CN109680112A - Last furnace shell cooling wall installation system and installation method - Google Patents
Last furnace shell cooling wall installation system and installation method Download PDFInfo
- Publication number
- CN109680112A CN109680112A CN201910141094.7A CN201910141094A CN109680112A CN 109680112 A CN109680112 A CN 109680112A CN 201910141094 A CN201910141094 A CN 201910141094A CN 109680112 A CN109680112 A CN 109680112A
- Authority
- CN
- China
- Prior art keywords
- furnace shell
- cooling wall
- telescopic rod
- frame
- out against
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Muffle Furnaces And Rotary Kilns (AREA)
Abstract
The invention discloses a kind of last furnace shell cooling wall installation system and installation methods, the system includes adjustable holding device, the hanger of muti-piece cooling wall can be lifted in furnace shell and with the operating platform of furnace shell central axis and simultaneously, adjustable holding device includes telescopic rod, telescopic rod one end can 360 degree rotation it is hinged on the operational platform, middle part is slidably supported on the operational platform by support, the other end, which is fixed with, holds out against frame, the hinge joint of telescopic rod is located on furnace shell central axis, hold out against the hydraulic top that frame is equipped with multiple linkages, the cooling wall held out against on the hydraulic top and hanger on frame corresponds.The system can install multiple cooling walls simultaneously, and installation accuracy is high, and installation effectiveness is high.
Description
Technical field
The invention belongs to blast furnace installing areas, and in particular to a kind of last furnace shell cooling wall installation system and installation method.
Background technique
Currently, quantity is more when last furnace shell cooling wall is installed, heavy workload, task weight, can only installation one by one,
Labor intensive is excessive, and construction efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of last furnace shell cooling wall installation system and installation method, which can pacify simultaneously
Multiple cooling walls are filled, installation accuracy is high, and installation effectiveness is high.
The technical scheme adopted by the invention is that:
A kind of last furnace shell cooling wall installation system, including adjustable holding device, be located at furnace shell in and with furnace shell central axis
Vertical operating platform and the hanger that can lift muti-piece cooling wall simultaneously, adjustable holding device includes telescopic rod, telescopic rod one end
Can 360 degree rotation it is hinged on the operational platform, middle part by support slidably support on the operational platform, the other end fixes
Frame is held out against, the hinge joint of telescopic rod is located on furnace shell central axis, holds out against the hydraulic top that frame is equipped with multiple linkages, holds out against on frame
Hydraulic top and hanger on cooling wall correspond.
Further, support is at least two groups A-frame, and the top of A-frame is connect with telescopic rod, two supporting legs of A-frame
Bottom end be equipped with pulley.
Further, the inner bearing casing and outer bearing casing by bearing fit are equipped at the hinge joint of telescopic rod, it is interior
Bearing sleeve upper end is connect with telescopic rod, lower end is equipped with and sells for the line position of Anti-extrusion, and outer bearing casing is fixed with operating platform.
A kind of last furnace shell cooling wall installation method based on above-mentioned last furnace shell cooling wall installation system is first flat by operation
Platform be fixed in furnace shell and guarantee with furnace shell central axis, then assemble adjustable holding device, when assembling, first cut with scissors telescopic rod
It connects on the operational platform, then the erection support on telescopic rod, then installation holds out against frame and hydraulic top on telescopic rod, after assembling, first
It is lifted near muti-piece cooling wall to hole to be installed simultaneously by hanger, then adjusts the rotation angle and collapsing length of telescopic rod
So that hydraulic top corresponds and hold out against cooling wall, all cooling walls are headed into corresponding hole finally by hydraulic top.
The beneficial effects of the present invention are:
The system is headed into cooling wall in hole by hydraulic top, by adjusting the rotation angle and collapsing length of telescopic rod
So as to adjust the setting angle of cooling wall and hole, therefore installation accuracy is high;The system can install multiple cooling walls simultaneously and lead to
It crosses hydraulic top and applies pressure, installation effectiveness is high, reduces construction cost.
Detailed description of the invention
Fig. 1 is the operation schematic diagram of the embodiment of the present invention.
Fig. 2 is the schematic diagram of adjustable holding device and hanger in Fig. 1.
Fig. 3 is the top view of adjustable holding device in Fig. 1.
Fig. 4 is the schematic diagram in Fig. 1 at hinge joint.
In figure: 1- furnace shell;2- hanger;3- cooling wall;4- hydraulic top;5- holds out against frame;6- telescopic rod;7- hinge joint;8- behaviour
Make platform;9- support;10- inner bearing casing;11- bearing;12- outer bearing casing;13- line position pin.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1 to Figure 3, a kind of last furnace shell cooling wall installation system, including adjustable holding device, be located at furnace shell 1
It is interior and can lift with the operating platform 8 of 1 central axis of furnace shell and simultaneously the hanger 2 of muti-piece cooling wall 3, adjustable holding device packet
Include telescopic rod 6,6 one end of telescopic rod being hinged on operating platform 8 of 360 degree rotation, middle part is slidably supported by support 9
On operating platform 8, the other end be fixed with and hold out against frame 5, the hinge joint 7 of telescopic rod 6 is located on 1 central axis of furnace shell, holds out against on frame 5
Hydraulic top 4 equipped with multiple linkages, the cooling wall 3 held out against on hydraulic top 4 and hanger 2 on frame 5 correspond.When work: first
Operating platform 8 is fixed in furnace shell 1 and guarantee with 1 central axis of furnace shell, then assemble adjustable holding device, when assembling,
First telescopic rod 6 is hinged on operating platform 8, then the erection support 9 on telescopic rod 6, then installation holds out against frame 5 on telescopic rod 6
And hydraulic top 4, after assembling, first passes through hanger 2 while lifting near muti-piece cooling wall 3 to hole to be installed, then adjust flexible
The rotation angle and collapsing length of bar 6 correspond hydraulic top 4 and hold out against cooling wall 3, will own finally by hydraulic top 4
Cooling wall 3 heads into corresponding hole.The system is headed into cooling wall 3 in hole by hydraulic top 4, by adjusting telescopic rod 6
Rotation angle and collapsing length so as to adjust the setting angle of cooling wall 3 and hole, therefore installation accuracy is high;The system can be same
When multiple cooling walls 3 are installed and pressure is applied by hydraulic top 4, installation effectiveness is high, reduces construction cost.
As shown in Figure 1 to Figure 3, in the present embodiment, support 9 is at least two groups A-frame, the top of A-frame and flexible
Bar 6 connects, and the bottom end of two supporting legs of A-frame is equipped with pulley, forms gusseted using A-frame, and not only stability is high, also
It is fairly simple.
As shown in figure 4, in the present embodiment, the internal bearing sleeve cooperated by bearing 11 is equipped at the hinge joint 7 of telescopic rod 6
Pipe 10 and outer bearing casing 11 (inner bearing casing 10 and 11 length of outer bearing casing can be 200~500mm), inner bearing casing 10
Upper end is connect with telescopic rod 6, lower end is equipped with the line position pin 13 for Anti-extrusion, and outer bearing casing 12 and operating platform 8 are fixed, is adopted
It is rotated with sliding is rolled, rotation is smooth, and service life is high.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description,
And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.
Claims (4)
1. a kind of last furnace shell cooling wall installation system, it is characterised in that: including adjustable holding device, be located at furnace shell in and and furnace
The operating platform of shell central axis and the hanger that can lift muti-piece cooling wall simultaneously, adjustable holding device includes telescopic rod, is stretched
Contracting bar one end can 360 degree rotation it is hinged on the operational platform, middle part slidably supported on the operational platform, separately by support
One end, which is fixed with, holds out against frame, and the hinge joint of telescopic rod is located on furnace shell central axis, holds out against the hydraulic top that frame is equipped with multiple linkages,
The cooling wall held out against on the hydraulic top and hanger on frame corresponds.
2. last furnace shell cooling wall installation system as described in claim 1, it is characterised in that: support is at least two groups herringbone
The top of frame, A-frame is connect with telescopic rod, and the bottom end of two supporting legs of A-frame is equipped with pulley.
3. last furnace shell cooling wall installation system as described in claim 1, it is characterised in that: be equipped at the hinge joint of telescopic rod
By the inner bearing casing and outer bearing casing of bearing fit, inner bearing sleeve upper end is connect with telescopic rod, lower end is equipped with and is used for
The line position of Anti-extrusion is sold, and outer bearing casing is fixed with operating platform.
4. a kind of last furnace shell cooling wall based on the last furnace shell cooling wall installation system as described in claims 1 to 3 is any
Installation method, it is characterised in that: first operating platform is fixed in furnace shell and guarantee with furnace shell central axis, then assembling can
Holding device is adjusted, when assembling, hingedly on the operational platform by telescopic rod first, then the erection support on telescopic rod, then in telescopic rod
Upper installation holds out against frame and hydraulic top, after assembling, first passes through hanger while lifting near muti-piece cooling wall to hole to be installed, then
The rotation angle and collapsing length for adjusting telescopic rod correspond hydraulic top and hold out against cooling wall, will finally by hydraulic top
All cooling walls head into corresponding hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910141094.7A CN109680112B (en) | 2019-02-26 | 2019-02-26 | Blast furnace shell cooling wall installation system and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910141094.7A CN109680112B (en) | 2019-02-26 | 2019-02-26 | Blast furnace shell cooling wall installation system and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109680112A true CN109680112A (en) | 2019-04-26 |
CN109680112B CN109680112B (en) | 2021-05-18 |
Family
ID=66197005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910141094.7A Active CN109680112B (en) | 2019-02-26 | 2019-02-26 | Blast furnace shell cooling wall installation system and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680112B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113549718A (en) * | 2021-07-19 | 2021-10-26 | 鞍钢建设集团有限公司 | Replacement method of blast furnace cooling wall |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5798609A (en) * | 1980-12-08 | 1982-06-18 | Sumitomo Metal Ind Ltd | Method for cooling blast furnace body |
JP2001254113A (en) * | 2000-03-10 | 2001-09-18 | Sankyu Inc | Method of fitting wall member onto steel-made wall |
CN201648416U (en) * | 2010-04-20 | 2010-11-24 | 中冶实久建设有限公司 | Holding pole device for installation of cooling wall of blast furnace |
CN102212630A (en) * | 2011-05-23 | 2011-10-12 | 北京首钢建设集团有限公司 | Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold |
CN202297632U (en) * | 2011-10-27 | 2012-07-04 | 鞍钢建设集团有限公司 | Hydraulic jacking device for mounting cooling wall of blast furnace |
CN202412173U (en) * | 2011-12-23 | 2012-09-05 | 中国一冶集团有限公司 | Installation device for cooling wall at conical section of furnace shell of blast furnace |
CN204589214U (en) * | 2015-04-14 | 2015-08-26 | 中国十九冶集团有限公司南京分公司 | The installation thrustor of blast furnace cooling stave |
CN108384909A (en) * | 2018-04-17 | 2018-08-10 | 中冶天工集团天津有限公司 | A kind of blast furnace cooling stave mounting device and its application method |
-
2019
- 2019-02-26 CN CN201910141094.7A patent/CN109680112B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5798609A (en) * | 1980-12-08 | 1982-06-18 | Sumitomo Metal Ind Ltd | Method for cooling blast furnace body |
JP2001254113A (en) * | 2000-03-10 | 2001-09-18 | Sankyu Inc | Method of fitting wall member onto steel-made wall |
CN201648416U (en) * | 2010-04-20 | 2010-11-24 | 中冶实久建设有限公司 | Holding pole device for installation of cooling wall of blast furnace |
CN102212630A (en) * | 2011-05-23 | 2011-10-12 | 北京首钢建设集团有限公司 | Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold |
CN202297632U (en) * | 2011-10-27 | 2012-07-04 | 鞍钢建设集团有限公司 | Hydraulic jacking device for mounting cooling wall of blast furnace |
CN202412173U (en) * | 2011-12-23 | 2012-09-05 | 中国一冶集团有限公司 | Installation device for cooling wall at conical section of furnace shell of blast furnace |
CN204589214U (en) * | 2015-04-14 | 2015-08-26 | 中国十九冶集团有限公司南京分公司 | The installation thrustor of blast furnace cooling stave |
CN108384909A (en) * | 2018-04-17 | 2018-08-10 | 中冶天工集团天津有限公司 | A kind of blast furnace cooling stave mounting device and its application method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113549718A (en) * | 2021-07-19 | 2021-10-26 | 鞍钢建设集团有限公司 | Replacement method of blast furnace cooling wall |
Also Published As
Publication number | Publication date |
---|---|
CN109680112B (en) | 2021-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204802753U (en) | Interval adjustable cable winding device | |
CN205367529U (en) | Balancing hanger of crane | |
CN210370009U (en) | Assembled wallboard strutting arrangement | |
CN201593299U (en) | Hanging basket for construction engineering | |
CN110616901A (en) | Building material building frame is built in room | |
CN109680112A (en) | Last furnace shell cooling wall installation system and installation method | |
CN209603534U (en) | Multifunctional wall body corrects instrument | |
CN206233542U (en) | It is a kind of to hang die device for jacking construction platform | |
CN109914852A (en) | A kind of Construction of Civil Engineering supporting construction | |
CN108442706A (en) | Concrete distributing device | |
CN109610878B (en) | Multifunctional wall body correcting instrument and wall body correcting method | |
CN207726600U (en) | A kind of tubular body promotion claw | |
CN210705391U (en) | Assembled water drilling equipment | |
CN206545379U (en) | Supporting surface gradient adjustable jack | |
CN206053355U (en) | A kind of tower concrete spreader | |
CN209313364U (en) | Distribution box fittable slackening device | |
CN117146164B (en) | Suspension bracket of laser level meter | |
CN208235320U (en) | A kind of highway bridge modulus type expansion joint mounting suspension | |
CN209229133U (en) | A kind of underground piping partial collapse prosthetic device | |
CN209725630U (en) | Rice weight control system | |
CN215358305U (en) | Combine and adopt working face emulsion pump head to dismantle strutting arrangement | |
CN215976734U (en) | Regulation formula highway engineering template bearing structure | |
CN211648035U (en) | Oil pipe bridge support | |
CN209409229U (en) | Vertical type can be rotated silica gel pan feeding gun barrel mechanism and its silicon rubber Jet forming machine | |
CN221137492U (en) | Robot chassis linkage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |