CN107341738A - Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model - Google Patents

Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model Download PDF

Info

Publication number
CN107341738A
CN107341738A CN201710305194.XA CN201710305194A CN107341738A CN 107341738 A CN107341738 A CN 107341738A CN 201710305194 A CN201710305194 A CN 201710305194A CN 107341738 A CN107341738 A CN 107341738A
Authority
CN
China
Prior art keywords
msub
business
work order
property right
mrow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710305194.XA
Other languages
Chinese (zh)
Inventor
夏洪涛
施婧
牛东晓
陈铁义
夏慧聪
王亿
赵永良
张建松
张彩友
张旭东
王锋华
戴波
邬秀玲
傅馨越
韩振华
徐莉莉
王晓辉
孙晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
North China Electric Power University
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
North China Electric Power University
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, North China Electric Power University, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710305194.XA priority Critical patent/CN107341738A/en
Publication of CN107341738A publication Critical patent/CN107341738A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of matching somebody with somebody based on Ramsey Pricing principle to rob business and non-property right work order billing model, including:Input module, input under different schemes with the bill of materials for robbing business and non-property right work order and material unit price, fee of material computing module, calculate the fee of material with business of robbing with non-property right work order under different schemes;Service charge computing module, calculate the service charge with business of robbing with non-property right work order under different schemes;Totle drilling cost computing module, calculate the totle drilling cost with business of robbing with non-property right work order under different schemes;Compare output module, will match somebody with somebody to rob business compared with the totle drilling cost of non-property right work order and export under different schemes and matching somebody with somebody for the lowest cost rob business and non-property right work order.The present invention facilitates the maintenance cost rushed to repair after user and the rapid design schedule of repair personnel, while more ensure that the service price transparent management of paid service.

Description

Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model
Technical field
The present invention relates to electric power data analytical technology, and in particular to the cost calculation mould with the business of robbing Yu non-property right work order Type.
Background technology
Power grid enterprises pay attention to customer service work further, and by taking national grid as an example, 95598 phone full-services are upper to be received extremely General headquarters' aspect, troublshooting traffic entity have been concentrated to two, north and south customer service branch center, response efficiency to breakdown repair, Processing quality is proposed higher requirement.And from the point of view of the said firm's troublshooting work order data, some work order is non-confession Electric property right of enterprises equipment fault, such as " the line failure after table " of user, because such failure is not belonging to power supply enterprise's maintenance range, greatly Do not repaired after fractional unit failure judgement reason, this has been resulted in, and ERM wastes and user satisfaction declines two sternly Weight consequence.
Currently, the electricity of each aspect, which changes, is operated in iterative method.To adapt to new situations, grid company is actively developed the marketization and sold Electricity service and innovation developing power network extension business, under the support of advanced technology, using the existing advantage of company, comply with market rule Rule, cultivates the core competitiveness in power sales, to strive for more power sales shares, and it is customer-centric, with market To be oriented to, by science and technology, management innovation, existing top king's business ecology, the overall management level of lifting company are expanded in optimization. Under such overall background, " after table " repairing has also incorporated pilot and exploratory stage as the extension of good service with compensation.
Refer to that distribution network failure is rushed to repair with the business of robbing, be that routinely one of important process, occurrence frequency are higher for distribution production. Electric power enterprise is needed to analyze the general expenses with the business of robbing, and business is robbed by calculating to match somebody with somebody with the business of robbing and non-property right work order Required totle drilling cost, within the time limit of distribution repairing, complete to match somebody with somebody with minimum cost and rob business.
The content of the invention
The technical problems to be solved by the invention be just to provide it is a kind of based on Ramsey Pricing principle with rob business with it is non- Property right work order billing model, the general expenses data with the business of robbing and non-property right work order are analyzed, and then formulated for enterprise Optimal Rush Repair Scheme provides foundation.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:Matching somebody with somebody based on Ramsey Pricing principle robs industry Business and non-property right work order billing model, including:Input module, input the material with business of robbing with non-property right work order under different schemes Inventory and material unit price,
Fee of material computing module, calculate the fee of material with business of robbing with non-property right work order under different schemes;Service charge calculates Module, calculate the service charge with business of robbing with non-property right work order under different schemes;Totle drilling cost computing module, calculate under different schemes Totle drilling cost with the business of robbing Yu non-property right work order;Compare output module, business of robbing and non-property right work order will be matched somebody with somebody under different schemes Totle drilling cost, which is compared and exported, robs business and non-property right work order matching somebody with somebody for the lowest cost.
Further, fee of material computing module according under different schemes with robbing business and non-property right restoring material inventory, meter The fee of material needed for each scheme is calculated,
12 distribution box unit prices are PA, quantity QA;2 distribution box unit prices are PB, quantity QB;1.5 squares of electric wire unit prices For PC, quantity QC;2.5 squares of electric wire unit prices are PD, quantity QD;4 squares of electric wire unit prices are PE, quantity QE;6 squares of electric wires Unit price is PF, quantity QF;It is P to cover spool unit priceG, quantity QG;Pipe order valency is PH, quantity QH;Electrical adhesive tape (8*2.5) Unit price is PI, quantity QI;It is P that back box unit price is inserted on groundJ, quantity QJ;Socket unit price is PK, quantity QK;Air conditioner socket unit price For PL, quantity QL;It is P to protect socket unit priceM, quantity QM;Compartment unit price is PN, quantity QN;Tied silk unit price is PO, number Measure as QO;Screw unit price is PP, quantity QP;Glue unit price is PQ, quantity QQ;It is P to leak declaration form valencyR, quantity QR;Isolator PS, quantity QS, then
FM=PAQA+PBQB+PCQC+PDQD+PEQE+PFQF
+PGQG+PHQH+PIQI+PJQJ+PKQK
+PLQL+PMQM+PNQN+POQO
+PPQP+PQQQ+PRQR+PSQS
(1)。
Further, the computational methods of service charge computing module comprise the following steps:
3.1 unit of account labor cost stepping prices,
According to Ramsey Pricing principle, following condition should be met by meeting all kinds of commodity prices of social welfare maximization:
Wherein, pi、pjFor all kinds of commodity prices, ηi、ηjFor all kinds of demand for commodity coefficient of elasticity, MCi、MCjFor all kinds of commodity Marginal cost,
Unit labor cost is divided into two grades:When the quantity of labour force needed for repairing is less than q every time, all personnel's unit labor Power cost is according to p1Calculate, when the required quantity of labour force is higher than q, overage personnel press p2Calculate, it is assumed that in a period of time All aggregate demands with two grades of labours for robbing business formation are respectively η on the coefficient of elasticity of price1、η2, the side of labour Border cost is MC, then Ramsey Pricing principle can be expressed as:
And meet
p1·q1+p2·q2=R (4)
Wherein, q1、q2All aggregate demands with two grades of labours for robbing business formation, R tables in a period of time are represented respectively Show the cost recovery demand that two grades of labour costs should meet in this period, with reference to formula (3) and (4)
Calculate optimal unit labor cost p1、p2
3.2 calculate the labour cost with business of robbing with non-property right work order,
If certain is Q with the quantity of labour force needed for business is robbed1, the labour cost with the business of robbing and non-property right work order is
3.3 calculate the service charge with business of robbing with non-property right work order,
If unit vehicle cost of serving FC, service vehicle quantity Q2, the service charge with the business of robbing and non-property right work order is
FS=F1+FC·Q2 (6)。
Further, the totle drilling cost with business of robbing and non-property right work order under the calculating different schemes of totle drilling cost computing module is public Formula is:
FT=FM+FS (7)。
The technical solution adopted by the present invention, the totle drilling cost with the business of robbing and non-property right work order is divided into fee of material and service charge The acquisition cost of equipment and part needed for business is robbed in the assignment of two parts, wherein fee of material, and service charge includes labour cost and traffic Vehicle expense.Unit labour cost quantity of labour force according to needed for business is divided into two grades, rationally true according to Ramsey Pricing principle Fixed two grades unit price.By calculating the totle drilling cost with business of robbing with non-property right work order under different purchase inventories, according to cost minimization Change principle, optimal with the business of the robbing scheme minimum with non-property right work order totle drilling cost, therefore, the present invention is the optimal Rush Repair Scheme of selection Foundation is provided, facilitates the maintenance cost rushed to repair after user and the rapid design schedule of repair personnel, while more ensure that paid service Service price transparent management.
Compared with prior art, the present invention has advantages below and beneficial effect:
(1) method proposed by the present invention provides foundation to calculate the totle drilling cost with business of robbing and non-property right work order, convenient The maintenance cost rushed to repair after user and the rapid design schedule of repair personnel, while more ensure that the service price transparent pipe of paid service Reason.
(2) present invention optimized by being based partially on Ramsey Pricing principle to labour cost, improve with rob business with it is non- The accuracy of property right work order billing model.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the particular flow sheet of the present invention.
Embodiment
The technical scheme of the embodiment of the present invention is explained and illustrated with reference to the accompanying drawing of the embodiment of the present invention, but under It is only the preferred embodiments of the present invention to state embodiment, and not all.Based on the embodiment in embodiment, those skilled in the art Other embodiment is obtained on the premise of creative work is not made, belongs to protection scope of the present invention.
Totle drilling cost with the business of robbing and non-property right work order is divided into fee of material and service charge two parts, wherein material by the present invention The acquisition cost of equipment and part needed for business is robbed in expense assignment, and service charge includes labour cost and vehicular traffic expense.Unit people Work cost quantity of labour force according to needed for business is divided into two grades, and two grades of unit price is rationally determined according to Ramsey Pricing principle.It is logical Cross and calculate the totle drilling cost with business of robbing with non-property right work order under different purchase inventories, according to cost minimization principle, with the business of robbing Minimum scheme is optimal with non-property right work order totle drilling cost.
Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model, including:Input module, input is not With matching somebody with somebody the bill of materials for robbing business and non-property right work order under scheme and material is monovalent,
Fee of material computing module, calculate the fee of material with business of robbing with non-property right work order under different schemes;Service charge calculates Module, calculate the service charge with business of robbing with non-property right work order under different schemes;Totle drilling cost computing module, calculate under different schemes Totle drilling cost with the business of robbing Yu non-property right work order;Compare output module, business of robbing and non-property right work order will be matched somebody with somebody under different schemes Totle drilling cost, which is compared and exported, robs business and non-property right work order matching somebody with somebody for the lowest cost.
Wherein, fee of material computing module is according to, with business and non-property right restoring material inventory is robbed, calculating is respectively under different schemes Fee of material needed for scheme.
12 distribution box unit prices are PA, quantity QA;2 distribution box unit prices are PB, quantity QB;1.5 squares of electric wire unit prices For PC, quantity QC;2.5 squares of electric wire unit prices are PD, quantity QD;4 squares of electric wire unit prices are PE, quantity QE;6 squares of electric wires Unit price is PF, quantity QF;It is P to cover spool unit priceG, quantity QG;Pipe order valency is PH, quantity QH;Electrical adhesive tape (8*2.5) Unit price is PI, quantity QI;It is P that back box unit price is inserted on groundJ, quantity QJ;Socket unit price is PK, quantity QK;Air conditioner socket unit price For PL, quantity QL;It is P to protect socket unit priceM, quantity QM;Compartment unit price is PN, quantity QN;Tied silk unit price is PO, number Measure as QO;Screw unit price is PP, quantity QP;Glue unit price is PQ, quantity QQ;It is P to leak declaration form valencyR, quantity QR;Isolator PS, quantity QS, then
FM=PAQA+PBQB+PCQC+PDQD+PEQE+PFQF
+PGQG+PHQH+PIQI+PJQJ+PKQK
+PLQL+PMQM+PNQN+POQO
+PPQP+PQQQ+PRQR+PSQS (1)
The computational methods of service charge computing module comprise the following steps:
2.1 unit of account labor cost stepping prices.
According to Ramsey Pricing principle, following condition should be met by meeting all kinds of commodity prices of social welfare maximization:
Wherein, pi、pjFor all kinds of commodity prices, ηi、ηjFor all kinds of demand for commodity coefficient of elasticity, MCi、MCjFor all kinds of commodity Marginal cost.
Unit labor cost (cost of labor of the unit personnel within the unit interval) is divided into two grades:Every time needed for repairing When the quantity of labour force is less than q, all personnel's unit labor cost is according to p1Calculate, when the required quantity of labour force is higher than q, surpass Some of the staff are crossed by p2Calculate.Assuming that all aggregate demands with two grades of labours for robbing business formation are on valency in a period of time The coefficient of elasticity of lattice is respectively η1、η2, the marginal cost of labour is MC, then Ramsey Pricing principle can be expressed as:
And meet
p1·q1+p2·q2=R (4)
Wherein, q1、q2All aggregate demands with two grades of labours for robbing business formation, R tables in a period of time are represented respectively Show the cost recovery demand that two grades of labour costs should meet in this period.With reference to above-mentioned two formula calculate optimal unit labour into This p1、p2
2.2 calculate the labour cost with business of robbing with non-property right work order
If certain is Q with the quantity of labour force needed for business is robbed1, the labour cost with the business of robbing and non-property right work order is
2.3 calculate the service charge with business of robbing with non-property right work order
If unit vehicle cost of serving FC, service vehicle quantity Q2, the service charge with the business of robbing and non-property right work order is
FS=F1+FC·Q2 (6)。
Totle drilling cost computing module is calculated under different schemes:
FT=FM+FS (7)
Finally, F can be selectedTMinimum scheme is as optimal case.
It should be noted that various data used in above-mentioned calculation formula are directly transferred from database.
The present invention is further illustrated below in conjunction with application example.
Assuming that for a certain with business is robbed, there is two sets of plan, relative parameters setting difference is as shown in Table 1 and Table 2.
The parameter setting of 1 scheme of table one
The parameter setting of 2 scheme of table two
The totle drilling cost that two schemes are calculated is as shown in table 3.
Table 3, which is matched somebody with somebody, robs business and non-property right work order cost calculation result table
As seen from the above table, the totle drilling cost of scheme one is minimum, i.e. optimal case.

Claims (4)

1. matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model, it is characterised in that including:
Input module, input under different schemes and match somebody with somebody the bill of materials for robbing business and non-property right work order and material unit price,
Fee of material computing module, calculate the fee of material with business of robbing with non-property right work order under different schemes;
Service charge computing module, calculate the service charge with business of robbing with non-property right work order under different schemes;
Totle drilling cost computing module, calculate the totle drilling cost with business of robbing with non-property right work order under different schemes;
Compare output module, will be under different schemes with robbing business compared with the totle drilling cost of non-property right work order and export totle drilling cost Business and non-property right work order are robbed in minimum matching somebody with somebody.
2. matching somebody with somebody based on Ramsey Pricing principle according to claim 1 robs business and non-property right work order billing model, its It is characterised by, fee of material computing module under different schemes according to robbing business and non-property right restoring material inventory, calculating each scheme Required fee of material,
12 distribution box unit prices are PA, quantity QA;2 distribution box unit prices are PB, quantity QB;1.5 squares of electric wire unit prices are PC, Quantity is QC;2.5 squares of electric wire unit prices are PD, quantity QD;4 squares of electric wire unit prices are PE, quantity QE;6 squares of electric wire unit prices For PF, quantity QF;It is P to cover spool unit priceG, quantity QG;Pipe order valency is PH, quantity QH;Electrical adhesive tape (8*2.5) unit price For PI, quantity QI;It is P that back box unit price is inserted on groundJ, quantity QJ;Socket unit price is PK, quantity QK;Air conditioner socket unit price is PL, Quantity is QL;It is P to protect socket unit priceM, quantity QM;Compartment unit price is PN, quantity QN;Tied silk unit price is PO, quantity is QO;Screw unit price is PP, quantity QP;Glue unit price is PQ, quantity QQ;It is P to leak declaration form valencyR, quantity QR;Isolator PS, number Measure as QS, then
FM=PAQA+PBQB+PCQC+PDQD+PEQE+PFQF
+PGQG+PHQH+PIQI+PJQJ+PKQK
+PLQL+PMQM+PNQN+POQO
+PPQP+PQQQ+PRQR+PSQS (1)。
3. matching somebody with somebody based on Ramsey Pricing principle according to claim 2 robs business and non-property right work order billing model, its It is characterised by, the computational methods of service charge computing module comprise the following steps:
3.1 unit of account labor cost stepping prices,
According to Ramsey Pricing principle, following condition should be met by meeting all kinds of commodity prices of social welfare maximization:
<mrow> <mfrac> <mrow> <msub> <mi>p</mi> <mi>i</mi> </msub> <mo>-</mo> <msub> <mi>MC</mi> <mi>i</mi> </msub> </mrow> <mrow> <msub> <mi>p</mi> <mi>j</mi> </msub> <mo>-</mo> <msub> <mi>MC</mi> <mi>j</mi> </msub> </mrow> </mfrac> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>p</mi> <mi>j</mi> </msub> <msub> <mi>p</mi> <mi>i</mi> </msub> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>&amp;eta;</mi> <mi>j</mi> </msub> <msub> <mi>&amp;eta;</mi> <mi>i</mi> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
Wherein, pi、pjFor all kinds of commodity prices, ηi、ηjFor all kinds of demand for commodity coefficient of elasticity, MCi、MCjFor all kinds of commodity limit Cost,
Unit labor cost is divided into two grades:When the quantity of labour force needed for repairing is less than q every time, all personnel unit labour Cost is according to p1Calculate, when the required quantity of labour force is higher than q, overage personnel press p2Calculate, it is assumed that own in a period of time Aggregate demand with two grades of labours for robbing business formation is respectively η on the coefficient of elasticity of price1、η2, labour limit into This is MC, then Ramsey Pricing principle can be expressed as:
<mrow> <mfrac> <mrow> <msub> <mi>p</mi> <mn>1</mn> </msub> <mo>-</mo> <mi>M</mi> <mi>C</mi> </mrow> <mrow> <msub> <mi>p</mi> <mn>2</mn> </msub> <mo>-</mo> <mi>M</mi> <mi>C</mi> </mrow> </mfrac> <mo>&amp;CenterDot;</mo> <mfrac> <msub> <mi>p</mi> <mn>2</mn> </msub> <msub> <mi>p</mi> <mn>1</mn> </msub> </mfrac> <mo>=</mo> <mfrac> <msub> <mi>&amp;eta;</mi> <mn>2</mn> </msub> <msub> <mi>&amp;eta;</mi> <mn>1</mn> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
And meet
p1·q1+p2·q2=R (4)
Wherein, q1、q2Represent that all aggregate demands with two grades of labours for robbing business formation, R represent this in a period of time respectively The cost recovery demand that should meet of two grades of labour costs in the section time, with reference to formula (3) and the optimal unit labour of (4) calculating into This p1、p2
3.2 calculate the labour cost with business of robbing with non-property right work order,
If certain is Q with the quantity of labour force needed for business is robbed1, the labour cost with the business of robbing and non-property right work order is
<mrow> <msub> <mi>F</mi> <mn>1</mn> </msub> <mo>=</mo> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>p</mi> <mn>1</mn> </msub> <mo>&amp;CenterDot;</mo> <msub> <mi>Q</mi> <mn>1</mn> </msub> <mo>,</mo> <msub> <mi>Q</mi> <mn>1</mn> </msub> <mo>&amp;le;</mo> <mi>q</mi> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>p</mi> <mn>1</mn> </msub> <mo>&amp;CenterDot;</mo> <mi>q</mi> <mo>+</mo> <msub> <mi>p</mi> <mn>2</mn> </msub> <mo>&amp;CenterDot;</mo> <mrow> <mo>(</mo> <msub> <mi>Q</mi> <mn>1</mn> </msub> <mo>-</mo> <mi>q</mi> <mo>)</mo> </mrow> <mo>,</mo> <mi>q</mi> <mo>&lt;</mo> <msub> <mi>Q</mi> <mn>1</mn> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
3.3 calculate the service charge with business of robbing with non-property right work order,
If unit vehicle cost of serving FC, service vehicle quantity Q2, the service charge with the business of robbing and non-property right work order is
FS=F1+FC·Q2 (6)。
4. matching somebody with somebody based on Ramsey Pricing principle according to claim 3 robs business and non-property right work order billing model, its It is characterised by, is with the totle drilling cost formula for robbing business and non-property right work order under the calculating different schemes of totle drilling cost computing module:
FT=FM+FS (7)。
CN201710305194.XA 2017-05-03 2017-05-03 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model Pending CN107341738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710305194.XA CN107341738A (en) 2017-05-03 2017-05-03 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710305194.XA CN107341738A (en) 2017-05-03 2017-05-03 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model

Publications (1)

Publication Number Publication Date
CN107341738A true CN107341738A (en) 2017-11-10

Family

ID=60220110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710305194.XA Pending CN107341738A (en) 2017-05-03 2017-05-03 Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model

Country Status (1)

Country Link
CN (1) CN107341738A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685220A (en) * 2018-12-07 2019-04-26 融智通科技(北京)股份有限公司 Power grid O&M repairs operational method and platform
CN109685219A (en) * 2018-12-07 2019-04-26 融智通科技(北京)股份有限公司 The O&M repairing operational method and platform of power grid user equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685220A (en) * 2018-12-07 2019-04-26 融智通科技(北京)股份有限公司 Power grid O&M repairs operational method and platform
CN109685219A (en) * 2018-12-07 2019-04-26 融智通科技(北京)股份有限公司 The O&M repairing operational method and platform of power grid user equipment

Similar Documents

Publication Publication Date Title
Roberts et al. A comparison of arrangements for increasing self-consumption and maximising the value of distributed photovoltaics on apartment buildings
Wang et al. Review of real-time electricity markets for integrating distributed energy resources and demand response
CN106447405A (en) Automatic pricing method for electric power marketing project bidding and system thereof
Saur et al. US Geographic analysis of the cost of hydrogen from electrolysis
Roulot et al. The impacts of photovoltaic electricity self-consumption on value transfers between private and public stakeholders in France
Totare et al. Power sector reform in Maharashtra, India
Chabot From costs to prices: economic analysis of photovoltaic energy and services
CN107341738A (en) Matching somebody with somebody based on Ramsey Pricing principle robs business and non-property right work order billing model
Sewchurran et al. Technical and financial analysis of large-scale solar-PV in eThekwini Municipality: Residential, business and bulk customers
Li et al. Market transaction model design applicable for both plan and market environment of China’s renewable energy
CN103217958B (en) Electricity based on GIS platform is purchased for selling integral system and method
CN107316202A (en) A kind of rate of load condensate electricity price measuring method based on number of users spatial distribution characteristic
Baev et al. Improving the efficiency of using smalldistributed generation systems through mechanisms of demand management for electricity and gas
WO2017035571A1 (en) Analysing smart meter data for solar or storage recommendation
JP6884115B2 (en) Electricity rate management device for power generation system
Zatsarinnaya et al. An automated software package creation for energy consumption accounting
Davidson et al. US residential photovoltaic (PV) system prices, Q4 2013 Benchmarks: cash purchase, fair market value, and prepaid lease transaction prices
Bosu et al. Socio-economic impact of rural electrification program (REP) in Bangladesh and study on determination of electricity distribution cost of Pabna Pbs-2
Wan et al. Bidding strategy for day-ahead and real-time markets based on newsvendor method in electricity markets
Zatsarinnaya et al. Electricity in retail markets as a commodity in smart energy systems
Yin et al. Research on the development of domestic and foreign electricity sales markets serving the construction of electricity retail markets
Knaack Enabling PV in the MENA Region: The Emerging PV Market in Jordan
Akahori et al. Fujitsu's approach to electricity system reform through electricity retail solutions
Kumar et al. Comparison of Openly Available Power System Data for the Nordic Region
Peters Transmission service outside of ISO footprints: inefficient spot prices, illiquid secondary markets and misguided planning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 310007 Huanglong Road, Zhejiang, Hangzhou, No. 8

Applicant after: Zhejiang Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: North China Electric Power University

Applicant after: Zhejiang Huayun Information Technology Co., Ltd.

Address before: 310000 Huanglong Road, Zhejiang, Hangzhou, No. 8

Applicant before: State Grid Zhejiang Electric Power Company

Applicant before: State Grid Corporation of China

Applicant before: North China Electric Power University

Applicant before: Zhejiang Huayun Information Technology Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110

RJ01 Rejection of invention patent application after publication