CN109684063A - A kind of method for scheduling task and device - Google Patents

A kind of method for scheduling task and device Download PDF

Info

Publication number
CN109684063A
CN109684063A CN201811600945.1A CN201811600945A CN109684063A CN 109684063 A CN109684063 A CN 109684063A CN 201811600945 A CN201811600945 A CN 201811600945A CN 109684063 A CN109684063 A CN 109684063A
Authority
CN
China
Prior art keywords
task
new
scheduling process
status
new task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811600945.1A
Other languages
Chinese (zh)
Other versions
CN109684063B (en
Inventor
周阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asiainfo Technologies China Inc
Original Assignee
Asiainfo Technologies China Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asiainfo Technologies China Inc filed Critical Asiainfo Technologies China Inc
Priority to CN201811600945.1A priority Critical patent/CN109684063B/en
Publication of CN109684063A publication Critical patent/CN109684063A/en
Application granted granted Critical
Publication of CN109684063B publication Critical patent/CN109684063B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues

Abstract

The present invention provides a kind of method for scheduling task and device, it include: task manager timing scan task list, judge the addition for whether having new task in the task list, the task status and executive plan for having each task are wherein recorded in the task list, the executive plan includes the execution time of task;When task manager, which judges, has new task addition in the task list, task manager obtains the task status and executive plan of the new task, and task status and executive plan generation task schedule plan according to the new task, the task schedule plan includes the task status of the new task and the execution time of the new task;Execution time of the task manager according to the new task, by the task schedule planned assignment to any one the scheduling process being in idle condition, so that the scheduling process executes the new task.The present invention does not need to restart scheduling process, can be realized the real-time processing to new being added in task list for task.

Description

A kind of method for scheduling task and device
Technical field
The present invention relates to technical fields more particularly to a kind of tasks such as mobile service support and business support system design Dispatching method and device.
Background technique
Currently, all tasks are documented in task list, after scheduling process initial start-up in loading tasks list All tasks, and gradually handle each task.
But when there is new task to be added in task list, it is necessary to new task could be handled by restarting scheduling process, The task that exactly existing method for scheduling task can not newly be added in real time processing tasks list.
Summary of the invention
In view of this, the present invention provides a kind of method for scheduling task and device, to realize in real time processing tasks list Newly being added for task.Technical solution is as follows:
Based on an aspect of of the present present invention, the present invention provides a kind of method for scheduling task, and method includes:
Task manager timing scan task list judges the addition for whether having new task in the task list, wherein Record has the task status and executive plan of each task in the task list, when the executive plan includes the execution of task Between;
When the task manager, which judges, has new task addition in the task list, the task manager obtains institute The task status and executive plan of new task are stated, and task status and executive plan generation task schedule according to the new task Plan, the task schedule plan includes the task status of the new task and the execution time of the new task;
Execution time of the task manager according to the new task, by the task schedule planned assignment to being in empty Any one scheduling process of not busy state, so that the scheduling process executes the new task.
Optionally, the scheduling process is before executing the new task, the method also includes:
Task status of the scheduling process according to the new task, judges whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
Optionally, the method also includes:
When the scheduling process judges that the new task is abnormal, the scheduling process will indicate the new task not just Normal result is sent to the task manager;
The task manager is according to described as a result, the new task, the new post that will be recorded in the task list The task status and executive plan of business, and generate the new task task schedule plan delete.
Optionally, the scheduling process judge the new task it is abnormal include: that the scheduling process judges the new post The task status of business is that deletion state and/or the new task are not recorded in the task list.
Optionally, the task list includes the first sublist and the second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist At least one executive plan.
Based on another aspect of the present invention, the present invention provides a kind of task scheduling apparatus, comprising:
Scanning element is used for timing scan task list;
Judging unit, the addition for judging whether to have new task in the task list, wherein in the task list Record has the task status and executive plan of each task, and the executive plan includes the execution time of task;
Task schedule plan generation unit, for judging there is new task addition in the task list in the judging unit When, the task status and executive plan of the new task are obtained, and task status and executive plan life according to the new task At task schedule plan, the task schedule plan include the new task task status and the new task execution when Between;
Allocation unit, for the execution time according to the new task, by the task schedule planned assignment to being in empty Any one scheduling process of not busy state, so that the scheduling process executes the new task.
Optionally, before executing the new task, the scheduling process is also used to the scheduling process:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
Optionally, described device further include:
Receiving unit, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit is deleted, it is described as a result, the new task, the new task that will be recorded in the task list for foundation Task status and executive plan, and generate the new task task schedule plan delete.
Optionally, the scheduling process judge the new task it is abnormal include: that the scheduling process judges the new post The task status of business is that deletion state and/or the new task are not recorded in the task list.
Optionally, the task list includes the first sublist and the second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist At least one executive plan.
In method for scheduling task and device provided by the invention, by task manager timing scan task list, judgement is appointed Whether the addition of new task is had in business list.When task manager, which determines in task list, new task addition, it is new to obtain this The task status and executive plan of task, and task status and executive plan generation task schedule plan according to the new task, The task schedule plan includes the task status of the new task and the execution time of the new task, and then according to the new task Execute the time, by task schedule planned assignment to any one the scheduling process being in idle condition so that it is described dispatch into New task described in Cheng Zhihang.During realization of the invention, when there is new task to be added in task list, task manager The task status and executive plan of the new task can be obtained in time, and task status and executive plan life according to the new task It goes to execute at task schedule plan, and then by task schedule planned assignment to any one the scheduling process being in idle condition, The present invention does not need to restart scheduling process, realizes the real-time processing to new being added in task list for task.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of flow chart of method for scheduling task provided by the invention;
Fig. 2 is the flow chart of another method for scheduling task provided by the invention;
Fig. 3 is a kind of structural schematic diagram of task scheduling apparatus provided by the invention;
Fig. 4 is the structural schematic diagram of another task scheduling apparatus provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In view of gradually handling the mode of each task in task list by a scheduling process in the prior art, exist The problem of can not being newly added in real time processing tasks list for task, the present invention propose to be executed respectively simultaneously by multiple scheduling processes Task in task list, while judging whether there is new task in task list by task manager timing scan task list Addition, and task manager judgement there is new task to be added in task list when, can obtain in time the new task appoint Business state and executive plan, and task status and executive plan generation task schedule plan according to the new task, and then will appoint Business operation plan distributes to any one the scheduling process being in idle condition and goes to execute, the present invention do not need to restart dispatch into Journey realizes the real-time processing to new being added in task list for task.
Specifically, as shown in Figure 1, method for scheduling task provided by the invention may include:
Step 101, task manager timing scan task list.
In the present invention, record has the task status and executive plan of each task, the executive plan packet in task list Include the execution time of task.
Wherein task status may include pending state, state, the state that is finished, deletion state etc. in execution. Executive plan includes the execution time of task, the execution content of task etc..In the present invention preferably, task list can be specific It such as include the first sublist and the second sublist including two tables.Wherein the first sublist is used to record the task status of each task, the Two sublists are used to record the executive plan of each task, wherein the task in the task and the second sublist in the first sublist is by appointing Association is realized in business number, at least one executive plan in corresponding second sublist of a task in the first sublist, i.e. a task At least one corresponding executive plan.
Step 102, task manager judges the addition for whether having new task in the task list.If so, executing step Rapid 103, if not provided, continuing to return to step 101.
Step 103, task manager obtains the task status and executive plan of the new task, and according to the new task Task status and executive plan generate task schedule plan, the task schedule plan includes the task status of the new task With the execution time of the new task.
In the present invention, when task manager, which monitors, the addition of new task in task list, the new post is obtained at once The task status and executive plan of business, and task status and executive plan generation task schedule plan according to new task, it is described Task schedule plan includes the task status of new task and the execution time of new task.
Step 104, execution time of the task manager according to the new task, by the task schedule planned assignment to place In any one scheduling process of idle state, so that the scheduling process executes the new task.
Execution time of the task manager according to the new task can choose default before the execution time of the new task In time, by task schedule planned assignment to any one the scheduling process being in idle condition.
For example the execution time of new task is 8 o'clock sharps of on January 1st, 2019, the task manager in the present invention can be When 7: 30 59: on the 1st January in 2019, by the task schedule planned assignment of the new task to being currently at idle state Any one scheduling process.
After scheduling process receives task schedule plan, the new task is executed according to task schedule plan.
Therefore in method for scheduling task provided by the invention, when there is new task to be added in task list, task pipe Reason device can monitor in time and get the task status and executive plan of the new task, and the task status according to the new task Task schedule plan is generated with executive plan, and then task schedule planned assignment to any one being in idle condition is dispatched Process goes to execute, and the present invention does not need to restart scheduling process, realizes the real-time processing to new being added in task list for task.
In actual application, there is also need the case where deleting the task in task list in time.
For needing the case where deleting task in task list in time, the prior art can only stop scheduling process manually, and After deleting the task in task list, restarts scheduling process, other tasks are continued to execute by the scheduling process after restarting.It is aobvious So, there is also can not handle to need the problem of deleting task in real time for existing method for scheduling task.
In view of this, as shown in Fig. 2, the present invention is on the basis of Fig. 1, further includes:
Step 105, scheduling process, according to the task status of the new task, judges institute before executing the new task Whether normal state new task.If normal, step 106 is executed, if abnormal, executes step 107.
Step 106, scheduling process executes the new task.
Step 107, scheduling process stops executing the new task.
In the present invention, scheduling process judge new task it is abnormal may include: task shape that scheduling process judges new task State is deletion state, and/or judges that new task is not recorded in task list.
When the process of scheduling judges that new task is normal, then executing the new task, and judging that new task is abnormal, then stop Only execute the new task.
Preferably as the present invention, when the process of scheduling judges that new task is abnormal, it can feed back and use to task manager In the expression abnormal result of new task.
When task manager receives the result, it can determine that current task needs to delete, and then will be in task list Record the new task, the task status and executive plan of the new task, and generate the new task task tune Degree plan is deleted.
In method for scheduling task provided by the invention, scheduling process can first check for the new task when dispatching new task Task status, and the task status based on new task judges whether new task is normal.When scheduling process determines appointing for the new task Business state is deletion state or in the absence of in task list, and scheduling process will stop the execution of task, and result is fed back To task manager, the relevant information (executive plan, task schedule plan) of the new task is deleted by task manager.
The task that the present invention deletes needs can realize stopping scheduling and deletion task relevant information automatically, thus Guarantee the stopping needing to delete in time of the task, efficiently reduce scheduling process and restart bring tasks interrupt, realizes for needing Delete the real-time processing of task.
Based on a kind of method for scheduling task provided by the invention above, as shown in figure 3, the present invention also provides a kind of task tune Device is spent, which can be applied particularly in previously described task manager.The task scheduling apparatus can To include:
Scanning element 10 is used for timing scan task list;
Judging unit 20, the addition for judging whether to have new task in the task list, wherein the task list Middle to record the task status and executive plan for having each task, the executive plan includes the execution time of task;
Task schedule plan generation unit 30, for judging there is new task in the task list in the judging unit 10 When addition, the task status and executive plan of the new task are obtained, and according to the task status of the new task and execute meter It draws and generates task schedule plan, the task schedule plan includes the execution of the task status and the new task of the new task Time;
Allocation unit 40, for the execution time according to the new task, by the task schedule planned assignment to being in Any one scheduling process of idle state, so that the scheduling process executes the new task.
Wherein during the present invention realizes, scheduling process before executing the new task, also use by the scheduling process In:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
So preferably, as shown in figure 4, task scheduling apparatus provided by the invention can also include:
Receiving unit 50, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit 60 is deleted, it is described as a result, the new task, the new post that will be recorded in the task list for foundation The task status and executive plan of business, and generate the new task task schedule plan delete.
In the present invention, the scheduling process judge the new task it is abnormal may include: that the scheduling process judges institute The task status for stating new task is deletion state, and/or judges that the new task is not recorded in the task list.
The task list may include the first sublist and the second sublist;Wherein,
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein task in first sublist and described Task in second sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist At least one executive plan.
It should be noted that all the embodiments in this specification are described in a progressive manner, each embodiment weight Point explanation is the difference from other embodiments, and the same or similar parts between the embodiments can be referred to each other. For device class embodiment, since it is basically similar to the method embodiment, so being described relatively simple, related place ginseng See the part explanation of embodiment of the method.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
A kind of method for scheduling task provided by the present invention and device are described in detail above, it is used herein A specific example illustrates the principle and implementation of the invention, and the above embodiments are only used to help understand originally The method and its core concept of invention;At the same time, for those skilled in the art, according to the thought of the present invention, specific There will be changes in embodiment and application range, in conclusion the content of the present specification should not be construed as to of the invention Limitation.

Claims (10)

1. a kind of method for scheduling task, which is characterized in that method includes:
Task manager timing scan task list judges the addition for whether having new task in the task list, wherein described Record has the task status and executive plan of each task in task list, and the executive plan includes the execution time of task;
When the task manager, which judges, has new task addition in the task list, the task manager obtains described new The task status and executive plan of task, and task status and executive plan generation task schedule meter according to the new task It draws, the task schedule plan includes the task status of the new task and the execution time of the new task;
Execution time of the task manager according to the new task, by the task schedule planned assignment to being in idle shape Any one scheduling process of state, so that the scheduling process executes the new task.
2. the method according to claim 1, wherein the scheduling process is before executing the new task, institute State method further include:
Task status of the scheduling process according to the new task, judges whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
When the scheduling process judges that the new task is abnormal, the scheduling process will indicate that the new task is abnormal As a result it is sent to the task manager;
The task manager is according to described as a result, by the new task recorded in the task list, the new task Task status and executive plan, and generate the new task task schedule plan delete.
4. according to the method in claim 2 or 3, which is characterized in that the scheduling process judges that the new task is abnormal It include: that the scheduling process judges that the task status of the new task is not recorded in for deletion state and/or the new task In the task list.
5. method according to claim 1-3, which is characterized in that the task list includes the first sublist and the Two sublists;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein the task in first sublist and described second Task in sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist extremely A few executive plan.
6. a kind of task scheduling apparatus characterized by comprising
Scanning element is used for timing scan task list;
Judging unit, the addition for judging whether to have new task in the task list, wherein being recorded in the task list There are the task status and executive plan of each task, the executive plan includes the execution time of task;
Task schedule plan generation unit, for when the judging unit, which judges, has new task addition in the task list, The task status and executive plan of the new task are obtained, and task status and executive plan generation times according to the new task Business operation plan, the task schedule plan includes the task status of the new task and the execution time of the new task;
Allocation unit, for the execution time according to the new task, by the task schedule planned assignment to being in idle shape Any one scheduling process of state, so that the scheduling process executes the new task.
7. device according to claim 6, which is characterized in that the scheduling process is before executing the new task, institute Scheduling process is stated to be also used to:
According to the task status of the new task, judge whether the new task is normal;
If normal, the scheduling process executes the new task;
If abnormal, the scheduling process stops executing the new task.
8. device according to claim 7, which is characterized in that described device further include:
Receiving unit, for receiving that the scheduling process sends for indicating the abnormal result of the new task;
Unit is deleted, it is described for foundation as a result, by times of the new task recorded in the task list, the new task Business state and executive plan, and generate the new task task schedule plan delete.
9. device according to claim 7 or 8, which is characterized in that the scheduling process judges that the new task is abnormal It include: that the scheduling process judges that the task status of the new task is not recorded in for deletion state and/or the new task In the task list.
10. according to the described in any item devices of claim 6-8, which is characterized in that the task list include the first sublist and Second sublist;
First sublist is used to record the task status of each task;
Second sublist is used to record the executive plan of each task, wherein the task in first sublist and described second Task in sublist is realized by task number to be associated with, and a task in first sublist corresponds in second sublist extremely A few executive plan.
CN201811600945.1A 2018-12-26 2018-12-26 Task scheduling method and device Active CN109684063B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811600945.1A CN109684063B (en) 2018-12-26 2018-12-26 Task scheduling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811600945.1A CN109684063B (en) 2018-12-26 2018-12-26 Task scheduling method and device

Publications (2)

Publication Number Publication Date
CN109684063A true CN109684063A (en) 2019-04-26
CN109684063B CN109684063B (en) 2021-03-26

Family

ID=66188494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811600945.1A Active CN109684063B (en) 2018-12-26 2018-12-26 Task scheduling method and device

Country Status (1)

Country Link
CN (1) CN109684063B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111708613A (en) * 2020-08-18 2020-09-25 广东睿江云计算股份有限公司 Method and system for repairing boot failure card task of VM virtual machine

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007028942A1 (en) * 2005-09-09 2007-03-15 The University Of Leicester Time-triggered co-operative hardware scheduler
CN101425024A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 Multitasking method and device
CN101431430A (en) * 2007-11-07 2009-05-13 中兴通讯股份有限公司 Policy execution system and method
CN101710411A (en) * 2009-12-01 2010-05-19 中国建设银行股份有限公司 Method and equipment for processing real-time task
WO2011061034A1 (en) * 2009-11-23 2011-05-26 International Business Machines Corporation A method and system for job scheduling in a data processing system with virtual environment
CN103324534A (en) * 2012-03-22 2013-09-25 阿里巴巴集团控股有限公司 Operation scheduling method and operation scheduler
CN104503845A (en) * 2015-01-14 2015-04-08 北京邮电大学 Task distributing method and system
CN106412061A (en) * 2016-09-28 2017-02-15 上海爱数信息技术股份有限公司 Linux-based log folder remote transmission system
CN106815066A (en) * 2015-11-30 2017-06-09 阿里巴巴集团控股有限公司 A kind of timed task dispatching method, apparatus and system
CN107621972A (en) * 2016-07-15 2018-01-23 中兴通讯股份有限公司 Big data task dynamic management approach, device and server
CN107766129A (en) * 2016-08-17 2018-03-06 北京金山云网络技术有限公司 A kind of task processing method, apparatus and system
US20180124014A1 (en) * 2014-03-17 2018-05-03 Fortinet, Inc. Security information and event management
CN108037991A (en) * 2017-12-26 2018-05-15 中山大学 A kind of timing operation dispatching method and system for supporting job dependence relation
CN108710537A (en) * 2018-04-09 2018-10-26 平安科技(深圳)有限公司 A kind of task processing method, storage medium and server
CN108804096A (en) * 2017-05-05 2018-11-13 中思博安科技(北京)有限公司 A kind of task scheduling execution method and apparatus based on intelligent contract
CN108829503A (en) * 2018-06-27 2018-11-16 泰康保险集团股份有限公司 Method for scheduling task, device, system, medium and electronic equipment
CN109032779A (en) * 2018-07-09 2018-12-18 广州酷狗计算机科技有限公司 Task processing method, device, computer equipment and readable storage medium storing program for executing

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007028942A1 (en) * 2005-09-09 2007-03-15 The University Of Leicester Time-triggered co-operative hardware scheduler
CN101431430A (en) * 2007-11-07 2009-05-13 中兴通讯股份有限公司 Policy execution system and method
CN101425024A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 Multitasking method and device
WO2011061034A1 (en) * 2009-11-23 2011-05-26 International Business Machines Corporation A method and system for job scheduling in a data processing system with virtual environment
CN101710411A (en) * 2009-12-01 2010-05-19 中国建设银行股份有限公司 Method and equipment for processing real-time task
CN103324534A (en) * 2012-03-22 2013-09-25 阿里巴巴集团控股有限公司 Operation scheduling method and operation scheduler
US20180124014A1 (en) * 2014-03-17 2018-05-03 Fortinet, Inc. Security information and event management
CN104503845A (en) * 2015-01-14 2015-04-08 北京邮电大学 Task distributing method and system
CN106815066A (en) * 2015-11-30 2017-06-09 阿里巴巴集团控股有限公司 A kind of timed task dispatching method, apparatus and system
CN107621972A (en) * 2016-07-15 2018-01-23 中兴通讯股份有限公司 Big data task dynamic management approach, device and server
CN107766129A (en) * 2016-08-17 2018-03-06 北京金山云网络技术有限公司 A kind of task processing method, apparatus and system
CN106412061A (en) * 2016-09-28 2017-02-15 上海爱数信息技术股份有限公司 Linux-based log folder remote transmission system
CN108804096A (en) * 2017-05-05 2018-11-13 中思博安科技(北京)有限公司 A kind of task scheduling execution method and apparatus based on intelligent contract
CN108037991A (en) * 2017-12-26 2018-05-15 中山大学 A kind of timing operation dispatching method and system for supporting job dependence relation
CN108710537A (en) * 2018-04-09 2018-10-26 平安科技(深圳)有限公司 A kind of task processing method, storage medium and server
CN108829503A (en) * 2018-06-27 2018-11-16 泰康保险集团股份有限公司 Method for scheduling task, device, system, medium and electronic equipment
CN109032779A (en) * 2018-07-09 2018-12-18 广州酷狗计算机科技有限公司 Task processing method, device, computer equipment and readable storage medium storing program for executing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111708613A (en) * 2020-08-18 2020-09-25 广东睿江云计算股份有限公司 Method and system for repairing boot failure card task of VM virtual machine
CN111708613B (en) * 2020-08-18 2020-12-11 广东睿江云计算股份有限公司 Method and system for repairing boot failure card task of VM virtual machine

Also Published As

Publication number Publication date
CN109684063B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
WO2012025977A1 (en) Method of managing schedule and schedule management server
US20170269924A1 (en) Managing a software-patch submission queue
CN106406993A (en) Timed task management method and system
CN104699541A (en) Method, device, data transmission assembly and system for synchronizing data
CN112379995A (en) DAG-based unitized distributed scheduling system and method
CN111125444A (en) Big data task scheduling management method, device, equipment and storage medium
CN104750522B (en) The Dynamic Execution method and system of task or flow
US20120215583A1 (en) System and method for managing real-time batch workflows
CN112559159A (en) Task scheduling method based on distributed deployment
CN104615486B (en) For searching for the multi-task scheduling of Extension Software Platform and executing methods, devices and systems
CN114153580A (en) Cross-multi-cluster work scheduling method and device
CN107832130A (en) A kind of job stream scheduling of banking system performs method, apparatus and electronic equipment
CN106293911A (en) Dispatching System, method
CN109684063A (en) A kind of method for scheduling task and device
CN103024791A (en) Multi-service processing model and multi-service processing method in communication test system
CN105446812A (en) Multitask scheduling configuration method
CN101866458A (en) Method and system for obtaining schedule data of task
JPH0916527A (en) Method and system for large scale distributed information processing
CN115907683A (en) Realization system and method of workflow engine based on financial product management
CN115309558A (en) Resource scheduling management system, method, computer equipment and storage medium
CN115469989A (en) Distributed batch task scheduling method and system
CN102147750A (en) Method and system for processing operation
CN111522630B (en) Method and system for executing planned tasks based on batch dispatching center
CN103970854B (en) Method for synchronizing incremental certificate information between SAP ECC end and SAP BW end
JP5387083B2 (en) Job management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant