CN107742161A - A kind of data monitoring system - Google Patents
A kind of data monitoring system Download PDFInfo
- Publication number
- CN107742161A CN107742161A CN201710978733.6A CN201710978733A CN107742161A CN 107742161 A CN107742161 A CN 107742161A CN 201710978733 A CN201710978733 A CN 201710978733A CN 107742161 A CN107742161 A CN 107742161A
- Authority
- CN
- China
- Prior art keywords
- capacity
- computer room
- processing module
- asset
- submodule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Alarm Systems (AREA)
Abstract
The present invention discloses a kind of data monitoring system, including computer room capacity processing module and asset of equipments processing module, computer room capacity processing module, the utilization rate of computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity and computer room physical space capacity is calculated respectively, and export result of calculation, administrative staff can understand capacity service condition in real time, find resource distribution bottleneck in time;Asset of equipments processing module, target computer room device location is monitored in real time, and output monitoring result, in order to positioning searching target calculator room equipment, it can realize that collection neutralizes long-range monitoring, there is provided equipment control flexibility, reliability.
Description
Technical field
The present invention relates to data processing field, more specifically to a kind of data monitoring system.
Background technology
At present, machine room monitoring system also rests on simple data acquisition and storage aspect, and content is single, can not meet pair
Data center's Centralized Monitoring, the demand of unified management, pipe is improved especially for the lack of control of computer room capacity, assets information etc.
Reason.
The content of the invention
In view of this, the present invention proposes a kind of data monitoring system, is intended to realize and improves equipment control automation, reduces equipment
The purpose of management service cost.
To achieve these goals, it is proposed that scheme it is as follows:
A kind of data monitoring system, including:Computer room capacity processing module and asset of equipments processing module;
The computer room capacity processing module, for holding respectively to computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity
Amount and the utilization rate of computer room physical space capacity are calculated, and export result of calculation;
The asset of equipments processing module, for being supervised in real time to target computer room device location using radio RF recognition technology
Control, and output monitoring result.
Preferably, the computer room capacity processing module, in addition to:
Computer room distribution capacity submodule, for when computer room adds new equipment, judging the demand electricity of the new equipment to be
It is no to be more than computer room distribution capacity surplus, if so, then sending electric power low capacity alarm signal.
Preferably, the computer room capacity processing module, in addition to:
Computer room load-carrying capacity submodule, for monitoring whether remaining load-carrying capacity is less than default load-carrying threshold value, if so, then sending out
Going out residue can load capacity deficiency alarm signal.
Preferably, the computer room capacity processing module, in addition to:
Computer room refrigerating capacity capacity submodule, for monitoring whether remaining refrigerating capacity is less than default refrigeration threshold value, if so, then sending out
Go out remaining refrigerating capacity deficiency alarm signal.
Preferably, the computer room capacity processing module, in addition to:
Computer room physical space capacity submodule, for when computer room adds new equipment, judging the demand thing of the new equipment
Whether reason space is more than computer room physical space capacity surplus, if so, then sending space low capacity alarm signal.
Preferably, the asset of equipments processing module, in addition to:
Assets handle submodule, for whether judging target calculator room equipment in corresponding position range, if it is not, then sending non-
Method carries fixed assets alarm signal.
Preferably, the asset of equipments processing module, in addition to:
Basic data submodule, for establishing assets classes, so that user carries out Classification Management to assets information.
Preferably, the asset of equipments processing module, in addition to:
Cable handles submodule, for the information of the intermediate node of all cables and cable in storage room, so that user examines
Suo Dingwei target cables.
Preferably, the asset of equipments processing module, in addition to:
Asset count submodule, for receiving the computer room assets information of handheld device upload, analysis assets miss situation, and
Export analysis result.
Preferably, the computer room capacity processing module, in addition to:
Volume change submodule, for generate respectively computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity capacity and
The history graphs of the utilization rate of computer room physical space capacity, and export the history graphs.
Compared with prior art, technical scheme has advantages below:
A kind of data monitoring system that above-mentioned technical proposal provides, including computer room capacity processing module and asset of equipments processing
Module, computer room capacity processing module are empty to computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity and computer room physics respectively
Between the utilization rate of capacity calculated, and export result of calculation, administrative staff can understand capacity service condition in real time, in time hair
Existing resource distribution bottleneck;Asset of equipments processing module, target computer room device location is monitored in real time, and output monitoring result, with
It is easy to positioning searching target calculator room equipment, can realizes that collection neutralizes long-range monitoring, there is provided is equipment control flexibility, reliable
Property.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of data monitoring system provided in an embodiment of the present invention;
Fig. 2 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 3 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 4 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 5 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 6 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 7 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 8 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Fig. 9 is the structural representation of another data monitoring system provided in an embodiment of the present invention;
Figure 10 is the structural representation of another data monitoring system provided in an embodiment of the present invention.
Embodiment
The core concept of the present invention is by the automatic data collection of computer room data, statistical analysis and monitoring in real time, realizing
The population size utilization rate of displaying computer room, administrative staff can understand capacity service condition in real time comprehensively, find that resource is matched somebody with somebody in time
Put bottleneck;By being monitored in real time to calculator room equipment position, improve the automation of equipment control, reduce equipment control safeguard into
This.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
The present embodiment provides a kind of data monitoring system, and referring to Fig. 1, the system includes:Computer room capacity processing module 1 and set
Standby assets processing module 2;
The computer room capacity processing module 1, for respectively to computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity
The utilization rate of capacity and computer room physical space capacity is calculated, and exports result of calculation.
The utilization rate of computer room distribution capacity calculates.According to power distribution cabinet, UPS (Uninterruptible Power in computer room
System, uninterrupted power source), the basic distribution of the equipment such as PDU (Power Distribution Unit, power distribution unit)
Data, the real time electrical quantity data of acquisition monitoring calculator room equipment, energy consumption data.The utilization rate of computer room distribution capacity=(real time electrical quantity
Data+energy consumption data)/computer room distribution total amount.UPS is a kind of device containing energy storage, using inverter as chief component
The uninterrupted power source of constant voltage constant frequency.It can ensure that computer system works on a period of time after having a power failure, so that user
Can promptly deposit, make user not reason have a power failure and influence work or make computer not reason have a power failure and lose data.PDU is machine
Cabinet power distribution socket, possesses power distribution and management function.
The utilization rate of computer room load-carrying capacity calculates.According to the relevant rudimentary data of calculator room equipment, computer room load is calculated in real time
The utilization rate of weight capacity, i.e. load factor, and then administrative staff will be seen that residue can load capacity.The utilization of computer room load-carrying capacity
Rate=computer room real-time load/computer room airlift capacity.Residue can load capacity=computer room airlift capacity-computer room real-time load.
The utilization rate of computer room refrigerating capacity capacity calculates.According to formula Qt=Q1+Q2Calculate total refrigeration that computer room is actually needed
Amount, wherein QtRepresent the overall refrigerating effect (kw) that computer room is actually needed, Q1Represent that indoor equipment load is plant capacity × 0.8, Q2Table
Show environmental heat load i.e. Q21× machine room area.Q21Span is preferably 0.12~0.18kw/m2, for different regions Q21
Different values, such as southern area optional 0.18 are selected, northern area may be selected 0.12.The utilization rate of computer room refrigerating capacity capacity=
The overall refrigerating effect that computer room is actually needed/air-conditioning power output.Standard computer room can not be fully met during in view of actual Design of Machine Room
Design requirement, to improve result of calculation accuracy, the Q that will can be calculatedtIt is multiplied by 1.2 and obtains total system that computer room is actually needed
Cold, and then the utilization rate of computer room refrigerating capacity capacity is calculated.
The utilization rate of computer room physical space capacity calculates.Whenever computer room increase or sweep equipment, according to the actual face of computer room
Product, can accommodate rack number and specific rack digit, and the utilization rate of computer room physical space capacity is calculated, i.e. computer room physics is empty
Between capacity utilization rate.Accurate physical space capacity management data are provided for administrative staff.Computer room physical space usage amount S=
Computer room all devices floor space A+ equipment rooms are away from H+ width of walkways D.When computer room all devices are known models equipment, according to
Each equipment corresponds to floor space, and computer room all devices floor space is calculatedaiRefer to the occupation of land of i-th of equipment
Area.When the concrete model of equipment in computer room is unknown, computer room all devices floor space A=is estimated out according to number of devices
KN, K are coefficient, 4.5~6.5m of value2/ platform (frame), N refer to table of equipment (frame) number of all non-type selectings.Equipment room is usually away from H
Two relative cabinet front distances are not less than 1.5m, and cabinet front is 0.5~1.2m away from wall spacing.Width of walkway D is not less than 1.2m.
The utilization rate of the computer room physical space capacity=computer room physical space usage amount S/ computer room gross areas.
The asset of equipments processing module 2, for real-time to target computer room device location using radio RF recognition technology
Monitoring, and output monitoring result.
Using radio RF recognition technology, i.e. RFID (Radio Frequency Identification) technology, realize
Comprehensive, the information-based integrated management of asset of equipments.By installing RFID reader antenna in computer room, all fixations of computer room are covered
Assets, so as to realize the real-time locating and monitoring for the fixed assets for posting RFID label tag, by RFID reader, to determine that computer room is consolidated
Determine the positional information of assets and the state of current deposit position.
Data monitoring system supports multi-user, multidisciplinary be laid out by enterprise network to access database, account management simultaneously
B/S frameworks are used with Role Management, the user of different rights can be distributed, determine the access right of the user of different stage.
The above-mentioned data monitoring system that the present embodiment provides, including computer room capacity processing module 1 and asset of equipments processing mould
Block 2, computer room capacity processing module 1 is respectively to computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity and computer room physical space
The utilization rate of capacity is calculated, and exports result of calculation, and administrative staff can understand capacity service condition in real time, is found in time
Resource distribution bottleneck;Asset of equipments processing module 2 monitors in real time to target computer room device location, and output monitoring result, so as to
In positioning searching target calculator room equipment, it can realize that collection neutralizes long-range monitoring, there is provided equipment control flexibility, reliability.
The present embodiment provides another data monitoring system, and referring to Fig. 2, the computer room capacity processing module 1 of the system is also wrapped
Include:
Computer room distribution capacity submodule 11, for when computer room adds new equipment, judging the demand electricity of the new equipment
Whether computer room distribution capacity surplus is more than, if so, then sending electric power low capacity alarm signal.Computer room distribution capacity surplus=
Computer room distribution total amount-real time electrical quantity data-energy consumption data.Electric power low capacity alarm signal notifies correlation by modes such as sound, light
Personnel.By monitoring room distribution capacity surplus, the reasonable deployment of computer room distribution capacity is realized, reduces O&M cost.
The present embodiment provides another data monitoring system, and referring to Fig. 3, the computer room capacity processing module 1 of the system is also wrapped
Include:
Computer room load-carrying capacity submodule 12, for monitoring whether remaining load-carrying capacity is less than default load-carrying threshold value, if so, then
Sending residue can load capacity deficiency alarm signal.Remaining load-carrying capacity be residue can load capacity, remaining load-carrying capacity=machine
Room airlift capacity-computer room real-time load.Residue can load capacity deficiency alarm signal relevant people is notified by modes such as sound, light
Member.By monitoring remaining load-carrying capacity, overload potential problem is prevented, has reduced O&M cost.
The present embodiment provides another data monitoring system, and referring to Fig. 4, the computer room capacity processing module 1 of the system is also wrapped
Include:
Computer room refrigerating capacity capacity submodule 13, for monitoring whether remaining refrigerating capacity is less than default refrigeration threshold value, if so, then
Send remaining refrigerating capacity deficiency alarm signal.The refrigerating capacity of remaining refrigerating capacity=air-conditioning power output-actual use, actual use
Refrigerating capacity be overall refrigerating effect that computer room is actually needed.Remaining refrigerating capacity deficiency alarm signal notifies phase by modes such as sound, light
Pass personnel.By monitoring remaining refrigerating capacity, prevented temperature it is too high caused by potential safety hazard, reduce O&M cost.
The present embodiment provides another data monitoring system, and referring to Fig. 5, the computer room capacity processing module 1 of the system is also wrapped
Include:
Computer room physical space capacity submodule 14, for when computer room adds new equipment, judging the demand of the new equipment
Whether physical space is more than computer room physical space capacity surplus, if so, then sending space low capacity alarm signal.Computer room physics
Spatial content surplus=computer room the gross area-computer room physical space usage amount S.Space low capacity alarm signal passes through sound, light etc.
Mode notifies related personnel.By monitoring room physical space capacity surplus, the reasonable portion of computer room physical space capacity is realized
Administration, reduces O&M cost.
The present embodiment provides another data monitoring system, and referring to Fig. 6, the asset of equipments processing module 2 of the system is also wrapped
Include:
Assets handle submodule 21, for whether judging target calculator room equipment in corresponding position range, if it is not, then sending
It is illegal to carry fixed assets alarm signal.Target calculator room equipment installs RFID label tag, when someone illegally carries target calculator room equipment
When going out, assets processing submodule 15 judges target calculator room equipment not in corresponding position range, and then sends illegal carry admittedly
Determine assets alarm signal, administrative staff is understood the whereabouts of target calculator room equipment in time.It is illegal to carry fixed assets alarm signal
Related personnel is notified by modes such as sound, light.Set by the positional information of real-time monitoring objective calculator room equipment, and in target computer room
For not in relevant position scope, alarm is sent, the effective monitoring of target calculator room equipment is realized, reduces O&M cost.
The present embodiment provides another data monitoring system, and referring to Fig. 7, the asset of equipments processing module 2 of the system is also wrapped
Include:
Basic data submodule 22, for establishing assets classes, so that user carries out Classification Management to assets information.Pass through
Assets separation is established, facilitates user to reduce duplicate data typing to assets information Classification Management.
The present embodiment provides another data monitoring system, and referring to Fig. 8, the asset of equipments processing module 2 of the system is also wrapped
Include:
Cable handles submodule 23, for the information of the intermediate node of all cables and cable in storage room, for user
Retrieval positioning target cable, and check cable full link.
The present embodiment provides another data monitoring system, and referring to Fig. 9, the asset of equipments processing module 2 of the system is also wrapped
Include:
Asset count submodule 24, for receiving the computer room assets information of handheld device upload, analysis assets miss situation,
And export analysis result.Administrative staff carry out inquiry of making an inventory by handheld device to the assets for having bound RFID, then
Data after making an inventory upload to asset count submodule 23, the computer room assets that asset count submodule 23 uploads handheld device
Information, it is compared, exists in display data storehouse and in handheld device with all computer room assets informations preserved inside database
Pass the computer room assets information being not present in information so that administrative staff understand the leakage situation of assets.
The present embodiment provides another data monitoring system, and referring to Figure 10, the computer room capacity processing module 1 of the system is also wrapped
Include:
Volume change submodule 15, for generating computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity capacity respectively
With the history graphs of the utilization rate of computer room physical space capacity, and the history graphs are exported.Administrative staff pass through various
It the history graphs of the utilization rate of capacity, can comprehensively understand the service condition of various capacity, and then realize that computer room capacity closes
Reason deployment, and provide planning to computer room dilatation and instruct.
Device embodiment described above is only schematical, wherein the unit illustrated as separating component can
To be or may not be physically separate, it can be as the part that unit is shown or may not be physics list
Member, you can with positioned at a place, or can also be distributed on multiple NEs.It can be selected according to the actual needs
In some or all of module realize the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying creativeness
In the case of work, you can to understand and implement.
Herein, term " comprising ", "comprising" or any other variant thereof is intended to cover non-exclusive inclusion, from
And process, method, article or the equipment for include a series of elements not only include those key elements, but also including not bright
The other element really listed, or also include for this process, method, article or the intrinsic key element of equipment.Do not having
In the case of more limitations, the key element that is limited by sentence "including a ...", it is not excluded that the process including the key element,
Other identical element in method, article or equipment also be present.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
To the described above of disclosed embodiment of this invention, professional and technical personnel in the field is realized or use this
Invention.A variety of modifications to these embodiments will be apparent for those skilled in the art, institute herein
The General Principle of definition can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore,
The present invention is not intended to be limited to the embodiments shown herein, and is to fit to special with principles disclosed herein and novelty
The consistent most wide scope of point.
Claims (10)
- A kind of 1. data monitoring system, it is characterised in that including:Computer room capacity processing module and asset of equipments processing module;The computer room capacity processing module, for respectively to computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity capacity and The utilization rate of computer room physical space capacity is calculated, and exports result of calculation;The asset of equipments processing module, for being monitored in real time to target computer room device location using radio RF recognition technology, And output monitoring result.
- 2. system according to claim 1, it is characterised in that the computer room capacity processing module, in addition to:Computer room distribution capacity submodule, for when computer room adds new equipment, judging whether the demand electricity of the new equipment is big In computer room distribution capacity surplus, if so, then sending electric power low capacity alarm signal.
- 3. system according to claim 1, it is characterised in that the computer room capacity processing module, in addition to:Computer room load-carrying capacity submodule, for monitoring whether remaining load-carrying capacity is less than default load-carrying threshold value, if so, then sending surplus It is remaining can load capacity deficiency alarm signal.
- 4. system according to claim 1, it is characterised in that the computer room capacity processing module, in addition to:Computer room refrigerating capacity capacity submodule, for monitoring whether remaining refrigerating capacity is less than default refrigeration threshold value, if so, then sending surplus Remaining refrigerating capacity deficiency alarm signal.
- 5. system according to claim 1, it is characterised in that the computer room capacity processing module, in addition to:Computer room physical space capacity submodule, for when computer room adds new equipment, judging that the demand physics of the new equipment is empty Between whether be more than computer room physical space capacity surplus, if so, then sending space low capacity alarm signal.
- 6. system according to claim 1, it is characterised in that the asset of equipments processing module, in addition to:Assets handle submodule, for judging that target calculator room equipment whether in corresponding position range, is illegally taken if it is not, then sending Band fixed assets alarm signal.
- 7. system according to claim 1, it is characterised in that the asset of equipments processing module, in addition to:Basic data submodule, for establishing assets classes, so that user carries out Classification Management to assets information.
- 8. system according to claim 1, it is characterised in that the asset of equipments processing module, in addition to:Cable handles submodule, for the information of the intermediate node of all cables and cable in storage room, so that user search is determined Position target cable.
- 9. system according to claim 1, it is characterised in that the asset of equipments processing module, in addition to:Asset count submodule, for receiving the computer room assets information of handheld device upload, analysis assets leakage situation, and export Analysis result.
- 10. according to the system described in claim 1~9 any one, it is characterised in that the computer room capacity processing module, also Including:Volume change submodule, for generating computer room distribution capacity, computer room load-carrying capacity, computer room refrigerating capacity capacity and computer room respectively The history graphs of the utilization rate of physical space capacity, and export the history graphs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710978733.6A CN107742161A (en) | 2017-10-19 | 2017-10-19 | A kind of data monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710978733.6A CN107742161A (en) | 2017-10-19 | 2017-10-19 | A kind of data monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107742161A true CN107742161A (en) | 2018-02-27 |
Family
ID=61237697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710978733.6A Pending CN107742161A (en) | 2017-10-19 | 2017-10-19 | A kind of data monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107742161A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108445847A (en) * | 2018-03-22 | 2018-08-24 | 上海精鲲计算机科技有限公司 | A kind of visualization computer room management system |
CN108921243A (en) * | 2018-06-21 | 2018-11-30 | 中国联合网络通信集团有限公司 | A kind of acquisition methods and device of data center's capacity |
CN109661141A (en) * | 2018-12-28 | 2019-04-19 | 中国能源建设集团广东省电力设计研究院有限公司 | Data center's infrastructure management system |
CN109684385A (en) * | 2018-11-21 | 2019-04-26 | 平安科技(深圳)有限公司 | Data center's distribution alarming method for power, device, equipment and storage medium |
CN111859509A (en) * | 2020-07-27 | 2020-10-30 | 北京优锘科技有限公司 | Machine room capacity management system and method based on data center |
CN112084096A (en) * | 2020-09-22 | 2020-12-15 | 科华恒盛股份有限公司 | Cold channel sealing management method and device and terminal equipment |
CN113379016A (en) * | 2021-07-13 | 2021-09-10 | 国网浙江省电力有限公司信息通信分公司 | Cabinet comprehensive space calculation method and related equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201909992U (en) * | 2011-01-14 | 2011-07-27 | 中华人民共和国湖北出入境检验检疫局 | Remote room environment monitoring device based on VPN (virtual private network) technology |
CN103049666A (en) * | 2012-12-27 | 2013-04-17 | 德讯科技股份有限公司 | Data center machine room capacity analysis processing method based on space and energy consumption |
CN103646373A (en) * | 2013-12-12 | 2014-03-19 | 浪潮电子信息产业股份有限公司 | Equipment room asset managing and monitoring system based on RFID technology |
CN103926891A (en) * | 2014-04-09 | 2014-07-16 | 宁夏宏安信息技术有限公司 | System and method for monitoring mobile communication machine room and base station power environment devices |
CN104461822A (en) * | 2014-11-12 | 2015-03-25 | 北京百度网讯科技有限公司 | Supervision method and device for capacity of data center |
CN106483903A (en) * | 2016-12-05 | 2017-03-08 | 成都信息工程大学 | A kind of fixed assets Weigh sensor management and dynamic monitoring system and method |
-
2017
- 2017-10-19 CN CN201710978733.6A patent/CN107742161A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201909992U (en) * | 2011-01-14 | 2011-07-27 | 中华人民共和国湖北出入境检验检疫局 | Remote room environment monitoring device based on VPN (virtual private network) technology |
CN103049666A (en) * | 2012-12-27 | 2013-04-17 | 德讯科技股份有限公司 | Data center machine room capacity analysis processing method based on space and energy consumption |
CN103646373A (en) * | 2013-12-12 | 2014-03-19 | 浪潮电子信息产业股份有限公司 | Equipment room asset managing and monitoring system based on RFID technology |
CN103926891A (en) * | 2014-04-09 | 2014-07-16 | 宁夏宏安信息技术有限公司 | System and method for monitoring mobile communication machine room and base station power environment devices |
CN104461822A (en) * | 2014-11-12 | 2015-03-25 | 北京百度网讯科技有限公司 | Supervision method and device for capacity of data center |
CN106483903A (en) * | 2016-12-05 | 2017-03-08 | 成都信息工程大学 | A kind of fixed assets Weigh sensor management and dynamic monitoring system and method |
Non-Patent Citations (2)
Title |
---|
胡蔚星: "广电机房精密空调的选配", 《有线电视技术》 * |
谢拥华: "通信局(站)柴油发电机组的容量选择", 《电信工程技术与标准化》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108445847A (en) * | 2018-03-22 | 2018-08-24 | 上海精鲲计算机科技有限公司 | A kind of visualization computer room management system |
CN108921243A (en) * | 2018-06-21 | 2018-11-30 | 中国联合网络通信集团有限公司 | A kind of acquisition methods and device of data center's capacity |
CN108921243B (en) * | 2018-06-21 | 2021-08-17 | 中国联合网络通信集团有限公司 | Method and device for acquiring capacity of data center |
CN109684385A (en) * | 2018-11-21 | 2019-04-26 | 平安科技(深圳)有限公司 | Data center's distribution alarming method for power, device, equipment and storage medium |
CN109684385B (en) * | 2018-11-21 | 2023-09-29 | 平安科技(深圳)有限公司 | Data center power distribution warning method, device, equipment and storage medium |
CN109661141A (en) * | 2018-12-28 | 2019-04-19 | 中国能源建设集团广东省电力设计研究院有限公司 | Data center's infrastructure management system |
CN111859509A (en) * | 2020-07-27 | 2020-10-30 | 北京优锘科技有限公司 | Machine room capacity management system and method based on data center |
CN112084096A (en) * | 2020-09-22 | 2020-12-15 | 科华恒盛股份有限公司 | Cold channel sealing management method and device and terminal equipment |
CN113379016A (en) * | 2021-07-13 | 2021-09-10 | 国网浙江省电力有限公司信息通信分公司 | Cabinet comprehensive space calculation method and related equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107742161A (en) | A kind of data monitoring system | |
CN106203890B (en) | Battalion's auxiliary tone integration data modeling method based on CIM | |
US11454659B2 (en) | Multi-purpose (multi-dwelling) electric metering system and method | |
CN102332101B (en) | The method and system of asset identification and management | |
CN104115077B (en) | Co-location electrical architecture | |
CN103914047B (en) | Intelligent archive management control system and method | |
CN106357414B (en) | Information interacting method and system for base station electric generation management | |
CN106529708A (en) | Distribution network planning system based on cloud platform | |
EP2634889A1 (en) | Battery charge/swap monitoring system and method based on internet of things | |
Levy et al. | A new approach to data center infrastructure monitoring and management (DCIMM) | |
WO2012012082A2 (en) | Recording the power distribution hierarchy in datacenters | |
CN108734383A (en) | A kind of power grid enterprises' tool management system and method based on cloud platform | |
CN104299093A (en) | Object managing and monitoring method and system | |
CN104714501B (en) | Instant demand control system and its control method | |
US9952570B2 (en) | Electric power management | |
CN106447209A (en) | Determination method and device for evaluation factor of power distribution network project | |
CN106896788A (en) | Dynamic environment monitoring devices and methods therefor | |
CN106845780A (en) | A kind of generating set operating condition analysis system and its analysis method | |
CN106771734A (en) | Electric power monitoring method and device | |
CN207008631U (en) | Computer room management system for monitoring based on RFID | |
WO2024060652A1 (en) | Intelligent complete-set recommendation method for electric power materials | |
CN108306413A (en) | Electric power resource response platform and its method for handling electric load resource | |
CN108846155B (en) | Vector calculation method for electrical load center of building engineering and power transformation design method | |
KR20120040404A (en) | System for managing a big store using rtls(real time location system) | |
CN109661141A (en) | Data center's infrastructure management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180227 |