CN110298549A - Project task processing method, device, equipment and the medium of airport passenger throughput - Google Patents
Project task processing method, device, equipment and the medium of airport passenger throughput Download PDFInfo
- Publication number
- CN110298549A CN110298549A CN201910461149.2A CN201910461149A CN110298549A CN 110298549 A CN110298549 A CN 110298549A CN 201910461149 A CN201910461149 A CN 201910461149A CN 110298549 A CN110298549 A CN 110298549A
- Authority
- CN
- China
- Prior art keywords
- task
- terminal
- processing terminal
- project
- sent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000004590 computer program Methods 0.000 claims description 39
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000005194 fractionation Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 15
- 238000010586 diagram Methods 0.000 description 11
- 230000008569 process Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 239000000284 extract Substances 0.000 description 4
- 230000005055 memory storage Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000010365 information processing Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 210000004556 brain Anatomy 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The project task processing method based on airport passenger throughput that the present invention relates to a kind of, device, computer equipment and storage medium, the project task of server acquisition airport passenger throughput, it is sent to task distribution terminal, task distribution terminal determines the hierarchical relationship between multiple tasks processing terminal and each task processing terminal, project task is split layer by layer according to sequence from high to low based on hierarchical relationship, obtain multiple subtasks, the terminal iidentification of multiple subtasks and multiple tasks processing terminal is sent to server, multiple subtasks are sent to corresponding task processing terminal and handled by server.Project task can be split as multiple subtasks according to the hierarchical relationship of each task distribution terminal by the program, need not rely upon the specific working procedure of project task, it only need to carry out successively dividing according to hierarchical relationship specific between each task distribution terminal that task fractionation can be completed, and the task distribution terminal of being assigned to is handled, to improve the treatment effeciency of project task.
Description
Technical field
The present invention relates to airport engineering construction technique fields, appoint more particularly to a kind of project based on airport passenger throughput
Business processing method, project task processing unit, computer equipment and computer readable storage medium based on airport passenger throughput.
Background technique
Airport passenger throughput is usually huge and complicated engineering project, needs to coordinate in many ways and makes full use of information processing
Technology is to be more efficiently completed the construction task to airport engineering.Wherein, by the information processing technology can build for pair
The airport building item management system that airport building item is managed collectively, convenient for the work for projects portion, each Construction Party
It is cooperateed with, to improve airport construction.
And in the process of airport construction, need to be arranged according to the actual progress of engineering construction corresponding project task,
And corresponding responsible person is arranged to handle.And the task processing method that traditional technology provides is the construction being related to according to project task
The tasks such as component construction are distributed to respective handling people and handled by process, however this technology is easy since working procedure is more
And cause task distribution that can also be unfavorable for carrying out project task by scattered distribution, to reduce the efficiency of project task processing
Control.
Summary of the invention
Based on this, it is necessary to for the lower technical problem of the efficiency of traditional technology processing item task, provide a kind of base
It is set in the project task processing method, the project task processing unit based on airport passenger throughput, computer of airport passenger throughput
Standby and computer readable storage medium.
A kind of project task processing method based on airport passenger throughput is applied to server, comprising steps of
Obtain the project task of airport passenger throughput;
The project task is sent to task distribution terminal, determines multiple tasks for triggering the task distribution terminal
Processing terminal, and obtain the hierarchical relationship between the multiple task processing terminal, is based on described hierarchical relationship, according to from height
The project task is split layer by layer to low hierarchic sequence, obtains multiple subtasks;Wherein, the multiple subtask point
It is not corresponding with the multiple task processing terminal;
Receive the terminal mark of multiple subtasks and the multiple task processing terminal that the task distribution terminal is sent
Know;
According to the terminal iidentification, the multiple subtask is sent to corresponding task processing terminal and is handled.
A kind of project task processing method based on airport passenger throughput is applied to terminal, comprising steps of
Receive the project task that server is sent;The project task is the airport passenger throughput that the server obtains
Project task;
It determines multiple tasks processing terminal, and obtains the hierarchical relationship between the multiple task processing terminal;
Based on described hierarchical relationship, the project task is split layer by layer according to hierarchic sequence from high to low, is obtained
To multiple subtasks;Wherein, the multiple subtask is corresponding with the multiple task processing terminal respectively;
The terminal iidentification of the multiple subtask and the multiple task processing terminal is sent to the server, is used for
The server is triggered according to the terminal iidentification, the multiple subtask is sent at corresponding task processing terminal
Reason.
A kind of project task processing unit based on airport passenger throughput is applied to server, comprising:
Task acquisition module, for obtaining the project task of airport passenger throughput;
First task splits module, for the project task to be sent to task distribution terminal, for triggering described appoint
Business distribution terminal determines multiple tasks processing terminal, and obtains the hierarchical relationship between the multiple task processing terminal, base
In described hierarchical relationship, the project task is split according to hierarchic sequence from high to low layer by layer, obtains multiple sons and appoint
Business;Wherein, the multiple subtask is corresponding with the multiple task processing terminal respectively;
Subtask receiving module, for receiving multiple subtasks that the task distribution terminal is sent and the multiple
The terminal iidentification of task processing terminal;
First task processing module, for according to the terminal iidentification, the multiple subtask to be sent to corresponding appoint
Business processing terminal is handled.
A kind of project task processing unit based on airport passenger throughput is applied to terminal, comprising:
Task receiving module, for receiving the project task of server transmission;The project task is airport passenger throughput
Project task;
Terminal deciding module for determining multiple tasks processing terminal, and obtains between the multiple task processing terminal
Hierarchical relationship;
Second task splits module, for being based on described hierarchical relationship, according to hierarchic sequence from high to low by the item
Mesh task is split layer by layer, obtains multiple subtasks;Wherein, the multiple subtask is whole with the processing of the multiple task respectively
It holds corresponding;
Second task processing module, for by the terminal iidentification of the multiple subtask and the multiple task processing terminal
It is sent to the server, for triggering the server according to the terminal iidentification, the multiple subtask is sent to phase
The task processing terminal answered is handled.
A kind of computer equipment, including processor and memory, the memory are stored with computer program, the processing
Device realizes following steps when executing the computer program:
Obtain the project task of airport passenger throughput;The project task is sent to task distribution terminal, for triggering
The task distribution terminal determines multiple tasks processing terminal, and the level obtained between the multiple task processing terminal is closed
System is based on described hierarchical relationship, splits the project task layer by layer according to hierarchic sequence from high to low, obtain multiple
Subtask;Wherein, the multiple subtask is corresponding with the multiple task processing terminal respectively;Receive the task distribution eventually
Hold the terminal iidentification of the multiple subtasks and the multiple task processing terminal that send;It, will be described according to the terminal iidentification
Multiple subtasks are sent to corresponding task processing terminal and are handled.
A kind of computer equipment, including processor and memory, the memory are stored with computer program, the processing
Device realizes following steps when executing the computer program:
Receive the project task that server is sent;The project task is the airport passenger throughput that the server obtains
Project task;It determines multiple tasks processing terminal, and obtains the hierarchical relationship between the multiple task processing terminal;Based on institute
Hierarchical relationship is stated, the project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Its
In, the multiple subtask is corresponding with the multiple task processing terminal respectively;By the multiple subtask and the multiple
The terminal iidentification of task processing terminal is sent to the server, for triggering the server according to the terminal iidentification, incites somebody to action
The multiple subtask is sent to corresponding task processing terminal and is handled.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
Following steps are realized when row:
Obtain the project task of airport passenger throughput;The project task is sent to task distribution terminal, for triggering
The task distribution terminal determines multiple tasks processing terminal, and the level obtained between the multiple task processing terminal is closed
System is based on described hierarchical relationship, splits the project task layer by layer according to hierarchic sequence from high to low, obtain multiple
Subtask;Wherein, the multiple subtask is corresponding with the multiple task processing terminal respectively;Receive the task distribution eventually
Hold the terminal iidentification of the multiple subtasks and the multiple task processing terminal that send;It, will be described according to the terminal iidentification
Multiple subtasks are sent to corresponding task processing terminal and are handled.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
Following steps are realized when row:
Receive the project task that server is sent;The project task is the airport passenger throughput that the server obtains
Project task;It determines multiple tasks processing terminal, and obtains the hierarchical relationship between the multiple task processing terminal;Based on institute
Hierarchical relationship is stated, the project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Its
In, the multiple subtask is corresponding with the multiple task processing terminal respectively;By the multiple subtask and the multiple
The terminal iidentification of task processing terminal is sent to the server, for triggering the server according to the terminal iidentification, incites somebody to action
The multiple subtask is sent to corresponding task processing terminal and is handled.
Above-mentioned project task processing method, device, computer equipment and storage medium based on airport passenger throughput, service
Device obtains the project task of airport passenger throughput, and is sent to task distribution terminal, and task distribution terminal determines at multiple tasks
Terminal is managed, and obtains the hierarchical relationship between each task processing terminal, the hierarchical relationship is based on, according to sequence from high to low
Project task is split layer by layer, thus obtain corresponding respectively to multiple subtasks of multiple tasks processing terminal, this is more
The terminal iidentification of a subtask and multiple tasks processing terminal is sent to server, and server is according to the terminal iidentification by multiple sons
Task is sent to corresponding task processing terminal and is handled.The program can distribute a project task according to each task
Hierarchical relationship between terminal is split as corresponding multiple subtasks, needs not rely upon specific working procedure in project task,
Only according to height hierarchical relationship specific between each task distribution terminal need to successively divide and tearing open for project task can be completed
Point, the subtask distributed is finally assigned to each task distribution terminal and is handled, to improve the processing of project task
Efficiency also helps the project task executed to each task distribution terminal and manages.
Detailed description of the invention
Fig. 1 is the application scenario diagram of the project task processing method based on airport passenger throughput in one embodiment;
Fig. 2 is the flow diagram of the project task processing method based on airport passenger throughput in one embodiment;
Fig. 3 is the flow diagram of the project task processing method based on airport passenger throughput in another embodiment;
Fig. 4 is the structural block diagram of the project task processing unit based on airport passenger throughput in one embodiment;
Fig. 5 is the structural block diagram of the project task processing unit based on airport passenger throughput in another embodiment;
Fig. 6 is the internal structure chart of computer equipment in one embodiment;
Fig. 7 is the internal structure chart of computer equipment in another embodiment.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the present invention, not
For limiting the present invention.
" first second " is only to distinguish similar object it should be noted that term involved in the embodiment of the present invention,
The particular sorted for object is not represented, it is possible to understand that ground, " first second " can be interchanged specific suitable in the case where permission
Sequence or precedence.It should be understood that the object that " first second " is distinguished is interchangeable under appropriate circumstances, so that described herein
The embodiment of the present invention can be performed in other sequences than those illustrated or described herein.
Project task processing method provided by the invention based on airport passenger throughput, can be applied to as shown in Figure 1
In application scenarios, Fig. 1 is the application scenario diagram of the project task processing method based on airport passenger throughput in one embodiment, should
Application scenarios may include terminal 100 and server 200, and terminal 100 can pass through network connection to server 200, wherein eventually
End 100 may include task distribution terminal 110 and multiple tasks processing terminal, and task distribution terminal 110 and multiple tasks are handled
Terminal can be communicatively coupled with server 200 by network respectively, and task distribution terminal 110 is mainly to project task at end
It is allocated in end 100, such as project task is distributed into task processing terminal 121, task processing terminal 132 etc., with
These task processing terminals are made to handle corresponding task, it should be noted that task distribution terminal 110 can also be used as it in itself
In a task processing terminal.
Specifically, the project task of the available airport passenger throughput of server 200, which can be by user
It is arranged and stored in the database of server 200, the project task stored in server 200 can be multiple, difference
Corresponding to different airport passenger throughputs.The project task can be sent to task distribution terminal 110 and be divided by server 200
Match, task distribution terminal 110 receives the project task, and multiple tasks processing terminal can be determined in terminal 100, and obtain
The hierarchical relationship between these task processing terminals is taken, hierarchical relationship is then based on, according to the level from high-level to low-level
Sequentially, project task is split layer by layer, obtains multiple subtasks, wherein each subtask corresponds respectively to multiple tasks
Processing terminal.Then, task distribution terminal 110 is by the multiple subtasks split and the terminal of each task processing terminal
Mark is sent to server 200, and multiple subtasks are sent to corresponding task and handled eventually by server 200 according to terminal iidentification
End is handled.
Wherein, terminal 100 can be, but not limited to be various personal computers, laptop, smart phone and plate electricity
Brain, server 200 can be realized with the server cluster of the either multiple server compositions of independent server.
In one embodiment, a kind of project task processing method based on airport passenger throughput is provided, with reference to Fig. 2,
Fig. 2 is the flow diagram of the project task processing method based on airport passenger throughput in one embodiment, is applied in this way
Be illustrated for server 200 in Fig. 1, should project task processing method based on airport passenger throughput may include with
Lower step:
Step S101 obtains the project task of airport passenger throughput.
In this step, server 200 can extract the airport passenger throughput that user presets and stores from database
Project task, and the type of project task has very much, such as document uploads task, item is acted on behalf in progress queries task, meeting
Query task and the building task dispatching of airport BIM model etc..Wherein, user can log on to the server by corresponding terminal
Corresponding project task is inquired or is handled in 200 creations.
Project task is sent to task distribution terminal by step S102, determines multiple for triggering task distribution terminal
It is engaged in processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminals, hierarchical relationship is based on, according to from high to low
Hierarchic sequence is split project task layer by layer, obtains multiple subtasks;Wherein, multiple subtasks respectively with the multiple
Business processing terminal is corresponding.
In this step, server 200 is sent to task distribution terminal after obtaining project task, by the project task
110, as shown in Figure 1, being typically provided with a task distribution terminal 110, in terminal 100 convenient for carrying out unification to project task
Distribution.And task distribution terminal 110 can be used for after receiving project task according to the determination of the specifying information of the project task
The quantity of the task processing terminal of the project task is handled, such as task distribution terminal 110 can be according to the pre- of the project task
Deadline phase, project task the information such as difficulty assessment determine multiple tasks processing terminal, then obtain the processing of these tasks
Hierarchical relationship between terminal.Wherein, terminal 100 includes multiple terminals, such as task distribution terminal 110, task processing terminal
121, task processing terminal 132 etc., and there is certain hierarchical relationship between these terminals, task distribution terminal 110 is to use
In the terminal of distribution task, it is usually located at highest level, as shown in Figure 1, task processing terminal 121 and task processing terminal 122
Belong to next level of task distribution terminal 110, and so on it can be seen that the terminal of the terminal 100 including three levels, and
Task distribution terminal 110 can be according to the hierarchical relationship between each task processing terminal, by project task according to from high to low
Hierarchic sequence split layer by layer, until be divided into lowest hierarchical level, obtain multiple subtasks, each subtask corresponds respectively to
Different task processing terminal, to pass through the distribution of 110 finished item task of task distribution terminal.
Step S103 receives the terminal of multiple subtasks and multiple tasks processing terminal that task distribution terminal is sent
Mark.
This step mainly task distribution terminal 110 completed in step S102 the division layer by layer of project task with
Afterwards, the terminal iidentification of ready-portioned multiple subtasks and multiple tasks processing terminal is sent jointly into server 200.Its
In, task distribution terminal 110 can extract the terminal mark of each task processing terminal after dividing a lot of subtask
Know, is then sent to server 200.
Multiple subtasks are sent to corresponding task processing terminal and handled by step S104 according to terminal iidentification.
In this step, server 200 is in the terminal iidentification for receiving the transmission of task distribution terminal 110 and multiple subtasks
After, according to terminal iidentification corresponding with each task processing terminal, each subtask is respectively allocated to corresponding task
Processing terminal, so that each task processing terminal handles the task of distribution.
The above-mentioned project task processing method based on airport passenger throughput, task distribution terminal determine multiple tasks processing eventually
End, and obtains the hierarchical relationship between each task processing terminal, is based on the hierarchical relationship, according to sequence from high to low by item
Mesh task is split layer by layer, to obtain corresponding respectively to multiple subtasks of multiple tasks processing terminal, by multiple son
The terminal iidentification of task and multiple tasks processing terminal is sent to server, and server is according to the terminal iidentification by multiple subtasks
Corresponding task processing terminal is sent to be handled.The program can be by a project task according to each task distribution terminal
Between hierarchical relationship be split as corresponding multiple subtasks, need not rely upon specific working procedure in project task, only need
It carries out successively dividing the fractionation that project task can be completed according to height hierarchical relationship specific between each task distribution terminal, most
The subtask distributed each task distribution terminal is assigned to afterwards to handle, so that the treatment effeciency of project task is improved,
The project task for executing each task distribution terminal is also helped to manage.
In one embodiment, project task is sent to task distribution terminal in step S102, is further used for touching
Hair task distribution terminal obtains the historic task treatment effeciency of each task processing terminal in current level, is handled according to historic task
Efficiency determines that task distributes weight, and task based access control distributes weight, project task to be allocated in current level is distributed to accordingly
Task processing terminal.
As shown in Figure 1, the present embodiment is mainly that project task is being distributed to each task processing by task distribution terminal 110
When terminal, the task treatment effeciency in conjunction with each task processing terminal is needed to carry out the division of task.And due to project task
Division successively divide, that is to say, that project task division is first carried out in current level, then again based on dividing
Current level to next level carry out task division.For example, task distribution terminal 110 carries out task stroke in second layer grade
Point, as task processing terminal 121 and task processing terminal 122 distribute subtask, at this point, if equal proportion draws project task
Task processing terminal 121 and task processing terminal 122 are given to complete, then is easy to cause due to treatment effeciency whole
Project schedule slows down.Based on this, the present embodiment is when current level (such as the second level) carries out task division, task distribution
Terminal 110 first obtains the historic task treatment effeciency of each task processing terminal of current level, the historic task treatment effeciency
Can store in server 200, task distribution terminal 110 can to server 200 send treatment effeciency acquisition request with
The historic task treatment effeciency for obtaining corresponding task processing terminal is then based on the historic task treatment effeciency and determines that task is distributed
Weight can distribute more tasks generally for the high task processing terminal for the treatment of effeciency, i.e. task distribution weight is bigger, most
Weight is distributed based on the task afterwards, project task to be allocated in current level is distributed into corresponding task processing terminal, is lifted
For example, if the task of task processing terminal 121 and task processing terminal 122 distribution weight is 1:4, current level is waited for
20% project task in the project task of distribution is distributed as subtask to task processing terminal 121, and remaining 80%
Distribute to task processing terminal 122.And after the task of the second level divides completion, it can be with task based access control processing terminal 121
20% project task be allocated in the task processing terminal 131 and task processing terminal 132 of third level, task
The concrete form of division be then referred in the second level based on the historic task treatment effeciency of corresponding task processing terminal into
Row divides, and completes so that the corresponding subtask of the task processing terminal of three levels divides.The scheme of the present embodiment can combine
The historic task treatment effeciency of the task processing terminal of current level carries out the division of project task, can further increase project
The treatment effeciency of task.
In one embodiment, the corresponding task processing terminal that is sent to multiple subtasks in step S104 carries out
After the step of processing, can also include:
Receive the task performance of first task processing terminal feedback;It is determined at first task according to hierarchical relationship
Manage the second task processing terminal of a level in terminal;Task performance is sent at the second task processing terminal and task
Manage terminal.
The present embodiment is mainly that the task performance that task processing terminal is fed back can be sent to accordingly by server 200
Terminal.Specifically, server 200 is after sending subtask to each task processing terminal, and each task processing is eventually
End can feed back inter-related task performance, whether such as task schedule needs to assist in the process that subtask is handled
Etc..Wherein, task performance can be sent to server 200 by first task processing terminal, and server 200 is receiving
After the task performance of first task processing terminal feedback, the hierarchical relationship of each task processing terminal is obtained, so as to
The second task processing terminal in a level on the first task processing terminal is determined according to the hierarchical relationship, such as Fig. 1 institute
Show, if first task processing terminal is 131, then the second task processing terminal is 121.Then, server 200 can will be first
The task performance of business processing terminal feedback is sent to the second task processing terminal, and whole for the ease of carrying out to project task
The task performance that the first task processing terminal is fed back can also be sent at task by body control, server 200 simultaneously
Manage terminal 110.It subtask or needs to report in this way, having any problem or having been completed in processing subtask when task processing terminal
When task processing progress, corresponding terminal can be sent to by server 200, so as on the whole to project task
It is managed, also helps and resource is coordinated according to task execution situation, to improve the treatment effeciency of project task.
In one embodiment, a kind of project task processing method based on airport passenger throughput is additionally provided, with reference to figure
3, Fig. 3 be the flow diagram of the project task processing method based on airport passenger throughput in another embodiment, in this way
It, should the project task processing method based on airport passenger throughput applied to being illustrated for the task distribution terminal 110 in Fig. 1
It may comprise steps of:
Step S401 receives the project task that server is sent;The project task is the airport construction work that server obtains
The project task of journey.
This step, server 200 can extract user from database and preset and the airport passenger throughput that stores
Project task, and the type of project task has very much, such as document uploads task, progress queries task, meeting charg`e d'affaires's item and looks into
Inquiry task and the building task dispatching of airport BIM model etc..Wherein, user can log on to the server by corresponding terminal
Corresponding project task is inquired or is handled in 200 creations.Server 200 sends the project task after obtaining project task
To task distribution terminal 110.
Step S402 determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal.
Step S403 is based on hierarchical relationship, splits project task layer by layer according to hierarchic sequence from high to low, obtain
To multiple subtasks;Wherein, multiple subtasks are corresponding with multiple tasks processing terminal respectively.
For above-mentioned steps S402 and step S403, mainly task distribution terminal 110 is allocated place to project task
Reason.With reference to Fig. 1, a task distribution terminal 110 is typically provided in terminal 100, convenient for carrying out unified point to project task
Match.And task distribution terminal 110 can be determined according to the specifying information of the project task for locating after receiving project task
The quantity of the task processing terminal of the project task is managed, such as task distribution terminal 110 can be according to the expection of the project task
Deadline, project task the information such as difficulty assessment determine multiple tasks processing terminal, then obtain the processing of these tasks eventually
Hierarchical relationship between end.Wherein, terminal 100 include multiple terminals, as task distribution terminal 110, task processing terminal 121,
Task processing terminal 132 etc., and there is certain hierarchical relationship between these terminals, task distribution terminal 110 is for dividing
Terminal with task, is usually located at highest level, as shown in Figure 1, task processing terminal 121 and task processing terminal 122 belong to
Next level of task distribution terminal 110, and so on it can be seen that the terminal of the terminal 100 including three levels, and task
Distribution terminal 110 can be according to the hierarchical relationship between each task processing terminal, by project task according to layer from high to low
Grade sequence is split layer by layer, until being divided into lowest hierarchical level, obtains multiple subtasks, each subtask corresponds respectively to difference
Task processing terminal, to pass through the distribution of 110 finished item task of task distribution terminal.
The terminal iidentification of multiple subtasks and multiple tasks processing terminal is sent to server, for touching by step S404
Server is sent out according to the terminal iidentification, multiple subtasks are sent to corresponding task processing terminal and are handled.
After task distribution terminal 110 completes the division layer by layer of project task, by ready-portioned multiple subtasks with
And the terminal iidentification of multiple tasks processing terminal sends jointly to server 200.Wherein, task distribution terminal 110 can drawn
Divide after a lot of subtask, extracts the terminal iidentification of each task processing terminal, be then sent to server 200.Service
Device 200 receive task distribution terminal 110 transmission terminal iidentification and multiple subtasks after, according to at each task
The corresponding terminal iidentification of terminal is managed, each subtask is respectively allocated to corresponding task processing terminal, so that each task
Processing terminal handles the task of distribution.
The above-mentioned project task processing method based on airport passenger throughput, can be by a project task according to each task
Hierarchical relationship between distribution terminal is split as corresponding multiple subtasks, needs not rely upon work of specifically constructing in project task
Sequence, successively division need to be only carried out according to height hierarchical relationship specific between each task distribution terminal can be completed project task
It splits, the subtask distributed is finally assigned to each task distribution terminal and is handled, to improve the place of project task
Efficiency is managed, the project task executed to each task distribution terminal is also helped and manages.
In one embodiment, project task being torn open layer by layer according to hierarchic sequence from high to low in step S403
Point the step of may include:
Obtain the historic task treatment effeciency of each task processing terminal in current level;It is true according to historic task treatment effeciency
Determine task distribution weight;Weight is distributed according to task, project task to be allocated in current level is split.
As shown in Figure 1, the present embodiment is mainly that project task is being distributed to each task processing by task distribution terminal 110
When terminal, the task treatment effeciency in conjunction with each task processing terminal is needed to carry out the division of task.And due to project task
Division successively divide, that is to say, that project task division is first carried out in current level, then again based on dividing
Current level to next level carry out task division.For example, task distribution terminal 110 carries out task stroke in second layer grade
Point, as task processing terminal 121 and task processing terminal 122 distribute subtask, at this point, if equal proportion draws project task
Task processing terminal 121 and task processing terminal 122 are given to complete, then is easy to cause due to treatment effeciency whole
Project schedule slows down.Based on this, the present embodiment is when current level (such as the second level) carries out task division, task distribution
Terminal 110 first obtains the historic task treatment effeciency of each task processing terminal of current level, the historic task treatment effeciency
Can store in server 200, task distribution terminal 110 can to server 200 send treatment effeciency acquisition request with
The historic task treatment effeciency for obtaining corresponding task processing terminal is then based on the historic task treatment effeciency and determines that task is distributed
Weight can distribute more tasks generally for the high task processing terminal for the treatment of effeciency, i.e. task distribution weight is bigger, most
Weight is distributed based on the task afterwards, project task to be allocated in current level is distributed into corresponding task processing terminal, is lifted
For example, if the task of task processing terminal 121 and task processing terminal 122 distribution weight is 1:4, current level is waited for
20% project task in the project task of distribution is distributed as subtask to task processing terminal 121, and remaining 80%
Distribute to task processing terminal 122.And after the task of the second level divides completion, it can be with task based access control processing terminal 121
20% project task be allocated in the task processing terminal 131 and task processing terminal 132 of third level, task
The concrete form of division be then referred in the second level based on the historic task treatment effeciency of corresponding task processing terminal into
Row divides, and completes so that the corresponding subtask of the task processing terminal of three levels divides.The scheme of the present embodiment can combine
The historic task treatment effeciency of the task processing terminal of current level carries out the division of project task, can further increase project
The treatment effeciency of task.
In one embodiment, the terminal iidentification by multiple subtasks and multiple tasks processing terminal in step s 404
It is sent to server, for trigger the server according to terminal iidentification, multiple subtasks are sent to corresponding task processing terminal
After the step of being handled, it can also include the following steps:
Receive the task performance that server is sent;Wherein, task performance is that server is handled from first task
The received task performance of terminal;Server is also used to receive the task performance of first task processing terminal feedback, and
The second task processing terminal in a level on first task processing terminal is determined according to hierarchical relationship, by task performance
It is sent to the second task processing terminal.
The present embodiment is mainly that the task performance that task processing terminal is fed back can be sent to accordingly by server 200
Terminal.Specifically, server 200 is after sending subtask to each task processing terminal, and each task processing is eventually
End can feed back inter-related task performance, whether such as task schedule needs to assist in the process that subtask is handled
Etc..Wherein, task performance can be sent to server 200 by first task processing terminal, and server 200 is receiving
After the task performance of first task processing terminal feedback, the hierarchical relationship of each task processing terminal is obtained, so as to
The second task processing terminal in a level on the first task processing terminal is determined according to the hierarchical relationship, such as Fig. 1 institute
Show, if first task processing terminal is 131, then the second task processing terminal is 121.Then, server 200 can will be first
The task performance of business processing terminal feedback is sent to the second task processing terminal, and whole for the ease of carrying out to project task
The task performance that the first task processing terminal is fed back can also be sent at task by body control, server 200 simultaneously
Manage terminal 110.It subtask or needs to report in this way, having any problem or having been completed in processing subtask when task processing terminal
When task processing progress, corresponding terminal can be sent to by server 200, so as on the whole to project task
It is managed, also helps and resource is coordinated according to task execution situation, to improve the treatment effeciency of project task.
In one embodiment, a kind of project task processing unit based on airport passenger throughput is provided, with reference to Fig. 4,
Fig. 4 is the structural block diagram of the project task processing unit based on airport passenger throughput in one embodiment, should be based on airport construction
The project task processing unit of engineering may include:
Task acquisition module 101, for obtaining the project task of airport passenger throughput;
First task splits module 102, for project task to be sent to task distribution terminal, for triggering task distribution
Terminal determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal, is based on hierarchical relationship,
Project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Wherein, multiple subtasks point
It is not corresponding with multiple tasks processing terminal;
Subtask receiving module 103, for receiving at the multiple subtasks and multiple tasks that task distribution terminal is sent
Manage the terminal iidentification of terminal;
First task processing module 104, for multiple subtasks being sent to corresponding task and are handled according to terminal iidentification
Terminal is handled.
In one embodiment, first task splits module 102, is further used for triggering task distribution terminal and obtains currently
The historic task treatment effeciency of each task processing terminal in level determines that task distributes weight according to historic task treatment effeciency,
Task based access control distributes weight, and project task to be allocated in current level is distributed to corresponding task processing terminal.
In one embodiment, can also include:
First transmission unit, for receiving the task performance of first task processing terminal feedback;According to hierarchical relationship
Determine the second task processing terminal in a level on first task processing terminal;Task performance is sent to second
Business processing terminal and task processing terminal.
In one embodiment, a kind of project task processing unit based on airport passenger throughput is additionally provided, with reference to figure
5, Fig. 5 be the structural block diagram of the project task processing unit based on airport passenger throughput in another embodiment, should be based on airport
The project task processing unit of construction project may include:
Task receiving module 401, for receiving the project task of server transmission;Project task is airport passenger throughput
Project task;
Terminal deciding module 402 for determining multiple tasks processing terminal, and obtains between multiple tasks processing terminal
Hierarchical relationship;
Second task splits module 403, for being based on hierarchical relationship, according to hierarchic sequence from high to low by project task
It is split layer by layer, obtains multiple subtasks;Wherein, multiple subtasks are corresponding with multiple tasks processing terminal respectively;
Second task processing module 404, for sending the terminal iidentification of multiple subtasks and multiple tasks processing terminal
Multiple subtasks are sent to corresponding task processing terminal and are carried out for trigger the server according to terminal iidentification to server
Processing.
In one embodiment, the second task splits module 403 and is further used for: obtaining each task processing in current level
The historic task treatment effeciency of terminal;Determine that task distributes weight according to historic task treatment effeciency;Weight is distributed according to task,
Project task to be allocated in current level is split.
In one embodiment, can also include:
Second transmission unit, for receiving the task performance of server transmission;Task performance be server from
The received task performance of first task processing terminal;Server is also used to receive the task of first task processing terminal feedback
Performance, and the second task processing terminal in a level on first task processing terminal is determined according to hierarchical relationship, it will
Task performance is sent to the second task processing terminal.
Project task processing unit based on airport passenger throughput of the invention and of the invention based on airport passenger throughput
Project task processing method correspond, about the project task processing unit based on airport passenger throughput it is specific limit can
With the restriction in seeing above for the project task processing method based on airport passenger throughput, airport construction work is based on above-mentioned
The technical characteristic and its advantages that the embodiment of the project task processing method of journey illustrates are suitable for based on airport construction work
In the embodiment of the project task processing unit of journey, details are not described herein.At the above-mentioned project task based on airport passenger throughput
Modules in reason device can be realized fully or partially through software, hardware and combinations thereof.Above-mentioned each module can be with hardware
Form is embedded in or independently of in the processor in computer equipment, can also be stored in computer equipment in a software form
In memory, the corresponding operation of the above modules is executed in order to which processor calls.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction
Composition can using as shown in fig. 6, Fig. 6 as the internal structure chart of computer equipment in one embodiment.The computer equipment includes logical
Cross processor, memory, network interface and the database of system bus connection.Wherein, the processor of the computer equipment is used for
Calculating and control ability are provided.The memory of the computer equipment includes non-volatile memory medium, built-in storage.This is non-volatile
Property storage medium is stored with operating system, computer program and database.The built-in storage is in non-volatile memory medium
The operation of operating system and computer program provides environment.The database of the computer equipment can be used for storing airport construction work
The data such as the project task of journey.The network interface of the computer equipment is used to communicate with external terminal by network connection.It should
To realize a kind of project task processing method based on airport passenger throughput when computer program is executed by processor.
In one embodiment, a kind of computer equipment is provided, which can be terminal, internal structure
Figure can with as shown in fig. 7, Fig. 7 be another embodiment in computer equipment internal structure chart.The computer equipment includes logical
Cross processor, memory, network interface, display screen and the input unit of system bus connection.Wherein, the place of the computer equipment
Device is managed for providing calculating and control ability.The memory of the computer equipment includes non-volatile memory medium, built-in storage.
The non-volatile memory medium is stored with operating system and computer program.The built-in storage is in non-volatile memory medium
The operation of operating system and computer program provides environment.The network interface of the computer equipment is used to pass through with external terminal
Network connection communication.To realize at a kind of project task based on airport passenger throughput when the computer program is executed by processor
Reason method.The display screen of the computer equipment can be liquid crystal display or electric ink display screen, the computer equipment
Input unit can be the touch layer covered on display screen, be also possible to the key being arranged on computer equipment shell, trace ball
Or Trackpad, it can also be external keyboard, Trackpad or mouse etc..
It will be understood by those skilled in the art that structure shown in Fig. 6 and Fig. 7, only relevant to the present invention program
The block diagram of part-structure does not constitute the restriction for the computer equipment being applied thereon to the present invention program, specific to calculate
Machine equipment may include perhaps combining certain components or with different components than more or fewer components as shown in the figure
Arrangement.
In one embodiment, a kind of computer equipment, including processor and memory, the memory storage are provided
There is computer program, the processor is realized described in as above any one embodiment when executing the computer program based on airport
The project task processing method of construction project.
In one embodiment, a kind of computer equipment, including processor and memory, the memory storage are provided
There is computer program, the processor performs the steps of when executing the computer program
Obtain the project task of airport passenger throughput;Project task is sent to task distribution terminal, for triggering task
Distribution terminal determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal, is based on level
Project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks by relationship;Multiple subtasks point
It is not corresponding with multiple tasks processing terminal;The multiple subtasks and multiple tasks processing that reception task distribution terminal is sent
The terminal iidentification of terminal;According to terminal iidentification, multiple subtasks are sent to corresponding task processing terminal and are handled.
In one embodiment, it is also performed the steps of when processor executes computer program
Project task is sent to task distribution terminal, is further used for triggering task distribution terminal and obtains in current level
The historic task treatment effeciency of each task processing terminal determines that task distributes weight according to historic task treatment effeciency, is based on appointing
Business distribution weight, distributes to corresponding task processing terminal for project task to be allocated in current level.
In one embodiment, it is also performed the steps of when processor executes computer program
Receive the task performance of first task processing terminal feedback;It is determined at first task according to hierarchical relationship
Manage the second task processing terminal of a level in terminal;Task performance is sent at the second task processing terminal and task
Manage terminal.
In one embodiment, a kind of computer equipment, including processor and memory, the memory storage are provided
There is computer program, the processor performs the steps of when executing the computer program
Receive the project task that server is sent;Project task is that the project for the airport passenger throughput that server obtains is appointed
Business;It determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal;Based on hierarchical relationship, press
Project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Multiple subtasks respectively with it is more
A task processing terminal is corresponding;The terminal iidentification of multiple subtasks and multiple tasks processing terminal is sent to server, is used
In trigger the server according to terminal iidentification, multiple subtasks are sent to corresponding task processing terminal and are handled.
In one embodiment, it is also performed the steps of when processor executes computer program
Obtain the historic task treatment effeciency of each task processing terminal in current level;It is true according to historic task treatment effeciency
Determine task distribution weight;Weight is distributed according to task, project task to be allocated in current level is split.
In one embodiment, it is also performed the steps of when processor executes computer program
Receive the task performance that server is sent;Task performance is that server connects from first task processing terminal
The task performance of receipts;Server is also used to receive the task performance of first task processing terminal feedback, and according to layer
Grade relationship is determined in the second task processing terminal of a level on first task processing terminal, and task performance is sent to
Second task processing terminal.
Above-mentioned computer equipment can be pressed a project task by the computer program run on the processor
Corresponding multiple subtasks are split as according to the hierarchical relationship between each task distribution terminal, are needed not rely upon special in project task
Fixed working procedure, only according to height hierarchical relationship specific between each task distribution terminal need to successively divide can be completed
The subtask distributed is finally assigned to each task distribution terminal and handled, to improve item by the fractionation of project task
The treatment effeciency of mesh task also helps the project task executed to each task distribution terminal and manages.
Those of ordinary skill in the art will appreciate that realizing described in as above any one embodiment based on airport passenger throughput
Project task processing method in all or part of the process, be that can instruct relevant hardware come complete by computer program
At the computer program can be stored in a non-volatile computer read/write memory medium, which is holding
When row, it may include such as the process of the embodiment of above-mentioned each method.Wherein, used in each embodiment provided by the present invention pair
Memory, storage, any reference of database or other media, may each comprise non-volatile and/or volatile memory.It is non-easy
The property lost memory may include that read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electric erasable can
Programming ROM (EEPROM) or flash memory.Volatile memory may include that random access memory (RAM) or external speed buffering are deposited
Reservoir.By way of illustration and not limitation, RAM is available in many forms, such as static state RAM (SRAM), dynamic ram (DRAM), synchronizes
DRAM (SDRAM), double data rate sdram (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronization link (Synchlink)
DRAM (SLDRAM), memory bus (Rambus) directly RAM (RDRAM), direct memory bus dynamic ram (DRDRAM),
And memory bus dynamic ram (RDRAM) etc..
Accordingly, a kind of computer readable storage medium is also provided in one embodiment, is stored thereon with computer program,
Wherein, the project task based on airport passenger throughput described in as above any one embodiment is realized when which is executed by processor
Processing method.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program performs the steps of when being executed by processor
Obtain the project task of airport passenger throughput;Project task is sent to task distribution terminal, for triggering task
Distribution terminal determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal, is based on level
Project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks by relationship;Multiple subtasks point
It is not corresponding with multiple tasks processing terminal;The multiple subtasks and multiple tasks processing that reception task distribution terminal is sent
The terminal iidentification of terminal;According to terminal iidentification, multiple subtasks are sent to corresponding task processing terminal and are handled.
In one embodiment, it is also performed the steps of when computer program is executed by processor
Project task is sent to task distribution terminal, is further used for triggering task distribution terminal and obtains in current level
The historic task treatment effeciency of each task processing terminal determines that task distributes weight according to historic task treatment effeciency, is based on appointing
Business distribution weight, distributes to corresponding task processing terminal for project task to be allocated in current level.
In one embodiment, it is also performed the steps of when computer program is executed by processor
Receive the task performance of first task processing terminal feedback;It is determined at first task according to hierarchical relationship
Manage the second task processing terminal of a level in terminal;Task performance is sent at the second task processing terminal and task
Manage terminal.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program performs the steps of when being executed by processor
Receive the project task that server is sent;Project task is that the project for the airport passenger throughput that server obtains is appointed
Business;It determines multiple tasks processing terminal, and obtains the hierarchical relationship between multiple tasks processing terminal;Based on hierarchical relationship, press
Project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Multiple subtasks respectively with it is more
A task processing terminal is corresponding;The terminal iidentification of multiple subtasks and multiple tasks processing terminal is sent to server, is used
In trigger the server according to terminal iidentification, multiple subtasks are sent to corresponding task processing terminal and are handled.
In one embodiment, it is also performed the steps of when computer program is executed by processor
Obtain the historic task treatment effeciency of each task processing terminal in current level;It is true according to historic task treatment effeciency
Determine task distribution weight;Weight is distributed according to task, project task to be allocated in current level is split.
In one embodiment, it is also performed the steps of when computer program is executed by processor
Receive the task performance that server is sent;Task performance is that server connects from first task processing terminal
The task performance of receipts;Server is also used to receive the task performance of first task processing terminal feedback, and according to layer
Grade relationship is determined in the second task processing terminal of a level on first task processing terminal, and task performance is sent to
Second task processing terminal.
Above-mentioned computer readable storage medium, by its store computer program, can by a project task according to
Hierarchical relationship between each task distribution terminal is split as corresponding multiple subtasks, needs not rely upon specific in project task
Working procedure, only need to according to height hierarchical relationship specific between each task distribution terminal carry out successively division item can be completed
The subtask distributed is finally assigned to each task distribution terminal and handled, to improve project by the fractionation of mesh task
The treatment effeciency of task also helps the project task executed to each task distribution terminal and manages.
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of project task processing method based on airport passenger throughput is applied to server, which is characterized in that including step
It is rapid:
Obtain the project task of airport passenger throughput;
The project task is sent to task distribution terminal, determines that multiple tasks are handled for triggering the task distribution terminal
Terminal, and the hierarchical relationship between the multiple task processing terminal is obtained, it is based on described hierarchical relationship, according to from high to low
Hierarchic sequence the project task is split layer by layer, obtain multiple subtasks;Wherein, the multiple subtask respectively with
The multiple task processing terminal is corresponding;
Receive the terminal iidentification of multiple subtasks and the multiple task processing terminal that the task distribution terminal is sent;
According to the terminal iidentification, the multiple subtask is sent to corresponding task processing terminal and is handled.
2. the method according to claim 1, wherein described be sent to task distribution eventually for the project task
End is further used for triggering the historic task processing effect that the task distribution terminal obtains each task processing terminal in current level
Rate determines that task distributes weight according to the historic task treatment effeciency, distributes weight based on the task, will be in current level
Project task to be allocated distributes to corresponding task processing terminal.
3. the method according to claim 1, wherein the multiple subtask is sent to corresponding appoint described
After the step of business processing terminal is handled, further includes:
Receive the task performance of first task processing terminal feedback;
The second task processing terminal in a level on the first task processing terminal is determined according to described hierarchical relationship;
The task performance is sent to the second task processing terminal and the task processing terminal.
4. a kind of project task processing method based on airport passenger throughput is applied to terminal, which is characterized in that comprising steps of
Receive the project task that server is sent;The project task is the project for the airport passenger throughput that the server obtains
Task;
It determines multiple tasks processing terminal, and obtains the hierarchical relationship between the multiple task processing terminal;
Based on described hierarchical relationship, the project task is split layer by layer according to hierarchic sequence from high to low, is obtained more
A subtask;Wherein, the multiple subtask is corresponding with the multiple task processing terminal respectively;
The terminal iidentification of the multiple subtask and the multiple task processing terminal is sent to the server, for triggering
The multiple subtask is sent to corresponding task processing terminal and handled by the server according to the terminal iidentification.
5. according to the method described in claim 4, it is characterized in that, it is described according to hierarchic sequence from high to low by the project
The step of task is split layer by layer include:
Obtain the historic task treatment effeciency of each task processing terminal in current level;
Determine that task distributes weight according to the historic task treatment effeciency;
Weight is distributed according to the task, project task to be allocated in the current level is split.
6. according to the method described in claim 4, it is characterized in that, described by the multiple subtask and the multiple task
The terminal iidentification of processing terminal is sent to the server, will be described for triggering the server according to the terminal iidentification
Multiple subtasks were sent to after the step of corresponding task processing terminal is handled, further includes:
Receive the task performance that the server is sent;Wherein, the task performance is the server from first
The received task performance of task processing terminal;The server is also used to receive the first task processing terminal feedback
The task performance, and the second task in a level on first task processing terminal is determined according to described hierarchical relationship
Task performance is sent to the second task processing terminal by processing terminal.
7. a kind of project task processing unit based on airport passenger throughput is applied to server characterized by comprising
Task acquisition module, for obtaining the project task of airport passenger throughput;
First task splits module, for the project task to be sent to task distribution terminal, for triggering the task point
Multiple tasks processing terminal is determined with terminal, and obtains the hierarchical relationship between the multiple task processing terminal, is based on institute
Hierarchical relationship is stated, the project task is split layer by layer according to hierarchic sequence from high to low, obtains multiple subtasks;Its
In, the multiple subtask is corresponding with the multiple task processing terminal respectively;
Subtask receiving module, for receiving the multiple subtasks and the multiple task that the task distribution terminal is sent
The terminal iidentification of processing terminal;
First task processing module, for according to the terminal iidentification, the multiple subtask to be sent at corresponding task
Reason terminal is handled.
8. a kind of project task processing unit based on airport passenger throughput is applied to terminal characterized by comprising
Task receiving module, for receiving the project task of server transmission;The project task is the item of airport passenger throughput
Mesh task;
Terminal deciding module for determining multiple tasks processing terminal, and obtains the layer between the multiple task processing terminal
Grade relationship;
Second task splits module, for being based on described hierarchical relationship, appoints the project according to hierarchic sequence from high to low
Business is split layer by layer, obtains multiple subtasks;Wherein, the multiple subtask respectively with the multiple task processing terminal phase
It is corresponding;
Second task processing module, for sending the terminal iidentification of the multiple subtask and the multiple task processing terminal
The multiple subtask is sent to accordingly for triggering the server according to the terminal iidentification to the server
Task processing terminal is handled.
9. a kind of computer equipment, including processor and memory, the memory are stored with computer program, feature exists
In when the processor executes the computer program the step of any one of realization claim 1 to 6 the method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of any one of claim 1 to 6 the method is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910461149.2A CN110298549B (en) | 2019-05-30 | 2019-05-30 | Project task processing method, device, equipment and medium for airport construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910461149.2A CN110298549B (en) | 2019-05-30 | 2019-05-30 | Project task processing method, device, equipment and medium for airport construction engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110298549A true CN110298549A (en) | 2019-10-01 |
CN110298549B CN110298549B (en) | 2022-05-06 |
Family
ID=68027500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910461149.2A Active CN110298549B (en) | 2019-05-30 | 2019-05-30 | Project task processing method, device, equipment and medium for airport construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110298549B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112381370A (en) * | 2020-11-03 | 2021-02-19 | 中国直升机设计研究所 | Demand distribution automation method based on DOORS system |
CN113127198A (en) * | 2021-04-16 | 2021-07-16 | 建信金融科技有限责任公司 | Task processing method, device and equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101715001A (en) * | 2009-10-21 | 2010-05-26 | 南京邮电大学 | Method for controlling execution of grid task |
CN106452899A (en) * | 2016-10-27 | 2017-02-22 | 中国工商银行股份有限公司 | Distributed data mining system and method |
CN107609721A (en) * | 2016-07-11 | 2018-01-19 | 上海新昇半导体科技有限公司 | Project task distribution method, device, computer equipment and project management system |
US20180285414A1 (en) * | 2017-04-03 | 2018-10-04 | Ocient, Inc | Database management system cluster node subtasking data query |
-
2019
- 2019-05-30 CN CN201910461149.2A patent/CN110298549B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101715001A (en) * | 2009-10-21 | 2010-05-26 | 南京邮电大学 | Method for controlling execution of grid task |
CN107609721A (en) * | 2016-07-11 | 2018-01-19 | 上海新昇半导体科技有限公司 | Project task distribution method, device, computer equipment and project management system |
CN106452899A (en) * | 2016-10-27 | 2017-02-22 | 中国工商银行股份有限公司 | Distributed data mining system and method |
US20180285414A1 (en) * | 2017-04-03 | 2018-10-04 | Ocient, Inc | Database management system cluster node subtasking data query |
Non-Patent Citations (1)
Title |
---|
马巧云: "基于多Agent系统的动态任务分配研究", 《中国博士学位论文全文数据库(信息科技辑)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112381370A (en) * | 2020-11-03 | 2021-02-19 | 中国直升机设计研究所 | Demand distribution automation method based on DOORS system |
CN113127198A (en) * | 2021-04-16 | 2021-07-16 | 建信金融科技有限责任公司 | Task processing method, device and equipment |
Also Published As
Publication number | Publication date |
---|---|
CN110298549B (en) | 2022-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101645022B (en) | Work scheduling management system and method for a plurality of colonies | |
CN108769212B (en) | Data synchronization method and device, computer equipment and storage medium | |
CN108763090A (en) | Test environment dispositions method, device, computer equipment and storage medium | |
CN110351342A (en) | Service order processing method, device, computer equipment and storage medium | |
WO2019075842A1 (en) | Task allocation method and apparatus, storage medium and computer device | |
CN107659739B (en) | List distribution method and device | |
CN104270349A (en) | Isolation method and device for cloud computing multi-tenant application | |
CN109743202B (en) | Data management method, device and equipment and readable storage medium | |
CN114239951A (en) | Satellite measurement and control task scheduling method, device and equipment based on hierarchical optimization | |
CN109814995A (en) | Method for scheduling task, device, computer equipment and storage medium | |
CN110298549A (en) | Project task processing method, device, equipment and the medium of airport passenger throughput | |
CN110704095A (en) | Workflow-based configuration processing method and device, computer equipment and storage medium | |
CN103780686A (en) | Method and system for customizing application approval procedure in cloud organization | |
CN109462508A (en) | Node deployment method, device and storage medium | |
CN109460252A (en) | Configuration file processing method, device and computer equipment based on git | |
CN108345462A (en) | The method and apparatus of component upgrade | |
CN112288400A (en) | Multi-system data interaction method and device, computer equipment and storage medium | |
CN111258741B (en) | Warehouse task execution method, distributed server cluster and computer equipment | |
WO2021036319A1 (en) | Data cleaning method and system | |
CN112543211A (en) | Interaction method and device based on building model, computer equipment and storage medium | |
CN111130991A (en) | Instant messaging information processing method and device, computer equipment and storage medium | |
CN115344533A (en) | Microservice log retrieval method, microservice log retrieval system, microservice log retrieval control device, and storage medium | |
CN111880921A (en) | Job processing method and device based on rule engine and computer equipment | |
CN112232902B (en) | Order data processing method, device and system, computer equipment and storage medium | |
CN110941681B (en) | Multi-tenant data processing system, method and device of power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200603 Address after: 510080 Baiyun International Airport general office building, Baiyun District, Guangzhou City, Guangdong Province Applicant after: Engineering construction headquarters of Guangdong Airport Management Group Co., Ltd Address before: 510405 Construction Command Office Building of Renzhen Baiyun Airport South Work Area, Baiyun District, Guangzhou City, Guangdong Province Applicant before: Guangdong Civil Aviation Airport Construction Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |