CN109670605A - The O&M repairing operational method and platform of power grid equipment under a bureau - Google Patents
The O&M repairing operational method and platform of power grid equipment under a bureau Download PDFInfo
- Publication number
- CN109670605A CN109670605A CN201811496362.9A CN201811496362A CN109670605A CN 109670605 A CN109670605 A CN 109670605A CN 201811496362 A CN201811496362 A CN 201811496362A CN 109670605 A CN109670605 A CN 109670605A
- Authority
- CN
- China
- Prior art keywords
- power grid
- bureau
- equipment under
- failure
- work order
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
There is provided the O&M repairing operational method and platform of a kind of power grid equipment under a bureau, which is characterized in that the described method includes: (A) obtains the relevant information of the power grid equipment under a bureau about failure;(B) electronic work order is obtained using the relevant information of the power grid equipment under a bureau of the failure;(C) electronic work order is stored, alternatively, the electronic work order is sent to power grid repairing O&M job platform.According to the method and platform, power supply company spent cost and repairing situation is repaired to power grid equipment under a bureau the input of the template type of the relevant information of power grid of the repair personnel to failure equipment under a bureau to present in the form of electronic contract, the many and diverse finish message of power supply company back office force and statistical work can effectively be mitigated, data statistics and maintenance management can also be carried out convenient for subsequent power supply company, the social responsibility precise quantification for undertaking power supply company, provides important evidence for Engineering Project Audit.
Description
Technical field
This invention relates generally to grid equipments to repair field, more particularly, is related to a kind of power grid equipment under a bureau
O&M repairs operational method and platform.
Background technique
Currently, the operation maintenance management of power grid power supply unit, it is normally based on the property ownership of power supply unit to determine, example
Such as, belong to dedicated nature under a bureau, but the power supply unit not in communal substation, by operation maintenance management under a bureau;Belong to shared
Property or the power supply unit for occupying shared line planning corridor, are managed collectively by power supply company.
However, although power supply company adheres to the problem of " Zhang Gong list, a troop, primary scene " settlement mechanism, greatly
The work flow time is shortened greatly, first-aid repair efficiency is improved, has fulfiled the social responsibility of power supply enterprise, it is still, under a bureau at present to set
Standby repairing operation management work still suffers from more problem, for example, due to the operation for lacking engineering supervision experiences and specification
Process, the Workload Account for resulting in repairing maintenance of the power supply company for equipment under a bureau is more chaotic, existing work flow
It is unfavorable for transport inspection department and carries out engineering packing, influences the application of corresponding fund;Equipment under a bureau repairs work randomness by force and perambulator
Member and repair personnel can't occur simultaneously at the scene, and therefore, the material statistics difficulty of emergency first-aid repair is larger, further, since not
The bill of materials of emergency first-aid repair is provided, therefore, the staff for not knowing about the power supply company of engineering first-aid repair field condition can not be by
Engineering Settlement provides engineering cost detail list.
Summary of the invention
Exemplary embodiment of the present invention is that the O&M for providing a kind of power grid equipment under a bureau repairs operational method and platform,
It can overcome it is existing to power grid equipment under a bureau repairing record it is lack of standardization, repairing accessory supply estimate inaccuracy, Wu Faji
When calculate repairing expense defect.
The one side of an exemplary embodiment of the present invention provides a kind of O&M repairing operator of power grid equipment under a bureau
Method, which is characterized in that the described method includes: (A) obtains the relevant information of the power grid equipment under a bureau about failure;(B) institute is utilized
The relevant information for stating the power grid equipment under a bureau of failure obtains electronic work order;(C) electronic work order is stored, alternatively, by the electricity
Sub- work order is sent to power grid repairing O&M job platform.
Optionally, step (B) includes: to repair O&M job platform using the electronic work order template prestored or from the power grid
The relevant information of the power grid equipment under a bureau of received electronic work order template and the failure generates electronic work order, alternatively, from described
Power grid repairs operation platform and receives the electronic work order.
Optionally, the relevant information of the power grid about failure equipment under a bureau includes at least one in following item: therefore
The power grid of failure before the work order number of the power grid of barrier equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance is under a bureau to be set
The maintenance items information of the power grid equipment under a bureau of standby picture, failure, the materials information of the power grid equipment under a bureau of failure, failure
Non- materials information, the maintenance time of the power grid equipment under a bureau of failure and the electric network fault of the failure after maintenance of power grid equipment under a bureau
The picture of equipment.
Optionally, the materials information of the power grid of failure equipment under a bureau includes at least one in following item: maintenance event
Type, specification and the quantity of material needed for the power grid of barrier equipment under a bureau;The non-materials of the power grid of failure equipment under a bureau are believed
Breath includes at least one in following item: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, step (B) includes: the materials of the power grid equipment under a bureau of price and maintenance failure based on the material prestored
The expense of each material needed for information determines the power grid of maintenance failure equipment under a bureau;Price based on the special equipment prestored is true
Special equipment expense needed for determining the power grid equipment under a bureau of maintenance failure;It is every needed for power grid equipment under a bureau based on maintenance failure
The expense of each material needed for the expense and special equipment expense of item material generate the power grid equipment under a bureau including maintenance failure,
The power grid of special equipment expense and total cost equipment under a bureau repairs bill of materials, wherein the power grid equipment under a bureau repairs object
Material inventory is included in the electronic work order.
Another aspect according to an exemplary embodiment of the present invention provides a kind of O&M repairing operation horizontal of power grid equipment under a bureau
Platform, which is characterized in that the platform includes: information acquisition unit, obtains the relevant information of the power grid equipment under a bureau about failure;
Processing unit obtains electronic work order using the relevant information of the power grid of failure equipment under a bureau;Interactive unit stores the electricity
Sub- work order, alternatively, the electronic work order is sent to power grid repairing O&M job platform.
Optionally, processing unit is received using the electronic work order template prestored or from power grid repairing O&M job platform
Electronic work order template and the failure power grid equipment under a bureau relevant information generate electronic work order, alternatively, from the power grid
It repairs operation platform and receives the electronic work order.
Optionally, the relevant information of the power grid about failure equipment under a bureau includes at least one in following item: therefore
The power grid of failure before the work order number of the power grid of barrier equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance is under a bureau to be set
The maintenance items information of the power grid equipment under a bureau of standby picture, failure, the materials information of the power grid equipment under a bureau of failure, failure
Non- materials information, the maintenance time of the power grid equipment under a bureau of failure and the electric network fault of the failure after maintenance of power grid equipment under a bureau
The picture of equipment.
Optionally, the materials information of the power grid of failure equipment under a bureau includes at least one in following item: maintenance event
Type, specification and the quantity of material needed for the power grid of barrier equipment under a bureau;The non-materials of the power grid of failure equipment under a bureau are believed
Breath includes at least one in following item: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, the processing unit includes: supplies expenses determination unit, the price based on the material prestored and maintenance event
The expense of each material needed for the materials information of the power grid of barrier equipment under a bureau determines the power grid of maintenance failure equipment under a bureau;Non- object
Material expense determination unit, based on the special equipment prestored price determine the power grid equipment under a bureau of maintenance failure needed for special type set
Standby expense;Bill of materials determination unit, the expense and special type of each material needed for the power grid equipment under a bureau based on maintenance failure
It includes the expense of each material needed for the power grid equipment under a bureau of maintenance failure, special equipment expense and total that cost of equipment, which generates,
The power grid of expense equipment under a bureau repairs bill of materials, wherein the power grid equipment repairing bill of materials under a bureau is included in the electricity
In sub- work order.
In accordance with an alternative illustrative embodiment of the present invention, a kind of electric terminal is provided, wherein the electric terminal includes:
Processor;Memory is stored with computer program, and power grid equipment under a bureau is realized when the computer program is executed by processor
O&M repair operational method.
Another aspect according to an exemplary embodiment of the present invention provides and a kind of is stored with the computer-readable of computer program
Storage medium, when the computer program realizes that the O&M of power grid according to the present invention equipment under a bureau is robbed when being executed by processor
Repair operational method.
It repairs in operational method and platform, passes through in the O&M of power grid according to an exemplary embodiment of the present invention equipment under a bureau
Repair personnel inputs power supply company to power grid equipment under a bureau the template type of the relevant information of the power grid of failure equipment under a bureau
It is repaired spent cost and repairing situation to present in the form of electronic contract, can effectively be mitigated in power supply company
The many and diverse finish message of diligent personnel and statistical work can also carry out data statistics and maintenance management convenient for subsequent power supply company,
The social responsibility precise quantification for undertaking power supply company, provides important evidence for Engineering Project Audit.
Part in following description is illustrated into the other aspect and/or advantage of present general inventive concept, there are also one
Dividing will be apparent by description, or can learn by the implementation of present general inventive concept.
Detailed description of the invention
Pass through the detailed description carried out below with reference to the attached drawing for being exemplarily illustrated embodiment, exemplary embodiment of the present
Above and other purpose will become apparent, in which:
Fig. 1 shows the process of the O&M repairing operational method of power grid according to an exemplary embodiment of the present invention equipment under a bureau
Figure;
Fig. 2 shows the relevant informations according to an exemplary embodiment of the present invention for obtaining the power grid equipment under a bureau about failure
Example;
Fig. 3 shows the block diagram of the O&M repairing job platform of power grid according to an exemplary embodiment of the present invention equipment under a bureau.
Specific embodiment
It reference will now be made in detail exemplary embodiment of the present invention, examples of the embodiments are shown in the accompanying drawings, wherein phase
Same number refers to identical component always.It will illustrate the embodiment, by referring to accompanying drawing below to explain this hair
It is bright.
Fig. 1 shows the process of the O&M repairing operational method of power grid according to an exemplary embodiment of the present invention equipment under a bureau
Figure.The method can be realized by computer program.For example, the method can be by the power grid office that is mounted in electric terminal
The application for belonging to the repairing operation of equipment O&M executes, or the function program realized in the operating system for passing through electric terminal is held
Row.Here, the electric terminal for realizing the method can be mobile communication terminal (for example, smart phone), individual calculus
The electric terminals such as machine, tablet computer, game machine, digital multimedia player.
Referring to Fig.1, in step S100, the relevant information of the power grid equipment under a bureau about failure is obtained.
Particularly, as an example, failure can be obtained by receiving input or the selection operation of O&M repair personnel
The relevant information of power grid equipment under a bureau.
As an example, the relevant information of the power grid about failure equipment under a bureau may include at least one in following item
: the power grid office of the failure before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance
Belong to the picture of equipment, the maintenance items information of the power grid equipment under a bureau of failure, the materials information of the power grid equipment under a bureau of failure, event
Non- materials information, the maintenance time of the power grid equipment under a bureau of failure and the power grid of the failure after maintenance of the power grid of barrier equipment under a bureau
The picture of faulty equipment.
In addition, as an example, the materials information of the power grid of failure equipment under a bureau may include at least one in following item
: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The power grid of failure equipment under a bureau
Non- materials information may include in following item at least one of: special equipment type needed for the power grid of maintenance failure equipment under a bureau and
Specification.
Fig. 2 shows the relevant informations according to an exemplary embodiment of the present invention for obtaining the power grid equipment under a bureau about failure
Example.
Assuming that the application that the method can repair operation by the power grid being mounted in electric terminal equipment O&M under a bureau comes
It executes, and is inputted by received O&M repair personnel to obtain the relevant information of the power grid equipment under a bureau of failure.
Particularly, as shown in (a) in Fig. 2, firstly, can receive O&M repair personnel to the grid equipment repaired
The selection operation of nature of property right is then jumped to as shown in (b) in Fig. 2 for example, O&M repair personnel has selected " equipment under a bureau "
The page, receive the information source made a report on of O&M repair personnel and work order number, click " next step " in O&M repair personnel
After operation, the page as shown in (c) in Fig. 2 is jumped to, obtained in predetermined map using localization methods such as GIS and shows event
The detail location of the power grid of barrier equipment under a bureau jumps to after the operation that O&M repair personnel clicks " next step " as in Fig. 2
(d) page shown in, the picture before shooting and uploading the power grid maintenance of equipment under a bureau of failure, O&M repair personnel click " under
After the operation of one step ", the page as shown in (e) in Fig. 2 is jumped to, receive that O&M repair personnel is under a bureau to the power grid of failure to be set
The selection operation of standby maintenance items jumps to after the operation that O&M repair personnel clicks " next step " such as (f) in Fig. 2
Shown in the page, receive O&M repair personnel to maintenance power grid equipment under a bureau used in material and non-material selection operation,
For example, the selected material of O&M repair personnel is " 30 meters of the cable of BX model ", non-material is " one, 12 tons of crane ",
" artificial 4 people of daily requirement " jumps to as shown in (g) in Fig. 2 after the operation that O&M repair personnel clicks " next step "
The page, obtains the maintenance time of the power grid equipment under a bureau of maintenance failure, and the power grid for receiving the failure after uploading maintenance under a bureau is set
Standby picture.
In step S200, electronic work order is obtained using the relevant information of the power grid of failure equipment under a bureau.
Here, the step of electronic work order preview part is obtained about the relevant information of the power grid equipment under a bureau using the failure
Suddenly, there can be following three exemplary embodiments:
In first exemplary embodiment, set using the power grid of the electronic work order template that prestores and the failure is under a bureau
Standby relevant information generates electronic work order.
In second exemplary embodiment, the received electronic work order of O&M job platform is repaired using from the power grid
The relevant information of the power grid equipment under a bureau of template and the failure generates electronic work order.
In third exemplary embodiment, operation platform can be repaired from the power grid and receive the electronic work order.
Here, in second and third exemplary embodiment, the power grid repairing O&M job platform may be provided at service
In device, for carrying out data interaction with the electric terminal for the platform for being provided with execution the method.
It particularly, can be by specific rule to the electronic work order prestored in the first and second exemplary embodiments
Template and the equipment under a bureau of the power grid about failure obtained carry out integration processing, to obtain electronic contract preview part, as an example,
Information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance content, maintenance time can be covered in the electronic work order
Etc. entries.Optionally, above-mentioned certain entries can obtain in the following manner:
It is repaired for example, can be determined based on the materials information of the price of the material prestored and the power grid of maintenance failure equipment under a bureau
The expense of each material needed for the power grid of failure equipment under a bureau;Maintenance failure can be determined based on the price of the special equipment prestored
Power grid equipment under a bureau needed for special equipment expense;It can each material needed for the power grid equipment under a bureau based on maintenance failure
The expense of each material needed for expense and special equipment expense generate the power grid equipment under a bureau including maintenance failure, special equipment
The power grid of expense and total cost equipment under a bureau repairs bill of materials, and here, the power grid equipment under a bureau repairs bill of materials packet
It includes in the electronic work order.
In step S300, the electronic work order is stored, alternatively, the electronic work order is sent to power grid repairing O&M operation
Platform.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example
Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come
It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe
Reason and displaying.
Fig. 3 shows the block diagram of the O&M repairing job platform of power grid according to an exemplary embodiment of the present invention equipment under a bureau.
As shown in figure 3, the O&M repairing job platform of power grid equipment under a bureau according to an exemplary embodiment of the present invention includes acquisition of information
Unit 100, processing unit 200 and interactive unit 300.
Particularly, information acquisition unit 100 obtains the relevant information of the power grid equipment under a bureau about failure.
It is set as an example, the power grid that can obtain failure by receiving input or the selection operation of O&M repair personnel is under a bureau
Standby relevant information.
As an example, the relevant information of the power grid about failure equipment under a bureau may include at least one in following item
: the power grid office of the failure before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance
Belong to the picture of equipment, the maintenance items information of the power grid equipment under a bureau of failure, the materials information of the power grid equipment under a bureau of failure, event
Non- materials information, the maintenance time of the power grid equipment under a bureau of failure and the power grid of the failure after maintenance of the power grid of barrier equipment under a bureau
The picture of faulty equipment.
In addition, as an example, the materials information of the power grid of failure equipment under a bureau may include at least one in following item
: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The power grid of failure equipment under a bureau
Non- materials information may include in following item at least one of: special equipment type needed for the power grid of maintenance failure equipment under a bureau and
Specification.
Processing unit 200 obtains electronic work order using the relevant information of the power grid equipment under a bureau of the failure.
Here, electronic work order is obtained using the relevant information of the power grid equipment under a bureau of the failure about processing unit 200
The processing of preview part can have following three exemplary embodiments:
In first exemplary embodiment, set using the power grid of the electronic work order template that prestores and the failure is under a bureau
Standby relevant information generates electronic work order.
In second exemplary embodiment, the received electronic work order of O&M job platform is repaired using from the power grid
The relevant information of the power grid equipment under a bureau of template and the failure generates electronic work order.
In third exemplary embodiment, operation platform can be repaired from the power grid and receive the electronic work order.
Here, in second and third exemplary embodiment, the power grid repairing O&M job platform may be provided at service
In device, for carrying out data interaction with the electric terminal for the platform for being provided with execution the method.
On the other hand, information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance can be covered in electronic work order
Content, the entries such as maintenance time.As an example, can be based on during the bill of materials entry of acquisition electronic work order preview part
The materials information of the price of the material prestored and the power grid of maintenance failure equipment under a bureau determines maintenance failure by pre-defined algorithm
Power grid equipment under a bureau needed for each material expense, it is true by pre-defined algorithm to may be based on the price of the special equipment prestored
Special equipment expense needed for determining the power grid equipment under a bureau of maintenance failure.
Interactive unit 300 stores the electronic work order, alternatively, the electronic work order is sent to power grid repairing O&M operation
Platform.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example
Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come
It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe
Reason and displaying.
Moreover, it should be understood that the O&M of power grid equipment under a bureau according to an exemplary embodiment of the present invention repairs job platform
In each unit can be implemented hardware component and/or component software.Those skilled in the art are according to each unit institute of restriction
The processing of execution, can such as use site programmable gate array (FPGA) or specific integrated circuit (ASIC) realize each list
Member.
The computer readable storage medium of an exemplary embodiment of the present invention, be stored with makes when being executed by a processor
The O&M for obtaining the power grid equipment under a bureau that processor executes the above exemplary embodiments repairs the computer program of operational method.The meter
Calculation machine readable storage medium storing program for executing is the arbitrary data storage device that can store the data read by computer system.It is computer-readable to deposit
The example of storage media includes: read-only memory, random access memory, CD-ROM, tape, floppy disk, optical data storage devices
It (is such as transmitted through wired or wireless transmission path by the data of internet) with carrier wave.
The electric terminal of an exemplary embodiment of the present invention includes: that processor (not shown) and memory (do not show
Out), wherein memory is stored with computer program, when the computer program is executed by processor, realizes such as above-mentioned example
Property embodiment power grid equipment under a bureau O&M repair operational method.
In conclusion the O&M repairing operational method peace of power grid equipment under a bureau according to an exemplary embodiment of the present invention
Platform is inputted power supply company by the template type of the relevant information of power grid of the repair personnel to failure equipment under a bureau to power grid office
Category equipment is repaired spent cost and repairing situation and is presented in the form of electronic contract, and power supply can be effectively mitigated
The many and diverse finish message of company back office force and statistical work can also carry out data statistics and maintenance convenient for subsequent power supply company
Management, the social responsibility precise quantification for undertaking power supply company provide important evidence for Engineering Project Audit.
Although being particularly shown and describing the present invention, those skilled in the art referring to its exemplary embodiment
It should be understood that in the case where not departing from the spirit and scope of the present invention defined by claim form can be carried out to it
With the various changes in details.
Claims (10)
1. a kind of O&M of power grid equipment under a bureau repairs operational method, which is characterized in that the described method includes:
(A) relevant information of the power grid equipment under a bureau about failure is obtained;
(B) electronic work order is obtained using the relevant information of the power grid equipment under a bureau of the failure;
(C) electronic work order is stored, alternatively, the electronic work order is sent to power grid repairing O&M job platform.
2. the method as described in claim 1, which is characterized in that step (B) includes:
The received electronic work order template of O&M job platform and institute are repaired using the electronic work order template prestored or from the power grid
The relevant information for stating the power grid equipment under a bureau of failure generates electronic work order.
3. the method as described in claim 1, which is characterized in that the relevant information packet of the power grid about failure equipment under a bureau
Include at least one in following item:
The power grid of failure before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance
The picture of equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, the materials information of the power grid equipment under a bureau of failure,
Non- materials information, the maintenance time of the power grid equipment under a bureau of failure and the electricity of the failure after maintenance of the power grid of failure equipment under a bureau
The picture of net faulty equipment.
4. method as claimed in claim 3, which is characterized in that the materials information of the power grid of failure equipment under a bureau include with
At least one of in lower item: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The failure
The non-materials information of power grid equipment under a bureau includes at least one in following item: spy needed for the power grid of maintenance failure equipment under a bureau
Kind device type and specification.
5. method as claimed in claim 4, which is characterized in that step (B) includes:
The materials information of the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines the power grid of maintenance failure
The expense of each material needed for equipment under a bureau;
Based on the special equipment prestored price determine the power grid equipment under a bureau of maintenance failure needed for special equipment expense;
It includes maintenance that the expense and special equipment expense of each material needed for power grid equipment under a bureau based on maintenance failure, which generate,
The expense of each material needed for the power grid of failure equipment under a bureau, the power grid equipment under a bureau of special equipment expense and total cost are robbed
Bill of materials is repaired,
Wherein, power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
6. the O&M of power grid equipment under a bureau a kind of repairs job platform, which is characterized in that the platform includes:
Information acquisition unit obtains the relevant information of the power grid equipment under a bureau about failure;
Processing unit obtains electronic work order using the relevant information of the power grid of failure equipment under a bureau;
Interactive unit stores the electronic work order, alternatively, the electronic work order is sent to power grid repairing O&M job platform.
7. platform as claimed in claim 6, which is characterized in that the processing unit using the electronic work order template prestored or from
The relevant information of the power grid equipment under a bureau of the power grid repairing received electronic work order template of O&M job platform and the failure
Generate electronic work order.
8. platform as claimed in claim 6, which is characterized in that the relevant information packet of the power grid about failure equipment under a bureau
Include at least one in following item: the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, dimension
The power grid office of the picture of the power grid of failure before repairing equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, failure
Belong to the maintenance time of the materials information of equipment, the non-materials information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure
With the picture of the electric network fault equipment of the failure after maintenance.
9. a kind of electric terminal, wherein the electric terminal includes:
Processor;
Memory is stored with computer program, when the computer program is executed by processor, realizes such as claim 1 to 5
In any one described in power grid equipment under a bureau O&M repair operational method.
10. a kind of computer readable storage medium for being stored with computer program, when the computer program is executed by processor
Method of the Shi Shixian as described in any one of claim 1 to 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811496362.9A CN109670605A (en) | 2018-12-07 | 2018-12-07 | The O&M repairing operational method and platform of power grid equipment under a bureau |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811496362.9A CN109670605A (en) | 2018-12-07 | 2018-12-07 | The O&M repairing operational method and platform of power grid equipment under a bureau |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109670605A true CN109670605A (en) | 2019-04-23 |
Family
ID=66145012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811496362.9A Pending CN109670605A (en) | 2018-12-07 | 2018-12-07 | The O&M repairing operational method and platform of power grid equipment under a bureau |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109670605A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104850968A (en) * | 2015-06-15 | 2015-08-19 | 中冶赛迪电气技术有限公司 | Equipment asset operation and maintenance management system for iron and steel enterprises |
-
2018
- 2018-12-07 CN CN201811496362.9A patent/CN109670605A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104850968A (en) * | 2015-06-15 | 2015-08-19 | 中冶赛迪电气技术有限公司 | Equipment asset operation and maintenance management system for iron and steel enterprises |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nurre et al. | Integrated network design and scheduling problems with parallel identical machines: Complexity results and dispatching rules | |
CN107358417B (en) | Payment method capable of being monitored based on block chain technology | |
US20150073862A1 (en) | System and method for risk optimized, spatially sensitive preventive maintenance scheduling for asset management | |
WO2019006654A1 (en) | Financial self-service equipment maintenance dispatch generation method, hand-held terminal and electronic device | |
US20070282655A1 (en) | Method and apparatus for discovering and utilizing atomic services for service delivery | |
US9201768B1 (en) | System, method, and computer program for recommending a number of test cases and effort to allocate to one or more business processes associated with a software testing project | |
AU2020256454A1 (en) | Method and System for Managing Geospatial Deployment | |
CN111652439B (en) | Method and device for generating dispatch quantity of dispatch points and computer system | |
JP2021149185A (en) | Periodic inspection information cooperation system and periodic inspection information cooperation method | |
CN109242665B (en) | Business rule multi-channel sharing method, device, equipment and storage medium | |
CN109670605A (en) | The O&M repairing operational method and platform of power grid equipment under a bureau | |
CN115731028A (en) | Early warning method, early warning device, electronic equipment and computer readable medium | |
CN109685219A (en) | The O&M repairing operational method and platform of power grid user equipment | |
JP2012203702A (en) | Business system change support system, business system change support program, and business system change support method | |
CN110838003B (en) | Management system, method, equipment and readable medium for shared office | |
Ferreira et al. | Transmission expansion planning under consideration of uncertainties in facility implementation times for regulatory purposes | |
JP2007183729A (en) | System and method for detecting and responding to problem sign in early stage | |
Pozin | The principles of life cycle supporting system for mission-critical systems | |
Michael et al. | Strategic role of capacity management in electricity service centre using Markovian and simulation approach | |
KR20190101868A (en) | System for managing expense and method using therewith | |
JP2016048473A (en) | Reservation information handling device, reservation information handling system, reservation information handling method, and program | |
Panjom et al. | Asset Management System with Digital Technology: A Case Study of Government Agencies | |
CN109685220A (en) | Power grid O&M repairs operational method and platform | |
Bose et al. | Dealing with concept drifts in process mining: A case study in a Dutch municipality | |
KR101771310B1 (en) | Installment Payment System Of Duty Charge And Method Threof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190423 |