CN109685220A - Power grid O&M repairs operational method and platform - Google Patents

Power grid O&M repairs operational method and platform Download PDF

Info

Publication number
CN109685220A
CN109685220A CN201811496470.6A CN201811496470A CN109685220A CN 109685220 A CN109685220 A CN 109685220A CN 201811496470 A CN201811496470 A CN 201811496470A CN 109685220 A CN109685220 A CN 109685220A
Authority
CN
China
Prior art keywords
power grid
failure
equipment
bureau
user equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811496470.6A
Other languages
Chinese (zh)
Inventor
李继东
简朝阳
李斌
刘宇
何潇
于淼
刘萱
刘晔
姚尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Melt Logical Science And Technology Of Intelligence (beijing) Inc Co
Original Assignee
Melt Logical Science And Technology Of Intelligence (beijing) Inc Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Melt Logical Science And Technology Of Intelligence (beijing) Inc Co filed Critical Melt Logical Science And Technology Of Intelligence (beijing) Inc Co
Priority to CN201811496470.6A priority Critical patent/CN109685220A/en
Publication of CN109685220A publication Critical patent/CN109685220A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

There is provided a kind of power grid O&M repairing operational method and platform, which comprises (A) obtains the relevant information of the power grid user equipment about failure or the relevant information of the power grid equipment under a bureau about failure;(B) electronic contract preview part is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored, alternatively, generating electronic work order using the relevant information of the power grid equipment under a bureau of the electronic work order template and the failure that prestore;(C) the electronic contract preview part is sent to electric terminal, alternatively, storing the electronic work order, wherein the power grid repairing O&M operational method is executed in server end.According to the method and platform, each power supply company can be got to the record data of the repairing work of O&M each time, and data statistics and maintenance management are carried out based on the data got, the social responsibility precise quantification for undertaking power supply company provides important evidence for Engineering Project Audit.

Description

Power grid O&M repairs operational method and platform
Technical field
This invention relates generally to grid equipments to repair field, more particularly, is related to a kind of power grid O&M repairing work Industry method and platform.
Background technique
Currently, the operation maintenance management of power grid power supply unit, it is normally based on the property ownership of power supply unit to determine, example Such as, belong to user personality matter, but the power supply unit not in communal substation, operation maintenance management is responsible for by user;Belong to User shares the power supply unit of property, is collectively responsible for operation maintenance management by the user to hold property right;Belong to shared property or accounts for With shared line planning corridor, unified management is responsible for by power supply company.
However, power supply company be other than it will be responsible for belonging to the power supply unit of property under a bureau, when some belong to user's property Power supply unit break down when, certain customers can using impotentia repairing as reason, by the repairing O&M that itself should be undertaken blame Appoint and evade to power supply company, power supply company can also go repairing to belong to the power supply unit of user's property to fulfil social responsibility.But Be, either to power grid equipment under a bureau still to power grid user equipment carry out O&M repairing, all because repairing material, special equipment, The Workload Account that labour cost etc. effectively records not in time and O&M is repaired is chaotic, therefore, existing to set to power grid The method of received shipment dimension repairing is extremely unfavorable for successive projects project auditing.
Summary of the invention
Exemplary embodiment of the present invention is to provide a kind of power grid repairing O&M operational method and platform, can overcome It is existing to power grid user equipment and/or power grid equipment under a bureau repairing record lack of standardization, repairing accessory supply estimate inaccuracy, The defect of O&M repairing expense can not be calculated in time.
The one side of an exemplary embodiment of the present invention provides a kind of power grid repairing O&M operational method, feature It is, which comprises (A) obtains the relevant information of the power grid user equipment about failure or about the power grid office of failure Belong to the relevant information of equipment;(B) related to the power grid user equipment about failure using the electronic contract template prestored Information generates electronic contract preview part, alternatively, utilizing the power grid equipment under a bureau of the electronic work order template and the failure that prestore Relevant information generates electronic work order;(C) the electronic contract preview part is sent to electric terminal, alternatively, storing the electronics Work order, wherein the power grid repairing O&M operational method is executed in server end.
Optionally, the method also includes: (D) receives and stores electronic contract, wherein the electronic contract be based on user The confirmation operation of the electronic contract preview part is generated.
Optionally, the relevant information of the power grid user equipment about failure includes at least one in following item: therefore The user information of the power grid user equipment of barrier, the property right boundary demarcation information of the power grid user equipment of failure, failure power grid user set The picture of the power grid user equipment of failure before standby position, maintenance, the maintenance items information of the power grid user equipment of failure therefore The failure cause of the power grid user equipment of barrier, the materials information of the power grid user equipment of failure, the power grid user equipment of failure The picture of the power grid user equipment of non-materials information, the maintenance time of the power grid user equipment of failure and the failure after maintenance;Institute State the power grid equipment under a bureau about failure relevant information include in following item at least one of: the power grid of failure equipment under a bureau The power grid of the picture of the power grid equipment under a bureau of failure before work order number, the position of the power grid equipment under a bureau of failure, maintenance, failure Maintenance items information, the materials information of the power grid equipment under a bureau of failure, the non-use of the power grid equipment under a bureau of failure of equipment under a bureau Expect the picture of the electric network fault equipment of information, the maintenance time of the power grid equipment under a bureau of failure and the failure after maintenance, wherein institute State the power grid user equipment of failure materials information include in following item at least one of: the power grid user equipment institute of maintenance failure Type, specification and the quantity of the material needed;The non-materials information of the power grid user equipment of the failure include in following item extremely One item missing: special equipment type and specification needed for the power grid user equipment of maintenance failure and manual work type, the event The materials information of the power grid of barrier equipment under a bureau includes at least one in following item: needed for the power grid of maintenance failure equipment under a bureau Type, specification and the quantity of material;The non-materials information of the power grid of failure equipment under a bureau includes at least one in following item : special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, step (B) includes: the materials of the power grid user equipment of price and maintenance failure based on the material prestored The expense of each material needed for information determines the power grid user equipment of maintenance failure;Price based on the special equipment prestored and Special equipment expense and labour cost needed for artificial price list determines the power grid user equipment of maintenance failure;Based on maintenance failure Power grid user equipment needed for the expense of each material, special equipment expense and labour cost generate include maintenance failure electricity The expense of each material needed for network users equipment, special equipment expense, the power grid user equipment of labour cost and total cost Bill of materials is repaired, alternatively, the materials information of the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines The expense of each material needed for the power grid of maintenance failure equipment under a bureau;Maintenance event is determined based on the price of the special equipment prestored Special equipment expense needed for the power grid user equipment of barrier;Each material needed for power grid equipment under a bureau based on maintenance failure The expense of each material needed for expense and special equipment expense generate the power grid equipment under a bureau including maintenance failure, special equipment The power grid of expense and total cost equipment under a bureau repairs bill of materials, wherein the power grid user equipment repairs bill of materials packet It includes in the electronic contract preview part and/or electronic contract, the power grid equipment repairing bill of materials under a bureau is included in described In electronic work order.
Optionally, the method also includes: repair bill of materials and/or power grid equipment under a bureau using power grid user equipment and rob Bill of materials is repaired to determine specific unit under a bureau and/or all units under a bureau at least one of the following expense of predetermined period Expense: repairing supplies expenses, special equipment expense and labour cost.
Optionally, the method also includes the positions of the power grid user equipment of (F) based on the failure in each electronic contract The position display diagram for generating the faulty grids user equipment of specific time period, alternatively, the electricity based on the failure in each electronic work order Net the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment under a bureau.
Optionally, the method also includes: (G) is for statistical analysis to the electronic contract and/or the electronic work order, To obtain specific unit under a bureau and/or all units under a bureau in the material number inventory for maintenance of specific time period.
Another aspect according to an exemplary embodiment of the present invention provides a kind of power grid repairing O&M job platform, feature It is, the platform includes: information acquisition unit, obtains the relevant information of the power grid user equipment about failure or about event The relevant information of the power grid of barrier equipment under a bureau;Unit is generated, the electronic contract template and the electricity about failure prestored is utilized The relevant information of network users equipment generates electronic contract preview part, alternatively, utilizing the electronic work order template and the failure that prestore Power grid equipment under a bureau relevant information generate electronic work order;The electronic contract preview part is sent electron by interactive unit Terminal, alternatively, storing the electronic work order, wherein the power grid repairing O&M job platform is arranged in server end.
Optionally, interactive unit also receives and stores electronic contract, wherein the electronic contract is based on user to the electricity The confirmation operation of sub- contract preview part and generate.
Optionally, the relevant information of the power grid user equipment about failure includes at least one in following item: therefore The user information of the power grid user equipment of barrier, the property right boundary demarcation information of the power grid user equipment of failure, failure power grid user set The picture of the power grid user equipment of failure before standby position, maintenance, the maintenance items information of the power grid user equipment of failure therefore The failure cause of the power grid user equipment of barrier, the materials information of the power grid user equipment of failure, the power grid user equipment of failure The picture of the power grid user equipment of non-materials information, the maintenance time of the power grid user equipment of failure and the failure after maintenance;Institute State the power grid equipment under a bureau about failure relevant information include in following item at least one of: the power grid of failure equipment under a bureau The power grid of the picture of the power grid equipment under a bureau of failure before work order number, the position of the power grid equipment under a bureau of failure, maintenance, failure Maintenance items information, the materials information of the power grid equipment under a bureau of failure, the non-use of the power grid equipment under a bureau of failure of equipment under a bureau Expect the picture of the electric network fault equipment of information, the maintenance time of the power grid equipment under a bureau of failure and the failure after maintenance, wherein institute State the power grid user equipment of failure materials information include in following item at least one of: the power grid user equipment institute of maintenance failure Type, specification and the quantity of the material needed;The non-materials information of the power grid user equipment of the failure include in following item extremely One item missing: special equipment type and specification needed for the power grid user equipment of maintenance failure and manual work type, the event The materials information of the power grid of barrier equipment under a bureau includes at least one in following item: needed for the power grid of maintenance failure equipment under a bureau Type, specification and the quantity of material;The non-materials information of the power grid of failure equipment under a bureau includes at least one in following item : special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
Optionally, the generation unit includes: supplies expenses determination unit, the price based on the material prestored and maintenance event The expense of each material needed for the materials information of the power grid user equipment of barrier determines the power grid user equipment of maintenance failure;Non- object Material expense determination unit, price and artificial price list based on the special equipment prestored determine the power grid user equipment of maintenance failure Required special equipment expense and labour cost;Bill of materials determination unit, needed for the power grid user equipment based on maintenance failure The expense of each material, special equipment expense and labour cost to generate include every needed for the power grid user equipment of maintenance failure The expense of material, special equipment expense, the power grid user equipment of labour cost and total cost repair bill of materials, alternatively, The materials information of supplies expenses determination unit, the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines dimension The expense of each material needed for repairing the power grid equipment under a bureau of failure;Non- supplies expenses determination unit, is set based on the special type prestored Special equipment expense needed for standby price determines the power grid user equipment of maintenance failure;Bill of materials determination unit, based on dimension The expense and special equipment expense of each material needed for repairing the power grid equipment under a bureau of failure generate the power grid including maintenance failure The expense of each material needed for equipment under a bureau, the power grid equipment repairing material under a bureau of special equipment expense and total cost are clear It is single, wherein the power grid user equipment repairing bill of materials is included in the electronic contract preview part and/or electronic contract, The power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
Optionally, the generation unit also repairs bill of materials using power grid user equipment and/or power grid equipment under a bureau is robbed Bill of materials is repaired to determine specific unit under a bureau and/or all units under a bureau at least one of the following expense of predetermined period Expense: repairing supplies expenses, special equipment expense and labour cost.
Optionally, the position for generating the unit also power grid user equipment based on the failure in each electronic contract generates The position display diagram of the faulty grids user equipment of specific time period, alternatively, the power grid office based on the failure in each electronic work order Belong to the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment.
Optionally, the generation unit is also for statistical analysis to the electronic contract and/or the electronic work order, with To specific unit under a bureau or all units under a bureau specific time period the material number inventory for maintenance.
Another aspect according to an exemplary embodiment of the present invention provides a kind of electric terminal, wherein the electric terminal packet It includes: processor;Memory is stored with computer program, when the computer program is executed by processor, realizes power grid repairing O&M operational method.
Another aspect according to an exemplary embodiment of the present invention provides and a kind of is stored with the computer-readable of computer program Storage medium, when the computer program realizes power grid repairing O&M operator according to the present invention when being executed by processor Method.
It repairs in operational method and platform, can get each in power grid O&M according to an exemplary embodiment of the present invention Power supply company repairs O&M each time the record data of work, and carries out data statistics and maintenance based on the data got Management, the social responsibility precise quantification for undertaking power supply company provide important evidence for Engineering Project Audit.
Part in following description is illustrated into the other aspect and/or advantage of present general inventive concept, there are also one Dividing will be apparent by description, or can learn by the implementation of present general inventive concept.
Detailed description of the invention
Pass through the detailed description carried out below with reference to the attached drawing for being exemplarily illustrated embodiment, exemplary embodiment of the present Above and other purpose will become apparent, in which:
Fig. 1 shows the flow chart of power grid repairing O&M operational method according to an exemplary embodiment of the present invention;
Fig. 2 shows specific units under a bureau according to an exemplary embodiment of the present invention and all units under a bureau in predetermined period Repair supplies expenses statistical chart;
Fig. 3 shows the power grid user equipment of the failure of the specific region of specific time period according to an exemplary embodiment of the present invention With the position display diagram of the power grid equipment under a bureau of failure;
Fig. 4 shows specific unit under a bureau according to an exemplary embodiment of the present invention or all units under a bureau in specific time period Material number inventory for maintenance;
Fig. 5 shows the block diagram of power grid repairing O&M job platform according to an exemplary embodiment of the present invention.
Specific embodiment
It reference will now be made in detail exemplary embodiment of the present invention, examples of the embodiments are shown in the accompanying drawings, wherein phase Same label refers to identical component always.It will illustrate the embodiment, by referring to accompanying drawing below to explain this hair It is bright.
Fig. 1 shows the flow chart of power grid repairing O&M operational method according to an exemplary embodiment of the present invention.Here, described Power grid is repaired O&M operational method and is executed in server end.Particularly, the power grid repairing O&M operational method can pass through clothes The be engaged in computer program at device end is realized.For example, the power grid repairing O&M operational method can pass through the operating system of server The function program of middle realization executes.
Referring to Fig.1, in step S100, the relevant information of the power grid user equipment about failure is obtained or about failure The relevant information of power grid equipment under a bureau.
Particularly, as an example, can from execute the associated electric terminal of the server of the method obtain about The relevant information of the relevant information of the power grid user equipment of failure or the power grid equipment under a bureau about failure.
In one exemplary embodiment, the relevant information of the power grid user equipment about failure includes in following item At least one of: the user information of the power grid user equipment of failure, the property right boundary demarcation information of the power grid user equipment of failure, failure The position of power grid user equipment, the picture of power grid user equipment of failure before maintenance, failure power grid user equipment dimension Repair the electricity of project information, the failure cause of the power grid user equipment of failure, the materials information of the power grid user equipment of failure, failure Non- materials information, the maintenance time of the power grid user equipment of failure and the power grid user of the failure after maintenance of network users equipment are set Standby picture.In addition, as an example, the materials information of the power grid user equipment of the failure includes at least one in following item : type, specification and the quantity of material needed for the power grid user equipment of maintenance failure;The power grid user equipment of the failure Non- materials information includes at least one in following item: special equipment type and rule needed for the power grid user equipment of maintenance failure Lattice and manual work type.
In another exemplary embodiment, the relevant information of the power grid about failure equipment under a bureau includes following item At least one of in: the event before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance The picture of the power grid of barrier equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure After materials information, the non-materials information of the power grid equipment under a bureau of failure, the maintenance time of the power grid equipment under a bureau of failure and maintenance Failure electric network fault equipment picture.In addition, as an example, the materials information of the power grid of failure equipment under a bureau includes At least one of in following item: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The failure Power grid equipment under a bureau non-materials information include in following item at least one of: needed for the power grid of maintenance failure equipment under a bureau Special equipment type and specification.
In step S200, the electronic contract template prestored letter related to the power grid user equipment about failure is utilized Breath generates electronic contract preview part, alternatively, the phase of the power grid equipment under a bureau using the electronic work order template and the failure that prestore It closes information and generates electronic work order.
Particularly, about the process for generating electronic contract preview part, the electronics prestored can be closed by specific rule Integration processing is carried out with template and the power grid user equipment about failure obtained, to obtain electronic contract preview part, as showing Example, can cover in the electronic contract preview part user information, maintenance items, repairing bill of materials, failure cause, in maintenance Hold, the entries such as maintenance time.Optionally, above-mentioned certain entries can obtain in the following manner:
It is repaired for example, can be determined based on the materials information of the power grid user equipment of the price and maintenance failure of the material prestored The expense of each material needed for the power grid user equipment of failure;It can price based on the special equipment prestored and artificial price list Special equipment expense and labour cost needed for determining the power grid user equipment of maintenance failure;It can be used based on the power grid of maintenance failure Expense, special equipment expense and the labour cost of each material needed for the equipment of family generate the power grid user including maintenance failure and set Material is repaired for the power grid user equipment of the expense of each required material, special equipment expense, labour cost and total cost Inventory, here, the power grid user equipment repairing bill of materials are included in the electronic contract preview part.
In addition, to the electronic work order template prestored and can be obtained by specific rule about the process for generating electronic work order The equipment under a bureau of the power grid about failure taken carries out integration processing, to obtain electronic contract preview part, as an example, the electronics Information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance content, the entries such as maintenance time can be covered in work order. Optionally, above-mentioned certain entries can obtain in the following manner:
It is repaired for example, can be determined based on the materials information of the price of the material prestored and the power grid of maintenance failure equipment under a bureau The expense of each material needed for the power grid of failure equipment under a bureau;Maintenance failure can be determined based on the price of the special equipment prestored Power grid user equipment needed for special equipment expense;It can each material needed for the power grid equipment under a bureau based on maintenance failure The expense of each material needed for expense and special equipment expense generate the power grid equipment under a bureau including maintenance failure, special equipment The power grid of expense and total cost equipment under a bureau repairs bill of materials, and here, the power grid equipment under a bureau repairs bill of materials packet It includes in the electronic work order.
In step S300, the electronic contract preview part is sent to electric terminal, alternatively, storing the electronic work order.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe Reason and displaying.
In addition, as an example, the method can be added also after the electronic contract preview part is sent to electric terminal Ground includes the steps that receiving and storing electronic contract, wherein the electronic contract is based on user to the electronic contract preview part Confirmation operation and generate.
By the above-mentioned means, relevant information or the pass of the power grid user equipment about failure can be obtained from electric terminal In the relevant information of the power grid of failure equipment under a bureau, electronic contract or electronic work order are obtained using above- mentioned information come to user The operational data and material data used done to power supply company are managed, analyze and safeguard, in order to successive projects Project auditing and work are shown.
In addition, after server end gets electronic contract and electronic work order, that is, getting power supply company to every The record data of O&M repairing work, therefore, server end can electronic contract based on acquisition and electronic work order to data For statistical analysis, management, maintenance are shown.
For example, in one exemplary embodiment, repairing bill of materials using power grid user equipment and/or power grid being under a bureau Equipment repairs bill of materials to determine specific unit under a bureau and/or all units under a bureau in the following expense of predetermined period extremely Few a kind of expense: repairing supplies expenses, special equipment expense and labour cost.
Fig. 2 shows specific units under a bureau according to an exemplary embodiment of the present invention and all units under a bureau in predetermined period Repair supplies expenses statistical chart.
As shown in Fig. 2, can be based on all power grid user equipment obtained during on August 31st, 1 day 1 January in 2017 Supplies expenses, special equipment expense and the labour cost etc. recorded in repairing inventory and power grid equipment repairing inventory under a bureau count The correlative charges that each power supply company is paid, for example, during on August 31st, 1 day 1 January in 2017, and justice power supply Supplies expenses be 4235 yuan, special equipment expense is 3265 yuan and labour cost is 1500 yuan.In addition, similarly, may be used also Count that the material total cost that all power supply companies are paid is 59310 yuan, special equipment total cost is 45690 yuan and artificial total Expense is 22500 yuan.In this way, expense pointed by each power supply company can be intuitively understood, is subsequent project Audit provides reference frame.
It in another exemplary embodiment, can be based on the position of the power grid user equipment of the failure in each electronic contract The position display diagram for generating the faulty grids user equipment of specific time period, alternatively, the electricity based on the failure in each electronic work order Net the position display diagram of the faulty grids equipment under a bureau of the position generation specific time period of equipment under a bureau.
Fig. 3 shows the power grid user equipment of the failure of the specific region of specific time period according to an exemplary embodiment of the present invention With the position display diagram of the power grid equipment under a bureau of failure.
As shown in figure 3, can be obtained based on specific time period (for example, during on August 31st, 1 day 1 January in 2017) The faulty grids that the position of the power grid user equipment of failure in all power grid user equipment repairing inventories generates specific region are used The position display diagram of family equipment, for example, the power grid equipment under a bureau of position instruction failure of the black balloon in Fig. 3 in map Position, the position of the power grid user equipment of position instruction failure of the white balloon in map in Fig. 3.In this way, The position of the grid equipment of failure intuitively can be showed into staff, fast and effeciently grasp failure convenient for power supply company Take place frequently the distribution situation in region.
In another exemplary embodiment, for statistical analysis to the electronic contract and/or the electronic work order, with Specific unit under a bureau or all units under a bureau are obtained in the material number inventory for maintenance of specific time period.
Fig. 4 shows specific unit under a bureau according to an exemplary embodiment of the present invention or all units under a bureau in specific time period Material number inventory for maintenance.
As shown in figure 4, showing based on uniting to the material number in the electronic contract and/or the electronic work order Meter analysis each of is obtained the number of material used in the number and all units under a bureau of material used in unit under a bureau Mesh.In this way, the service condition of material can be clearly counted, material is repaired for subsequent deposit and is ready.
Fig. 5 shows the block diagram of power grid repairing O&M job platform according to an exemplary embodiment of the present invention.
As shown in figure 5, power grid repairing O&M job platform according to an exemplary embodiment of the present invention includes acquisition of information list Member 100 generates unit 200 and interactive unit 300, wherein the power grid repairing O&M job platform is arranged in server end.
Particularly, information acquisition unit 100 obtain about failure power grid user equipment relevant information or about The relevant information of the power grid of failure equipment under a bureau.
As an example, information acquisition unit 100 can be obtained from electric terminal associated with the server of the method is executed Take the relevant information of the relevant information of the power grid user equipment about failure or the power grid equipment under a bureau about failure.
In one exemplary embodiment, the relevant information of the power grid user equipment about failure includes in following item At least one of: the user information of the power grid user equipment of failure, the property right boundary demarcation information of the power grid user equipment of failure, failure The position of power grid user equipment, the picture of power grid user equipment of failure before maintenance, failure power grid user equipment dimension Repair the electricity of project information, the failure cause of the power grid user equipment of failure, the materials information of the power grid user equipment of failure, failure Non- materials information, the maintenance time of the power grid user equipment of failure and the power grid user of the failure after maintenance of network users equipment are set Standby picture.In addition, as an example, the materials information of the power grid user equipment of the failure includes at least one in following item : type, specification and the quantity of material needed for the power grid user equipment of maintenance failure;The power grid user equipment of the failure Non- materials information includes at least one in following item: special equipment type and rule needed for the power grid user equipment of maintenance failure Lattice and manual work type.
In another exemplary embodiment, the relevant information of the power grid about failure equipment under a bureau includes following item At least one of in: the event before the work order number of the power grid of failure equipment under a bureau, the position of the power grid equipment under a bureau of failure, maintenance The picture of the power grid of barrier equipment under a bureau, the maintenance items information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure After materials information, the non-materials information of the power grid equipment under a bureau of failure, the maintenance time of the power grid equipment under a bureau of failure and maintenance Failure electric network fault equipment picture.In addition, as an example, the materials information of the power grid of failure equipment under a bureau includes At least one of in following item: type, specification and the quantity of material needed for the power grid of maintenance failure equipment under a bureau;The failure Power grid equipment under a bureau non-materials information include in following item at least one of: needed for the power grid of maintenance failure equipment under a bureau Special equipment type and specification.
Unit 200 is generated using the electronic contract template prestored letter related to the power grid user equipment about failure Breath generates electronic contract preview part, alternatively, the phase of the power grid equipment under a bureau using the electronic work order template and the failure that prestore It closes information and generates electronic work order.
Particularly, about the process for generating electronic contract preview part, generating unit 200 can be by specific rule to pre- The electronic contract template deposited and the power grid user equipment about failure obtained carry out integration processing, to obtain electronic contract preview Part, as an example, it is former to cover user information, maintenance items, repairing bill of materials, failure in the electronic contract preview part Cause, maintenance content, the entries such as maintenance time.Optionally, above-mentioned certain entries can obtain in the following manner:
For example, generate unit 200 can price and maintenance failure based on the material prestored power grid user equipment materials The expense of each material needed for information determines the power grid user equipment of maintenance failure;Generating unit 200 can be based on the spy prestored Special equipment expense and labour cost needed for the price of kind equipment and artificial price list determine the power grid user equipment of maintenance failure With;Generate unit 200 can the expense of each material needed for the power grid user equipment based on maintenance failure, special equipment expense and It includes the expense of each material needed for the power grid user equipment of maintenance failure that labour cost, which generates, special equipment expense, artificial The power grid user equipment of expense and total cost repairs bill of materials, and here, the power grid user equipment repairs bill of materials packet It includes in the electronic contract preview part.
In addition, generating unit 200 can be by specific rule to the electronics work prestored about the process for generating electronic work order Single mode plate and the equipment under a bureau of the power grid about failure obtained carry out integration processing, to obtain electronic contract preview part, as showing Example can cover information under a bureau, maintenance items, repairing bill of materials, failure cause, maintenance content, maintenance in the electronic work order The entries such as time.Optionally, above-mentioned certain entries can obtain in the following manner:
For example, generate unit 200 can price and maintenance failure based on the material prestored power grid equipment under a bureau materials The expense of each material needed for information determines the power grid of maintenance failure equipment under a bureau;Generating unit 200 can be based on the spy prestored Special equipment expense needed for the price of kind equipment determines the power grid user equipment of maintenance failure;Generating unit 200 can be based on dimension The expense and special equipment expense of each material needed for repairing the power grid equipment under a bureau of failure generate the power grid including maintenance failure The expense of each material needed for equipment under a bureau, the power grid equipment repairing material under a bureau of special equipment expense and total cost are clear Single, here, the power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
The electronic contract preview part is sent to electric terminal by interactive unit 300, alternatively, storing the electronic work order.
Particularly, the electronic work order can be used as power supply company to the foundation of power grid equipment under a bureau repairing maintenance, example Such as, can be for statistical analysis based on the content in contract after power grid repairing O&M job platform gets electronic work order, come It is carried out safeguarding the various supplies expenses undertaken by power grid equipment under a bureau in arbitrary period to power supply company, is convenient for follow-up data pipe Reason and displaying.
In addition, as an example, interactive unit can be additionally after the electronic contract preview part is sent to electric terminal Receive and store electronic contract, wherein the electronic contract based on user to the confirmation operation of the electronic contract preview part and It generates.
By the above-mentioned means, relevant information or the pass of the power grid user equipment about failure can be obtained from electric terminal In the relevant information of the power grid of failure equipment under a bureau, electronic contract or electronic work order are obtained using above- mentioned information come user couple The operational data and material data used that power supply company is done are managed, analyze and safeguard, in order to successive projects item Mesh audit and work are shown.
In addition, after server end gets electronic contract and electronic work order, that is, getting power supply company to every The record data of O&M repairing work, therefore, server end can electronic contract based on acquisition and electronic work order to data For statistical analysis, management, maintenance are shown.
For example, in one exemplary embodiment, generate unit 200 using power grid user equipment repairing bill of materials and/ Or power grid equipment under a bureau repairs bill of materials to determine specific unit under a bureau and/or all units under a bureau in the following of predetermined period At least one of expense expense: repairing supplies expenses, special equipment expense and labour cost.It in this way, can be with Expense pointed by each power supply company is intuitively understood, provides reference frame for subsequent project audit.
In another exemplary embodiment, generating unit 200 can be used based on the power grid of the failure in each electronic contract The position of family equipment generates the position display diagram of the faulty grids user equipment of specific time period, alternatively, being based on each electronic work order In failure power grid equipment under a bureau position generate specific time period faulty grids equipment under a bureau position display diagram.Pass through this Kind mode, intuitively can show staff for the position of the grid equipment of failure, fast and effeciently convenient for power supply company Grasp the distribution situation in Frequent Troubles region.
In another exemplary embodiment, unit 200 is generated to carry out the electronic contract and/or the electronic work order Statistical analysis, to obtain specific unit under a bureau or all units under a bureau in the material number inventory for maintenance of specific time period. In this way, the service condition of material can be clearly counted, material is repaired for subsequent deposit and is ready.
Moreover, it should be understood that each list in power grid O&M repairing job platform according to an exemplary embodiment of the present invention Member can be implemented hardware component and/or component software.Those skilled in the art's processing according to performed by each unit of restriction, It can such as use site programmable gate array (FPGA) or specific integrated circuit (ASIC) Lai Shixian each unit.
Moreover, it should be understood that the O&M of power grid user equipment according to an exemplary embodiment of the present invention repairs job platform In each unit can be implemented hardware component and/or component software.Those skilled in the art are according to each unit institute of restriction The processing of execution, can such as use site programmable gate array (FPGA) or specific integrated circuit (ASIC) realize each list Member.
The computer readable storage medium of an exemplary embodiment of the present invention, be stored with makes when being executed by a processor Obtain the computer program that processor executes the power grid O&M repairing operational method of the above exemplary embodiments.This is computer-readable to deposit Storage media is the arbitrary data storage device that can store the data read by computer system.Computer readable storage medium shows Example include: read-only memory, random access memory, CD-ROM, tape, floppy disk, optical data storage devices and carrier wave (such as It is transmitted through wired or wireless transmission path by the data of internet).
The electric terminal of an exemplary embodiment of the present invention includes: that processor (not shown) and memory (do not show Out), wherein memory is stored with computer program, when the computer program is executed by processor, realizes such as above-mentioned example Property embodiment power grid O&M repair operational method.
In conclusion power grid O&M repairing operational method according to an exemplary embodiment of the present invention and platform, can obtain To each power supply company to the record data of the repairing work of O&M each time, and data statistics is carried out based on the data got And maintenance management, the social responsibility precise quantification for undertaking power supply company, and important evidence is provided for Engineering Project Audit.
Although being particularly shown and describing the present invention, those skilled in the art referring to its exemplary embodiment It should be understood that in the case where not departing from the spirit and scope of the present invention defined by claim form can be carried out to it With the various changes in details.

Claims (10)

1. a kind of power grid repairs O&M operational method, which is characterized in that the described method includes:
(A) the related letter of the relevant information of the power grid user equipment about failure or the power grid equipment under a bureau about failure is obtained Breath;
(B) electronics is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored to close With preview part, alternatively, generating electricity using the relevant information of the power grid equipment under a bureau of the electronic work order template and the failure that prestore Sub- work order;
(C) the electronic contract preview part is sent to electric terminal, alternatively, the electronic work order is stored,
Wherein, the power grid repairing O&M operational method is executed in server end.
2. the method as described in claim 1, further includes:
(D) electronic contract is received and stored, wherein confirmation of the electronic contract based on user to the electronic contract preview part It operates and generates.
3. the method as described in claim 1, which is characterized in that the relevant information packet of the power grid user equipment about failure Include at least one in following item: user information, the property right of the power grid user equipment of failure point of the power grid user equipment of failure The picture of the power grid user equipment of failure before boundary's information, the position of the power grid user equipment of failure, maintenance, the power grid of failure are used The materials letter of the maintenance items information of family equipment, the failure cause of the power grid user equipment of failure, the power grid user equipment of failure Breath, the non-materials information of power grid user equipment of failure, the maintenance time of the power grid user equipment of failure and the failure after maintenance Power grid user equipment picture;
The relevant information of the power grid about failure equipment under a bureau includes at least one in following item: the power grid of failure is under a bureau The picture of the power grid equipment under a bureau of failure before the work order number of equipment, the position of the power grid equipment under a bureau of failure, maintenance, failure The maintenance items information of power grid equipment under a bureau, the materials information of the power grid equipment under a bureau of failure, the power grid equipment under a bureau of failure Non- materials information, the power grid equipment under a bureau of failure maintenance time and the failure after maintenance electric network fault equipment picture,
Wherein, the materials information of the power grid user equipment of the failure includes at least one in following item: the electricity of maintenance failure Type, specification and the quantity of material needed for network users equipment;The non-materials information of the power grid user equipment of the failure includes At least one of in following item: special equipment type needed for the power grid user equipment of maintenance failure and specification and manual work Type,
The materials information of the power grid of failure equipment under a bureau includes at least one in following item: the power grid of maintenance failure is under a bureau Type, specification and the quantity of material needed for equipment;The non-materials information of the power grid of failure equipment under a bureau includes following item At least one of in: special equipment type and specification needed for the power grid of maintenance failure equipment under a bureau.
4. method as claimed in claim 3, which is characterized in that step (B) includes:
The materials information of the power grid user equipment of price and maintenance failure based on the material prestored determines the power grid of maintenance failure The expense of each material needed for user equipment;
Special type needed for price and artificial price list based on the special equipment prestored determine the power grid user equipment of maintenance failure Cost of equipment and labour cost;
Expense, special equipment expense and the labour cost of each material needed for power grid user equipment based on maintenance failure generate The expense of each material needed for power grid user equipment including maintenance failure, special equipment expense, labour cost and total take Power grid user equipment repairs bill of materials,
Alternatively,
The materials information of the power grid equipment under a bureau of price and maintenance failure based on the material prestored determines the power grid of maintenance failure The expense of each material needed for equipment under a bureau;
Based on the special equipment prestored price determine the power grid user equipment of maintenance failure needed for special equipment expense;
It includes maintenance that the expense and special equipment expense of each material needed for power grid equipment under a bureau based on maintenance failure, which generate, The expense of each material needed for the power grid of failure equipment under a bureau, the power grid equipment under a bureau of special equipment expense and total cost are robbed Bill of materials is repaired,
Wherein, the power grid user equipment repairing bill of materials is included in the electronic contract preview part and/or electronic contract, The power grid equipment repairing bill of materials under a bureau is included in the electronic work order.
5. method as claimed in claim 4, further includes:
(E) bill of materials and/or power grid equipment repairing bill of materials under a bureau are repaired using power grid user equipment to determine specific office Belong to unit and/or all units under a bureau at least one of the following expense of predetermined period expense: repairing supplies expenses, special type Cost of equipment and labour cost.
6. method according to claim 2, further includes:
(F) position of the power grid user equipment based on the failure in each electronic contract generates the faulty grids user of specific time period The position display diagram of equipment, alternatively, when the position of the power grid equipment under a bureau based on the failure in each electronic work order generates specific The position display diagram of the faulty grids equipment under a bureau of section.
7. method as claimed in claim 4, further includes:
(G) for statistical analysis to the electronic contract and/or the electronic work order, to obtain specific unit under a bureau and/or institute There is unit under a bureau in the material number inventory for maintenance of specific time period.
8. a kind of power grid repairs O&M job platform, which is characterized in that the platform includes:
Information acquisition unit, power grid of the acquisition about the relevant information of the power grid user equipment of failure or about failure is under a bureau to be set Standby relevant information;
Unit is generated, is generated using the relevant information of the electronic contract template and the power grid user equipment about failure prestored Electronic contract preview part, alternatively, the relevant information of the power grid equipment under a bureau using the electronic work order template and the failure that prestore Generate electronic work order;
The electronic contract preview part is sent to electric terminal by interactive unit, alternatively, the electronic work order is stored,
Wherein, the power grid repairing O&M job platform is arranged in server end.
9. a kind of electric terminal, wherein the electric terminal includes:
Processor;
Memory is stored with computer program, when the computer program is executed by processor, realizes such as claim 1 to 7 In any one described in power grid repair O&M operational method.
10. a kind of computer readable storage medium for being stored with computer program, when the computer program is executed by processor Shi Shixian method as claimed in any of claims 1 to 7 in one of claims.
CN201811496470.6A 2018-12-07 2018-12-07 Power grid O&M repairs operational method and platform Pending CN109685220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811496470.6A CN109685220A (en) 2018-12-07 2018-12-07 Power grid O&M repairs operational method and platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811496470.6A CN109685220A (en) 2018-12-07 2018-12-07 Power grid O&M repairs operational method and platform

Publications (1)

Publication Number Publication Date
CN109685220A true CN109685220A (en) 2019-04-26

Family

ID=66187136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811496470.6A Pending CN109685220A (en) 2018-12-07 2018-12-07 Power grid O&M repairs operational method and platform

Country Status (1)

Country Link
CN (1) CN109685220A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080172346A1 (en) * 2007-01-12 2008-07-17 Clean Power Finance, Inc. Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment
CN105373901A (en) * 2015-12-15 2016-03-02 国网北京市电力公司 Grid fault worksheet handling method, apparatus, and system
CN105894197A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN107341738A (en) * 2017-05-03 2017-11-10 国网浙江省电力公司 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080172346A1 (en) * 2007-01-12 2008-07-17 Clean Power Finance, Inc. Methods, systems and agreements for increasing the likelihood of repayments under a financing agreement for renewable energy equipment
CN105373901A (en) * 2015-12-15 2016-03-02 国网北京市电力公司 Grid fault worksheet handling method, apparatus, and system
CN105894197A (en) * 2016-03-31 2016-08-24 国网北京市电力公司 Work order processing method and device
CN107341738A (en) * 2017-05-03 2017-11-10 国网浙江省电力公司 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丰台供电公司 陈晓东: "《中国电力新闻网》", 25 October 2012 *
国网宁夏电力公司营销部: "《国网宁夏电力公司营销业务应用系统典型操作案例 新装 增容及变更用电 2》", 30 April 2016, 银川:宁夏人民出版社 *

Similar Documents

Publication Publication Date Title
US20190354922A1 (en) Digital twin management in iot systems
US8694351B2 (en) System and method for an audit tool for communications service providers
US20150073862A1 (en) System and method for risk optimized, spatially sensitive preventive maintenance scheduling for asset management
US8650061B2 (en) Compliance management system and method
CN109919676B (en) Method and system for intelligent environment-friendly bag charging management
US20150127601A1 (en) System and method for improving and managing smart grid unread meter investigations
US7865382B2 (en) Compliance control framework
CN105246061A (en) Service terminal of mobile communication service
US9582837B2 (en) Management system for gas cock opening and closing
CN109359922A (en) Spare parts management method and device
CN109685220A (en) Power grid O&M repairs operational method and platform
CN116991678A (en) Intelligent operation and maintenance system of data center
CN109242665B (en) Business rule multi-channel sharing method, device, equipment and storage medium
US20150186809A1 (en) System and method for tracking ami assets
JP2009025864A (en) Repair information processing system and repair information processing program of multiple dwelling houses, and recording medium
US20100325604A1 (en) System and method for performing cost estimation in a service provider environment
CN109685219A (en) The O&M repairing operational method and platform of power grid user equipment
WO1998027505A9 (en) Method for remote viewing of damage and authorization of repairs
US7956737B2 (en) Method and apparatus for network service assurance
US8635095B2 (en) Method and apparatus for tracking an intent
Pozin The principles of life cycle supporting system for mission-critical systems
CN109670605A (en) The O&M repairing operational method and platform of power grid equipment under a bureau
US20130024236A1 (en) Methods for product management and devices thereof
Popov et al. Service Order extensions to the Outage Management System
Negrini Data Center Monitoring System Upgrade

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426