CN109680944B - 一种现浇混凝土预留洞模具的拆模装置及其拆模方法 - Google Patents
一种现浇混凝土预留洞模具的拆模装置及其拆模方法 Download PDFInfo
- Publication number
- CN109680944B CN109680944B CN201910141345.1A CN201910141345A CN109680944B CN 109680944 B CN109680944 B CN 109680944B CN 201910141345 A CN201910141345 A CN 201910141345A CN 109680944 B CN109680944 B CN 109680944B
- Authority
- CN
- China
- Prior art keywords
- adjusting
- bolt
- cast
- supporting beam
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G19/00—Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
Abstract
本发明提供了一种现浇混凝土预留洞模具的拆模装置,属于建筑施工技术领域。其技术方案为:一种现浇混凝土预留洞模具的拆模装置,包括混凝土楼面,预固定在混凝土楼面上,且顶壁开设定位通孔的预埋件,预埋件顶面中心处设置轴线与定位通孔的轴线重合的第一内螺纹套,其中,现浇混凝土预留洞模具的拆模装置还包括支撑梁,和连接在支撑梁上的调节部件。本发明的有益效果为:本发明提供的一种现浇混凝土预留洞模具的拆模装置结构简单、体积小、便于携带、操作简单且方便、节省人力。
Description
技术领域
本发明涉及建筑施工技术领域,尤其涉及一种现浇混凝土预留洞模具的拆模装置。
背景技术
目前,我国的高层建筑物越来越普遍,如何提高建筑材料的可周转使用率,实现建筑绿色可持续发展这一问题越来越突出。例如高层建筑物的预留洞,同一规格预留洞数量越来越多,进而出现了多种可周转使用的预留洞模具,其中,用贯穿模具的定位螺栓将模具与模板定位的预留洞施工方式,是现代建筑施工中使用较为广泛施工方式,其在拆模时,通常步骤为:首先转动定位螺栓,将其与模板分离,然后在定位螺栓上人工施力,将预留洞模具松动并拆出。此种方法耗费人力,且当混凝土凝固时间较长时,人工施力根本无法将其拆出。
如何解决上述技术问题为本发明面临的课题。
发明内容
本发明的目的在于提供一种结构简单、体积小、便于携带、操作简单且方便、节省人力的现浇混凝土预留洞模具的拆模装置。
本发明是通过如下措施实现的:一种现浇混凝土预留洞模具的拆模装置,包括混凝土楼面,预固定在所述混凝土楼面(16)上,且顶壁开设定位通孔的预埋件,所述预埋件顶面中心处设置轴线与所述定位通孔的轴线重合的第一内螺纹套,其中,所述现浇混凝土预留洞模具的拆模装置还包括支撑梁,和连接在所述支撑梁上的调节部件;
所述调节部件包括设置在所述支撑梁中部的第一调节组件,和相对应设置在所述支撑梁两端部的两个第二调节组件;所述第一调节组件和每一个所述第二调节组件均包括调节筒,以及一端分别螺纹连接在每一个所述调节筒两端的第一螺栓和第二螺栓,每一个所述调节筒两端的螺纹方向相反;每一个所述第一螺栓的另一端固定连接在所述支撑梁上;
所述第一调节组件中的所述第二螺栓的另一端与所述第一内螺纹套相互螺纹连接;
每一个所述第二调节组件中的所述第二螺栓的另一端与所述混凝土楼面相互接触配合。
本发明的具体特点还有,每一个所述第二调节组件中的所述第二螺栓与所述混凝土楼面相接触的端面设有垫板,增大装置底面与混凝土楼面的接触面积,保护混凝土楼面。
本发明的具体特点还有,每一个所述调节筒外侧圆周面上的设有调节手柄,方便作业人员操作。
本发明的具体特点还有,每一个所述第一螺栓与所述支撑梁通过第二紧固件相互连接。
一种利用现浇混凝土预留洞模具的拆模装置进行的拆模方法,包括以下步骤:
步骤一:将拆模装置置于所述预埋件上方,将所述第一调节组件的所述第二螺栓的下端与所述第一内螺纹套相互螺纹连接;
步骤二:持所述第一调节组件上的所述调节手柄转动所述调节筒,使整个拆模装置向下移动,至使两个所述第二调节组件的下端面的所述垫板与所述混凝土楼面相互接触配合;
步骤三:持所述第二调节组件上的所述调节手柄转动所述调节筒,使整个拆模装置向上移动,带动所述预埋件松动,并将其拆出,实现预埋件,即预留洞模具的拆卸。
本发明的有益效果为:本发明结构简单,体积小,便于携带;使用本装置进行拆模时的拆模方法,仅需要分别拧动第一调节组件和第二组件的调节筒,操作简单且方便,同时节省人力;本发明设置垫板,增大装置底面与混凝土楼面的接触面积,保护混凝土楼面;本发明设置调节手柄,方便作业人员操作。
附图说明
图1本发明实施例沿第一内螺纹套轴线剖开的结构示意图。
其中,附图标记为:1、预埋件;3、第一内螺纹套;7、支撑梁;8、第一调节组件;9、第二调节组件;10、调节手柄;11、第一螺栓;12、调节筒;13、第二螺栓;14、垫板;15、第二紧固件;16、混凝土楼面。
具体实施方式
为能清楚说明本方案的技术特点,下面通过具体实施方式,对本方案进行阐述。
参见图1,本发明是一种现浇混凝土预留洞模具的拆模装置,包括混凝土楼面16,和预固定在混凝土楼面16,且顶壁开设定位通孔的预埋件1,预埋件1顶面中心处设置轴线与定位通孔的轴线重合的第一内螺纹套3,其中,现浇混凝土预留洞模具的拆模装置还包括支撑梁7,和连接在支撑梁7上的调节部件;
调节部件包括设置在支撑梁7中部的第一调节组件8,和相对应设置在支撑梁7两端部的两个第二调节组件9;第一调节组件8和每一个第二调节组件9均包括调节筒12,以及一端分别螺纹连接在每一个调节筒12两端的第一螺栓11和第二螺栓13,每一个调节筒12两端的螺纹方向相反;每一个第一螺栓11的另一端固定连接在支撑梁7上;
第一调节组件8中的第二螺栓13的另一端与第一内螺纹套3相互螺纹连接;
每一个第二调节组件9中的第二螺栓13的另一端与混凝土楼面16相互接触配合。
本发明的具体特点还有,每一个第二调节组件9中的第二螺栓13与混凝土楼面16相接触的端面设有垫板14。
本发明的具体特点还有,每一个调节筒12外侧圆周面上的设有调节手柄10。
本发明的具体特点还有,每一个第一螺栓11与支撑梁7通过第二紧固件15相互连接。
本发明在实际使用时,一种利用现浇混凝土预留洞模具的拆模装置进行的拆模方法,包括以下步骤:
步骤一:将拆模装置置于预埋件1上方,将第一调节组件8的第二螺栓13的下端与第一内螺纹套3相互螺纹连接;
步骤二:持第一调节组件8上的调节手柄10转动调节筒12,使整个拆模装置向下移动,至使两个第二调节组件9的下端面的垫板14与混凝土楼面16相互接触配合;
步骤三:持第二调节组件9上的调节手柄10转动调节筒12,使整个拆模装置向上移动,带动预埋件1松动,并将其拆出,实现预埋件,即预留洞模具的拆卸。
本发明未经描述的技术特征可以通过或采用现有技术实现,在此不再赘述,当然,上述说明并非是对本发明的限制,本发明也并不仅限于上述举例,本技术领域的普通技术人员在本发明的实质范围内所做出的变化、改型、添加或替换,也应属于本发明的保护范围。
Claims (1)
1.一种现浇混凝土预留洞模具的拆模装置的拆模方法,拆模装置包括混凝土楼面(16),预固定在所述混凝土楼面(16)上,且顶壁开设定位通孔的预埋件(1),所述预埋件(1)顶面中心处设置轴线与所述定位通孔的轴线重合的第一内螺纹套(3),其特征在于,所述现浇混凝土预留洞模具的拆模装置还包括支撑梁(7),和连接在所述支撑梁(7)上的调节部件;
所述调节部件包括设置在所述支撑梁(7)中部的第一调节组件(8),和相对应设置在所述支撑梁(7)两端部的两个第二调节组件(9);所述第一调节组件(8)和每一个所述第二调节组件(9)均包括调节筒(12),以及一端分别螺纹连接在每一个所述调节筒(12)两端的第一螺栓(11)和第二螺栓(13),每一个所述调节筒(12)两端的螺纹方向相反;
每一个所述第一螺栓(11)的另一端固定连接在所述支撑梁(7)上,每一个所述第一螺栓(11)与所述支撑梁(7)通过第二紧固件(15)相互连接;每一个所述调节筒(12)外侧圆周面上的设有调节手柄(10);
所述第一调节组件(8)中的所述第二螺栓(13)的另一端与所述第一内螺纹套(3)相互螺纹连接;
每一个所述第二调节组件(9)中的所述第二螺栓(13)的另一端与所述混凝土楼面(16)相互接触配合,每一个所述第二调节组件(9)中的所述第二螺栓(13)与所述混凝土楼面(16)相接触的端面设有垫板(14);
所述现浇混凝土预留洞模具的拆模装置的使用方法包括以下步骤:
步骤一:将拆模装置置于所述预埋件(1)上方,将所述第一调节组件(8)的所述第二螺栓(13)的下端与所述第一内螺纹套(3)相互螺纹连接;
步骤二:持所述第一调节组件(8)上的所述调节手柄(10)转动所述调节筒(12),使整个拆模装置向下移动,至使两个所述第二调节组件(9)的下端面的所述垫板(14)与所述混凝土楼面(16)相互接触配合;
步骤三:持所述第二调节组件(9)上的所述调节手柄(10)转动所述调节筒(12),使整个拆模装置向上移动,带动所述预埋件(1)松动,并将其拆出,实现预埋件,即预留洞模具的拆卸。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910141345.1A CN109680944B (zh) | 2019-02-26 | 2019-02-26 | 一种现浇混凝土预留洞模具的拆模装置及其拆模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910141345.1A CN109680944B (zh) | 2019-02-26 | 2019-02-26 | 一种现浇混凝土预留洞模具的拆模装置及其拆模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109680944A CN109680944A (zh) | 2019-04-26 |
CN109680944B true CN109680944B (zh) | 2023-10-20 |
Family
ID=66197033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910141345.1A Active CN109680944B (zh) | 2019-02-26 | 2019-02-26 | 一种现浇混凝土预留洞模具的拆模装置及其拆模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680944B (zh) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000192664A (ja) * | 1998-12-25 | 2000-07-11 | Kumagai Gumi Co Ltd | 建物の構築方法 |
JP2004036137A (ja) * | 2002-07-01 | 2004-02-05 | Sunrise Square Hanbai Kk | コンクリートアンカー |
JP2004257194A (ja) * | 2003-02-27 | 2004-09-16 | Sunrise Square Hanbai Kk | コンクリートアンカー |
JP2006077538A (ja) * | 2004-09-13 | 2006-03-23 | Giken:Kk | 棒状体取付装置及び貫通孔形成用スリーブ管装置 |
CN204024053U (zh) * | 2014-07-31 | 2014-12-17 | 山东三箭建设工程股份有限公司 | 一种现浇混凝土楼板管道预留洞模具 |
WO2016013969A1 (en) * | 2014-07-25 | 2016-01-28 | Fredriksson Roland | A method of and means for positioning of an outer form panel used as a part of a form for concreting of walls |
CN106522546A (zh) * | 2016-10-25 | 2017-03-22 | 中国冶集团有限公司 | 用于混凝土结构物预留洞孔槽底模的拆除装置及拆模方法 |
DE102015012483A1 (de) * | 2015-09-24 | 2017-03-30 | Stefan Heimerl | Abziehvorrichtung für Abschalelemente im Betonbau |
CN108265976A (zh) * | 2017-12-05 | 2018-07-10 | 徐硕 | 一种管道孔洞预留装置及操作方法 |
CN108385976A (zh) * | 2018-04-08 | 2018-08-10 | 曾翰跃 | 一种便携式建筑领域用拆模装置 |
CN207776445U (zh) * | 2018-01-18 | 2018-08-28 | 福建易安特新型建材有限公司 | 一种带侧连接销孔的拼接式混凝土顶板的拆模装置 |
CN109208906A (zh) * | 2018-09-06 | 2019-01-15 | 刘小平 | 一种建筑工地用模板拆模装置 |
CN209653408U (zh) * | 2019-02-26 | 2019-11-19 | 中建八局第一建设有限公司 | 一种现浇混凝土预留洞模具的拆模装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2281212B1 (es) * | 2002-11-18 | 2008-08-16 | Sistemas Industrializados Barcons, S.L. | Perfeccionamientos en los sistemas de construccion de estructuras de hormigon armado u otro material mediante encofrados modulares e integrales de alta precision. |
-
2019
- 2019-02-26 CN CN201910141345.1A patent/CN109680944B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000192664A (ja) * | 1998-12-25 | 2000-07-11 | Kumagai Gumi Co Ltd | 建物の構築方法 |
JP2004036137A (ja) * | 2002-07-01 | 2004-02-05 | Sunrise Square Hanbai Kk | コンクリートアンカー |
JP2004257194A (ja) * | 2003-02-27 | 2004-09-16 | Sunrise Square Hanbai Kk | コンクリートアンカー |
JP2006077538A (ja) * | 2004-09-13 | 2006-03-23 | Giken:Kk | 棒状体取付装置及び貫通孔形成用スリーブ管装置 |
WO2016013969A1 (en) * | 2014-07-25 | 2016-01-28 | Fredriksson Roland | A method of and means for positioning of an outer form panel used as a part of a form for concreting of walls |
CN204024053U (zh) * | 2014-07-31 | 2014-12-17 | 山东三箭建设工程股份有限公司 | 一种现浇混凝土楼板管道预留洞模具 |
DE102015012483A1 (de) * | 2015-09-24 | 2017-03-30 | Stefan Heimerl | Abziehvorrichtung für Abschalelemente im Betonbau |
CN106522546A (zh) * | 2016-10-25 | 2017-03-22 | 中国冶集团有限公司 | 用于混凝土结构物预留洞孔槽底模的拆除装置及拆模方法 |
CN108265976A (zh) * | 2017-12-05 | 2018-07-10 | 徐硕 | 一种管道孔洞预留装置及操作方法 |
CN207776445U (zh) * | 2018-01-18 | 2018-08-28 | 福建易安特新型建材有限公司 | 一种带侧连接销孔的拼接式混凝土顶板的拆模装置 |
CN108385976A (zh) * | 2018-04-08 | 2018-08-10 | 曾翰跃 | 一种便携式建筑领域用拆模装置 |
CN109208906A (zh) * | 2018-09-06 | 2019-01-15 | 刘小平 | 一种建筑工地用模板拆模装置 |
CN209653408U (zh) * | 2019-02-26 | 2019-11-19 | 中建八局第一建设有限公司 | 一种现浇混凝土预留洞模具的拆模装置 |
Non-Patent Citations (1)
Title |
---|
现浇混凝土构件静态脱模施工技术;王忠凯;王家阳;;湖北工业大学学报(第05期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN109680944A (zh) | 2019-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110939268A (zh) | 一种楼板预留孔洞封堵装置及封堵方法 | |
CN101525940B (zh) | 易脱混凝土模板装置及支模脱模方法 | |
CN109680944B (zh) | 一种现浇混凝土预留洞模具的拆模装置及其拆模方法 | |
CN108590175B (zh) | 屋顶排气管道施工工装 | |
CN201339322Y (zh) | 大钢模板专用脱模器 | |
CN213979903U (zh) | 一种新型建筑模板 | |
CN202299427U (zh) | 建筑钢模板连接定位装置 | |
CN2632213Y (zh) | 模板紧固装置 | |
CN209653408U (zh) | 一种现浇混凝土预留洞模具的拆模装置 | |
CN110666942A (zh) | 一种新型预制装配式混凝土楼梯模具制造方法 | |
CN215887926U (zh) | 一种斜腹板挂篮内模调节角模 | |
CN220226243U (zh) | 一种建筑工程模板固定装置 | |
CN211898503U (zh) | 一种用于塔机的固定节安装的调平工装 | |
CN217704263U (zh) | 一种可拆装重复使用的模具 | |
CN211104692U (zh) | 一种易于拆模的预制墙板成型模具 | |
CN211621073U (zh) | 一种便捷可快速高质量安装的路缘石以及对应的成型模具 | |
CN220814929U (zh) | 一种绿色建筑施工支撑结构 | |
CN204152205U (zh) | 装饰清水混凝土施工方法所用对拉螺栓孔模具 | |
CN216616830U (zh) | 一种建筑施工用铝模板 | |
CN210589826U (zh) | 浇筑模具拆卸工装 | |
CN203030827U (zh) | 一种铝行业除气机内衬的浇铸模具 | |
CN211250598U (zh) | 一种楼梯板的浇筑模具 | |
CN213143867U (zh) | 一种建筑工程结构预留洞成型装置 | |
CN218425185U (zh) | 一种五金件加工用的冲压模具 | |
CN217861906U (zh) | 一种建筑混凝土预制板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |