CN109661141A - Data center's infrastructure management system - Google Patents
Data center's infrastructure management system Download PDFInfo
- Publication number
- CN109661141A CN109661141A CN201811624308.8A CN201811624308A CN109661141A CN 109661141 A CN109661141 A CN 109661141A CN 201811624308 A CN201811624308 A CN 201811624308A CN 109661141 A CN109661141 A CN 109661141A
- Authority
- CN
- China
- Prior art keywords
- information
- computer room
- module
- management
- distributing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/14—Mounting supporting structure in casing or on frame or rack
- H05K7/1485—Servers; Data center rooms, e.g. 19-inch computer racks
- H05K7/1488—Cabinets therefor, e.g. chassis or racks or mechanical interfaces between blades and support structures
- H05K7/1491—Cabinets therefor, e.g. chassis or racks or mechanical interfaces between blades and support structures having cable management arrangements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Abstract
The present invention relates to a kind of data center's infrastructure management system, which includes distributing frame apparatus for management of information, computer room asset management device and cable management mapping device;Distributing frame apparatus for management of information is transferred to cable management mapping device for obtaining the wiring capability information of distributing frame, and by wiring capability information;Wiring capability information after data conversion for carrying out data conversion to wiring capability information, and is sent to computer room asset management device according to the mapping ruler of setting by cable management mapping device;Computer room asset management device is integrated into infrastructure data information for receiving wiring capability information, and by wiring capability information and computer room assets information.The present embodiment realizes the wiring capability information of distributing frame and effectively integrating for computer room assets information, realizes the unified management and analysis of data, conducive to the fining operation management for realizing data center.
Description
Technical field
The present invention relates to technical field of data administration, more particularly to a kind of data center's infrastructure management system.
Background technique
Data center's infrastructure management (Data Center Infrastructure management, DCIM) be by
Information technology (Information Technology, IT) and equipment management, which combine, collects data center's key equipment
The centralized management such as middle monitoring, capacity planning.By software, hardware and sensor etc., DCIM system passes through software, hardware and sensing
The equipment such as device are monitored in real time and are managed to data center information technical equipment and infrastructure.Wiring system is for managing
The system of the hardware and software of comprehensive wiring is, it can be achieved that unite to the electronization of software and hardware on off operating mode in comprehensive wiring and quantity
Meter.
In practical applications, when information technoloy equipment being mounted in building, DCIM system is only to space, power supply and refrigeration capacity
It is monitored and manages.In order to carry out refinement maintenance to the hardware and software device in building, it is necessary to will be in wiring system
Statistical data effectively combines with data such as collected space, power supply and refrigeration capacities in DCIM system carries out unified O&M
Management.However, traditional technology is by the way of manually counting by the data inputting DCIM system in wiring system.With data
The continuous growth of center scale, the continuous improvement of system architecture and equipment interconnection complexity, the scale of wiring system is bigger, complicated
It spends also higher.The mode low efficiency of manual entry is unfavorable for realizing the fining operation management of data center.
Summary of the invention
Based on this, it is necessary to aiming at the problem that comprehensive wiring managerial data O&M low efficiency, provide in a kind of data
Heart infrastructure management system.
The embodiment of the present invention provides a kind of data center's infrastructure management system, comprising: distributing frame apparatus for management of information,
Computer room asset management device and cable management mapping device;
Distributing frame apparatus for management of information is transmitted for obtaining the wiring capability information of distributing frame, and by wiring capability information
To cable management mapping device;
Cable management mapping device, for carrying out data conversion to wiring capability information, and by the wiring after data conversion
Capacity information is sent to computer room asset management device according to the mapping ruler of setting;
Computer room asset management device, for receiving wiring capability information, and by wiring capability information and computer room assets information
It is integrated into infrastructure data information.
Cable management mapping device includes data conversion module and mapping transmission module in one of the embodiments,;
Data conversion module, for carrying out data conversion to wiring capability information;
Transmission module is mapped, for filling according to the mapping ruler of setting in distributing frame information management according to wiring capability information
It sets and establishes transmission path between computer room asset management device, and the wiring capability information after data conversion is passed through into transmission path
It is sent to computer room asset management device.
Distributing frame apparatus for management of information includes port status detection module, distributing frame failure in one of the embodiments,
Detection module and wiring capability module;
Port status detection module is used to obtain the port occupied information of distributing frame, and port occupied information is sent to cloth
Line capacity module;
Distributing frame fault detection module is used to obtain the fault status information of distributing frame, and fault status information is sent to
Wiring capability module;
Wiring capability module, for generating wiring capability information according to port occupied information and fault status information.
Computer room assets information includes computer room physical space capacity information, computer room power supply capacity in one of the embodiments,
Information and computer room refrigeration capacity information.
Computer room asset management device further includes computer room physical space capacity management module in one of the embodiments,;
Computer room physical space capacity module, for obtaining the device space capacity information of each calculator room equipment, according to equipment sky
Between capacity information generate computer room physical space capacity information.
Computer room asset management device further includes computer room power supply capacity management module in one of the embodiments,;
Computer room power supply capacity management module is believed for obtaining the equipment energy information of each calculator room equipment according to equipment electric energy
Breath generates computer room power supply capacity information.
Computer room asset management device further includes computer room refrigeration capacity module in one of the embodiments,;
Computer room refrigeration capacity module is believed for obtaining the equipment cooling capacity information of each calculator room equipment according to equipment cooling capacity
Breath generates computer room refrigeration capacity information.
Computer room asset management device further includes computer room assets information module in one of the embodiments,;
Computer room assets information module, for integrating computer room physical space capacity information, computer room power supply capacity information and machine
Room refrigeration capacity information generates computer room assets information.
It in one of the embodiments, further include inquiry unit;
Inquiry unit inquires infrastructure data information for receiving the inquiry instruction of peripheral operation transmission.
It in one of the embodiments, further include report generation device;
Report generation device, for generating the data sheet of infrastructure data information, and output data report.
Data center's infrastructure management system provided by the above embodiment, by cable management mapping device by distributing frame
Wiring capability information on apparatus for management of information is transferred in computer room asset management device, and computer room asset management device holds wiring
Amount information and computer room assets information are integrated into infrastructure data information, so that the wiring capability information and computer room of distributing frame
Assets information effectively integrates, and realizes the unified management and analysis of data, conducive to the fining operation management for realizing data center.
Detailed description of the invention
Fig. 1 is a kind of first structure diagram of data center's infrastructure management system provided in an embodiment of the present invention;
Fig. 2 is a kind of the second structural schematic diagram of data center's infrastructure management system provided in an embodiment of the present invention;
Fig. 3 is a kind of third structural schematic diagram of data center's infrastructure management system provided in an embodiment of the present invention.
Specific embodiment
It to facilitate the understanding of the present invention, below will be to invention is more fully described.But the present invention can be to be permitted
Mostly different form is realized, however it is not limited to embodiment described herein.On the contrary, purpose of providing these embodiments is makes
It is more thorough and comprehensive to the understanding of the disclosure.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Fig. 1 is a kind of first structure diagram of data center's infrastructure management system provided in an embodiment of the present invention,
As shown in Figure 1, data center's infrastructure management system includes: distributing frame apparatus for management of information 110, cable management mapping device
120 and computer room asset management device 130.
Distributing frame apparatus for management of information 110 is passed for obtaining the wiring capability information of distributing frame, and by wiring capability information
It is handed to cable management mapping device 120;Cable management mapping device 120, for carrying out data conversion to wiring capability information, and
Wiring capability information after data conversion is sent to computer room asset management device 130 according to the mapping ruler of setting;Computer room money
Managing device 130 is produced, for receiving wiring capability information, and will be set based on wiring capability information and the integration of computer room assets information
Apply data information.
In embodiment, the equipment that distributing frame is used to carry out final exchange line or junction line allotment connection is typically mounted on
On cabinet or wall.Various active devices, such as senser element are placed with inside distributing frame.In general, distributing frame includes wiring
Frame ontology, scan module and information module.One or more ports, information module and distributing frame sheet are provided on distributing frame ontology
Each port on body corresponds, and is set on the port of distributing frame ontology, and scan module is connect with each information module,
Scan module is scanned the port on distributing frame ontology, obtains the port information of distributing frame.It is all provided on each information module
It is equipped with elastic contact pilotage, at least a pair of of golden finger is provided on scan module, each information module and each pair of golden finger correspond,
Two elastic contact pilotages on each information module are contacted with each pair of golden finger on scan module.
Distributing frame apparatus for management of information 110 is the system for managing distributing frame information, a variety of data including distributing frame,
Such as port capacity information, port occupied state, fault status information, port number, port name.Wiring capability refers to synthesis
The quantity for the wiring that can be accommodated in wiring, in embodiment, the letter such as state, port failure state that can be occupied according to port
Breath acquires the wiring capability of distributing frame.The wiring capability information for detecting distributing frame, when the wiring that distributing frame can accommodate
When total amount is not able to satisfy actual wiring capability, need to carry out distributing frame to open up appearance.
Since distributing frame apparatus for management of information 110 and computer room asset management device 130 are respectively using different types of data
Storing data, so that distributing frame apparatus for management of information 110 directly can not carry out information biography with computer room asset management device 130
It passs.Wiring capability information in order to be stored in distributing frame apparatus for management of information 130 is sent to computer room asset management dress
130 setting storage address is set, and is carried out in conjunction with matching with the computer room assets information in computer room asset management device 130, to cloth
Line capacity information carries out data conversion, to meet the data format of computer room asset management device 130, setting mapping ruler so that
Wiring capability information after data conversion can carry out data transmission according to mapping ruler and Data Matching, wherein mapping rule
It then include address of cache, port mapping, report mapping etc..
Computer room asset management device 130 contains computer room asset information database, and the storage of computer room asset information database is organic
The data informations such as room physical space capacity, computer room power supply capacity, computer room refrigeration capacity, computer room load-carrying capacity.Computer room asset management
Device 130 receives wiring capability information, and according to the data format of computer room asset management device 130, to wiring capability information
It the operation such as arranged, cleaned, being converted, being loaded into computer room asset information database, be integrated into infrastructure data information.
Data center's infrastructure management system provided in this embodiment is believed distributing frame by cable management mapping device
Wiring capability information in breath managing device is transferred in computer room asset management device, and computer room asset management device is by wiring capability
Information and computer room assets information are integrated into infrastructure data information, so that the wiring capability information and computer room of distributing frame provide
It produces information to effectively integrate, realizes the unified management and analysis of data, conducive to the fining operation management for realizing data center.
Fig. 2 is a kind of the second structural schematic diagram of data center's infrastructure management system provided in an embodiment of the present invention,
As shown in Fig. 2, cable management mapping device 120 includes data conversion module 121 and mapping transmission in one of the embodiments,
Module 122;Data conversion module 121, for carrying out data conversion to wiring capability information;Transmission module 122 is mapped, root is used for
According to wiring capability information according to the mapping ruler of setting in distributing frame apparatus for management of information 110 and computer room asset management device 130
Between establish transmission path, and the wiring capability information after data conversion is sent to computer room asset management dress by transmission path
It sets.
Since distributing frame apparatus for management of information 110 is different from the data format of computer room asset management device 130, in order to enable
Wiring capability information can normal transmission to computer room asset management device 130, need in distributing frame apparatus for management of information 110
Wiring capability information carries out data type conversion.Wiring capability information is converted Uniform data format by data conversion module 121
It is uploaded to computer room asset management device 130.
In order to make the wiring capability information in distributing frame apparatus for management of information 110 be correctly transmitted to computer room asset management dress
Preset storage address in 130 is set, needs to preset mapping ruler according to wiring capability information, in distributing frame apparatus for management of information
Transmission path is established between 110 and computer room asset management device 130.Wherein, mapping ruler can be address of cache rule, according to
Address of cache rule, will be stored in the wiring capability information on the address A of distributing frame apparatus for management of information 110 after data conversion
The address B being sent in computer room asset management device 130.Optionally, it according to mapping ruler, can be filled in distributing frame information management
It sets and establishes mapping between 110 and the report of computer room asset management device 130, according to the common keywords in report, will be stored in
Wiring capability information in the report of distributing frame apparatus for management of information 110 is sent in the report of computer room asset management device 130
To realize Data Integration.
With continued reference to Fig. 2, distributing frame apparatus for management of information 110 is detected including port status in one of the embodiments,
Module 111, distributing frame fault detection module 112 and wiring capability module 113;Port status detection module 111 is for obtaining
The port occupied information of distributing frame, and port occupied information is sent to wiring capability module 113;Distributing frame fault detection module
112 for obtaining the fault status information of distributing frame, and fault status information is sent to wiring capability module 113;Wiring is held
Module 113 is measured, for generating wiring capability information according to port occupied information and fault status information.
In the present embodiment, distributing frame ontology is provided with guide groove, when scan module is inserted into distributing frame ontology by guide rail
When the guide groove of two sides, the elastic contact pilotage on information module contacted with each pair of golden finger on scan module and be connected be formed into a loop into
The transmission of row signal, detects that port corresponding to the information module is occupied at this time.When event occurs for the active device on distributing frame
Barrier or damage when, circuit of the active device corresponding to distributing frame due to active device malfunction or damage and open circuit occurs,
To detect the fault status information of distributing frame.It is available currently to match according to port occupied information and fault status information
The wiring capability information of coil holder, and remaining wiring capability information is obtained according to total wiring capability of distributing frame, it is later equipment
Wiring makes reference.
Computer room assets information includes computer room physical space capacity information, computer room power supply capacity in one of the embodiments,
Information and computer room refrigeration capacity information.
Computer room assets information include computer room cabinet, exchange routing, PDU, the basic information of equipment such as physical server and its
Associate device information.The remote access of the accomplished in many ways such as file and control are controlled by IPMI/Telnet/SSH.Embodiment
In, computer room physical space capacity information, computer room power supply capacity information and computer room refrigeration capacity information are counted.Wherein,
Computer room physical space capacity information refers to the real area according to each computer room, can accommodate cabinet number and actual use cabinet digit,
Count the computer room physical space capacity of each computer room, i.e. computer room physical space usage amount.Computer room power supply capacity information refers to computer room
Interior each equipment, such as power distribution cabinet, UPS (Uninterruptible Power System, uninterruptible power supply) and PDU (Power
Distribution Unit, power distribution unit) etc. equipment power information, load factor including equipment and dump power are held
Surplus is measured, the sum of the energy information of each calculator room equipment obtains computer room power supply capacity information.Computer room refrigeration capacity information is each machine
The summation of the refrigerating capacity of room refrigeration equipment.
With continued reference to Fig. 2, computer room asset management device 130 further includes computer room physical space in one of the embodiments,
Capacity management module 131;Computer room physical space capacity module 131, for obtaining the device space capacity information of each calculator room equipment,
Computer room physical space capacity information is generated according to device space capacity information.
When computer room increases and decreases equipment, according to computer room real area, cabinet number and specific cabinet digit can be accommodated,
The utilization rate of computer room physical space capacity, the i.e. utilization rate of computer room physical space capacity is calculated, provides standard for administrative staff
True computer room physical space capacity management data.Computer room physical space usage amount=each occupation area of equipment+equipment spacing of computer room+
Width of walkway.
With continued reference to Fig. 2, computer room asset management device 130 further includes computer room power supply capacity in one of the embodiments,
Management module 132;Computer room power supply capacity management module 132, for obtaining the equipment energy information of each calculator room equipment, according to equipment
Energy information generates computer room power supply capacity information.
According to the basic power dispatching data of the equipment such as power distribution cabinet, UPS, PDU in computer room, the real time electrical quantity number of calculator room equipment is acquired
According to, energy consumption data and computer room distribution total amount etc..Equipment energy information includes real time electrical quantity data, energy consumption data etc..According to each
The equipment energy information of calculator room equipment, the computer room power supply capacity information of available each computer room.It, can when new equipment is added in computer room
Whether the energy information that current increased equipment is judged according to the computer room power supply capacity information of computer room is more than computer room power supply surplus.
With continued reference to Fig. 2, computer room asset management device 130 further includes computer room refrigeration capacity in one of the embodiments,
Module 133;Computer room refrigeration capacity module 133, for obtaining the equipment cooling capacity information of each calculator room equipment, according to equipment cooling capacity
Information generates computer room refrigeration capacity information.
Multiple refrigeration equipments, such as air-conditioning are provided in computer room, by acquiring the power and refrigerating capacity of each refrigeration equipment, according to
Host equipment room where refrigeration equipment counts the computer room refrigeration capacity information of each computer room.It in practice, can be according to formula Qt=
Q1+Q2 calculates computer room refrigeration capacity information, and wherein Qt is computer room overall refrigerating effect actually required, i.e. computer room refrigeration capacity, Q1
Indicate that indoor equipment load, i.e. the 0.8 of plant capacity times, Q2 indicate environmental heat load, the i.e. product of Q21 and machine room area.Q21
Value range is preferably 0.12~0.18kw/m2, and for different regions, the different values of Q21 selection, such as southern area are optional
0.18, northern area may be selected 0.12.In computer room refrigeration capacity information management, computer room refrigeration capacity and computer room refrigerating capacity are needed
The amount of asking is compared, and analysis show whether computer room refrigerating capacity meets the refrigeration capacity requirement of current computer room.
Computer room asset management device 130 further includes computer room assets information module 134 in one of the embodiments,;Computer room
Assets information module 134, for integrating computer room physical space capacity information, computer room power supply capacity information and computer room refrigeration capacity
Information generates computer room assets information.
Embodiment integrates computer room physical space capacity information, computer room power supply capacity information and computer room refrigeration capacity information
Refer to computer room physical space capacity information, computer room power supply capacity information and computer room refrigeration capacity information carry out data processing and
Analysis, is analyzed and again summarizing, cleaning to the part of redundancy including all kinds of capacity information data according to actual needs
The operation such as Combination nova, generates computer room assets information, and can be a variety of by table, histogram, line chart, pie chart, scatter plot etc.
Form indicates, for example, can according to the real area of each computer room, cabinet number can be accommodated, actually use cabinet digit, count each machine
The computer room physical space capacity report in room, and calculate corresponding physical space utilization rate;It can be according to power distribution cabinet, UPS and PDU etc.
Power information, calculate corresponding load factor in real time, generate corresponding computer room power supply capacity report and chart;According to
The position of the information such as the refrigerating capacity of refrigeration equipment and each refrigeration equipment is counted each computer room refrigerating capacity capacity report and is become with history
Gesture figure, and corresponding computer room refrigeration utilization rate is calculated in real time.The classification of computer room assets information can also be established, simultaneously for user
Classification Management is carried out to computer room assets information.By establishing assets separation, facilitates user to assets information Classification Management, reduce weight
Complex data typing.
Fig. 3 is a kind of third structural schematic diagram of data center's infrastructure management system provided in an embodiment of the present invention,
As shown in figure 3, in one of the embodiments, further including inquiry unit 140;Inquiry unit 140, for receiving peripheral operation hair
The inquiry instruction sent inquires infrastructure data information.
When user needs to inquire infrastructure data information by data center's infrastructure management system, pass through input
Equipment input inquiry order, and inquiry instruction corresponding to querying command is sent to inquiry unit.Input equipment can be key
Disk, mouse etc..Inquiry unit receives the inquiry instruction that peripheral operation is sent, and parses the inquiry instruction, inquires the inquiry instruction institute
Corresponding infrastructure data.
It in one of the embodiments, further include report generation device 150;Report generation device 150, for generating basis
The data sheet of facility data information, and output data report.
Data sheet may include the diversified forms data drawing list such as table, histogram, line chart, pie chart, scatter plot.Management
Personnel, can the intuitive wiring that must be understood in computer room in comprehensive wiring by the data sheet of the infrastructure data information generated
Capacity situation and computer room asset equipment information believe physical space capacity information, the computer room power supply capacity of data center machine room
Breath and computer room refrigeration capacity information and wiring capability information are counted, utilization rate, low capacity are alarmed etc., help administrative staff
Capacity service condition is grasped in real time, trend prediction and planning simulation are provided, and realizes rapid deployment.Administrative staff pass through data center
Wiring capability and computer room capacity report and utilization rate curve graph can be generated in infrastructure management system, understands computer room wiring and machine
Room volume change situation to realize that computer room capacity is rationally disposed, and provides planning guidance to computer room dilatation.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
Herein, the terms "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, from
Which and to include the process, method, article or equipments of a series of elements not only to include element, but also including not bright
The other element really listed, or further include for elements inherent to such a process, method, article, or device.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of data center's infrastructure management system characterized by comprising distributing frame apparatus for management of information, computer room money
Produce managing device and cable management mapping device;
The distributing frame apparatus for management of information, for obtaining the wiring capability information of distributing frame, and by the wiring capability information
It is transferred to the cable management mapping device;
The cable management mapping device, for carrying out data conversion to the wiring capability information, and will be after data conversion
The wiring capability information is sent to the computer room asset management device according to the mapping ruler of setting;
The computer room asset management device, for receiving the wiring capability information, and by the wiring capability information and computer room
Assets information is integrated into infrastructure data information.
2. data center's infrastructure management system according to claim 1, which is characterized in that the cable management mapping
Device includes data conversion module and mapping transmission module;
The data conversion module, for carrying out data conversion to the wiring capability information;
The mapping transmission module, for according to the wiring capability information according to the mapping ruler of setting in distributing frame message tube
Transmission path is established between reason device and the computer room asset management device, and by the wiring capability information after data conversion
The computer room asset management device is sent to by the transmission path.
3. data center's infrastructure management system according to claim 1, which is characterized in that the distributing frame message tube
Managing device includes port status detection module, distributing frame fault detection module and wiring capability module;
The port status detection module is used to obtain the port occupied information of distributing frame, and the port occupied information is sent
To the wiring capability module;
The distributing frame fault detection module is used to obtain the fault status information of distributing frame, and the fault status information is sent out
It send to the wiring capability module;
The wiring capability module, for generating wiring capability according to the port occupied information and the fault status information
Information.
4. data center's infrastructure management system according to claim 1-3, which is characterized in that the computer room
Assets information includes computer room physical space capacity information, computer room power supply capacity information and computer room refrigeration capacity information.
5. data center's infrastructure management system according to claim 4, which is characterized in that the computer room asset management
Device further includes computer room physical space capacity management module;
The computer room physical space capacity module is set for obtaining the device space capacity information of each calculator room equipment according to described
Standby spatial content information generates the computer room physical space capacity information.
6. data center's infrastructure management system according to claim 5, which is characterized in that the computer room asset management
Device further includes computer room power supply capacity management module;
The computer room power supply capacity management module, for obtaining the equipment energy information of each calculator room equipment, according to the equipment electricity
It can the information generation computer room power supply capacity information.
7. data center's infrastructure management system according to claim 6, which is characterized in that the computer room asset management
Device further includes computer room refrigeration capacity module;
The computer room refrigeration capacity module is freezed for obtaining the equipment cooling capacity information of each calculator room equipment according to the equipment
It measures information and generates the computer room refrigeration capacity information.
8. data center's infrastructure management system according to claim 7, which is characterized in that the computer room asset management
Device further includes computer room assets information module;
The computer room assets information module, for integrating the computer room physical space capacity information, computer room power supply capacity letter
Breath and the computer room refrigeration capacity information, generate the computer room assets information.
9. according to the described in any item data center's infrastructure management systems of claim 5-8, which is characterized in that further include looking into
Ask device;
The inquiry unit inquires the infrastructure data information for receiving the inquiry instruction of peripheral operation transmission.
10. according to the described in any item data center's infrastructure management systems of claim 5-8, which is characterized in that further include
Report generation device;
The report generation device for generating the data sheet of the infrastructure data information, and exports the datagram
Table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811624308.8A CN109661141B (en) | 2018-12-28 | 2018-12-28 | Data center infrastructure management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811624308.8A CN109661141B (en) | 2018-12-28 | 2018-12-28 | Data center infrastructure management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109661141A true CN109661141A (en) | 2019-04-19 |
CN109661141B CN109661141B (en) | 2022-01-11 |
Family
ID=66117338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811624308.8A Active CN109661141B (en) | 2018-12-28 | 2018-12-28 | Data center infrastructure management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109661141B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112115318A (en) * | 2020-08-28 | 2020-12-22 | 湖南三湘银行股份有限公司 | Computer room wiring resource management method and device |
CN115158957A (en) * | 2022-07-29 | 2022-10-11 | 中国电子科技集团公司第三十八研究所 | Material caching system and method for radar electronic equipment structural member production line |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101247532A (en) * | 2008-03-20 | 2008-08-20 | 西课游学网络技术(上海)有限公司 | Electrical wiring schedule information management system |
CN101383528A (en) * | 2008-06-20 | 2009-03-11 | 江苏省电力公司泗洪县供电公司 | Computer control device and method for power transmission line synthetic wire laying |
CN202856733U (en) * | 2012-06-04 | 2013-04-03 | 赵忠旭 | Optical cable management system ocms |
CN103116807A (en) * | 2012-12-12 | 2013-05-22 | 天津市电力公司 | Functional area power distribution network refined planning method |
CN103166781A (en) * | 2011-12-13 | 2013-06-19 | 北京陆创科技有限公司 | Distributed type intelligent premise distribution system |
CN104461822A (en) * | 2014-11-12 | 2015-03-25 | 北京百度网讯科技有限公司 | Supervision method and device for capacity of data center |
CN105427201A (en) * | 2015-11-26 | 2016-03-23 | 普天线缆集团(上海)楼宇智能有限公司 | Intelligent wiring database management system |
CN107680004A (en) * | 2017-07-17 | 2018-02-09 | 国网浙江海盐县供电公司 | Micromodule formula data center and method for managing resource |
CN107742161A (en) * | 2017-10-19 | 2018-02-27 | 国铁工建(北京)科技有限公司 | A kind of data monitoring system |
CN207235018U (en) * | 2017-08-08 | 2018-04-13 | 上海天诚通信技术股份有限公司 | Multi-functional wiring system |
-
2018
- 2018-12-28 CN CN201811624308.8A patent/CN109661141B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101247532A (en) * | 2008-03-20 | 2008-08-20 | 西课游学网络技术(上海)有限公司 | Electrical wiring schedule information management system |
CN101383528A (en) * | 2008-06-20 | 2009-03-11 | 江苏省电力公司泗洪县供电公司 | Computer control device and method for power transmission line synthetic wire laying |
CN103166781A (en) * | 2011-12-13 | 2013-06-19 | 北京陆创科技有限公司 | Distributed type intelligent premise distribution system |
CN202856733U (en) * | 2012-06-04 | 2013-04-03 | 赵忠旭 | Optical cable management system ocms |
CN103116807A (en) * | 2012-12-12 | 2013-05-22 | 天津市电力公司 | Functional area power distribution network refined planning method |
CN104461822A (en) * | 2014-11-12 | 2015-03-25 | 北京百度网讯科技有限公司 | Supervision method and device for capacity of data center |
CN105427201A (en) * | 2015-11-26 | 2016-03-23 | 普天线缆集团(上海)楼宇智能有限公司 | Intelligent wiring database management system |
CN107680004A (en) * | 2017-07-17 | 2018-02-09 | 国网浙江海盐县供电公司 | Micromodule formula data center and method for managing resource |
CN207235018U (en) * | 2017-08-08 | 2018-04-13 | 上海天诚通信技术股份有限公司 | Multi-functional wiring system |
CN107742161A (en) * | 2017-10-19 | 2018-02-27 | 国铁工建(北京)科技有限公司 | A kind of data monitoring system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112115318A (en) * | 2020-08-28 | 2020-12-22 | 湖南三湘银行股份有限公司 | Computer room wiring resource management method and device |
CN112115318B (en) * | 2020-08-28 | 2023-08-11 | 湖南三湘银行股份有限公司 | Machine room wiring resource management method and device |
CN115158957A (en) * | 2022-07-29 | 2022-10-11 | 中国电子科技集团公司第三十八研究所 | Material caching system and method for radar electronic equipment structural member production line |
CN115158957B (en) * | 2022-07-29 | 2023-04-28 | 中国电子科技集团公司第三十八研究所 | Material caching system and method for structural member production line of radar electronic equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109661141B (en) | 2022-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8543714B2 (en) | Local power management unit and power management system employing the same | |
CN106329721B (en) | Integral intelligent electric energy meter and electric-power metering and Control protection system | |
CN101534021B (en) | Multimode data acquisitions and processing method applied to power automation system | |
CN101794480B (en) | Pre-purchased power controller | |
DK2737381T3 (en) | Systems and methods for wireless transmission of power distribution information | |
US20100318236A1 (en) | Management of the provisioning of energy for a workstation | |
CN106030452B (en) | The backup power source management of computing system | |
US20100100341A1 (en) | Power meter based on system on chip | |
CN109661141A (en) | Data center's infrastructure management system | |
CN108964276A (en) | Support the electricity consumption control terminal and system and load discrimination method of automatic demand response | |
CN109038678A (en) | Garden distributed energy intelligence managing and control system based on big data | |
CN108573342A (en) | State evaluating method, device, computer equipment and the storage medium of power equipment | |
CN207833300U (en) | A kind of building site water power energy-saving monitoring and wireless remote control system | |
Avancini et al. | A flexible iot energy monitoring solution | |
CN207281200U (en) | A kind of distribution cloud intellectual monitoring management system | |
CN108322314A (en) | For reducing the method and apparatus of the energy expenditure of the network equipment | |
CN109709839A (en) | A kind of biomass electric power plant multistage method for real-time monitoring | |
CN108564261A (en) | Method, apparatus and computer equipment are determined based on the power information of work ticket | |
CN205594620U (en) | IT equipment rack U position management system | |
CN108181845A (en) | A kind of intelligent electric meter information acquisition system | |
CN215264413U (en) | Intelligent metering turnover cabinet device | |
CN201528212U (en) | Diesel set power divider | |
CN113188673A (en) | Passive monitoring device and method for server in cabinet | |
CN103597777A (en) | Measuring system | |
CN207251307U (en) | A kind of digital substation relay protection device state monitoring apparatus with forecast function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |