- Prior art keywords
- power grid
- failure
- equipment
- bureau
- user equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
There is provided a kind of power grid O&M repairing operational method and platform, which comprises (A) obtains the relevant information of the power grid user equipment about failure or the relevant information of the power grid equipment under a bureau about failure;(B) electronic contract preview part is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored, alternatively, generating electronic work order using the relevant information of the power grid equipment under a bureau of the electronic work order template and the failure that prestore;(C) the electronic contract preview part is sent to electric terminal, alternatively, storing the electronic work order, wherein the power grid repairing O&M operational method is executed in server end.According to the method and platform, each power supply company can be got to the record data of the repairing work of O&M each time, and data statistics and maintenance management are carried out based on the data got, the social responsibility precise quantification for undertaking power supply company provides important evidence for Engineering Project Audit.
Description
Technical field
This invention relates generally to grid equipments to repair field, more particularly, is related to a kind of power grid O&M repairing work
Industry method and platform.
Background technique
Currently, the operation maintenance management of power grid power supply unit, it is normally based on the property ownership of power supply unit to determine, example
Such as, belong to user personality matter, but the power supply unit not in communal substation, operation maintenance management is responsible for by user;Belong to
User shares the power supply unit of property, is collectively responsible for operation maintenance management by the user to hold property right;Belong to shared property or accounts for
With shared line planning corridor, unified management is responsible for by power supply company.
However, power supply company be other than it will be responsible for belonging to the power supply unit of property under a bureau, when some belong to user's property
Power supply unit break down when, certain customers can using impotentia repairing as reason, by the repairing O&M that itself should be undertaken blame
Appoint and evade to power supply company, power supply company can also go repairing to belong to the power supply unit of user's property to fulfil social responsibility.But
Be, either to power grid equipment under a bureau still to power grid user equipment carry out O&M repairing, all because repairing material, special equipment,
The Workload Account that labour cost etc. effectively records not in time and O&M is repaired is chaotic, therefore, existing to set to power grid
The method of received shipment dimension repairing is extremely unfavorable for successive projects project auditing.
Summary of the invention
Exemplary embodiment of the present invention is to provide a kind of power grid repairing O&M operational method and platform, can overcome
It is existing to power grid user equipment and/or power grid equipment under a bureau repairing record lack of standardization, repairing accessory supply estimate inaccuracy,
The defect of O&M repairing expense can not be calculated in time.
The one side of an exemplary embodiment of the present invention provides a kind of power grid repairing O&M operational method, feature
It is, which comprises (A) obtains the relevant information of the power grid user equipment about failure or about the power grid office of failure
Belong to the relevant information of equipment;(B) related to the power grid user equipment about failure using the electronic contract template prestored
Information generates electronic contract preview part, alternatively, utilizing the power grid equipment under a bureau of the electronic work order template and the failure that prestore
Relevant information generates electronic work order;(C) the electronic contract preview part is sent to electric terminal, alternatively, storing the electronics
Work order, wherein the power grid repairing O&M operational method is executed in server end.
Optionally, the method also includes: (D) receives and stores electronic contract, wherein the electronic contract be based on user
The confirmation operation of the electronic contract preview part is generated.
Optionally, the relevant information of the power grid user equipment about failure includes at least one in following item: therefore
The user information of the power grid user equipment of barrier, the property right boundary demarcation information of the power grid user equipment of failure, failure power grid user set
The picture of the power grid user equipment of failure before standby position, maintenance, the maintenance items information of the power grid user equipment of failure therefore
The failure cause of the power grid user equipment of barrier, the materials information of the power grid user equipment of failure, the power grid user equipment of failure
The picture of the power grid user equipment of non-materials information, the maintenance time of the power grid user equipment of failure and the failure after maintenance;Institute
State the power grid equipment under a bureau about failure relevant information include in following item at least one of: the power grid of failure equipment under a bureau
The power grid of the picture of the power grid equipment under a bureau of failure before work order number, the position of the power grid equipment under a bureau of failure, maintenance, failure
Maintenance items information, the materials information of the power grid equipment under a bureau of failure, the non-use of the power grid equipment under a bureau of failure of equipment under a bureau
Expect the picture of the electric network fault equipment of information, the maintenance time of the power grid equipment under a bureau of failure and the failure after maintenance, wherein institute
State the power grid user equipment of failure materials information include in following item at least one of: the power grid user equipment institute of maintenance failure
Type, specification and the quantity of the material needed;The non-materials information of the power grid user equipment of the failure include in following item extremely
One item missing: special equipment type and specification needed for the power grid user equipment of maintenance failure and manual work type, the event
The materials information of the power grid of barrier equipment under a bureau includes at least one in following item: needed for the power grid of maintenance failure equipment under a bureau
Type, specification and the quantity of material;The non-materials information of the power grid of failure equipment under a bureau includes at least one in following item
: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, step (B) includes: the materials of the power grid user equipment of price and maintenance failure based on the material prestored
The expense of each material needed for information determines the power grid user equipment of maintenance failure;Price based on the special equipment prestored and
Special equipment expense and labour cost needed for artificial price list determines the power grid user equipment of maintenance failure;Based on maintenance failure
Power grid user equipment needed for the expense of each material, special equipment expense and labour cost generate include maintenance failure electricity
The expense of each material needed for network users equipment, special equipment expense, the power grid user equipment of labour cost and total cost
Bill of materials is repaired, alternatively, the materials information of the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines
The expense of each material needed for the power grid of maintenance failure equipment under a bureau;Maintenance event is determined based on the price of the special equipment prestored
Special equipment expense needed for the power grid user equipment of barrier;Each material needed for power grid equipment under a bureau based on maintenance failure
The expense of each material needed for expense and special equipment expense generate the power grid equipment under a bureau including maintenance failure, special equipment
The power grid of expense and total cost equipment under a bureau repairs bill of materials, wherein the power grid user equipment repairs bill of materials packet
It includes in the electronic contract preview part and/or electronic contract, the power grid equipment repairing bill of materials under a bureau is included in described
In electronic work order.
Optionally, the method also includes: repair bill of materials and/or power grid equipment under a bureau using power grid user equipment and rob
Bill of materials is repaired to determine specific unit under a bureau and/or all units under a bureau at least one of the following expense of predetermined period
Expense: repairing supplies expenses, special equipment expense and labour cost.
Optionally, the method also includes the positions of the power grid user equipment of (F) based on the failure in each electronic contract
The position display diagram for generating the faulty grids user equipment of specific time period, alternatively, the electricity based on the failure in each electronic work order
Net the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment under a bureau.
Optionally, the method also includes: (G) is for statistical analysis to the electronic contract and/or the electronic work order,
To obtain specific unit under a bureau and/or all units under a bureau in the material number inventory for maintenance of specific time period.
Another aspect according to an exemplary embodiment of the present invention provides a kind of power grid repairing O&M job platform, feature
It is, the platform includes: information acquisition unit, obtains the relevant information of the power grid user equipment about failure or about event
The relevant information of the power grid of barrier equipment under a bureau;Unit is generated, the electronic contract template and the electricity about failure prestored is utilized
The relevant information of network users equipment generates electronic contract preview part, alternatively, utilizing the electronic work order template and the failure that prestore
Power grid equipment under a bureau relevant information generate electronic work order;The electronic contract preview part is sent electron by interactive unit
Terminal, alternatively, storing the electronic work order, wherein the power grid repairing O&M job platform is arranged in server end.
Optionally, interactive unit also receives and stores electronic contract, wherein the electronic contract is based on user to the electricity
The confirmation operation of sub- contract preview part and generate.
Optionally, the relevant information of the power grid user equipment about failure includes at least one in following item: therefore
The user information of the power grid user equipment of barrier, the property right boundary demarcation information of the power grid user equipment of failure, failure power grid user set
The picture of the power grid user equipment of failure before standby position, maintenance, the maintenance items information of the power grid user equipment of failure therefore
The failure cause of the power grid user equipment of barrier, the materials information of the power grid user equipment of failure, the power grid user equipment of failure
The picture of the power grid user equipment of non-materials information, the maintenance time of the power grid user equipment of failure and the failure after maintenance;Institute
State the power grid equipment under a bureau about failure relevant information include in following item at least one of: the power grid of failure equipment under a bureau
The power grid of the picture of the power grid equipment under a bureau of failure before work order number, the position of the power grid equipment under a bureau of failure, maintenance, failure
Maintenance items information, the materials information of the power grid equipment under a bureau of failure, the non-use of the power grid equipment under a bureau of failure of equipment under a bureau
Expect the picture of the electric network fault equipment of information, the maintenance time of the power grid equipment under a bureau of failure and the failure after maintenance, wherein institute
State the power grid user equipment of failure materials information include in following item at least one of: the power grid user equipment institute of maintenance failure
Type, specification and the quantity of the material needed;The non-materials information of the power grid user equipment of the failure include in following item extremely
One item missing: special equipment type and specification needed for the power grid user equipment of maintenance failure and manual work type, the event
The materials information of the power grid of barrier equipment under a bureau includes at least one in following item: needed for the power grid of maintenance failure equipment under a bureau
Type, specification and the quantity of material;The non-materials information of the power grid of failure equipment under a bureau includes at least one in following item
: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, the generation unit includes: supplies expenses determination unit, the price based on the material prestored and maintenance event
The expense of each material needed for the materials information of the power grid user equipment of barrier determines the power grid user equipment of maintenance failure;Non- object
Material expense determination unit, price and artificial price list based on the special equipment prestored determine the power grid user equipment of maintenance failure
Required special equipment expense and labour cost;Bill of materials determination unit, needed for the power grid user equipment based on maintenance failure
The expense of each material, special equipment expense and labour cost to generate include every needed for the power grid user equipment of maintenance failure
The expense of material, special equipment expense, the power grid user equipment of labour cost and total cost repair bill of materials, alternatively,
The materials information of supplies expenses determination unit, the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines dimension
The expense of each material needed for repairing the power grid equipment under a bureau of failure;Non- supplies expenses determination unit, is set based on the special type prestored
Special equipment expense needed for standby price determines the power grid user equipment of maintenance failure;Bill of materials determination unit, based on dimension
The expense and special equipment expense of each material needed for repairing the power grid equipment under a bureau of failure generate the power grid including maintenance failure
The expense of each material needed for equipment under a bureau, the power grid equipment repairing material under a bureau of special equipment expense and total cost are clear
It is single, wherein the power grid user equipment repairing bill of materials is included in the electronic contract preview part and/or electronic contract,
The power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
Optionally, the generation unit also repairs bill of materials using power grid user equipment and/or power grid equipment under a bureau is robbed
Bill of materials is repaired to determine specific unit under a bureau and/or all units under a bureau at least one of the following expense of predetermined period
Expense: repairing supplies expenses, special equipment expense and labour cost.
Optionally, the position for generating the unit also power grid user equipment based on the failure in each electronic contract generates
The position display diagram of the faulty grids user equipment of specific time period, alternatively, the power grid office based on the failure in each electronic work order
Belong to the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment.
Optionally, the generation unit is also for statistical analysis to the electronic contract and/or the electronic work order, with
To specific unit under a bureau or all units under a bureau specific time period the material number inventory for maintenance.
Another aspect according to an exemplary embodiment of the present invention provides a kind of electric terminal, wherein the electric terminal packet
It includes: processor;Memory is stored with computer program, when the computer program is executed by processor, realizes power grid repairing
O&M operational method.
Another aspect according to an exemplary embodiment of the present invention provides and a kind of is stored with the computer-readable of computer program
Storage medium, when the computer program realizes power grid repairing O&M operator according to the present invention when being executed by processor
Method.
It repairs in operational method and platform, can get each in power grid O&M according to an exemplary embodiment of the present invention
Power supply company repairs O&M each time the record data of work, and carries out data statistics and maintenance based on the data got
Management, the social responsibility precise quantification for undertaking power supply company provide important evidence for Engineering Project Audit.
Part in following description is illustrated into the other aspect and/or advantage of present general inventive concept, there are also one
Dividing will be apparent by description, or can learn by the implementation of present general inventive concept.
Detailed description of the invention
Pass through the detailed description carried out below with reference to the attached drawing for being exemplarily illustrated embodiment, exemplary embodiment of the present
Above and other purpose will become apparent, in which:
Fig. 1 shows the flow chart of power grid repairing O&M operational method according to an exemplary embodiment of the present invention;
Fig. 2 shows specific units under a bureau according to an exemplary embodiment of the present invention and all units under a bureau in predetermined period
Repair supplies expenses statistical chart;
Fig. 3 shows the power grid user equipment of the failure of the specific region of specific time period according to an exemplary embodiment of the present invention
With the position display diagram of the power grid equipment under a bureau of failure;
Fig. 4 shows specific unit under a bureau according to an exemplary embodiment of the present invention or all units under a bureau in specific time period
Material number inventory for maintenance;
Fig. 5 shows the block diagram of power grid repairing O&M job platform according to an exemplary embodiment of the present invention.
Specific embodiment
It reference will now be made in detail exemplary embodiment of the present invention, examples of the embodiments are shown in the accompanying drawings, wherein phase
Same label refers to identical component always.It will illustrate the embodiment, by referring to accompanying drawing below to explain this hair
It is bright.
Fig. 1 shows the flow chart of power grid repairing O&M operational method according to an exemplary embodiment of the present invention.Here, described
Power grid is repaired O&M operational method and is executed in server end.Particularly, the power grid repairing O&M operational method can pass through clothes
The be engaged in computer program at device end is realized.For example, the power grid repairing O&M operational method can pass through the operating system of server
The function program of middle realization executes.
Referring to Fig.1, in step S100, the relevant information of the power grid user equipment about failure is obtained or about failure
The relevant information of power grid equipment under a bureau.
Particularly, as an example, can from execute the associated electric terminal of the server of the method obtain about
The relevant information of the relevant information of the power grid user equipment of failure or the power grid equipment under a bureau about failure.
In one exemplary embodiment, the relevant information of the power grid user equipment about failure includes in following item
At least one of: the user information of the power grid user equipment of failure, the property right boundary demarcation information of the power grid user equipment of failure, failure
The position of power grid user equipment, the picture of power grid user equipment of failure before maintenance, failure power grid user equipment dimension
Repair the electricity of project information, the failure cause of the power grid user equipment of failure, the materials information of the power grid user equipment of failure, failure
Non- materials information, the maintenance time of the power grid user equipment of failure and the power grid user of the failure after maintenance of network users equipment are set
Standby picture.In addition, as an example, the materials information of the power grid user equipment of the failure includes at least one in following item
: type, specification and the quantity of material needed for the power grid user equipment of maintenance failure;The power grid user equipment of the failure
Non- materials information includes at least one in following item: special equipment type and rule needed for the power grid user equipment of maintenance failure
Lattice and manual work type.
In another exemplary embodiment, the relevant information of the power grid about failure equipment under a bureau includes following item
At least one of in: the event before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance
The picture of the power grid of barrier equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure
After materials information, the non-materials information of the power grid equipment under a bureau of failure, the maintenance time of the power grid equipment under a bureau of failure and maintenance
Failure electric network fault equipment picture.In addition, as an example, the materials information of the power grid of failure equipment under a bureau includes
At least one of in following item: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The failure
Power grid equipment under a bureau non-materials information include in following item at least one of: needed for the power grid of maintenance failure equipment under a bureau
Special equipment type and specification.
In step S200, the electronic contract template prestored letter related to the power grid user equipment about failure is utilized
Breath generates electronic contract preview part, alternatively, the phase of the power grid equipment under a bureau using the electronic work order template and the failure that prestore
It closes information and generates electronic work order.
Particularly, about the process for generating electronic contract preview part, the electronics prestored can be closed by specific rule
Integration processing is carried out with template and the power grid user equipment about failure obtained, to obtain electronic contract preview part, as showing
Example, can cover in the electronic contract preview part user information, maintenance items, repairing bill of materials, failure cause, in maintenance
Hold, the entries such as maintenance time.Optionally, above-mentioned certain entries can obtain in the following manner:
It is repaired for example, can be determined based on the materials information of the power grid user equipment of the price and maintenance failure of the material prestored
The expense of each material needed for the power grid user equipment of failure;It can price based on the special equipment prestored and artificial price list
Special equipment expense and labour cost needed for determining the power grid user equipment of maintenance failure;It can be used based on the power grid of maintenance failure
Expense, special equipment expense and the labour cost of each material needed for the equipment of family generate the power grid user including maintenance failure and set
Material is repaired for the power grid user equipment of the expense of each required material, special equipment expense, labour cost and total cost
Inventory, here, the power grid user equipment repairing bill of materials are included in the electronic contract preview part.
In addition, to the electronic work order template prestored and can be obtained by specific rule about the process for generating electronic work order
The equipment under a bureau of the power grid about failure taken carries out integration processing, to obtain electronic contract preview part, as an example, the electronics
Information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance content, the entries such as maintenance time can be covered in work order.
Optionally, above-mentioned certain entries can obtain in the following manner:
It is repaired for example, can be determined based on the materials information of the price of the material prestored and the power grid of maintenance failure equipment under a bureau
The expense of each material needed for the power grid of failure equipment under a bureau;Maintenance failure can be determined based on the price of the special equipment prestored
Power grid user equipment needed for special equipment expense;It can each material needed for the power grid equipment under a bureau based on maintenance failure
The expense of each material needed for expense and special equipment expense generate the power grid equipment under a bureau including maintenance failure, special equipment
The power grid of expense and total cost equipment under a bureau repairs bill of materials, and here, the power grid equipment under a bureau repairs bill of materials packet
It includes in the electronic work order.
In step S300, the electronic contract preview part is sent to electric terminal, alternatively, storing the electronic work order.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example
Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come
It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe
Reason and displaying.
In addition, as an example, the method can be added also after the electronic contract preview part is sent to electric terminal
Ground includes the steps that receiving and storing electronic contract, wherein the electronic contract is based on user to the electronic contract preview part
Confirmation operation and generate.
By the above-mentioned means, relevant information or the pass of the power grid user equipment about failure can be obtained from electric terminal
In the relevant information of the power grid of failure equipment under a bureau, electronic contract or electronic work order are obtained using above- mentioned information come to user
The operational data and material data used done to power supply company are managed, analyze and safeguard, in order to successive projects
Project auditing and work are shown.
In addition, after server end gets electronic contract and electronic work order, that is, getting power supply company to every
The record data of O&M repairing work, therefore, server end can electronic contract based on acquisition and electronic work order to data
For statistical analysis, management, maintenance are shown.
For example, in one exemplary embodiment, repairing bill of materials using power grid user equipment and/or power grid being under a bureau
Equipment repairs bill of materials to determine specific unit under a bureau and/or all units under a bureau in the following expense of predetermined period extremely
Few a kind of expense: repairing supplies expenses, special equipment expense and labour cost.
Fig. 2 shows specific units under a bureau according to an exemplary embodiment of the present invention and all units under a bureau in predetermined period
Repair supplies expenses statistical chart.
As shown in Fig. 2, can be based on all power grid user equipment obtained during on August 31st, 1 day 1 January in 2017
Supplies expenses, special equipment expense and the labour cost etc. recorded in repairing inventory and power grid equipment repairing inventory under a bureau count
The correlative charges that each power supply company is paid, for example, during on August 31st, 1 day 1 January in 2017, and justice power supply
Supplies expenses be 4235 yuan, special equipment expense is 3265 yuan and labour cost is 1500 yuan.In addition, similarly, may be used also
Count that the material total cost that all power supply companies are paid is 59310 yuan, special equipment total cost is 45690 yuan and artificial total
Expense is 22500 yuan.In this way, expense pointed by each power supply company can be intuitively understood, is subsequent project
Audit provides reference frame.
It in another exemplary embodiment, can be based on the position of the power grid user equipment of the failure in each electronic contract
The position display diagram for generating the faulty grids user equipment of specific time period, alternatively, the electricity based on the failure in each electronic work order
Net the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment under a bureau.
Fig. 3 shows the power grid user equipment of the failure of the specific region of specific time period according to an exemplary embodiment of the present invention
With the position display diagram of the power grid equipment under a bureau of failure.
As shown in figure 3, can be obtained based on specific time period (for example, during on August 31st, 1 day 1 January in 2017)
The faulty grids that the position of the power grid user equipment of failure in all power grid user equipment repairing inventories generates specific region are used
The position display diagram of family equipment, for example, the power grid equipment under a bureau of position instruction failure of the black balloon in Fig. 3 in map
Position, the position of the power grid user equipment of position instruction failure of the white balloon in map in Fig. 3.In this way,
The position of the grid equipment of failure intuitively can be showed into staff, fast and effeciently grasp failure convenient for power supply company
Take place frequently the distribution situation in region.
In another exemplary embodiment, for statistical analysis to the electronic contract and/or the electronic work order, with
Specific unit under a bureau or all units under a bureau are obtained in the material number inventory for maintenance of specific time period.
Fig. 4 shows specific unit under a bureau according to an exemplary embodiment of the present invention or all units under a bureau in specific time period
Material number inventory for maintenance.
As shown in figure 4, showing based on uniting to the material number in the electronic contract and/or the electronic work order
Meter analysis each of is obtained the number of material used in the number and all units under a bureau of material used in unit under a bureau
Mesh.In this way, the service condition of material can be clearly counted, material is repaired for subsequent deposit and is ready.
Fig. 5 shows the block diagram of power grid repairing O&M job platform according to an exemplary embodiment of the present invention.
As shown in figure 5, power grid repairing O&M job platform according to an exemplary embodiment of the present invention includes acquisition of information list
Member 100 generates unit 200 and interactive unit 300, wherein the power grid repairing O&M job platform is arranged in server end.
Particularly, information acquisition unit 100 obtain about failure power grid user equipment relevant information or about
The relevant information of the power grid of failure equipment under a bureau.
As an example, information acquisition unit 100 can be obtained from electric terminal associated with the server of the method is executed
Take the relevant information of the relevant information of the power grid user equipment about failure or the power grid equipment under a bureau about failure.
In one exemplary embodiment, the relevant information of the power grid user equipment about failure includes in following item
At least one of: the user information of the power grid user equipment of failure, the property right boundary demarcation information of the power grid user equipment of failure, failure
The position of power grid user equipment, the picture of power grid user equipment of failure before maintenance, failure power grid user equipment dimension
Repair the electricity of project information, the failure cause of the power grid user equipment of failure, the materials information of the power grid user equipment of failure, failure
Non- materials information, the maintenance time of the power grid user equipment of failure and the power grid user of the failure after maintenance of network users equipment are set
Standby picture.In addition, as an example, the materials information of the power grid user equipment of the failure includes at least one in following item
: type, specification and the quantity of material needed for the power grid user equipment of maintenance failure;The power grid user equipment of the failure
Non- materials information includes at least one in following item: special equipment type and rule needed for the power grid user equipment of maintenance failure
Lattice and manual work type.
In another exemplary embodiment, the relevant information of the power grid about failure equipment under a bureau includes following item
At least one of in: the event before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance
The picture of the power grid of barrier equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure
After materials information, the non-materials information of the power grid equipment under a bureau of failure, the maintenance time of the power grid equipment under a bureau of failure and maintenance
Failure electric network fault equipment picture.In addition, as an example, the materials information of the power grid of failure equipment under a bureau includes
At least one of in following item: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The failure
Power grid equipment under a bureau non-materials information include in following item at least one of: needed for the power grid of maintenance failure equipment under a bureau
Special equipment type and specification.
Unit 200 is generated using the electronic contract template prestored letter related to the power grid user equipment about failure
Breath generates electronic contract preview part, alternatively, the phase of the power grid equipment under a bureau using the electronic work order template and the failure that prestore
It closes information and generates electronic work order.
Particularly, about the process for generating electronic contract preview part, generating unit 200 can be by specific rule to pre-
The electronic contract template deposited and the power grid user equipment about failure obtained carry out integration processing, to obtain electronic contract preview
Part, as an example, it is former to cover user information, maintenance items, repairing bill of materials, failure in the electronic contract preview part
Cause, maintenance content, the entries such as maintenance time.Optionally, above-mentioned certain entries can obtain in the following manner:
For example, generate unit 200 can price and maintenance failure based on the material prestored power grid user equipment materials
The expense of each material needed for information determines the power grid user equipment of maintenance failure;Generating unit 200 can be based on the spy prestored
Special equipment expense and labour cost needed for the price of kind equipment and artificial price list determine the power grid user equipment of maintenance failure
With;Generate unit 200 can the expense of each material needed for the power grid user equipment based on maintenance failure, special equipment expense and
It includes the expense of each material needed for the power grid user equipment of maintenance failure that labour cost, which generates, special equipment expense, artificial
The power grid user equipment of expense and total cost repairs bill of materials, and here, the power grid user equipment repairs bill of materials packet
It includes in the electronic contract preview part.
In addition, generating unit 200 can be by specific rule to the electronics work prestored about the process for generating electronic work order
Single mode plate and the equipment under a bureau of the power grid about failure obtained carry out integration processing, to obtain electronic contract preview part, as showing
Example can cover information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance content, maintenance in the electronic work order
The entries such as time.Optionally, above-mentioned certain entries can obtain in the following manner:
For example, generate unit 200 can price and maintenance failure based on the material prestored power grid equipment under a bureau materials
The expense of each material needed for information determines the power grid of maintenance failure equipment under a bureau;Generating unit 200 can be based on the spy prestored
Special equipment expense needed for the price of kind equipment determines the power grid user equipment of maintenance failure;Generating unit 200 can be based on dimension
The expense and special equipment expense of each material needed for repairing the power grid equipment under a bureau of failure generate the power grid including maintenance failure
The expense of each material needed for equipment under a bureau, the power grid equipment repairing material under a bureau of special equipment expense and total cost are clear
Single, here, the power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
The electronic contract preview part is sent to electric terminal by interactive unit 300, alternatively, storing the electronic work order.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example
Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come
It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe
Reason and displaying.
In addition, as an example, interactive unit can be additionally after the electronic contract preview part is sent to electric terminal
Receive and store electronic contract, wherein the electronic contract based on user to the confirmation operation of the electronic contract preview part and
It generates.
By the above-mentioned means, relevant information or the pass of the power grid user equipment about failure can be obtained from electric terminal
In the relevant information of the power grid of failure equipment under a bureau, electronic contract or electronic work order are obtained using above- mentioned information come user couple
The operational data and material data used that power supply company is done are managed, analyze and safeguard, in order to successive projects item
Mesh audit and work are shown.
In addition, after server end gets electronic contract and electronic work order, that is, getting power supply company to every
The record data of O&M repairing work, therefore, server end can electronic contract based on acquisition and electronic work order to data
For statistical analysis, management, maintenance are shown.
For example, in one exemplary embodiment, generate unit 200 using power grid user equipment repairing bill of materials and/
Or power grid equipment under a bureau repairs bill of materials to determine specific unit under a bureau and/or all units under a bureau in the following of predetermined period
At least one of expense expense: repairing supplies expenses, special equipment expense and labour cost.It in this way, can be with
Expense pointed by each power supply company is intuitively understood, provides reference frame for subsequent project audit.
In another exemplary embodiment, generating unit 200 can be used based on the power grid of the failure in each electronic contract
The position of family equipment generates the position display diagram of the faulty grids user equipment of specific time period, alternatively, being based on each electronic work order
In failure power grid equipment under a bureau position generate specific time period faulty grids equipment under a bureau position display diagram.Pass through this
Kind mode, intuitively can show staff for the position of the grid equipment of failure, fast and effeciently convenient for power supply company
Grasp the distribution situation in Frequent Troubles region.
In another exemplary embodiment, unit 200 is generated to carry out the electronic contract and/or the electronic work order
Statistical analysis, to obtain specific unit under a bureau or all units under a bureau in the material number inventory for maintenance of specific time period.
In this way, the service condition of material can be clearly counted, material is repaired for subsequent deposit and is ready.
Moreover, it should be understood that each list in power grid O&M repairing job platform according to an exemplary embodiment of the present invention
Member can be implemented hardware component and/or component software.Those skilled in the art's processing according to performed by each unit of restriction,
It can such as use site programmable gate array (FPGA) or specific integrated circuit (ASIC) Lai Shixian each unit.
Moreover, it should be understood that the O&M of power grid user equipment according to an exemplary embodiment of the present invention repairs job platform
In each unit can be implemented hardware component and/or component software.Those skilled in the art are according to each unit institute of restriction
The processing of execution, can such as use site programmable gate array (FPGA) or specific integrated circuit (ASIC) realize each list
Member.
The computer readable storage medium of an exemplary embodiment of the present invention, be stored with makes when being executed by a processor
Obtain the computer program that processor executes the power grid O&M repairing operational method of the above exemplary embodiments.This is computer-readable to deposit
Storage media is the arbitrary data storage device that can store the data read by computer system.Computer readable storage medium shows
Example include: read-only memory, random access memory, CD-ROM, tape, floppy disk, optical data storage devices and carrier wave (such as
It is transmitted through wired or wireless transmission path by the data of internet).
The electric terminal of an exemplary embodiment of the present invention includes: that processor (not shown) and memory (do not show
Out), wherein memory is stored with computer program, when the computer program is executed by processor, realizes such as above-mentioned example
Property embodiment power grid O&M repair operational method.
In conclusion power grid O&M repairing operational method according to an exemplary embodiment of the present invention and platform, can obtain
To each power supply company to the record data of the repairing work of O&M each time, and data statistics is carried out based on the data got
And maintenance management, the social responsibility precise quantification for undertaking power supply company, and important evidence is provided for Engineering Project Audit.
Although being particularly shown and describing the present invention, those skilled in the art referring to its exemplary embodiment
It should be understood that in the case where not departing from the spirit and scope of the present invention defined by claim form can be carried out to it
With the various changes in details.
Claims (10)
1. a kind of power grid repairs O&M operational method, which is characterized in that the described method includes:
(A) the related letter of the relevant information of the power grid user equipment about failure or the power grid equipment under a bureau about failure is obtained
Breath;
(B) electronics is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored to close
With preview part, alternatively, generating electricity using the relevant information of the power grid equipment under a bureau of the electronic work order template and the failure that prestore
Sub- work order;
(C) the electronic contract preview part is sent to electric terminal, alternatively, the electronic work order is stored,
Wherein, the power grid repairing O&M operational method is executed in server end.
2. the method as described in claim 1, further includes:
(D) electronic contract is received and stored, wherein confirmation of the electronic contract based on user to the electronic contract preview part
It operates and generates.
3. the method as described in claim 1, which is characterized in that the relevant information packet of the power grid user equipment about failure
Include at least one in following item: user information, the property right of the power grid user equipment of failure point of the power grid user equipment of failure
The picture of the power grid user equipment of failure before boundary's information, the position of the power grid user equipment of failure, maintenance, the power grid of failure are used
The materials letter of the maintenance items information of family equipment, the failure cause of the power grid user equipment of failure, the power grid user equipment of failure
Breath, the non-materials information of power grid user equipment of failure, the maintenance time of the power grid user equipment of failure and the failure after maintenance
Power grid user equipment picture;
The relevant information of the power grid about failure equipment under a bureau includes at least one in following item: the power grid of failure is under a bureau
The picture of the power grid equipment under a bureau of failure before the work order number of equipment, the position of the power grid equipment under a bureau of failure, maintenance, failure
The maintenance items information of power grid equipment under a bureau, the materials information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure
Non- materials information, the power grid equipment under a bureau of failure maintenance time and the failure after maintenance electric network fault equipment picture,
Wherein, the materials information of the power grid user equipment of the failure includes at least one in following item: the electricity of maintenance failure
Type, specification and the quantity of material needed for network users equipment;The non-materials information of the power grid user equipment of the failure includes
At least one of in following item: special equipment type needed for the power grid user equipment of maintenance failure and specification and manual work
Type,
The materials information of the power grid of failure equipment under a bureau includes at least one in following item: the power grid of maintenance failure is under a bureau
Type, specification and the quantity of material needed for equipment;The non-materials information of the power grid of failure equipment under a bureau includes following item
At least one of in: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
4. method as claimed in claim 3, which is characterized in that step (B) includes:
The materials information of the power grid user equipment of price and maintenance failure based on the material prestored determines the power grid of maintenance failure
The expense of each material needed for user equipment;
Special type needed for price and artificial price list based on the special equipment prestored determine the power grid user equipment of maintenance failure
Cost of equipment and labour cost;
Expense, special equipment expense and the labour cost of each material needed for power grid user equipment based on maintenance failure generate
The expense of each material needed for power grid user equipment including maintenance failure, special equipment expense, labour cost and total take
Power grid user equipment repairs bill of materials,
Alternatively,
The materials information of the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines the power grid of maintenance failure
The expense of each material needed for equipment under a bureau;
Based on the special equipment prestored price determine the power grid user equipment of maintenance failure needed for special equipment expense;
It includes maintenance that the expense and special equipment expense of each material needed for power grid equipment under a bureau based on maintenance failure, which generate,
The expense of each material needed for the power grid of failure equipment under a bureau, the power grid equipment under a bureau of special equipment expense and total cost are robbed
Bill of materials is repaired,
Wherein, the power grid user equipment repairing bill of materials is included in the electronic contract preview part and/or electronic contract,
The power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
5. method as claimed in claim 4, further includes:
(E) bill of materials and/or power grid equipment repairing bill of materials under a bureau are repaired using power grid user equipment to determine specific office
Belong to unit and/or all units under a bureau at least one of the following expense of predetermined period expense: repairing supplies expenses, special type
Cost of equipment and labour cost.
6. method according to claim 2, further includes:
(F) position of the power grid user equipment based on the failure in each electronic contract generates the faulty grids user of specific time period
The position display diagram of equipment, alternatively, when the position of the power grid equipment under a bureau based on the failure in each electronic work order generates specific
The position display diagram of the faulty grids equipment under a bureau of section.
7. method as claimed in claim 4, further includes:
(G) for statistical analysis to the electronic contract and/or the electronic work order, to obtain specific unit under a bureau and/or institute
There is unit under a bureau in the material number inventory for maintenance of specific time period.
8. a kind of power grid repairs O&M job platform, which is characterized in that the platform includes:
Information acquisition unit, power grid of the acquisition about the relevant information of the power grid user equipment of failure or about failure is under a bureau to be set
Standby relevant information;
Unit is generated, is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored
Electronic contract preview part, alternatively, the relevant information of the power grid equipment under a bureau using the electronic work order template and the failure that prestore
Generate electronic work order;
The electronic contract preview part is sent to electric terminal by interactive unit, alternatively, the electronic work order is stored,
Wherein, the power grid repairing O&M job platform is arranged in server end.
9. a kind of electric terminal, wherein the electric terminal includes:
Processor;
Memory is stored with computer program, when the computer program is executed by processor, realizes such as claim 1 to 7
In any one described in power grid repair O&M operational method.
10. a kind of computer readable storage medium for being stored with computer program, when the computer program is executed by processor
Shi Shixian method as claimed in any of claims 1 to 7 in one of claims.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811496470.6A CN109685220A (en) | 2018-12-07 | 2018-12-07 | Power grid O&M repairs operational method and platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811496470.6A CN109685220A (en) | 2018-12-07 | 2018-12-07 | Power grid O&M repairs operational method and platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109685220A true CN109685220A (en) | 2019-04-26 |
Family
ID=66187136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811496470.6A Pending CN109685220A (en) | 2018-12-07 | 2018-12-07 | Power grid O&M repairs operational method and platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109685220A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080172346A1 (en) * | 2007-01-12 | 2008-07-17 | Clean Power Finance, Inc. | Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment |
CN105373901A (en) * | 2015-12-15 | 2016-03-02 | 国网北京市电力公司 | Grid fault worksheet handling method, apparatus, and system |
CN105894197A (en) * | 2016-03-31 | 2016-08-24 | 国网北京市电力公司 | Work order processing method and device |
CN107341738A (en) * | 2017-05-03 | 2017-11-10 | 国网浙江省电力公司 | Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model |
-
2018
- 2018-12-07 CN CN201811496470.6A patent/CN109685220A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080172346A1 (en) * | 2007-01-12 | 2008-07-17 | Clean Power Finance, Inc. | Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment |
CN105373901A (en) * | 2015-12-15 | 2016-03-02 | 国网北京市电力公司 | Grid fault worksheet handling method, apparatus, and system |
CN105894197A (en) * | 2016-03-31 | 2016-08-24 | 国网北京市电力公司 | Work order processing method and device |
CN107341738A (en) * | 2017-05-03 | 2017-11-10 | 国网浙江省电力公司 | Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model |
Non-Patent Citations (2)
Title |
---|
丰台供电公司 陈晓东: "《中国电力新闻网》", 25 October 2012 * |
国网宁夏电力公司营销部: "《国网宁夏电力公司营销业务应用系统典型操作案例 新装 增容及变更用电 2》", 30 April 2016, 银川:宁夏人民出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190354922A1 (en) | Digital twin management in iot systems | |
US8694351B2 (en) | System and method for an audit tool for communications service providers | |
US20150073862A1 (en) | System and method for risk optimized, spatially sensitive preventive maintenance scheduling for asset management | |
US8650061B2 (en) | Compliance management system and method | |
CN109919676B (en) | Method and system for intelligent environment-friendly bag charging management | |
US20150127601A1 (en) | System and method for improving and managing smart grid unread meter investigations | |
US7865382B2 (en) | Compliance control framework | |
CN105246061A (en) | Service terminal of mobile communication service | |
US9582837B2 (en) | Management system for gas cock opening and closing | |
CN109359922A (en) | Spare parts management method and device | |
CN109685220A (en) | Power grid O&M repairs operational method and platform | |
CN116991678A (en) | Intelligent operation and maintenance system of data center | |
CN109242665B (en) | Business rule multi-channel sharing method, device, equipment and storage medium | |
US20150186809A1 (en) | System and method for tracking ami assets | |
JP2009025864A (en) | Repair information processing system and repair information processing program of multiple dwelling houses, and recording medium | |
US20100325604A1 (en) | System and method for performing cost estimation in a service provider environment | |
CN109685219A (en) | The O&M repairing operational method and platform of power grid user equipment | |
WO1998027505A9 (en) | Method for remote viewing of damage and authorization of repairs | |
US7956737B2 (en) | Method and apparatus for network service assurance | |
US8635095B2 (en) | Method and apparatus for tracking an intent | |
Pozin | The principles of life cycle supporting system for mission-critical systems | |
CN109670605A (en) | The O&M repairing operational method and platform of power grid equipment under a bureau | |
US20130024236A1 (en) | Methods for product management and devices thereof | |
Popov et al. | Service Order extensions to the Outage Management System | |
Negrini | Data Center Monitoring System Upgrade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190426 |