CN109684063A - A kind of method for scheduling task and device - Google Patents
A kind of method for scheduling task and device Download PDFInfo
- Publication number
- CN109684063A CN109684063A CN201811600945.1A CN201811600945A CN109684063A CN 109684063 A CN109684063 A CN 109684063A CN 201811600945 A CN201811600945 A CN 201811600945A CN 109684063 A CN109684063 A CN 109684063A
- Authority
- CN
- China
- Prior art keywords
- task
- new
- scheduling process
- status
- new task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/4881—Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
Abstract
The present invention provides a kind of method for scheduling task and device, it include: task manager timing scan task list, judge the addition for whether having new task in the task list, the task status and executive plan for having each task are wherein recorded in the task list, the executive plan includes the execution time of task;When task manager, which judges, has new task addition in the task list, task manager obtains the task status and executive plan of the new task, and task status and executive plan generation task schedule plan according to the new task, the task schedule plan includes the task status of the new task and the execution time of the new task;Execution time of the task manager according to the new task, by the task schedule planned assignment to any one the scheduling process being in idle condition, so that the scheduling process executes the new task.The present invention does not need to restart scheduling process, can be realized the real-time processing to new being added in task list for task.
Description
Technical field
The present invention relates to technical fields more particularly to a kind of tasks such as mobile service support and business support system design
Dispatching method and device.
Background technique
Currently, all tasks are documented in task list, after scheduling process initial start-up in loading tasks list
All tasks, and gradually handle each task.
But when there is new task to be added in task list, it is necessary to new task could be handled by restarting scheduling process,
The task that exactly existing method for scheduling task can not newly be added in real time processing tasks list.
Summary of the invention
In view of this, the present invention provides a kind of method for scheduling task and device, to realize in real time processing tasks list
Newly being added for task.Technical solution is as follows:
Based on an aspect of of the present present invention, the present invention provides a kind of method for scheduling task, and method includes:
Task manager timing scan task list judges the addition for whether having new task in the task list, wherein
Record has the task status and executive plan of each task in the task list, when the executive plan includes the execution of task
Between;
When the task manager, which judges, has new task addition in the task list, the task manager obtains institute
The task status and executive plan of new task are stated, and task status and executive plan generation task schedule according to the new task
Plan, the task schedule plan includes the task status of the new task and the execution time of the new task;
Execution time of the task manager according to the new task, by the task schedule planned assignment to being in empty
Any one scheduling process of not busy state, so that the scheduling process executes the new task.
Optionally, the scheduling process is before executing the new task, the method also includes:
Task status of the scheduling process according to the new task, judges whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
Optionally, the method also includes:
When the scheduling process judges that the new task is abnormal, the scheduling process will indicate the new task not just
Normal result is sent to the task manager;
The task manager is according to described as a result, the new task, the new post that will be recorded in the task list
The task status and executive plan of business, and generate the new task task schedule plan delete.
Optionally, the scheduling process judge the new task it is abnormal include: that the scheduling process judges the new post
The task status of business is that deletion state and/or the new task are not recorded in the task list.
Optionally, the task list includes the first sublist and the second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described
Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist
At least one executive plan.
Based on another aspect of the present invention, the present invention provides a kind of task scheduling apparatus, comprising:
Scanning element is used for timing scan task list;
Judging unit, the addition for judging whether to have new task in the task list, wherein in the task list
Record has the task status and executive plan of each task, and the executive plan includes the execution time of task;
Task schedule plan generation unit, for judging there is new task addition in the task list in the judging unit
When, the task status and executive plan of the new task are obtained, and task status and executive plan life according to the new task
At task schedule plan, the task schedule plan include the new task task status and the new task execution when
Between;
Allocation unit, for the execution time according to the new task, by the task schedule planned assignment to being in empty
Any one scheduling process of not busy state, so that the scheduling process executes the new task.
Optionally, before executing the new task, the scheduling process is also used to the scheduling process:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
Optionally, described device further include:
Receiving unit, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit is deleted, it is described as a result, the new task, the new task that will be recorded in the task list for foundation
Task status and executive plan, and generate the new task task schedule plan delete.
Optionally, the scheduling process judge the new task it is abnormal include: that the scheduling process judges the new post
The task status of business is that deletion state and/or the new task are not recorded in the task list.
Optionally, the task list includes the first sublist and the second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described
Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist
At least one executive plan.
In method for scheduling task and device provided by the invention, by task manager timing scan task list, judgement is appointed
Whether the addition of new task is had in business list.When task manager, which determines in task list, new task addition, it is new to obtain this
The task status and executive plan of task, and task status and executive plan generation task schedule plan according to the new task,
The task schedule plan includes the task status of the new task and the execution time of the new task, and then according to the new task
Execute the time, by task schedule planned assignment to any one the scheduling process being in idle condition so that it is described dispatch into
New task described in Cheng Zhihang.During realization of the invention, when there is new task to be added in task list, task manager
The task status and executive plan of the new task can be obtained in time, and task status and executive plan life according to the new task
It goes to execute at task schedule plan, and then by task schedule planned assignment to any one the scheduling process being in idle condition,
The present invention does not need to restart scheduling process, realizes the real-time processing to new being added in task list for task.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis
The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow chart of method for scheduling task provided by the invention;
Fig. 2 is the flow chart of another method for scheduling task provided by the invention;
Fig. 3 is a kind of structural schematic diagram of task scheduling apparatus provided by the invention;
Fig. 4 is the structural schematic diagram of another task scheduling apparatus provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In view of gradually handling the mode of each task in task list by a scheduling process in the prior art, exist
The problem of can not being newly added in real time processing tasks list for task, the present invention propose to be executed respectively simultaneously by multiple scheduling processes
Task in task list, while judging whether there is new task in task list by task manager timing scan task list
Addition, and task manager judgement there is new task to be added in task list when, can obtain in time the new task appoint
Business state and executive plan, and task status and executive plan generation task schedule plan according to the new task, and then will appoint
Business operation plan distributes to any one the scheduling process being in idle condition and goes to execute, the present invention do not need to restart dispatch into
Journey realizes the real-time processing to new being added in task list for task.
Specifically, as shown in Figure 1, method for scheduling task provided by the invention may include:
Step 101, task manager timing scan task list.
In the present invention, record has the task status and executive plan of each task, the executive plan packet in task list
Include the execution time of task.
Wherein task status may include pending state, state, the state that is finished, deletion state etc. in execution.
Executive plan includes the execution time of task, the execution content of task etc..In the present invention preferably, task list can be specific
It such as include the first sublist and the second sublist including two tables.Wherein the first sublist is used to record the task status of each task, the
Two sublists are used to record the executive plan of each task, wherein the task in the task and the second sublist in the first sublist is by appointing
Association is realized in business number, at least one executive plan in corresponding second sublist of a task in the first sublist, i.e. a task
At least one corresponding executive plan.
Step 102, task manager judges the addition for whether having new task in the task list.If so, executing step
Rapid 103, if not provided, continuing to return to step 101.
Step 103, task manager obtains the task status and executive plan of the new task, and according to the new task
Task status and executive plan generate task schedule plan, the task schedule plan includes the task status of the new task
With the execution time of the new task.
In the present invention, when task manager, which monitors, the addition of new task in task list, the new post is obtained at once
The task status and executive plan of business, and task status and executive plan generation task schedule plan according to new task, it is described
Task schedule plan includes the task status of new task and the execution time of new task.
Step 104, execution time of the task manager according to the new task, by the task schedule planned assignment to place
In any one scheduling process of idle state, so that the scheduling process executes the new task.
Execution time of the task manager according to the new task can choose default before the execution time of the new task
In time, by task schedule planned assignment to any one the scheduling process being in idle condition.
For example the execution time of new task is 8 o'clock sharps of on January 1st, 2019, the task manager in the present invention can be
When 7: 30 59: on the 1st January in 2019, by the task schedule planned assignment of the new task to being currently at idle state
Any one scheduling process.
After scheduling process receives task schedule plan, the new task is executed according to task schedule plan.
Therefore in method for scheduling task provided by the invention, when there is new task to be added in task list, task pipe
Reason device can monitor in time and get the task status and executive plan of the new task, and the task status according to the new task
Task schedule plan is generated with executive plan, and then task schedule planned assignment to any one being in idle condition is dispatched
Process goes to execute, and the present invention does not need to restart scheduling process, realizes the real-time processing to new being added in task list for task.
In actual application, there is also need the case where deleting the task in task list in time.
For needing the case where deleting task in task list in time, the prior art can only stop scheduling process manually, and
After deleting the task in task list, restarts scheduling process, other tasks are continued to execute by the scheduling process after restarting.It is aobvious
So, there is also can not handle to need the problem of deleting task in real time for existing method for scheduling task.
In view of this, as shown in Fig. 2, the present invention is on the basis of Fig. 1, further includes:
Step 105, scheduling process, according to the task status of the new task, judges institute before executing the new task
Whether normal state new task.If normal, step 106 is executed, if abnormal, executes step 107.
Step 106, scheduling process executes the new task.
Step 107, scheduling process stops executing the new task.
In the present invention, scheduling process judge new task it is abnormal may include: task shape that scheduling process judges new task
State is deletion state, and/or judges that new task is not recorded in task list.
When the process of scheduling judges that new task is normal, then executing the new task, and judging that new task is abnormal, then stop
Only execute the new task.
Preferably as the present invention, when the process of scheduling judges that new task is abnormal, it can feed back and use to task manager
In the expression abnormal result of new task.
When task manager receives the result, it can determine that current task needs to delete, and then will be in task list
Record the new task, the task status and executive plan of the new task, and generate the new task task tune
Degree plan is deleted.
In method for scheduling task provided by the invention, scheduling process can first check for the new task when dispatching new task
Task status, and the task status based on new task judges whether new task is normal.When scheduling process determines appointing for the new task
Business state is deletion state or in the absence of in task list, and scheduling process will stop the execution of task, and result is fed back
To task manager, the relevant information (executive plan, task schedule plan) of the new task is deleted by task manager.
The task that the present invention deletes needs can realize stopping scheduling and deletion task relevant information automatically, thus
Guarantee the stopping needing to delete in time of the task, efficiently reduce scheduling process and restart bring tasks interrupt, realizes for needing
Delete the real-time processing of task.
Based on a kind of method for scheduling task provided by the invention above, as shown in figure 3, the present invention also provides a kind of task tune
Device is spent, which can be applied particularly in previously described task manager.The task scheduling apparatus can
To include:
Scanning element 10 is used for timing scan task list;
Judging unit 20, the addition for judging whether to have new task in the task list, wherein the task list
Middle to record the task status and executive plan for having each task, the executive plan includes the execution time of task;
Task schedule plan generation unit 30, for judging there is new task in the task list in the judging unit 10
When addition, the task status and executive plan of the new task are obtained, and according to the task status of the new task and execute meter
It draws and generates task schedule plan, the task schedule plan includes the execution of the task status and the new task of the new task
Time;
Allocation unit 40, for the execution time according to the new task, by the task schedule planned assignment to being in
Any one scheduling process of idle state, so that the scheduling process executes the new task.
Wherein during the present invention realizes, scheduling process before executing the new task, also use by the scheduling process
In:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
So preferably, as shown in figure 4, task scheduling apparatus provided by the invention can also include:
Receiving unit 50, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit 60 is deleted, it is described as a result, the new task, the new post that will be recorded in the task list for foundation
The task status and executive plan of business, and generate the new task task schedule plan delete.
In the present invention, the scheduling process judge the new task it is abnormal may include: that the scheduling process judges institute
The task status for stating new task is deletion state, and/or judges that the new task is not recorded in the task list.
The task list may include the first sublist and the second sublist;Wherein,
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described
Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist
At least one executive plan.
It should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment weight
Point explanation is the difference from other embodiments, and the same or similar parts between the embodiments can be referred to each other.
For device class embodiment, since it is basically similar to the method embodiment, so being described relatively simple, related place ginseng
See the part explanation of embodiment of the method.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
A kind of method for scheduling task provided by the present invention and device are described in detail above, it is used herein
A specific example illustrates the principle and implementation of the invention, and the above embodiments are only used to help understand originally
The method and its core concept of invention;At the same time, for those skilled in the art, according to the thought of the present invention, specific
There will be changes in embodiment and application range, in conclusion the content of the present specification should not be construed as to of the invention
Limitation.
Claims (10)
1. a kind of method for scheduling task, which is characterized in that method includes:
Task manager timing scan task list judges the addition for whether having new task in the task list, wherein described
Record has the task status and executive plan of each task in task list, and the executive plan includes the execution time of task;
When the task manager, which judges, has new task addition in the task list, the task manager obtains described new
The task status and executive plan of task, and task status and executive plan generation task schedule meter according to the new task
It draws, the task schedule plan includes the task status of the new task and the execution time of the new task;
Execution time of the task manager according to the new task, by the task schedule planned assignment to being in idle shape
Any one scheduling process of state, so that the scheduling process executes the new task.
2. the method according to claim 1, wherein the scheduling process is before executing the new task, institute
State method further include:
Task status of the scheduling process according to the new task, judges whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
When the scheduling process judges that the new task is abnormal, the scheduling process will indicate that the new task is abnormal
As a result it is sent to the task manager;
The task manager is according to described as a result, by the new task recorded in the task list, the new task
Task status and executive plan, and generate the new task task schedule plan delete.
4. according to the method in claim 2 or 3, which is characterized in that the scheduling process judges that the new task is abnormal
It include: that the scheduling process judges that the task status of the new task is not recorded in for deletion state and/or the new task
In the task list.
5. method according to claim 1-3, which is characterized in that the task list includes the first sublist and the
Two sublists;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein the task in first sublist and described second
Task in sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist extremely
A few executive plan.
6. a kind of task scheduling apparatus characterized by comprising
Scanning element is used for timing scan task list;
Judging unit, the addition for judging whether to have new task in the task list, wherein being recorded in the task list
There are the task status and executive plan of each task, the executive plan includes the execution time of task;
Task schedule plan generation unit, for when the judging unit, which judges, has new task addition in the task list,
The task status and executive plan of the new task are obtained, and task status and executive plan generation times according to the new task
Business operation plan, the task schedule plan includes the task status of the new task and the execution time of the new task;
Allocation unit, for the execution time according to the new task, by the task schedule planned assignment to being in idle shape
Any one scheduling process of state, so that the scheduling process executes the new task.
7. device according to claim 6, which is characterized in that the scheduling process is before executing the new task, institute
Scheduling process is stated to be also used to:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
8. device according to claim 7, which is characterized in that described device further include:
Receiving unit, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit is deleted, it is described for foundation as a result, by times of the new task recorded in the task list, the new task
Business state and executive plan, and generate the new task task schedule plan delete.
9. device according to claim 7 or 8, which is characterized in that the scheduling process judges that the new task is abnormal
It include: that the scheduling process judges that the task status of the new task is not recorded in for deletion state and/or the new task
In the task list.
10. according to the described in any item devices of claim 6-8, which is characterized in that the task list include the first sublist and
Second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein the task in first sublist and described second
Task in sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist extremely
A few executive plan.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811600945.1A CN109684063B (en) | 2018-12-26 | 2018-12-26 | Task scheduling method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811600945.1A CN109684063B (en) | 2018-12-26 | 2018-12-26 | Task scheduling method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109684063A true CN109684063A (en) | 2019-04-26 |
CN109684063B CN109684063B (en) | 2021-03-26 |
Family
ID=66188494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811600945.1A Active CN109684063B (en) | 2018-12-26 | 2018-12-26 | Task scheduling method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109684063B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111708613A (en) * | 2020-08-18 | 2020-09-25 | 广东睿江云计算股份有限公司 | Method and system for repairing boot failure card task of VM virtual machine |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007028942A1 (en) * | 2005-09-09 | 2007-03-15 | The University Of Leicester | Time-triggered co-operative hardware scheduler |
CN101425024A (en) * | 2008-10-24 | 2009-05-06 | 中国移动通信集团山东有限公司 | Multitasking method and device |
CN101431430A (en) * | 2007-11-07 | 2009-05-13 | 中兴通讯股份有限公司 | Policy execution system and method |
CN101710411A (en) * | 2009-12-01 | 2010-05-19 | 中国建设银行股份有限公司 | Method and equipment for processing real-time task |
WO2011061034A1 (en) * | 2009-11-23 | 2011-05-26 | International Business Machines Corporation | A method and system for job scheduling in a data processing system with virtual environment |
CN103324534A (en) * | 2012-03-22 | 2013-09-25 | 阿里巴巴集团控股有限公司 | Operation scheduling method and operation scheduler |
CN104503845A (en) * | 2015-01-14 | 2015-04-08 | 北京邮电大学 | Task distributing method and system |
CN106412061A (en) * | 2016-09-28 | 2017-02-15 | 上海爱数信息技术股份有限公司 | Linux-based log folder remote transmission system |
CN106815066A (en) * | 2015-11-30 | 2017-06-09 | 阿里巴巴集团控股有限公司 | A kind of timed task dispatching method, apparatus and system |
CN107621972A (en) * | 2016-07-15 | 2018-01-23 | 中兴通讯股份有限公司 | Big data task dynamic management approach, device and server |
CN107766129A (en) * | 2016-08-17 | 2018-03-06 | 北京金山云网络技术有限公司 | A kind of task processing method, apparatus and system |
US20180124014A1 (en) * | 2014-03-17 | 2018-05-03 | Fortinet, Inc. | Security information and event management |
CN108037991A (en) * | 2017-12-26 | 2018-05-15 | 中山大学 | A kind of timing operation dispatching method and system for supporting job dependence relation |
CN108710537A (en) * | 2018-04-09 | 2018-10-26 | 平安科技(深圳)有限公司 | A kind of task processing method, storage medium and server |
CN108804096A (en) * | 2017-05-05 | 2018-11-13 | 中思博安科技(北京)有限公司 | A kind of task scheduling execution method and apparatus based on intelligent contract |
CN108829503A (en) * | 2018-06-27 | 2018-11-16 | 泰康保险集团股份有限公司 | Method for scheduling task, device, system, medium and electronic equipment |
CN109032779A (en) * | 2018-07-09 | 2018-12-18 | 广州酷狗计算机科技有限公司 | Task processing method, device, computer equipment and readable storage medium storing program for executing |
-
2018
- 2018-12-26 CN CN201811600945.1A patent/CN109684063B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007028942A1 (en) * | 2005-09-09 | 2007-03-15 | The University Of Leicester | Time-triggered co-operative hardware scheduler |
CN101431430A (en) * | 2007-11-07 | 2009-05-13 | 中兴通讯股份有限公司 | Policy execution system and method |
CN101425024A (en) * | 2008-10-24 | 2009-05-06 | 中国移动通信集团山东有限公司 | Multitasking method and device |
WO2011061034A1 (en) * | 2009-11-23 | 2011-05-26 | International Business Machines Corporation | A method and system for job scheduling in a data processing system with virtual environment |
CN101710411A (en) * | 2009-12-01 | 2010-05-19 | 中国建设银行股份有限公司 | Method and equipment for processing real-time task |
CN103324534A (en) * | 2012-03-22 | 2013-09-25 | 阿里巴巴集团控股有限公司 | Operation scheduling method and operation scheduler |
US20180124014A1 (en) * | 2014-03-17 | 2018-05-03 | Fortinet, Inc. | Security information and event management |
CN104503845A (en) * | 2015-01-14 | 2015-04-08 | 北京邮电大学 | Task distributing method and system |
CN106815066A (en) * | 2015-11-30 | 2017-06-09 | 阿里巴巴集团控股有限公司 | A kind of timed task dispatching method, apparatus and system |
CN107621972A (en) * | 2016-07-15 | 2018-01-23 | 中兴通讯股份有限公司 | Big data task dynamic management approach, device and server |
CN107766129A (en) * | 2016-08-17 | 2018-03-06 | 北京金山云网络技术有限公司 | A kind of task processing method, apparatus and system |
CN106412061A (en) * | 2016-09-28 | 2017-02-15 | 上海爱数信息技术股份有限公司 | Linux-based log folder remote transmission system |
CN108804096A (en) * | 2017-05-05 | 2018-11-13 | 中思博安科技(北京)有限公司 | A kind of task scheduling execution method and apparatus based on intelligent contract |
CN108037991A (en) * | 2017-12-26 | 2018-05-15 | 中山大学 | A kind of timing operation dispatching method and system for supporting job dependence relation |
CN108710537A (en) * | 2018-04-09 | 2018-10-26 | 平安科技(深圳)有限公司 | A kind of task processing method, storage medium and server |
CN108829503A (en) * | 2018-06-27 | 2018-11-16 | 泰康保险集团股份有限公司 | Method for scheduling task, device, system, medium and electronic equipment |
CN109032779A (en) * | 2018-07-09 | 2018-12-18 | 广州酷狗计算机科技有限公司 | Task processing method, device, computer equipment and readable storage medium storing program for executing |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111708613A (en) * | 2020-08-18 | 2020-09-25 | 广东睿江云计算股份有限公司 | Method and system for repairing boot failure card task of VM virtual machine |
CN111708613B (en) * | 2020-08-18 | 2020-12-11 | 广东睿江云计算股份有限公司 | Method and system for repairing boot failure card task of VM virtual machine |
Also Published As
Publication number | Publication date |
---|---|
CN109684063B (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012025977A1 (en) | Method of managing schedule and schedule management server | |
US20170269924A1 (en) | Managing a software-patch submission queue | |
CN106406993A (en) | Timed task management method and system | |
CN104699541A (en) | Method, device, data transmission assembly and system for synchronizing data | |
CN112379995A (en) | DAG-based unitized distributed scheduling system and method | |
CN111125444A (en) | Big data task scheduling management method, device, equipment and storage medium | |
CN104750522B (en) | The Dynamic Execution method and system of task or flow | |
US20120215583A1 (en) | System and method for managing real-time batch workflows | |
CN112559159A (en) | Task scheduling method based on distributed deployment | |
CN104615486B (en) | For searching for the multi-task scheduling of Extension Software Platform and executing methods, devices and systems | |
CN114153580A (en) | Cross-multi-cluster work scheduling method and device | |
CN107832130A (en) | A kind of job stream scheduling of banking system performs method, apparatus and electronic equipment | |
CN106293911A (en) | Dispatching System, method | |
CN109684063A (en) | A kind of method for scheduling task and device | |
CN103024791A (en) | Multi-service processing model and multi-service processing method in communication test system | |
CN105446812A (en) | Multitask scheduling configuration method | |
CN101866458A (en) | Method and system for obtaining schedule data of task | |
JPH0916527A (en) | Method and system for large scale distributed information processing | |
CN115907683A (en) | Realization system and method of workflow engine based on financial product management | |
CN115309558A (en) | Resource scheduling management system, method, computer equipment and storage medium | |
CN115469989A (en) | Distributed batch task scheduling method and system | |
CN102147750A (en) | Method and system for processing operation | |
CN111522630B (en) | Method and system for executing planned tasks based on batch dispatching center | |
CN103970854B (en) | Method for synchronizing incremental certificate information between SAP ECC end and SAP BW end | |
JP5387083B2 (en) | Job management system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |