CN109683073A - A kind of method of high voltage direct current pressure test electric discharge - Google Patents

A kind of method of high voltage direct current pressure test electric discharge Download PDF

Info

Publication number
CN109683073A
CN109683073A CN201910135651.4A CN201910135651A CN109683073A CN 109683073 A CN109683073 A CN 109683073A CN 201910135651 A CN201910135651 A CN 201910135651A CN 109683073 A CN109683073 A CN 109683073A
Authority
CN
China
Prior art keywords
discharge
electric discharge
electrical equipment
direct current
high voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910135651.4A
Other languages
Chinese (zh)
Other versions
CN109683073B (en
Inventor
陈章山
郭洪英
许荔娟
丁苏
张一航
郑燕敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
State Grid Fujian Electric Power Co Ltd
Original Assignee
FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd, State Grid Fujian Electric Power Co Ltd filed Critical FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
Priority to CN201910135651.4A priority Critical patent/CN109683073B/en
Publication of CN109683073A publication Critical patent/CN109683073A/en
Application granted granted Critical
Publication of CN109683073B publication Critical patent/CN109683073B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The present invention relates to a kind of methods of high voltage direct current pressure test electric discharge, one electric discharge device and a tested electrical equipment are provided, collect the parameter of the DC break down voltage test of tested electrical equipment first, and the discharge time t when test voltage for calculating tested electrical equipment is down to 1000V;Then electric discharge device is assembled, adjusts and carry out simulated operation, it is mobile to control sliding machine by operating stick, so that the guide rod that discharges is contacted with tested electrical equipment, and is discharged by discharge resistance;Finally, monitoring discharge current by discharge current detection module, and discharge current is set to reach preset value by adjusting discharge resistance value, when discharge current is 0, tested electrical equipment electric discharge terminates;The present invention can need quickly assembling adjustment according to scene, and safe operation is reliable, improves test efficiency.

Description

A kind of method of high voltage direct current pressure test electric discharge
Technical field
The present invention relates to electrical engineering experimental technique field, especially a kind of method of high voltage direct current pressure test electric discharge.
Background technique
In electrical installation project, after direct current cables installation is complete, for the safe operation for guaranteeing system, it is necessary to before putting into operation Commissioning test is carried out, wherein main project has the DC break down voltage of cable to test, it is that test test item insulation receiving is various excessively electric The effective ways of pressure energy power, to guaranteeing that equipment safety operation is of great significance.
DC break down voltage test refers to: applying a direct current for being higher than the overvoltage numerical value being likely encountered in operation to test item Pressure, and continue for some time, to check the dielectric level of equipment.The more preferable simulation test item of DC break down voltage test energy is in practical fortune The case where voltage is born in row, can effectively find the local defect of some test items;Again since its wiring and operation are simpler It is single, it is common pilot project.
Currently, mainly having for the mode discharged after electrical equipment DC break down voltage:
Method one: using special discharging rod, and low capacity, low-voltage discharge are applicable in, but discharges in high voltage, large capacity It is influenced in test by different voltages grade and discharge capacity, and execute-in-place is difficult, discharge time is long, has certain safety hidden Suffer from.
Method two: it first passes through after resitstance voltage divider is discharged to 70% test voltage and discharges through water resistance.
Analysis: by divider self discharge to 70% test voltage, water resistance resistance in electric discharge is unstable, heat capacity difference, Resistance can not be adjusted with the variation of discharge voltage.Discharge time is long.
Method three: it first passes through resitstance voltage divider and is discharged to after 70% test voltage through moist wood or wet tree discharge.
Analysis: by divider self discharge to 70% test voltage, discharge time is long, and moist branch or wood are in electric discharge Unstable, operational safety is poor.
Therefore, the method discharged after high voltage, large capacity subject electrical equipment DC break down voltage is furtherd investigate and is sought The method for looking for solution has certain theory significance and realistic meaning.
According to practical engineering experience, the method discharged after being tested for the electrical equipment DC break down voltage of large capacity, high voltage, Best bet is namely based on the impedance discharge technology of existing reliable performance, in conjunction with the various voltage class in scene and distinct device Structure, develops a kind of simple and easy, and the electric discharge device of combined application can be needed according to scene, improve the safety of discharge test Reliability greatly shortens discharge time, improves test efficiency.
Summary of the invention
In view of this, the purpose of the present invention is to propose to a kind of method of high voltage direct current pressure test electric discharge, it can be according to scene It needs quickly to assemble adjustment, safe operation is reliable, improves test efficiency.
The present invention is realized using following scheme: a kind of method of high voltage direct current pressure test electric discharge provides an electric discharge dress It sets and a tested electrical equipment, the electric discharge device includes discharge module, regulating device, slide trolley and described to place The dragging track of slide trolley and the insulating bar to push the slide trolley to advance;In the detection control module It is provided with discharge current detection module, the discharge current detection module is connect by conducting wire with the regulating device, to supervise Survey discharge current;The slide trolley is loaded with the insulated telescopic rods that can vertically stretch;The discharge module is by several electric discharges Resistance composes in series, and every group of discharge resistance passes through conducting wire and connect with the regulating device;The regulating device is also distant with outside Motor is controlled to be connected;The insulated telescopic rods are equipped with the electric discharge guide rod that can rotate, the electric discharge guide rod pass through conducting wire with it is described Regulating device connection;The tested electrical equipment includes high voltage direct current generator and is arranged on the high voltage direct current generator High voltage direct current generator grading ring;Test lead is provided on the high voltage direct current generator grading ring;
The charging method of above-mentioned electric discharge device the following steps are included:
Step S1: the DC break down voltage value of tested electrical equipment is provided, the capacitance C of tested electrical equipment, is tested The test voltage U of electrical equipmentfWith discharge capacity WC
Step S2: according to the test voltage U of tested electrical equipmentfWith discharge capacity WCIt calculates from described tested electrical The test voltage U of equipmentfIt is down to discharge time t when 1000V;Discharge time passes through formulaIt calculates;Wherein, UCIndicate that the voltage on tested electrical equipment, R indicate discharge resistance;
Step S3: assembling electric discharge device, adjustment and simulated operation;
Step S4: after the tested electrical equipment DC break down voltage, by operating described in the insulating bar promotion Slide trolley advances, and contact the electric discharge guide rod with the high voltage direct current generator grading ring, and passes through impedance discharge Start to discharge;
Step S5: monitoring discharge current by the discharge current detection module in discharge process, is filled by controlling to adjust The size for setting adjustment impedance discharge, so that discharge current reaches preset value, discharge current
Step S6: it when the residual voltage on the tested electrical equipment is lower than 1000V, is then directly shorted by ground connection Electric discharge;When discharge current is 0, the electric discharge of the tested electrical equipment terminates.
Further, the resistance value of every group of discharge resistance can adjust.
Further, every group of discharge resistance is by several electric discharges being bolted on a rosette Resistor coupled in parallel composition.
Further, simulated operation described in step S3 specifically:
It is connected between the regulating device and the electric discharge guide rod with conducting wire;Adjust height and the institute of the insulated telescopic rods State high voltage direct current generator grading ring height is consistent and the screw that is tightened, the angle for adjusting the electric discharge guide rod can be with institute The contact of high voltage direct current generator grading ring is stated, guide rail and the slide trolley of sliding is towards by the high voltage direct current generator side To arranging, so that being slided by the insulating bar promotion slide trolley towards tested electrical equipment, sliding distance Not less than the length of the insulated telescopic rods;After simulated operation, controls the slide trolley and the high direct voltage occurs The distance of device is not less than the position of the insulating telescopic pole length.
Further, the insulating bar is the structure for being able to carry out horizontal extension.
Further, the regulating device is to be able to carry out vertically flexible insulation spiral supporting post, the insulation spiral branch Short circuit sliding block is provided on column;The external remote control motor drives insulation spiral supporting post to be promoted and is shorted sliding block, is shorted different put Resistance.
Compared with prior art, the invention has the following beneficial effects:
The present invention can need quickly assembling adjustment according to scene, and safe operation is reliable, greatly shortening discharge time, improve Test efficiency.
Detailed description of the invention
Fig. 1 is the flow chart of the embodiment of the present invention.
Fig. 2 is the structural schematic diagram of the embodiment of the present invention.
Wherein, 1 is discharge resistance, and 2 be rosette, and 3 be earth stud, and 4 be fixed metal chassis, and 5 be conducting wire, and 6 are Regulating device, 7 be discharge current detection module, and 8 be detection control module, and 9 be conducting wire, and 10 stretch for electric discharge guide rod, 11 for insulation Contracting bar, 12 be fixed screw, and 13 be slide trolley, and 14 is slide guide rail, and 15 be insulating bar, and 16 be high voltage direct current generator Grading ring, 17 be high voltage direct current generator, and 18 be test lead.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and embodiments.
As shown in Figure 1, a kind of method for present embodiments providing high voltage direct current pressure test electric discharge, provides an electric discharge dress It sets and a tested electrical equipment, the electric discharge device includes discharge module, regulating device 6, slide trolley 13 and to place The slide trolley slides guide rail 14 and the insulating bar 15 to push the slide trolley to advance;The detection control Discharge current detection module 7 is provided on molding block 8, the discharge current detection module 7 passes through conducting wire and the regulating device 6 Connection, to monitor discharge current;The slide trolley is loaded with the insulated telescopic rods 11 that can vertically stretch;The electric discharge mould Block is composed in series by several discharge resistances, and every group of discharge resistance passes through conducting wire 5 and connect with the regulating device 6;The adjusting Device 6 is also connected with external remote control motor;The insulated telescopic rods 11 are equipped with the electric discharge guide rod 10 that can be rotated, the electric discharge Guide rod 10 is connect by conducting wire 9 with the regulating device 6;The tested electrical equipment includes high voltage direct current generator 17 and sets Set the high voltage direct current generator grading ring 16 on the high voltage direct current generator 17;The high voltage direct current generator grading ring 16 On be provided with test lead 18;
The charging method of above-mentioned electric discharge device the following steps are included:
Step S1: the DC break down voltage value of tested electrical equipment is provided, the capacitance C of tested electrical equipment, is tested The test voltage U of electrical equipmentfWith discharge capacity WC
Step S2: according to the test voltage U of tested electrical equipmentfWith discharge capacity WCIt calculates from described tested electrical The test voltage U of equipmentfIt is down to discharge time t≤30min when 1000V;The condition for carrying out calculating satisfaction is electric discharge device Test voltage U of the voltage rating not less than subject electrical equipmentf;Discharge time passes through formulaIt calculates;Wherein, UCIndicate that the voltage on subject electrical equipment, R indicate discharge resistance;
Step S3: assembling electric discharge device, adjustment and simulated operation;
Step S4: after the tested electrical equipment DC break down voltage, institute is pushed by operating the insulating bar 15 The advance of slide trolley 13 is stated, contact the electric discharge guide rod 10 with the high voltage direct current generator grading ring 16, and is passed through Impedance discharge starts to discharge;
Step S5: monitoring discharge current by the discharge current detection module in discharge process, is filled by controlling to adjust The size for setting adjustment impedance discharge, so that discharge current reaches preset value, discharge current
Step S6: it when the residual voltage on the tested electrical equipment is lower than 1000V, is then directly shorted by ground connection Electric discharge;When discharge current is 0, the electric discharge of the tested electrical equipment terminates.
In the present embodiment, the resistance value of every group of discharge resistance can adjust.
In the present embodiment, every group of discharge resistance is several on a rosette 2 by being bolted on Discharge resistance 1 composes in parallel.
In the present embodiment, simulated operation described in step S3 specifically:
In the present embodiment, the regulating device is to be able to carry out vertically flexible insulation spiral supporting post, the insulation spiral shell Short circuit sliding block is provided on circumflex branch column;The external remote control motor drives insulation spiral supporting post to be promoted and is shorted sliding block, is shorted different Discharge resistance.
Several discharge resistances 1 are fixed using bolt and rosette 2, electric discharge mould is composed in series with several discharge resistances Block;Each disk on discharge module is connect with the adjusting contact of regulating device 6 to using conducting wire 5, is shorted sliding block and is adjusted to zero-bit And be grounded, it is connected between the regulating device 6 and the electric discharge guide rod 10 with conducting wire 9;Adjust the adjustable insulated telescopic rods 11 Height is consistent with the height of the high voltage direct current generator grading ring 16 and the screw 12 that is tightened, adjust the electric discharge guide rod 10 angle can with 16 reliable contacts of high voltage direct current generator grading ring, it is described to slide guide rail 14 and the slide trolley 13 arrange towards by 17 direction of high voltage direct current generator, so that pushing the slide trolley by the insulating bar 15 It is reliably slided towards tested electrical equipment, slidably distance is not less than the length of the adjustable insulated telescopic rods;Simulated operation knot It is long not less than the adjustable insulated telescopic rods at a distance from the high voltage direct current generator 17 to control the slide trolley 13 by Shu Hou The position of degree.
In the present embodiment, the insulating bar is the structure for being able to carry out horizontal extension.
Preferably, the electric discharge device that the present embodiment is met the requirements according to the DC break down voltage parameter selection for being tested electrical equipment Combination carries out assembling simulation before the test of tested electrical equipment DC break down voltage, and electric discharge device accesses quilt after DC break down voltage test Examination electrical equipment discharges, and discharge resistance is adjusted by detection discharge current and voltage in engineering of discharging, so that discharge current The rated value for keeping discharge resistance to be born, until the residual voltage near 0 on discharge current and tested electrical equipment, electric discharge Terminate.
Particularly, the present embodiment specific embodiment includes the following steps:
(1) it collects the parameter of tested electrical equipment DC break down voltage test: being tested DC break down voltage value, the subject of electrical equipment The capacitance C of equipment determines the test voltage U of tested electrical equipmentfAnd discharge capacity;
(2) according to the test voltage U for being tested electrical equipmentfWith discharge capacity WCCalculate meet condition discharge resistance R and The class of insulation requirement of device, passes through formulaEstimate that discharge time t≤30min adjusts electric discharge if being unsatisfactory for Resistance R;Scene can be adjusted with flexible assembling according to actual needs, optimize electric discharge device.
(3) electric discharge device assembly is carried out according to the result of calculating before tested electrical equipment DC break down voltage, according to Fig. 2 into Row connection, adjusts and simulated operation, manipulation slide trolley 13 enable electric discharge guide rod 10 that can be abutted against with tested electrical equipment Touching after simulation is qualified, exits slide trolley 13 and tested electrical equipment and pressurized equipment keeps safe distance;
(4) after tested electrical equipment DC break down voltage, the movement of slide trolley 13 is controlled by operation insulating bar 15, is made The guide rod 10 that must discharge is contacted with tested electrical equipment, and starts to discharge by discharge resistance 1;
(5) according to monitoring discharge current in discharge process, the adjustment of adjustable resistance module is connect by external remote control motor control The size of discharge resistance, so that discharge current reaches required value;
(6) when the residual voltage on tested electrical equipment is lower than 100V, electric discharge, electric discharge directly can be shorted by ground connection When electric current is 0, the electric discharge of tested device terminates;
Electric discharge device can adjust 10 height of electric discharge guide rod and dielectric level by adjustable insulating guide rod 11, be allowed to adapt to tested Try the electric discharge requirement of electrical equipment.Adjustable discharge resistance and discharge current detection device are set, and adjustable resistance is during discharge Discharge current, which is allowed to, according to the electronic adjustment discharge resistance value of the progress of current value measured by discharge current detection device reaches maximum Value shortens discharge time.
The foregoing is merely presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with Modification, is all covered by the present invention.

Claims (5)

1. a kind of method of high voltage direct current pressure test electric discharge, it is characterised in that: provide an electric discharge device and a tested electricity Gas equipment, the electric discharge device include discharge module, regulating device, slide trolley and to place sliding for the slide trolley Track and the insulating bar to push the slide trolley to advance;Discharge current is provided in the detection control module Detection module, the discharge current detection module is connect by conducting wire with the regulating device, to monitor discharge current;It is described Slide trolley is loaded with the insulated telescopic rods that can vertically stretch;The discharge module is composed in series by several groups discharge resistance, Every group of discharge resistance passes through conducting wire and connect with the regulating device;The regulating device is also connected with external remote control motor;Institute It states insulated telescopic rods and is equipped with the electric discharge guide rod that can be rotated, the electric discharge guide rod is connect by conducting wire with the regulating device; The tested electrical equipment includes high voltage direct current generator and the high direct voltage being arranged on high voltage direct current generator hair Raw device grading ring;Test lead is provided on the high voltage direct current generator grading ring;
The charging method of above-mentioned electric discharge device the following steps are included:
Step S1: the DC break down voltage value of tested electrical equipment is provided, the capacitance C of tested electrical equipment, is tested electrically The test voltage U of equipmentfWith discharge capacity WC
Step S2: according to the test voltage U of tested electrical equipmentfWith discharge capacity WCIt calculates from the tested electrical equipment Test voltage UfIt is down to discharge time t when 1000V;Discharge time passes through formula It calculates;Wherein, UCIndicate that the voltage on tested electrical equipment, R indicate resistance;
Step S3: assembling electric discharge device, adjustment and simulated operation;
Step S4: it after the tested electrical equipment DC break down voltage, is slided described in the insulating bar promotion by operating Trolley advances, and contact the electric discharge guide rod with the high voltage direct current generator grading ring, and is started by discharge resistance Electric discharge;
Step S5: discharge current is monitored by the discharge current detection module in discharge process, passes through controling adjustment device tune The size of whole discharge resistance, so that discharge current reaches preset value, discharge current
Step S6: it when the residual voltage on the tested electrical equipment is lower than 1000V, is then directly put by being grounded to be shorted Electricity;When discharge current is 0, the electric discharge of the tested electrical equipment terminates.
2. a kind of method of high voltage direct current pressure test electric discharge according to claim 1, it is characterised in that: described every group puts Resistance is composed in parallel by several discharge resistances being bolted on a rosette.
3. a kind of method of high voltage direct current pressure test electric discharge according to claim 1, it is characterised in that: described in step S3 Simulated operation specifically:
It is connected between the regulating device and the electric discharge guide rod with conducting wire;Adjust the height of the insulated telescopic rods and described straight Flow high pressure generator grading ring height is consistent and the screw that is tightened, adjust the electric discharge guide rod angle can with it is described straight The contact of high pressure generator grading ring is flowed, guide rail and the slide trolley of sliding is towards by high voltage direct current generator direction cloth It sets, so that pushing the slide trolley to slide towards tested electrical equipment by the insulating bar, sliding distance is not small In the length of the insulated telescopic rods;After simulated operation, the slide trolley and the high voltage direct current generator are controlled Distance is not less than the position of the insulating telescopic pole length.
4. a kind of method of high voltage direct current pressure test electric discharge according to claim 1, it is characterised in that: the insulation behaviour It is the structure for being able to carry out horizontal extension as bar.
5. a kind of method of high voltage direct current pressure test electric discharge according to claim 1, it is characterised in that: the adjusting dress It is set to and is able to carry out vertically flexible insulation spiral supporting post, be provided with short circuit sliding block on the insulation spiral supporting post;The outside Remote-control motor drives insulation spiral supporting post to be promoted and is shorted sliding block, is shorted different discharge resistances.
CN201910135651.4A 2019-02-21 2019-02-21 High-voltage direct-current voltage withstand test discharging method Active CN109683073B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910135651.4A CN109683073B (en) 2019-02-21 2019-02-21 High-voltage direct-current voltage withstand test discharging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910135651.4A CN109683073B (en) 2019-02-21 2019-02-21 High-voltage direct-current voltage withstand test discharging method

Publications (2)

Publication Number Publication Date
CN109683073A true CN109683073A (en) 2019-04-26
CN109683073B CN109683073B (en) 2021-01-29

Family

ID=66196709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910135651.4A Active CN109683073B (en) 2019-02-21 2019-02-21 High-voltage direct-current voltage withstand test discharging method

Country Status (1)

Country Link
CN (1) CN109683073B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687405A (en) * 2019-09-02 2020-01-14 中国南方电网有限责任公司超高压输电公司检修试验中心 Discharging device and discharging method for direct-current withstand voltage test of seabed oil-filled cable
CN111308307A (en) * 2020-03-13 2020-06-19 深圳供电局有限公司 Instantaneous overcurrent capability detection system and method
CN112345893A (en) * 2020-09-25 2021-02-09 国网浙江省电力有限公司舟山供电公司 Large-capacity direct-current voltage withstand test platform with automatic discharge safety grounding device
CN113253068A (en) * 2021-05-13 2021-08-13 江苏方天电力技术有限公司 Discharging method after direct-current voltage withstand test of large-length high-voltage cable
CN113777446A (en) * 2021-07-26 2021-12-10 国网浙江省电力有限公司营销服务中心 Extra-high voltage withstand voltage tester with direct current charge-discharge state detection function and test method
CN114002567A (en) * 2021-11-09 2022-02-01 广州思泰信息技术有限公司 Rapid one-key test system and method for insulation performance

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2087786U (en) * 1990-12-15 1991-10-30 张钧华 Current-leakage voltage-withstand combined tester
JP2003009531A (en) * 2001-06-21 2003-01-10 Hioki Ee Corp Voltage step-up transformer
JP2005164376A (en) * 2003-12-02 2005-06-23 Tokyo Electric Power Co Inc:The Withstanding voltage test method for power equipment
CN103163434A (en) * 2013-03-07 2013-06-19 苏州科技学院 Constant current discharging device for ultra-high voltage long cable after direct-current withstand voltage test
CN203759191U (en) * 2014-03-24 2014-08-06 国家电网公司 Capacitor test discharging device
CN203942274U (en) * 2014-06-25 2014-11-12 国网山东省电力公司聊城供电公司 Portable power capacitor residual charge discharger
CN205506980U (en) * 2016-04-25 2016-08-24 国网浙江省电力公司电力科学研究院 Discharge coil excitation characteristic test loop
CN106646145A (en) * 2016-09-18 2017-05-10 国网福建省电力有限公司 Flexible direct current power transmission converter discharge model and discharge time fixed setting method thereof
CN106992497A (en) * 2017-05-27 2017-07-28 国网福建省电力有限公司 A kind of intelligent protection device of main transformer internal discharge failure and guard method
CN207318649U (en) * 2017-10-26 2018-05-04 国网福建省电力有限公司 Safety-type pressure test instrument
CN109189616A (en) * 2018-07-26 2019-01-11 上海与德通讯技术有限公司 A kind of discharge test method and terminal to be measured

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2087786U (en) * 1990-12-15 1991-10-30 张钧华 Current-leakage voltage-withstand combined tester
JP2003009531A (en) * 2001-06-21 2003-01-10 Hioki Ee Corp Voltage step-up transformer
JP2005164376A (en) * 2003-12-02 2005-06-23 Tokyo Electric Power Co Inc:The Withstanding voltage test method for power equipment
CN103163434A (en) * 2013-03-07 2013-06-19 苏州科技学院 Constant current discharging device for ultra-high voltage long cable after direct-current withstand voltage test
CN203759191U (en) * 2014-03-24 2014-08-06 国家电网公司 Capacitor test discharging device
CN203942274U (en) * 2014-06-25 2014-11-12 国网山东省电力公司聊城供电公司 Portable power capacitor residual charge discharger
CN205506980U (en) * 2016-04-25 2016-08-24 国网浙江省电力公司电力科学研究院 Discharge coil excitation characteristic test loop
CN106646145A (en) * 2016-09-18 2017-05-10 国网福建省电力有限公司 Flexible direct current power transmission converter discharge model and discharge time fixed setting method thereof
CN106992497A (en) * 2017-05-27 2017-07-28 国网福建省电力有限公司 A kind of intelligent protection device of main transformer internal discharge failure and guard method
CN207318649U (en) * 2017-10-26 2018-05-04 国网福建省电力有限公司 Safety-type pressure test instrument
CN109189616A (en) * 2018-07-26 2019-01-11 上海与德通讯技术有限公司 A kind of discharge test method and terminal to be measured

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邵先军 等: "550KVGIS现场交流耐压试验下放电故障的定位于分析研究", 《高压电器》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687405A (en) * 2019-09-02 2020-01-14 中国南方电网有限责任公司超高压输电公司检修试验中心 Discharging device and discharging method for direct-current withstand voltage test of seabed oil-filled cable
WO2021042601A1 (en) * 2019-09-02 2021-03-11 中国南方电网有限责任公司超高压输电公司检修试验中心 Discharge apparatus and discharge method for direct-current voltage withstand test of oil-filled submarine cable
CN111308307A (en) * 2020-03-13 2020-06-19 深圳供电局有限公司 Instantaneous overcurrent capability detection system and method
CN112345893A (en) * 2020-09-25 2021-02-09 国网浙江省电力有限公司舟山供电公司 Large-capacity direct-current voltage withstand test platform with automatic discharge safety grounding device
CN113253068A (en) * 2021-05-13 2021-08-13 江苏方天电力技术有限公司 Discharging method after direct-current voltage withstand test of large-length high-voltage cable
CN113777446A (en) * 2021-07-26 2021-12-10 国网浙江省电力有限公司营销服务中心 Extra-high voltage withstand voltage tester with direct current charge-discharge state detection function and test method
CN114002567A (en) * 2021-11-09 2022-02-01 广州思泰信息技术有限公司 Rapid one-key test system and method for insulation performance

Also Published As

Publication number Publication date
CN109683073B (en) 2021-01-29

Similar Documents

Publication Publication Date Title
CN109683073A (en) A kind of method of high voltage direct current pressure test electric discharge
CN101713810B (en) Test unit for monitoring oil-paper insulation state
CN109188090B (en) The nonlinear test method of different humidity electric resistance of soil in vertical demixing soil
CN109187653B (en) The Horizontal Layer Soil dynamic electric resistor characteristic test method of meter and different temperatures
CN108548986A (en) A kind of high resistance ground detecting system of small current neutral grounding system, device and method
CN101825649B (en) Superpower remote control electric discharge device
CN209728100U (en) DC break down voltage tests electric discharge device
CN206311733U (en) A kind of electricity generator stator coil Condition assessment of insulation device
CN103645410A (en) Dynamic simulation system and method of small current grounding systems in power grid
CN112345893A (en) Large-capacity direct-current voltage withstand test platform with automatic discharge safety grounding device
CN102645628B (en) Fixed-high and fixed-low fault injecting circuit and method for online test of digital circuit board
CN109188092A (en) Soil dynamic resistance characteristic test method under a kind of different temperatures
CN109188088B (en) A kind of vertical demixing electric resistance of soil nonlinear characteristic test method
CN109188091B (en) The test method of electric resistance of soil nonlinear characteristic under a kind of different in moisture content
US11467223B2 (en) Device and method for simulating intermittent arc grounding faults of power distribution network
CN108761208A (en) A kind of test method of vertical demixing soil dynamic resistance
CN112526292A (en) Distribution cable operation quality examination and test platform
CN109917256B (en) Method for evaluating insulation performance of bushing capacitor core under temperature change
CN203811519U (en) ADSS (All Dielectric Self Supporting) cable testing device
CN105509785A (en) Artificial ice-coating test platform capable of simulating field ice-coating meteorological condition
CN109490709A (en) A kind of system and method assisting small current earthing wire-selecting
CN112595894B (en) Iron tower earthing device transient resistance temperature distortion characteristic test device
CN105137311B (en) A kind of dry-type air-core reactor turn-to-turn insulation electrical ageing test system and its test method
CN108565978A (en) A kind of transmission line of electricity on-line monitoring equipment energy taking device
CN104931852B (en) The direct current grounding pole line flashover failure analysis methods of arc are built based on arcing horn

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant