CN109667262B - 一种岩溶落水洞封堵结构及其施工方法 - Google Patents

一种岩溶落水洞封堵结构及其施工方法 Download PDF

Info

Publication number
CN109667262B
CN109667262B CN201910138360.0A CN201910138360A CN109667262B CN 109667262 B CN109667262 B CN 109667262B CN 201910138360 A CN201910138360 A CN 201910138360A CN 109667262 B CN109667262 B CN 109667262B
Authority
CN
China
Prior art keywords
wedge
shaped groove
karst water
water falling
plugging structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910138360.0A
Other languages
English (en)
Other versions
CN109667262A (zh
Inventor
张文毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201910138360.0A priority Critical patent/CN109667262B/zh
Publication of CN109667262A publication Critical patent/CN109667262A/zh
Application granted granted Critical
Publication of CN109667262B publication Critical patent/CN109667262B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种岩溶落水洞封堵结构及其施工方法,包括在岩溶落水洞顶部四周通过扩挖形成的扩挖楔形槽,在该扩挖楔形槽下方的岩溶落水洞底部回填大块石,在大块石顶面铺设1m厚级配碎石至与扩挖楔形槽底部齐平;在扩挖楔形槽四周岩面水平布置水平砂浆锚杆,该水平砂浆锚杆采用三级钢筋为材料制成,同时采用与该水平砂浆锚杆相同型号的锚杆连接钢筋连接锚杆成为钢筋网骨架;在扩挖楔形槽内回填二级配常态混凝土;在扩挖楔形槽范围内采用固结灌浆加固下部基岩。本发明充分利用钢筋高抗拉强度特性,使锚杆和锚杆连接钢筋成为混凝土封堵结构钢筋骨架,极大增加封堵结构的承载能力以及抗弯、抗剪能力。

Description

一种岩溶落水洞封堵结构及其施工方法
技术领域
本发明属于岩溶处理工程技术领域,尤其涉及一种岩溶落水洞封堵结构及其施工方法。
背景技术
在我国西南地区,岩溶落水洞的发育广泛,在水库成库、弃渣堆存及建筑物地基处理时往往需要对岩溶落水洞进行封堵处理。对于岩溶落水的处理通常采用混凝土或者石渣压实回填,随着时间延长,下部岩溶进一步发育,支撑上部封堵体的岩体强度降低、变形增加,导致落水洞封堵体滑动开裂,最终危及水库蓄水或上部结构安全。
针对上述问题,设计一种岩溶落水洞封堵结构及其施工方法显得非常必要。
发明内容
本发明的目的在于提供一种岩溶落水洞封堵结构及其施工方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种岩溶落水洞封堵结构,包括在岩溶落水洞顶部四周通过扩挖形成的扩挖楔形槽,在该扩挖楔形槽下方的岩溶落水洞底部回填大块石,在大块石顶面铺设1m厚级配碎石至与扩挖楔形槽底部齐平;在扩挖楔形槽四周岩面水平布置水平砂浆锚杆,该水平砂浆锚杆采用三级钢筋为材料制成,同时采用与该水平砂浆锚杆相同型号的锚杆连接钢筋连接锚杆成为钢筋网骨架;在扩挖楔形槽内回填二级配常态混凝土;在扩挖楔形槽范围内采用固结灌浆加固下部基岩。
进一步的,所述水平砂浆锚杆与锚杆连接钢筋采用焊接连接,单面焊接长度不小于10d,双面焊接长度不小于5.0d,d为钢筋直径。
进一步的,所述水平砂浆锚杆直径不小于25mm,长度L=6.0m,锚杆间距0.5m,排距2.0~3.0m,锚杆外露长度按1.0m和1.5m错开。
进一步的,所述大块石粒径不小于30cm,抗压强度不小于30MPa。
进一步的,所述扩挖楔形槽呈矩形漏斗状,漏斗底部宽为2d,扩挖深度H为1~2d,d为扩挖楔形槽底部落水洞直径,开挖坡比不小于1:0.5。
前述的岩溶落水洞封堵结构的施工方法,包括如下步骤:岩溶落水洞洞口的扩挖楔型槽的扩挖及破碎岩体清理、底部大块石回填、大块石顶部级配碎石压实回填、扩挖楔型槽四周岩面的水平砂浆锚杆支护、通过锚杆连接钢筋进行锚杆钢筋连接、混凝土浇筑、周边固结灌浆施工。
与现有技术相比,本发明的有益效果是:
1、该封堵结构特别适合于直径5m以下的岩溶落水洞封堵施工,与传统岩溶落水洞处理措施相比,该封堵结构具有可靠性高,且受下部岩溶发育影响较小,能有效避免上部封堵体滑动或开裂等现象。
2、充分利用钢筋高抗拉强度特性,使锚杆和锚杆连接钢筋成为混凝土封堵结构钢筋骨架,极大增加封堵结构的承载能力以及抗弯、抗剪能力。
3、通过地面在楔形槽开挖范围内对支撑混凝土封堵体的岩体进行补强固结灌浆,提高了封堵结构的整体承载能力以及抗渗透能力。
附图说明
图1为岩溶落水洞封堵结构典型剖面图;
图2为扩挖楔形槽水平锚杆与钢筋连接示意图;
附图标记说明:1-岩溶落水洞,2-大块石,3-级配碎石压实回填,4-固结灌浆,5-水平砂浆锚杆,6-扩挖楔形槽,7-覆盖层及破碎岩体,8-锚杆连接钢筋,9-二级配常态混凝土。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“设置有”、“套设/接”、“连接”等,应做广义理解,例如“连接”,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。
以下将结合附图进一步对该发明技术方案的实施进行描述:
如图1和图2所示,本发明的技术方案适用的岩溶落水洞1直径不超过5m;扩挖楔形槽6呈矩形漏斗状,扩挖楔形槽坡比不小于1:0.5,高度为1~2倍岩溶落水洞1直径,扩挖楔形槽6施工时应清除覆盖层及破碎岩体7;底部大块石2粒径不小于30cm;大块石2顶部级配碎石3压实回填厚度不小于1.0m;扩挖楔形槽6沿四周扩挖岩面水平布置水平砂浆锚杆5,水平砂浆锚杆5采用三级钢筋,水平砂浆锚杆5直径不小于25mm,长度L=6.0m,锚杆间距0.5m,排距2.0~3.0m,锚杆外露长度按1.0m和1.5m错开;锚杆连接钢筋8采用与水平砂浆锚杆5相同的钢筋型号,采用焊接搭接,单面焊接长度不小于10d,双面焊接长度不小于5.0d(d为钢筋直径);扩挖楔形槽6回填二级配常态混凝土9,混凝土强度不低于C25;扩挖楔形槽6的扩挖范围内采用固结灌浆4加固下部基岩,固结灌浆4在混凝土封堵体顶部进行,固结灌浆4钻孔深入下部基岩长度不小于5m,间排距为2.0m,灌浆压力以不抬动上部回填混凝土为准。
具体实施时包括以下主要步骤:
步骤1、清除岩溶落水洞1附近覆盖层及破碎岩体7,对岩溶落水洞1四周进行扩挖为扩挖楔形槽6,扩挖楔形槽6呈矩形漏斗状,漏斗底部宽为2d,扩挖深度H为1~2d(d为扩挖楔形槽6底部落水洞直径),开挖坡比不小于1:0.5;
步骤2、落水洞底部回填大块石2,大块石2要求粒径不小于30cm,抗压强度不小于30MPa;随后在大块石2顶面铺设1m厚级配碎石3并夯实;
步骤3、在扩挖楔形槽6四周岩面水平布置水平砂浆锚杆5,锚杆采用三级钢筋,锚杆直径不小于25mm,长度L=6.0m,锚杆间距0.5m,排距2.0~3.0m,锚杆外露长度按1.0m和1.5m错开;采用与锚杆相同型号的锚杆连接钢筋8连接锚杆成为钢筋网骨架,如附图2所示;锚杆与钢筋采用焊接连接,单面焊接长度不小于10d,双面焊接长度不小于5.0d(d为钢筋直径);
步骤5、扩挖楔形槽6内回填二级配常态混凝土9,混凝土强度不低于C25;
步骤6、在扩挖楔形槽6范围内采用固结灌浆4加固下部基岩,固结灌浆4在混凝土封堵体顶面进行,固结灌浆4钻孔深入下部基岩长度不小于5m,间排距为2.0m,梅花形布置,固结灌浆4压力以不抬动上部回填混凝土为准,一般取0.3~0.5MPa。
尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (6)

1.一种岩溶落水洞封堵结构,其特征在于:包括在岩溶落水洞(1)顶部四周通过扩挖形成的扩挖楔形槽(6),在该扩挖楔形槽(6)下方的岩溶落水洞(1)底部回填大块石(2),在大块石(2)顶面铺设1m厚级配碎石(3)至与扩挖楔形槽(6)底部齐平;在扩挖楔形槽(6)四周岩面水平布置水平砂浆锚杆(5),该水平砂浆锚杆(5)采用三级钢筋为材料制成,同时采用与该水平砂浆锚杆(5)相同型号的锚杆连接钢筋(8)连接锚杆成为钢筋网骨架;在扩挖楔形槽(6)内回填二级配常态混凝土(9);在扩挖楔形槽(6)范围内采用固结灌浆(4)加固下部基岩。
2.根据权利要求1所述的岩溶落水洞封堵结构,其特征在于:所述水平砂浆锚杆(5)与锚杆连接钢筋(8)采用焊接连接,单面焊接长度不小于10d,双面焊接长度不小于5.0d,d为钢筋直径。
3.根据权利要求1所述的岩溶落水洞封堵结构,其特征在于:所述水平砂浆锚杆(5)直径不小于25mm,长度L=6.0m,锚杆间距0.5m,排距2.0~3.0m,锚杆外露长度按1.0m和1.5m错开。
4.根据权利要求1所述的岩溶落水洞封堵结构,其特征在于:所述大块石(2)粒径不小于30cm,抗压强度不小于30MPa。
5.根据权利要求1所述的岩溶落水洞封堵结构,其特征在于:所述扩挖楔形槽(6)呈矩形漏斗状,漏斗底部宽为2d,扩挖深度H为1~2d,d为扩挖楔形槽(6)底部落水洞直径,开挖坡比不小于1:0.5。
6.一种如权利要求1-5中任意一项所述的岩溶落水洞封堵结构的施工方法,其特征在于包括如下步骤:岩溶落水洞(1)洞口的扩挖楔形槽(6)的扩挖及破碎岩体清理、底部大块石(2)回填、大块石(2)顶部级配碎石(3)压实回填、扩挖楔形槽(6)四周岩面的水平砂浆锚杆(5)支护、通过锚杆连接钢筋(8)进行锚杆钢筋连接、混凝土浇筑、周边固结灌浆(4)施工。
CN201910138360.0A 2019-02-25 2019-02-25 一种岩溶落水洞封堵结构及其施工方法 Active CN109667262B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910138360.0A CN109667262B (zh) 2019-02-25 2019-02-25 一种岩溶落水洞封堵结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910138360.0A CN109667262B (zh) 2019-02-25 2019-02-25 一种岩溶落水洞封堵结构及其施工方法

Publications (2)

Publication Number Publication Date
CN109667262A CN109667262A (zh) 2019-04-23
CN109667262B true CN109667262B (zh) 2024-03-01

Family

ID=66151760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910138360.0A Active CN109667262B (zh) 2019-02-25 2019-02-25 一种岩溶落水洞封堵结构及其施工方法

Country Status (1)

Country Link
CN (1) CN109667262B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886308B (zh) * 2019-11-08 2021-05-07 济南轨道交通集团有限公司 一种基于保护岩溶水通道的快速冻结地下水封堵方法
CN110886305B (zh) * 2019-11-08 2021-05-07 济南轨道交通集团有限公司 一种基于保护岩溶水通道的基坑涌水分层回填封堵方法
CN111119197A (zh) * 2020-01-12 2020-05-08 桂林电子科技大学 一种基于土工织物的覆盖型岩溶区地面塌陷的治理方法
CN111424685A (zh) * 2020-04-14 2020-07-17 中国电建集团贵阳勘测设计研究院有限公司 一种大型岩溶洼地内回填地基深部落水洞处理结构及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (zh) * 2008-08-26 2009-01-21 中国水利水电第五工程局 软弱岩石地质条件下水电站调压室竖井的施工方法
CN106567405A (zh) * 2015-10-10 2017-04-19 中国电建集团贵阳勘测设计研究院有限公司 一种地下厂房岩壁吊车梁超挖补强结构及其施工方法
CN106988758A (zh) * 2017-05-08 2017-07-28 中铁五局集团第五工程有限责任公司 一种用于穿越大型竖向溶洞群隧道施工方法
CN209722944U (zh) * 2019-02-25 2019-12-03 中国电建集团贵阳勘测设计研究院有限公司 一种岩溶落水洞封堵结构

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926544B (zh) * 2016-06-24 2018-02-02 中国电建集团华东勘测设计研究院有限公司 一种经济型泥石流拦挡坝结构及其施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (zh) * 2008-08-26 2009-01-21 中国水利水电第五工程局 软弱岩石地质条件下水电站调压室竖井的施工方法
CN106567405A (zh) * 2015-10-10 2017-04-19 中国电建集团贵阳勘测设计研究院有限公司 一种地下厂房岩壁吊车梁超挖补强结构及其施工方法
CN106988758A (zh) * 2017-05-08 2017-07-28 中铁五局集团第五工程有限责任公司 一种用于穿越大型竖向溶洞群隧道施工方法
CN209722944U (zh) * 2019-02-25 2019-12-03 中国电建集团贵阳勘测设计研究院有限公司 一种岩溶落水洞封堵结构

Also Published As

Publication number Publication date
CN109667262A (zh) 2019-04-23

Similar Documents

Publication Publication Date Title
CN109667262B (zh) 一种岩溶落水洞封堵结构及其施工方法
CN103422510B (zh) 钢管框架式围堰结构及施工方法
CN206070508U (zh) 一种加固地基基础的装置
CN211200426U (zh) 一种微型钢管桩挡墙抗滑支挡结构
CN102235007B (zh) 上钉下桩组合的深基支护方法
CN212477620U (zh) 一种深厚覆盖层上修筑重力坝的结构
CN101215840A (zh) 飞机式基础加固予力工法
CN210238543U (zh) 一种倾斜坡面分层回填强夯整平结构
CN101691765B (zh) 复杂地基双灰井柱应力解除协调纠倾法
CN103882883A (zh) 塔吊与车库框架柱共用一个基础施工方法
CN217629964U (zh) 地下室深基坑替换撑
CN209722944U (zh) 一种岩溶落水洞封堵结构
CN114016544B (zh) 多级加筋土挡墙结构及施工方法
CN214460477U (zh) 一种组合式基坑支护
CN215252687U (zh) 一种砾石土心墙坝的分区结构
CN215052842U (zh) 柱锤夯扩法成孔增强体桩复合地基结构
CN111395082B (zh) 运营隧道上方的轻质路基结构、设计及施工方法
CN210122735U (zh) 一种基于外凸式翼脚板的地下结构抗浮体系
CN113123301A (zh) 砾石土心墙坝的分区结构
CN107059888B (zh) 一种钢筋石笼边坡支护结构
CN111877352A (zh) 全风化砂岩高边坡开挖施工方法
CN209989656U (zh) 一种深厚湿陷性黄土路基地基结构
CN218911468U (zh) 一种可让压的膨胀土高陡边坡用抢险修复结构
CN217922839U (zh) 一种深厚杂填土区高速铁路埋式高路堤结构
CN218148385U (zh) 一种预制混凝土基坑护坡

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant