直度的施工方法
CN208124998U (zh) 一种索导管中心线定位测量辅助基座
CN102346027A (zh) 一种高速铁路crts-ⅱ型板式无砟轨道桥台水平位移测试方法
CN102967237A (zh) 一种用于悬索桥主缆索股架设多功能测量仪
CN109208482A (zh) 构件中心安装定位装置及方法
CN116837726A (zh) 一种斜拉桥主梁索导管的精确安装方法
CN110318338A (zh) 一种安装定位钢锚梁的测量控制方法
CN110185479B (zh) 隧道二衬环向钢筋定位控制装置及其使用方法
CN205422750U (zh) 一种隧道钢拱架的纵向连接装置
CN107747934A (zh) 顶管轴线测量装置及顶管轴线测量方法
CN111424989B (zh) 网架钢拉杆张拉施工方法及施工工装
CN204495341U (zh) 一种水准测量装置
CN209559068U (zh) 一种测量管道煨弯加工后产生褶皱度的工具
CN209176813U (zh) 乘用车副车架柔性定位工装

Legal Events