CN109667424A - 一种铝合金模板拉杆固定装置及施工方法 - Google Patents

一种铝合金模板拉杆固定装置及施工方法 Download PDF

Info

Publication number
CN109667424A
CN109667424A CN201811651410.7A CN201811651410A CN109667424A CN 109667424 A CN109667424 A CN 109667424A CN 201811651410 A CN201811651410 A CN 201811651410A CN 109667424 A CN109667424 A CN 109667424A
Authority
CN
China
Prior art keywords
connecting hole
band iron
aluminum alloy
alloy mould
mould plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811651410.7A
Other languages
English (en)
Inventor
赵志飞
岳齐贤
马光大
娄树松
张宗攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO MCC20 CONSTRUCTION CO Ltd
China MCC20 Group Corp Ltd
Original Assignee
NINGBO MCC20 CONSTRUCTION CO Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO MCC20 CONSTRUCTION CO Ltd, China MCC20 Group Corp Ltd filed Critical NINGBO MCC20 CONSTRUCTION CO Ltd
Priority to CN201811651410.7A priority Critical patent/CN109667424A/zh
Publication of CN109667424A publication Critical patent/CN109667424A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0658Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts remaining completely or partially embedded in the cast material

Abstract

本发明提供了一种铝合金模板拉杆固定装置及施工方法,属于建筑工程施工技术领域;它解决了现有铝合金模板施工难度大、损耗大、成本高的技术问题;一种铝合金模板拉杆固定装置,包括扁铁,其为轴向设置的扁长条状,扁铁两端设置有第一连接孔,所述扁铁用于两块对立模板连接并预埋至混凝土内;L型连接件,其一端设置有钩部,另一端设置有第二连接孔,所述第二连接孔通过螺栓与第一连接孔固连,L型连接件的外侧壁上设置有鳍片;本拉杆固定装置,其结构简单,可操作性强,浇筑完成后仅损失扁铁这一项,大大节约了施工成本,同时,相较于传统的螺纹拉杆,此装置大大降低了施工周期,同时降低了施工难度。

Description

一种铝合金模板拉杆固定装置及施工方法
技术领域
本发明属于建筑工程施工技术领域,涉及一种铝合金模板拉杆固定装置及施工方法。
背景技术
随着铝合金模板的发展与在施工项目中的大量应用。铝合金模板具有重量轻、拆卸方便、浇筑混凝土表面光滑平整的优点。使用铝合金模板,拆卸方便,能够有效减少倒运成本同时节约施工周期。在混凝土模板浇筑施工中。当混凝土浇筑进入模板时受重力原因向外扩散,易将模板向外推开,同时,当混凝土凝结时,混凝土本身产生一定量膨胀,都会导致涨模现象的发生。在混凝土模板的浇筑施工时候,多采用带螺纹拉杆装置用于固定铝合金模板。带螺纹连杆连接方便,可以紧密固定铝合金模板。
但是带螺纹连杆成本较高。连杆要横穿整个铝合金模板浇筑区域。所用固定螺杆的量大。在浇筑结束后,螺杆大大部分被注入混凝土内部,需要将螺杆两端突出部分切割掉。螺纹连杆的两端采用螺帽拧紧的方式进行固定。在混凝土浇筑施工时,往往需要大量的铝合金模板作为支撑,使用带螺纹连杆进行连接大大增加了施工作业量。
鉴于上述带螺纹连杆在铝合金模板浇筑施工中的缺点,即:1、在铝合金模板拼接时,采用带螺纹拉杆的连接固定方式,大量耗费人工,加大施工作业难度,容易影响工程周期;2、带螺纹拉杆造价较高,螺纹拉杆为一次性使用,大量使用螺纹拉杆增加工程造价。检索有关文献显示,目前上述问题仍没有好的解决办法。
发明内容
本发明的目的是针对现有技术存在的上述问题,提出了一种结构简单、施工难度小、成本低、损耗小的铝合金模板拉杆固定装置。
本发明的目的可通过下列技术方案来实现:一种铝合金模板拉杆固定装置,包括
扁铁,其为轴向设置的扁长条状,扁铁两端设置有第一连接孔,所述扁铁用于两块对立模板连接并预埋至混凝土内;
L型连接件,其一端设置有钩部,另一端设置有第二连接孔,所述第二连接孔通过螺栓与第一连接孔固连,L型连接件的外侧壁上设置有鳍片。
本发明的目的是针对现有技术存在的上述问题,提出了一种铝合金模板拉杆固定装置的施工方法。
本发明的目的可通过下列技术方案来实现:一种铝合金模板拉杆固定装置施工方法,包括以下步骤:
S1:安置浇筑所用铝合金模板;
S2:将扁铁从模板中穿过,使扁铁两端的第一连接孔完全漏出在模板之外;
S3:将L型L型连接件的第二连接孔与扁铁的第一连接孔对齐,对齐后用螺栓穿过两个连接孔;
S4:依次安装别的限位装置,限位装置成水平线安装以方便安装横杆;
S5:将水平向的横杆安装在L型连接件与钩部间的凹陷处,使横杆紧贴L型连接件及铝合金模板,整套模板安装工作完成,开始浇筑混凝土;
S6:待混凝土凝固达到一定强度时,拆除横杆;
S7:取下固定螺栓,再取下L型连接件;
S8:取下所有的L型连接件后,取下铝合金模板,切下扁铁从混凝土墙体中突出的两端部分,保持墙面的平整。
与现有技术相比,本发明具有以下有益效果:
1、本拉杆固定装置,其结构简单,可操作性强,浇筑完成后仅损失扁铁这一项,大大节约了施工成本,同时,相较于传统的螺纹拉杆,此装置大大降低了施工周期,同时降低了施工难度;
2、本发明通过通过L型连接件与扁铁的组合,实现了铝合金模板的搭建的施工,整个施工方法简单、方便、易操作。与现有的施工方法相比,具有施工效率高、安全隐患小的效果。
附图说明
图1为本发明中扁铁的平面图。
图2为本发明中L型连接件的平面图。
图3为本发明中L型连接件的剖视图。
图中,10、扁铁;11、第一连接孔;20、L型连接件;21、钩部;22、第二连接孔;23、鳍片。
具体实施方式
以下是本发明的具体实施例并结合附图,对本发明的技术方案作进一步的描述,但本发明并不限于这些实施例。
如图1所示,本发明一种铝合金模板拉杆固定装置,包括扁铁10与L型连接件20。
扁铁10为轴向设置的扁长条状,扁铁10两端设置有第一连接孔11,第一连接孔11直径为10mm,所述扁铁10用于两块对立模板连接固定并预埋至混凝土内,且扁铁10为1次性使用,当浇筑完成后,扁铁10大部分被浇筑在墙体内,L型连接件20可以循环使用且寿命长,制造工艺简单价格低廉,其一端设置有钩部21,另一端设置有第二连接孔22,所述第二连接孔22通过螺栓与第一连接孔11固连,L型连接件20的外侧壁上设置有鳍片23,该鳍片23用于抵住模板下部,使整个装置受力平均同时能将横杆牢牢托举起来,简单快捷的完成模板搭建,同时,有效的防止了混凝土浇筑中涨模现象的出现。
本发明一种铝合金模板拉杆固定装置施工方法,包括以下步骤:
S1:安置浇筑所用铝合金模板;
S2:将扁铁从模板中穿过,使扁铁两端的第一连接孔完全漏出在模板之外;
S3:将L型L型连接件的第二连接孔与扁铁的第一连接孔对齐,对齐后用螺栓穿过两个连接孔;
S4:依次安装别的限位装置,限位装置成水平线安装以方便安装横杆;
S5:将水平向的横杆安装在L型连接件与钩部间的凹陷处,使横杆紧贴L型连接件及铝合金模板,整套模板安装工作完成,开始浇筑混凝土;
S6:待混凝土凝固达到一定强度时,拆除横杆;
S7:取下固定螺栓,再取下L型连接件;
S8:取下所有的L型连接件后,取下铝合金模板,切下扁铁从混凝土墙体中突出的两端部分,保持墙面的平整。
本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。

Claims (2)

1.一种铝合金模板拉杆固定装置,包括
扁铁,其为轴向设置的扁长条状,扁铁两端设置有第一连接孔,所述扁铁用于两块对立模板连接并预埋至混凝土内;
L型连接件,其一端设置有钩部,另一端设置有第二连接孔,所述第二连接孔通过螺栓与第一连接孔固连,L型连接件的外侧壁上设置有鳍片。
2.一种铝合金模板拉杆固定装置施工方法,包括以下步骤:
S1:安置浇筑所用铝合金模板;
S2:将扁铁从模板中穿过,使扁铁两端的第一连接孔完全漏出在模板之外;
S3:将L型L型连接件的第二连接孔与扁铁的第一连接孔对齐,对齐后用螺栓穿过两个连接孔;
S4:依次安装别的限位装置,限位装置成水平线安装以方便安装横杆;
S5:将水平向的横杆安装在L型连接件与钩部间的凹陷处,使横杆紧贴L型连接件及铝合金模板,整套模板安装工作完成,开始浇筑混凝土;
S6:待混凝土凝固达到一定强度时,拆除横杆;
S7:取下固定螺栓,再取下L型连接件;
S8:取下所有的L型连接件后,取下铝合金模板,切下扁铁从混凝土墙体中突出的两端部分,保持墙面的平整。
CN201811651410.7A 2018-12-31 2018-12-31 一种铝合金模板拉杆固定装置及施工方法 Pending CN109667424A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811651410.7A CN109667424A (zh) 2018-12-31 2018-12-31 一种铝合金模板拉杆固定装置及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811651410.7A CN109667424A (zh) 2018-12-31 2018-12-31 一种铝合金模板拉杆固定装置及施工方法

Publications (1)

Publication Number Publication Date
CN109667424A true CN109667424A (zh) 2019-04-23

Family

ID=66146990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811651410.7A Pending CN109667424A (zh) 2018-12-31 2018-12-31 一种铝合金模板拉杆固定装置及施工方法

Country Status (1)

Country Link
CN (1) CN109667424A (zh)

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH290194A (de) * 1951-04-13 1953-04-30 Adria S A Spannvorrichtung an Verschalungen von Mauern.
CH466548A (fr) * 1966-11-23 1968-12-15 Samvaz Sa Dispositif de fixation notamment d'un coffrage en reprise
CH529900A (de) * 1971-11-15 1972-10-31 Raschal Ag Vorrichtung zum Festlegen des Abstandes zwischen zwei Schalwänden einer Bauverschalung
CH542341A (de) * 1972-02-25 1973-09-30 Grofpa Soc R L Schalung zum Betonieren von Mauern
EP0434603A1 (de) * 1989-12-18 1991-06-26 Tratan Ag Vorrichtung zur Fixierung der Lage von zwei zueinander in Abstand gegenüberstehenden Schalungswänden
CN2247205Y (zh) * 1996-03-14 1997-02-12 张军 建筑用钢模板对拉扁铁
CN2262074Y (zh) * 1996-04-19 1997-09-10 于洪武 建筑模板多功能卡具
JP2006207367A (ja) * 2004-12-28 2006-08-10 Kenichi Hiraga コンクリート型枠固定締付構造およびコンクリート型枠固定締付支持金具およびコンクリート型枠
CN201065643Y (zh) * 2007-07-04 2008-05-28 江苏江中集团有限公司 插片式对拉杆模板装置
JP2009057727A (ja) * 2007-08-30 2009-03-19 Kenichi Hiraga コンクリート型枠緊締金具
JP2009287291A (ja) * 2008-05-29 2009-12-10 Kenichi Hiraga コンクリート型枠緊締金具
CN101824913A (zh) * 2010-02-03 2010-09-08 中国新兴建设开发总公司 自锁式模板卡具及用其施工构造柱的方法
CN203097291U (zh) * 2013-02-05 2013-07-31 中国十七冶集团有限公司 建筑施工模板加固对拉装置
CN105714961A (zh) * 2016-02-07 2016-06-29 天津鑫德源特能源科技发展有限公司 现浇筑免拆卸装配式保温外模板构件及外墙构造体及施工方法
CN205421924U (zh) * 2015-12-04 2016-08-03 天津鑫振东建筑模板有限公司 一种建筑模板用新型夹具
CN205475882U (zh) * 2016-02-07 2016-08-17 天津鑫德源特能源科技发展有限公司 现浇筑免拆卸装配式保温外模板构件
CN206873942U (zh) * 2017-06-07 2018-01-12 广西建工集团第二安装建设有限公司 地下室剪力墙反边钢筋拉杆加固件
CN206971745U (zh) * 2017-06-20 2018-02-06 贵州精正检测有限公司 一种用于砼浇筑模具固定的拉片
CN107724676A (zh) * 2017-10-12 2018-02-23 江苏双楼建设集团有限公司 一种可重复使用的夹底螺栓
RU184629U1 (ru) * 2018-07-03 2018-11-01 Федеральное государственное бюджетное научное учреждение "Волжский научно-исследовательский институт гидротехники и мелиорации" (ФГБНУ "ВолжНИИГиМ") Дождевальная машина
CN209817441U (zh) * 2018-12-31 2019-12-20 浙江二十冶建设有限公司 一种铝合金模板拉杆固定装置

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH290194A (de) * 1951-04-13 1953-04-30 Adria S A Spannvorrichtung an Verschalungen von Mauern.
CH466548A (fr) * 1966-11-23 1968-12-15 Samvaz Sa Dispositif de fixation notamment d'un coffrage en reprise
CH529900A (de) * 1971-11-15 1972-10-31 Raschal Ag Vorrichtung zum Festlegen des Abstandes zwischen zwei Schalwänden einer Bauverschalung
CH542341A (de) * 1972-02-25 1973-09-30 Grofpa Soc R L Schalung zum Betonieren von Mauern
EP0434603A1 (de) * 1989-12-18 1991-06-26 Tratan Ag Vorrichtung zur Fixierung der Lage von zwei zueinander in Abstand gegenüberstehenden Schalungswänden
CN2247205Y (zh) * 1996-03-14 1997-02-12 张军 建筑用钢模板对拉扁铁
CN2262074Y (zh) * 1996-04-19 1997-09-10 于洪武 建筑模板多功能卡具
JP2006207367A (ja) * 2004-12-28 2006-08-10 Kenichi Hiraga コンクリート型枠固定締付構造およびコンクリート型枠固定締付支持金具およびコンクリート型枠
CN201065643Y (zh) * 2007-07-04 2008-05-28 江苏江中集团有限公司 插片式对拉杆模板装置
JP2009057727A (ja) * 2007-08-30 2009-03-19 Kenichi Hiraga コンクリート型枠緊締金具
JP2009287291A (ja) * 2008-05-29 2009-12-10 Kenichi Hiraga コンクリート型枠緊締金具
CN101824913A (zh) * 2010-02-03 2010-09-08 中国新兴建设开发总公司 自锁式模板卡具及用其施工构造柱的方法
CN203097291U (zh) * 2013-02-05 2013-07-31 中国十七冶集团有限公司 建筑施工模板加固对拉装置
CN205421924U (zh) * 2015-12-04 2016-08-03 天津鑫振东建筑模板有限公司 一种建筑模板用新型夹具
CN105714961A (zh) * 2016-02-07 2016-06-29 天津鑫德源特能源科技发展有限公司 现浇筑免拆卸装配式保温外模板构件及外墙构造体及施工方法
CN205475882U (zh) * 2016-02-07 2016-08-17 天津鑫德源特能源科技发展有限公司 现浇筑免拆卸装配式保温外模板构件
CN206873942U (zh) * 2017-06-07 2018-01-12 广西建工集团第二安装建设有限公司 地下室剪力墙反边钢筋拉杆加固件
CN206971745U (zh) * 2017-06-20 2018-02-06 贵州精正检测有限公司 一种用于砼浇筑模具固定的拉片
CN107724676A (zh) * 2017-10-12 2018-02-23 江苏双楼建设集团有限公司 一种可重复使用的夹底螺栓
RU184629U1 (ru) * 2018-07-03 2018-11-01 Федеральное государственное бюджетное научное учреждение "Волжский научно-исследовательский институт гидротехники и мелиорации" (ФГБНУ "ВолжНИИГиМ") Дождевальная машина
CN209817441U (zh) * 2018-12-31 2019-12-20 浙江二十冶建设有限公司 一种铝合金模板拉杆固定装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
山西建筑工程(集团)总公司: "《主体结构工程施工工艺标准》", 山西科学技术出版社 *

Similar Documents

Publication Publication Date Title
CN208168368U (zh) 一种建筑墙体施工用模板连接件
CN102296812A (zh) 建筑模板成型结构、紧固件及建筑模板施工方法
CN105952154B (zh) 一种混凝土浇筑模板支架
CN105888078A (zh) 一种u型建筑预埋件及其锚固构件的施工方法
CN109667424A (zh) 一种铝合金模板拉杆固定装置及施工方法
CN209742380U (zh) 一种建筑模板连接件
CN213710393U (zh) 一种市政路桥施工用新型模板紧固装置
CN112695897A (zh) 预埋件预埋方法及预埋件
CN208830716U (zh) 一种混凝土框架柱浇筑施工系统
CN215803244U (zh) 一种隔离式纳塑保温板连接固定装置
CN107415029B (zh) 一种带有窗洞模组的pc墙板模具
CN209817441U (zh) 一种铝合金模板拉杆固定装置
CN206158192U (zh) 一种砼面上混凝土泵管的简易固定装置
CN205894688U (zh) 支模装置
CN214402735U (zh) 一种剪力墙稳固支撑装置
CN209523476U (zh) 一种建筑工程施工用模板固定装置
CN212224611U (zh) 一种剪力墙浇筑模板加固装置
CN109518970B (zh) 一种半固态成型的z型墙角的模板固定装置
CN109537873B (zh) 一种半固态成形的模板机构
CN111677286A (zh) 封闭空间混凝土浇筑振捣装置总成及振捣方法
CN209637268U (zh) 一种建筑模板用支架装置
CN212078672U (zh) 一种便于窄缝使用的支护结构
CN202148687U (zh) 建筑模板成型结构及紧固件
CN215330738U (zh) 连接件及保温外模板现浇混凝土墙体
CN214942383U (zh) 一种止水台快拆一体化模板

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Applicant after: Zhejiang 20 Smelter Construction Co.,Ltd.

Applicant after: CHINA MCC20 GROUP Corp.,Ltd.

Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Applicant before: NINGBO MCC 20 CONSTRUCTION Co.,Ltd.

Applicant before: CHINA MCC20 GROUP Corp.,Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190423