CN101425024A - Multitasking method and device - Google Patents

Multitasking method and device Download PDF

Info

Publication number
CN101425024A
CN101425024A CNA200810224137XA CN200810224137A CN101425024A CN 101425024 A CN101425024 A CN 101425024A CN A200810224137X A CNA200810224137X A CN A200810224137XA CN 200810224137 A CN200810224137 A CN 200810224137A CN 101425024 A CN101425024 A CN 101425024A
Authority
CN
China
Prior art keywords
subtask
state
task
multitask
execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810224137XA
Other languages
Chinese (zh)
Inventor
贾荣明
吕传祝
王琳
寇剑宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Shandong Co Ltd
Original Assignee
China Mobile Group Shandong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Shandong Co Ltd filed Critical China Mobile Group Shandong Co Ltd
Priority to CNA200810224137XA priority Critical patent/CN101425024A/en
Publication of CN101425024A publication Critical patent/CN101425024A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to the technical field of computers, in particular to a multitasking technique. The invention discloses a multitasking method and a device for solving the problem that subtasks included by a task can not relate with subtasks included by other tasks in the prior art. The multitasking method comprises the steps as follows: a multitask lift is monitored in real time, and records the state and the execution condition of each subtask included by every task; when the subtask meeting the execution condition is monitored according to the state and the execution condition of each subtask, the subtask is controlled to run on an execution node. The multitasking method and the device realize the harmonious dispatching among a plurality of tasks.

Description

A kind of multi-task processing method and device
Technical field
The present invention relates to field of computer technology, relate in particular to a kind of multitasking technique.
Background technology
Two or more different application programs operations are called multitasking, and each application program is known as a task.Process is the task executions entity, a task often need be finished jointly by several processes, process is some instructions dynamic implementations to the data set under certain environment, and the operation of each process can be regarded an included subtask of this task of execution as.A kind of the taking the form of of task action result generates a form.Along with the complicacy of task is more and more higher, for just generate a form and generally need obtain data and move a plurality of processes then and can finish from a plurality of data sources, and the process between the different task often also is related.
In the prior art, if a task is made up of the experimental process task, then each subtask all is an independently logical block, and independently carry out in order each included subtask of task, and each subtask all is finished, and this task is just complete.In the prior art, only realized management function, can't manage the situation that an included subtask (process) of task needs the included subtask (process) of related other task the individual event task.
Summary of the invention
The invention provides a kind of multi-task processing method and device, in order to solve the problem of can't related other task included subtask, the included subtask of a task existing in the prior art.
Multi-task processing method provided by the invention comprises:
The tabulation of monitoring multitask in real time, the state and the executive condition of each included each subtask of task of described multitask list records;
Exist when satisfying the subtask of executive condition when monitoring, control described subtask and on XM, move according to the state of each subtask and executive condition.
Multitasking device provided by the invention comprises memory module, monitoring modular and processing module, wherein:
Described memory module is used to store the multitask tabulation, the state and the executive condition of each included each subtask of task of described multitask list records;
Described monitoring modular is used for monitoring in real time multitask tabulation, and triggers described processing module when monitoring the subtask that existence satisfies executive condition according to the state of each subtask and executive condition;
Described processing module is used to control described subtask and moves on XM.
Multi-task processing method provided by the invention and device, set in advance the multitask tabulation, the state and the executive condition of each included each subtask of task of record in the multitask tabulation, the tabulation of monitoring multitask in real time, when finding that the subtask of executive condition is satisfied in existence, control this subtask and on XM, move.State by each subtask in the multitask tabulation and executive condition can included subtask and the included subtasks of other task of a related task, realized the coordinated scheduling between the multitask.
Description of drawings
Fig. 1 is a multi-task processing method process flow diagram in the embodiment of the invention;
Fig. 2 is a multitasking apparatus structure block diagram in the embodiment of the invention;
Fig. 3 is a kind of possibility structured flowchart of monitoring modular in the embodiment of the invention;
Fig. 4 is the processing flow chart of " exclusive monthly fee is shared " subtask in the embodiment of the invention;
Fig. 5 is the processing flow chart of " of that month arrearage importing " subtask in the embodiment of the invention.
Embodiment
The embodiment of the invention provides a kind of multi-task processing method and device, in order to solve the problem of can't related other task included subtask, the included subtask of a task existing in the prior art, realizes the coordinated scheduling between the multitask.
Below in conjunction with Figure of description the embodiment of the invention is described in detail.
As shown in Figure 1, the multi-task processing method that the embodiment of the invention provides comprises:
S101, monitor multitask tabulation, the state and the executive condition of each included each subtask of task of wherein multitask list records in real time;
S102, exist when satisfying the subtask of executive condition, control this subtask and on XM, move when monitoring according to the state of each subtask and executive condition.
The state of each subtask comprises not executing state, just at executing state, the state and carry out status of fail of running succeeded, wherein:
The original state of subtask is executing state not;
When the subtask began to move on XM, the state of this subtask was updated to just in executing state by executing state not;
After the subtask was moved successfully on XM, the state of this subtask was by just being updated to the state of running succeeded in executing state;
When failure was moved in the subtask on XM after, the state of this subtask was by just being updated to the execution status of fail in executing state.
Preferable, the execution dependence that the executive condition of each subtask comprises the execution time and is set with correlator task and state thereof, wherein, the execution dependence of each subtask is configured with the related of other subtask according to this subtask.
State and executive condition based on above-mentioned each subtask, the subtask is satisfied executive condition and specifically is meant: the state of subtask is for executing state, current time are not satisfied the execution time of subtask, and satisfy the state of setting according to the execution dependence correlator task of subtask, judge that then this subtask satisfies executive condition.
If be not strict with the execution time each included subtask of the multi-task, then also can not comprise the execution time in the executive condition of subtask, and include only the execution dependence that is set with correlator task and state thereof, promptly only limit the dependence of carrying out between each subtask.
Preferable, in order to improve the fault-tolerant ability of multitasking, the embodiment of the invention also provides the heavy treatment mechanism of makeing mistakes, pre-configured failure retry interval and maximum reattempt times, and the number of retries of each included each subtask of task is also write down in the multitask tabulation, subtask for carrying out status of fail also comprises following treatment step:
According to the failure retry interval of configuration, control is carried out the subtask of status of fail and is reruned on XM, and upgrades the number of retries of this subtask of record in the multitask tabulation, until the operation success or reach the maximum reattempt times of configuration.
If carrying out the subtask of status of fail reruns by several times, finally move successfully, then reached the purpose that improves the multitasking fault-tolerant ability, reached the maximum reattempt times of configuration if rerun by several times in the subtask of execution status of fail, then this method also can comprise:
Report the alarm information of multitasking failure, and carry the information of the subtask of this executions status of fail, for example title of subtask, sign or number, or the like.
By report and alarm message, can the real-time report multitasking failure, get rid of thereby in time carry out fault, and provide effective foundation for localization of fault.
Further, if waiting task is more in the multitasking process, then need simultaneously treated subtask just many, at least two XM are set in the embodiment of the invention, be used to move each subtask, and each XM taked the treatment mechanism of load balancing, specifically comprise:
Exist when satisfying the subtask of executive condition when monitoring,, control this subtask and on the XM of the current minimum number of moving the subtask, move according to the current quantity of moving the subtask on each XM.
In the embodiment of the invention, the tabulation of monitoring multitask in real time, when monitoring the subtask of satisfying executive condition, the control XM is moved this subtask, if success is all moved in each included subtask of each task in the multitask tabulation, then final this multitasking moves successfully, can generate the form of each task; And if failure is repeatedly moved in certain subtask, reached maximum reattempt times, cause report and alarm information, then whole multitasking operation failure, flow process is ended.
Based on same technical conceive, the embodiment of the invention provides a kind of multitasking device, as shown in Figure 2, comprises memory module 201, monitoring modular 202 and processing module 203, wherein:
Memory module 201 is used to store the multitask tabulation, the state and the executive condition of each included each subtask of task of wherein multitask list records;
Monitoring modular 202 is used for monitoring in real time multitask tabulation, and when monitor triggering processing module 203 when having the subtask of satisfying executive condition according to the state of each subtask and executive condition;
Processing module 203 is used to control this subtask and moves on XM.
Wherein, the state of subtask comprise not executing state, just at executing state, the state and carry out status of fail of running succeeded, then
Processing module 203, the original state that also is used for the subtask is set to not executing state, when the subtask begins to move on XM, the state of this subtask is updated to just in executing state by executing state not; After the subtask is moved successfully on XM, with the state of this subtask by just being updated to the state of running succeeded in executing state; When failure is moved in the subtask on XM after, with the state of this subtask by just being updated to the execution status of fail in executing state.
Preferable, the execution dependence that executive condition comprises the execution time and is set with correlator task and state thereof, then according to the state and the executive condition of above-mentioned subtask, a kind of possibility structure of monitoring modular 202, as shown in Figure 3, comprise real-time monitoring means 301 and identifying unit 302, wherein:
Monitoring means 301 is used for monitoring in real time the multitask tabulation in real time;
Judge subelement 302, be used for satisfying the execution time of subtask for not executing state, current time, and when satisfying the state of setting, trigger processing module 203 according to the execution dependence correlator task of subtask at the state of subtask.
Preferable, the number of retries of each included each subtask of task is also write down in the multitask tabulation, processing module 203, also be used for failure retry interval according to configuration, control is carried out the subtask of status of fail and is reruned on XM, and upgrade the number of retries of record in the multitask tabulation, until the operation success or reach the maximum reattempt times of configuration.
Preferable, this multitasking device also can comprise alarm module 204, wherein:
Processing module 203 triggers alarm module 204 when also being used for reaching the maximum reattempt times of configuration in the subtask of carrying out status of fail;
Alarm module 204 is used to report the alarm information of multitasking failure, and carries the information of the subtask of this execution status of fail.
This multitasking device also can comprise:
Monitoring maintenance module 205, be used to monitor the state of each subtask, from storage unit 201, obtain the subtask quantity of each state and return to this user according to user's query requests, and report the current quantity of moving the subtask on each XM to processing module 203.
In order to realize the load balancing of each subtask at least two XM, processing module 203, be used for according to the current quantity of moving the subtask on each XM, the subtask that executive condition is satisfied in control is moved on the XM of the current minimum number of moving the subtask.
Be the multitasking scheme that the example explanation embodiment of the invention provides with regularly entering an item of expenditure in the accounts of mobile communication system below.Regularly entering an item of expenditure in the accounts needs to carry out " processing of entering an item of expenditure in the accounts " and " arrearage processing " two tasks, wherein " processing of entering an item of expenditure in the accounts " comprise " generating synchronous bill ", " generate in the middle of bill ", " exclusive monthly fee is shared ", " generation result set " four subtasks, each subtask is by independently process realization, and each included subtask of " processing of entering an item of expenditure in the accounts " needs carry out successively according to the order of " generating synchronous bill ", " bill in the middle of generating ", " exclusive monthly fee is shared ", " generation result set "." arrearage processing " comprises " historical arrearage bill backup ", " historical arrearage divides aging ", " of that month arrearage importing " three subtasks, each included subtask of " arrearage processing " needs to carry out successively according to the order of " historical arrearage bill backup ", " historical arrearage divides aging ", " of that month arrearage importing ", and the execution of " of that month arrearage importing " needs the successful execution of interdependent " processing of entering an item of expenditure in the accounts " included " bill in the middle of generating " subtask.Then storage multitask tabulation in storage unit in advance, the state and the executive condition of each included each subtask of task of multitask list records, the i.e. state and the executive condition of " processing of entering an item of expenditure in the accounts " and " arrearage processing " two each subtasks that task is included, the execution dependence that executive condition comprises the execution time and is set with correlator task and state thereof.For example at " processing of entering an item of expenditure in the accounts " included subtask " exclusive monthly fee is shared ", its executive condition is set is every month 3:00 on the 3rd or be later than this time, and is provided with that to carry out dependence be the state of running succeeded for the state of " bill in the middle of generating "; At " arrearage processing " included subtask " of that month arrearage importing ", its executive condition is set is every month 3:30 on the 3rd or be later than this time, and is provided with and carries out dependence and be the state of running succeeded for " bill in the middle of generating " and the state of " historical arrearage divides aging ".
Be that example is elaborated with the treatment scheme of the included subtask " of that month arrearage importing " of the treatment scheme of " processing of entering an item of expenditure in the accounts " included subtask " exclusive monthly fee is shared " and " arrearage processing " respectively below.
The treatment scheme of the subtask " exclusive monthly fee is shared " that " processing of entering an item of expenditure in the accounts " is included as shown in Figure 4, comprises step:
S400, monitoring modular are monitored the multitask tabulation of storing in the memory module in real time;
S401, monitoring module monitors were 3:00 on the 3rd or are later than this time to the current time, promptly satisfied the execution time of " exclusive monthly fee is shared ", and the state of " exclusive monthly fee is shared " is executing state not, then continued execution S402;
It is pointed out that whether monitoring modular monitoring in real time always has the subtask of satisfying executive condition, and present embodiment is that example describes with the treatment scheme of " exclusive monthly fee is shared " subtask only, and other subtask is repeated no more;
S402, monitoring modular judge whether the state of " generating the centre bill " subtask before execution sequence is in " exclusive monthly fee is shared " subtask in " processings of entering an item of expenditure in the accounts " task is the state of running succeeded, if, then carry out S403, if not, then return and carry out S400;
S403, monitoring modular trigger processing module, processing module is moved on the XM of the current minimum number of moving the subtask according to the principle of load balancing control " exclusive monthly fee is shared " subtask, in the multitask tabulation state of " exclusive monthly fee is shared " subtask is updated to just in executing state by executing state not simultaneously;
S404, processing module judge whether " exclusive monthly fee is shared " subtask moves success on XM, if, then continue to carry out S405, if, then carry out S406 owing to failure is moved in reason " exclusive monthly fee is shared " subtasks such as system is busy on XM;
S405, processing module in the multitask tabulation with the state of " exclusive monthly fee is shared " subtask by just being updated to the state of running succeeded in executing state, and the working procedure of this subtask is normally withdrawed from XM;
So far " exclusive monthly fee is shared ", the subtask completed successfully, for the execution of its follow-up each subtask lays the first stone;
S406, processing module in the multitask tabulation with the state of " exclusive monthly fee is shared " subtask by just being updated to the execution status of fail in executing state;
S407, processing module are according to the failure retry interval that disposes, and after through failure retry interval official hour section, the number of retries with " exclusive monthly fee is shared " subtask in the multitask tabulation adds 1;
S408, processing module judge whether the number of retries of " exclusive monthly fee is shared " subtask reaches the maximum reattempt times of configuration, if, then carry out S409, if not, then return and carry out S403;
S409, processing module trigger alarm module, and alarm module reports the alarm information of multitasking failure;
So far, whole multitasking flow process is moved owing to " exclusive monthly fee is shared " subtask fails and is finished (termination).
The treatment scheme of the subtask " of that month arrearage importing " that " arrearage processing " is included as shown in Figure 5, comprises step:
S500, monitoring modular are monitored the multitask tabulation of storing in the memory module in real time;
S501, monitoring module monitors were 3:30 on the 3rd or are later than this time to the current time, promptly satisfied the execution time of " of that month arrearage importing ", and the state of " of that month arrearage importing " is executing state not, then continued execution S502;
It is pointed out that whether monitoring modular monitoring in real time always has the subtask of satisfying executive condition, and present embodiment is that example describes with the treatment scheme of " of that month arrearage importing " subtask only, and other subtask is repeated no more;
S502, monitoring modular judge whether the state of " generation centre bill " subtask that the state of " historical arrearage the divides aging " subtask before execution sequence is in " of that month arrearage importing " subtask in " arrearage processings " task and " processings of entering an item of expenditure in the accounts " task are included is the state of running succeeded, if, then carry out S503, if not, then return execution S500;
S503, monitoring modular trigger processing module, processing module is moved on the XM of the current minimum number of moving the subtask according to the principle of load balancing control " of that month arrearage importing " subtask, in the multitask tabulation state of " of that month arrearage importing " subtask is updated to just in executing state by executing state not simultaneously;
S504, processing module judge whether " of that month arrearage importing " subtask moves success on XM, if, then continue to carry out S505, if, then carry out S506 owing to failure is moved in reason " of that month arrearage importing " subtasks such as system is busy on XM;
S505, processing module in the multitask tabulation with the state of " of that month arrearage importing " subtask by just being updated to the state of running succeeded in executing state, and the working procedure of this subtask is normally withdrawed from XM;
So far " of that month arrearage importing " subtask completes successfully, for the execution of its follow-up each subtask lays the first stone;
S506, processing module in the multitask tabulation with the state of " of that month arrearage importing " subtask by just being updated to the execution status of fail in executing state;
S507, processing module are according to the failure retry interval that disposes, and after through failure retry interval official hour section, the number of retries with " of that month arrearage importing " subtask in the multitask tabulation adds 1;
S508, processing module judge whether " of that month arrearage importing " number of retries of subtask reaches the maximum reattempt times of setting, if, then carry out S509, if not, then return and carry out S503;
S509, processing module trigger alarm module, and alarm module reports the alarm information of multitasking failure;
So far, whole multitasking flow process is moved owing to " of that month arrearage importing " subtask fails and is finished (termination).
Multi-task processing method that the embodiment of the invention provides and device have improved the maintainability and the fault-tolerant ability of multitasking, have solved the coordinated scheduling between the multitask and the heavily handling problem that makes mistakes, and have realized the load balancing of a plurality of XM.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (13)

1, a kind of multi-task processing method is characterized in that, comprising:
The tabulation of monitoring multitask in real time, the state and the executive condition of each included each subtask of task of described multitask list records;
Exist when satisfying the subtask of executive condition when monitoring, control described subtask and on XM, move according to the state of each subtask and executive condition.
2, the method for claim 1 is characterized in that, the state of described subtask comprise not executing state, just in executing state, state and carry out status of fail runs succeeded; The execution dependence that described executive condition comprises the execution time and is set with correlator task and state thereof;
Describedly satisfy executive condition and comprise:
The state of subtask satisfies execution time of subtask for not executing state, current time, and satisfies the state of setting according to the described correlator task of the execution dependence of subtask.
3, method as claimed in claim 2 is characterized in that,
The original state of subtask is executing state not;
When the subtask began to move on XM, the state of this subtask was updated to just in executing state by executing state not;
After the subtask was moved successfully on XM, the state of this subtask was by just being updated to the state of running succeeded in executing state;
When failure was moved in the subtask on XM after, the state of this subtask was by just being updated to the execution status of fail in executing state.
4, method as claimed in claim 3 is characterized in that, the number of retries of each included each subtask of task is also write down in described multitask tabulation, and described method also comprises:
According to the failure retry interval of configuration, control is carried out the subtask of status of fail and is reruned on XM, and upgrades the number of retries of this subtask of record in the multitask tabulation, until the operation success or reach the maximum reattempt times of configuration.
5, method as claimed in claim 4 is characterized in that, also comprises:
If the subtask of carrying out status of fail reaches the maximum reattempt times of configuration, then report the alarm information of multitasking failure, and carry the information of the subtask of this execution status of fail.
6, as the arbitrary described method of claim 1 to 5, it is characterized in that described XM comprises at least two; And
Described control subtask is moved on XM, specifically comprises:
According to the current quantity of moving the subtask on each XM, control described subtask and on the XM of the current minimum number of moving the subtask, move.
7, a kind of multitasking device is characterized in that, comprises memory module, monitoring modular and processing module, wherein:
Described memory module is used to store the multitask tabulation, the state and the executive condition of each included each subtask of task of described multitask list records;
Described monitoring modular is used for monitoring in real time multitask tabulation, and triggers described processing module when monitoring the subtask that existence satisfies executive condition according to the state of each subtask and executive condition;
Described processing module is used to control described subtask and moves on XM.
8, device as claimed in claim 7 is characterized in that, the state of described subtask comprise not executing state, just in executing state, state and carry out status of fail runs succeeded; The execution dependence that described executive condition comprises the execution time and is set with correlator task and state thereof; And
Described monitoring modular comprises real-time monitoring means and identifying unit, wherein:
Described real-time monitoring means is used for monitoring in real time the multitask tabulation;
Described identifying unit is used for satisfying the execution time of subtask at the state of subtask for not executing state, current time, and when satisfying the state of setting according to the described correlator task of the execution dependence of subtask, triggers described processing module.
9, device as claimed in claim 8 is characterized in that,
Described processing module, the original state that also is used for the subtask is set to not executing state, when the subtask begins to move on XM, the state of this subtask is updated to just in executing state by executing state not; After the subtask is moved successfully on XM, with the state of this subtask by just being updated to the state of running succeeded in executing state; When failure is moved in the subtask on XM after, with the state of this subtask by just being updated to the execution status of fail in executing state.
10, device as claimed in claim 9 is characterized in that, the number of retries of each included each subtask of task is also write down in described multitask tabulation; And
Described processing module, also be used for failure retry interval according to configuration, control is carried out the subtask of status of fail and is reruned on XM, and upgrades the number of retries of this subtask of record in the multitask tabulation, until the operation success or reach the maximum reattempt times of configuration.
11, device as claimed in claim 10 is characterized in that, also comprises alarm module, wherein:
Described processing module when also being used for reaching the maximum reattempt times of configuration in the subtask of carrying out status of fail, triggers described alarm module;
Described alarm module is used to report the alarm information of multitasking failure, and carries the information of the subtask of this execution status of fail.
12, the described device of claim 11 is characterized in that, also comprises:
The monitoring maintenance module, be used to monitor the state of each subtask, from described memory module, obtain the subtask quantity of each state and return to described user according to user's query requests, and report the current quantity of moving the subtask on each XM to described processing module.
13, as the arbitrary described device of claim 7 to 12, it is characterized in that,
Described processing module is used for according to the current quantity of moving the subtask on each XM, controls described subtask and moves on the XM of the current minimum number of moving the subtask, and described XM comprises at least two.
CNA200810224137XA 2008-10-24 2008-10-24 Multitasking method and device Pending CN101425024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810224137XA CN101425024A (en) 2008-10-24 2008-10-24 Multitasking method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810224137XA CN101425024A (en) 2008-10-24 2008-10-24 Multitasking method and device

Publications (1)

Publication Number Publication Date
CN101425024A true CN101425024A (en) 2009-05-06

Family

ID=40615657

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810224137XA Pending CN101425024A (en) 2008-10-24 2008-10-24 Multitasking method and device

Country Status (1)

Country Link
CN (1) CN101425024A (en)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101853182A (en) * 2010-05-05 2010-10-06 中兴通讯股份有限公司 Task execution method and device based on database
CN102214187A (en) * 2010-04-12 2011-10-12 阿里巴巴集团控股有限公司 Complex event processing method and device
CN103019651A (en) * 2012-08-02 2013-04-03 青岛海信传媒网络技术有限公司 Parallel processing method and device for complex tasks
CN103154894A (en) * 2010-09-21 2013-06-12 法国大陆汽车公司 Method for managing tasks in a microprocessor or in a microprocessor assembly
CN103164262A (en) * 2011-12-15 2013-06-19 阿里巴巴集团控股有限公司 Task management method and device
CN103197970A (en) * 2013-04-12 2013-07-10 中国银行股份有限公司 Method for triggering jobs with multiple mechanisms running and bank data processing system
CN103246945A (en) * 2012-02-07 2013-08-14 阿里巴巴集团控股有限公司 Business-based flow processing method and system
CN103763373A (en) * 2014-01-23 2014-04-30 浪潮(北京)电子信息产业有限公司 Method for dispatching based on cloud computing and dispatcher
WO2014134810A1 (en) * 2013-03-05 2014-09-12 Xiang Zhiyong Multitask execution method and device for microcontroller of electronic cigarette
CN105701257A (en) * 2016-03-31 2016-06-22 北京奇虎科技有限公司 Data processing method and device
CN105700937A (en) * 2016-01-04 2016-06-22 北京百度网讯科技有限公司 Multi-thread task processing method and device
CN106155806A (en) * 2015-04-14 2016-11-23 腾讯科技(深圳)有限公司 A kind of multi-task scheduling method and server
CN106227596A (en) * 2016-07-13 2016-12-14 百度在线网络技术(北京)有限公司 Mission Monitor method and apparatus for task scheduling server
CN106528275A (en) * 2015-09-10 2017-03-22 网易(杭州)网络有限公司 Processing method of data tasks and task scheduler
CN106844592A (en) * 2017-01-12 2017-06-13 无线生活(杭州)信息科技有限公司 A kind of databases comparison method and device
CN106959895A (en) * 2016-01-12 2017-07-18 阿里巴巴集团控股有限公司 The resource regulating method and system of quick release thread
CN106970834A (en) * 2017-01-20 2017-07-21 阿里巴巴集团控股有限公司 The method and device of task processing
CN107025224A (en) * 2016-01-29 2017-08-08 阿里巴巴集团控股有限公司 A kind of method and apparatus of monitor task operation
CN107025129A (en) * 2016-01-29 2017-08-08 腾讯科技(深圳)有限公司 A kind of data processing method and device
CN107124285A (en) * 2017-04-13 2017-09-01 中国联合网络通信集团有限公司 Expenditure presentation processing method and device based on communication
WO2017167021A1 (en) * 2016-03-28 2017-10-05 阿里巴巴集团控股有限公司 Abnormality monitoring method and device
CN107239327A (en) * 2016-03-29 2017-10-10 平安科技(深圳)有限公司 The optimization method and device of declaration form processing
CN107341051A (en) * 2016-05-03 2017-11-10 北京京东尚科信息技术有限公司 Cluster task coordination approach, system and device
CN107370612A (en) * 2016-05-12 2017-11-21 中兴通讯股份有限公司 A kind of Network Quality Management system detectio method for scheduling task, device
CN107967189A (en) * 2016-10-20 2018-04-27 南京途牛科技有限公司 Abnormal task retries method and device
CN108984333A (en) * 2017-05-31 2018-12-11 北京京东尚科信息技术有限公司 The method and device calculated in real time for big data
CN109684063A (en) * 2018-12-26 2019-04-26 亚信科技(中国)有限公司 A kind of method for scheduling task and device
CN109783210A (en) * 2018-12-13 2019-05-21 平安科技(深圳)有限公司 Multi-task processing method, device, computer equipment and storage medium
CN110321211A (en) * 2019-06-27 2019-10-11 上海数禾信息科技有限公司 Asynchronous schedule method and device for operation system
CN110941485A (en) * 2019-11-21 2020-03-31 网易(杭州)网络有限公司 Game task running method and device and electronic terminal
CN112685145A (en) * 2019-10-18 2021-04-20 上海哔哩哔哩科技有限公司 Task management method and device and computer equipment
CN112766750A (en) * 2021-01-25 2021-05-07 中国原子能科学研究院 Task model construction method and system
CN116070879A (en) * 2023-02-27 2023-05-05 北京时代凌宇数字技术有限公司 City management event dispatching method and device, electronic equipment and storage medium

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102214187B (en) * 2010-04-12 2017-03-01 阿里巴巴集团控股有限公司 Complex event processing method and device
CN102214187A (en) * 2010-04-12 2011-10-12 阿里巴巴集团控股有限公司 Complex event processing method and device
CN101853182A (en) * 2010-05-05 2010-10-06 中兴通讯股份有限公司 Task execution method and device based on database
CN103154894A (en) * 2010-09-21 2013-06-12 法国大陆汽车公司 Method for managing tasks in a microprocessor or in a microprocessor assembly
CN103154894B (en) * 2010-09-21 2016-08-31 法国大陆汽车公司 For the method managing the task in microprocessor or microprocessor components
CN103164262A (en) * 2011-12-15 2013-06-19 阿里巴巴集团控股有限公司 Task management method and device
CN103246945A (en) * 2012-02-07 2013-08-14 阿里巴巴集团控股有限公司 Business-based flow processing method and system
CN103019651A (en) * 2012-08-02 2013-04-03 青岛海信传媒网络技术有限公司 Parallel processing method and device for complex tasks
CN103019651B (en) * 2012-08-02 2016-06-29 青岛海信传媒网络技术有限公司 The method for parallel processing of complex task and device
WO2014134810A1 (en) * 2013-03-05 2014-09-12 Xiang Zhiyong Multitask execution method and device for microcontroller of electronic cigarette
CN103197970A (en) * 2013-04-12 2013-07-10 中国银行股份有限公司 Method for triggering jobs with multiple mechanisms running and bank data processing system
CN103763373A (en) * 2014-01-23 2014-04-30 浪潮(北京)电子信息产业有限公司 Method for dispatching based on cloud computing and dispatcher
CN106155806B (en) * 2015-04-14 2020-08-11 腾讯科技(深圳)有限公司 Multitask scheduling method and server
CN106155806A (en) * 2015-04-14 2016-11-23 腾讯科技(深圳)有限公司 A kind of multi-task scheduling method and server
CN106528275A (en) * 2015-09-10 2017-03-22 网易(杭州)网络有限公司 Processing method of data tasks and task scheduler
CN105700937A (en) * 2016-01-04 2016-06-22 北京百度网讯科技有限公司 Multi-thread task processing method and device
CN106959895A (en) * 2016-01-12 2017-07-18 阿里巴巴集团控股有限公司 The resource regulating method and system of quick release thread
CN107025224B (en) * 2016-01-29 2020-10-16 阿里巴巴集团控股有限公司 Method and equipment for monitoring task operation
CN107025129B (en) * 2016-01-29 2020-10-09 腾讯科技(深圳)有限公司 Data processing method and device
CN107025224A (en) * 2016-01-29 2017-08-08 阿里巴巴集团控股有限公司 A kind of method and apparatus of monitor task operation
CN107025129A (en) * 2016-01-29 2017-08-08 腾讯科技(深圳)有限公司 A kind of data processing method and device
WO2017167021A1 (en) * 2016-03-28 2017-10-05 阿里巴巴集团控股有限公司 Abnormality monitoring method and device
CN107241205A (en) * 2016-03-28 2017-10-10 阿里巴巴集团控股有限公司 abnormality monitoring method and device
CN107239327A (en) * 2016-03-29 2017-10-10 平安科技(深圳)有限公司 The optimization method and device of declaration form processing
CN105701257B (en) * 2016-03-31 2019-05-21 北京奇虎科技有限公司 Data processing method and device
CN105701257A (en) * 2016-03-31 2016-06-22 北京奇虎科技有限公司 Data processing method and device
CN107341051A (en) * 2016-05-03 2017-11-10 北京京东尚科信息技术有限公司 Cluster task coordination approach, system and device
CN107370612A (en) * 2016-05-12 2017-11-21 中兴通讯股份有限公司 A kind of Network Quality Management system detectio method for scheduling task, device
CN106227596A (en) * 2016-07-13 2016-12-14 百度在线网络技术(北京)有限公司 Mission Monitor method and apparatus for task scheduling server
CN107967189A (en) * 2016-10-20 2018-04-27 南京途牛科技有限公司 Abnormal task retries method and device
CN106844592A (en) * 2017-01-12 2017-06-13 无线生活(杭州)信息科技有限公司 A kind of databases comparison method and device
CN106970834A (en) * 2017-01-20 2017-07-21 阿里巴巴集团控股有限公司 The method and device of task processing
CN107124285A (en) * 2017-04-13 2017-09-01 中国联合网络通信集团有限公司 Expenditure presentation processing method and device based on communication
CN108984333A (en) * 2017-05-31 2018-12-11 北京京东尚科信息技术有限公司 The method and device calculated in real time for big data
CN109783210A (en) * 2018-12-13 2019-05-21 平安科技(深圳)有限公司 Multi-task processing method, device, computer equipment and storage medium
CN109783210B (en) * 2018-12-13 2023-10-20 平安科技(深圳)有限公司 Multitasking method, apparatus, computer device and storage medium
CN109684063A (en) * 2018-12-26 2019-04-26 亚信科技(中国)有限公司 A kind of method for scheduling task and device
CN110321211A (en) * 2019-06-27 2019-10-11 上海数禾信息科技有限公司 Asynchronous schedule method and device for operation system
CN110321211B (en) * 2019-06-27 2020-05-12 上海数禾信息科技有限公司 Asynchronous scheduling method and device for service system
CN112685145A (en) * 2019-10-18 2021-04-20 上海哔哩哔哩科技有限公司 Task management method and device and computer equipment
CN110941485A (en) * 2019-11-21 2020-03-31 网易(杭州)网络有限公司 Game task running method and device and electronic terminal
CN110941485B (en) * 2019-11-21 2022-11-08 网易(杭州)网络有限公司 Game task running method and device and electronic terminal
CN112766750A (en) * 2021-01-25 2021-05-07 中国原子能科学研究院 Task model construction method and system
CN116070879A (en) * 2023-02-27 2023-05-05 北京时代凌宇数字技术有限公司 City management event dispatching method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN101425024A (en) Multitasking method and device
US7440973B2 (en) Systems, methods and software for automating database tasks
CN100594498C (en) Mass data real time processing structure and real time need-based processing platform used for the structure
CN101923490B (en) Job scheduling apparatus and job scheduling method
CN110249310A (en) The resource management for virtual machine in cloud computing system
CN104040485A (en) PAAS hierarchial scheduling and auto-scaling
CN108614688A (en) Visualization application layout applied to mixing cloud environment and method
CN111338791A (en) Method, device and equipment for scheduling cluster queue resources and storage medium
CN107450491A (en) A kind of robot scheduling system, method, electronic equipment and storage medium
CN108009258A (en) It is a kind of can Configuration Online data collection and analysis platform
JP7179086B2 (en) Method for scheduling a semiconductor back end fab
CN107241380A (en) For the method and apparatus of the load balancing adjusted based on the time
CN102663543A (en) Scheduling system used for enterprise data unification platform
CN110611707A (en) Task scheduling method and device
CN109800080A (en) A kind of method for scheduling task based on Quartz frame, system and terminal device
CN107562528A (en) Support the blocking on-demand computing method and relevant apparatus of a variety of Computational frames
CN102508717A (en) Memory scheduling method and memory scheduling device for multi-core processor
CN103561092B (en) Method and device for managing resources under private cloud environment
US20160026735A1 (en) Method and system for managing data in a manufacturing execution system
JP7261859B2 (en) Method, apparatus and storage medium for reducing latency in man-machine interaction
CN115033375A (en) Distributed task scheduling method, device, equipment and storage medium in cluster mode
CN102511041A (en) Attributing causality to program execution capacity modifications and dynamically modifying program execution capacity
CN103019813A (en) Method for obtaining interactive strength of SaaS-based interactive program
GB2514585A (en) Task scheduler
CN110298549A (en) Project task processing method, device, equipment and the medium of airport passenger throughput

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090506