CN108564261A - Method, apparatus and computer equipment are determined based on the power information of work ticket - Google Patents
Method, apparatus and computer equipment are determined based on the power information of work ticket Download PDFInfo
- Publication number
- CN108564261A CN108564261A CN201810276749.7A CN201810276749A CN108564261A CN 108564261 A CN108564261 A CN 108564261A CN 201810276749 A CN201810276749 A CN 201810276749A CN 108564261 A CN108564261 A CN 108564261A
- Authority
- CN
- China
- Prior art keywords
- electric power
- work
- data
- ticket
- triggering command
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 64
- 238000003860 storage Methods 0.000 claims abstract description 20
- 238000004590 computer program Methods 0.000 claims description 30
- 230000008569 process Effects 0.000 claims description 25
- 230000005611 electricity Effects 0.000 claims description 15
- 230000009466 transformation Effects 0.000 claims description 14
- 238000004422 calculation algorithm Methods 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims 1
- 238000004458 analytical method Methods 0.000 abstract description 19
- 238000004519 manufacturing process Methods 0.000 abstract description 9
- 238000005516 engineering process Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 9
- 238000012545 processing Methods 0.000 description 5
- 241001269238 Data Species 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 238000013507 mapping Methods 0.000 description 3
- 230000006399 behavior Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000007405 data analysis Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000006855 networking Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004141 dimensional analysis Methods 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000003733 optic disk Anatomy 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to the power informations based on work ticket to determine method, apparatus, computer equipment and storage medium, belongs to electronic circuit technology field.The method includes:Determine multiple elements that multiple work about electric power tickets include;Determine the incidence relation between the multiple element and preset multiple dimensions;Receive the triggering command for certain dimension;According to the triggering command and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;According to the electric power data, power information corresponding with the dimension in the multiple work about electric power ticket is obtained.Above-mentioned technical proposal solves the problems, such as that electric power data acquisition does not lead to obtain that power information is also not accurate and comprehensive enough comprehensively, can therefrom excavate comprehensive and accurate power information by the analysis to work ticket, improve the production efficiency and the efficiency of management of work about electric power.
Description
Technical field
The present invention relates to electronic circuit technology fields, and method, dress are determined more particularly to the power information based on work ticket
It sets, computer equipment and storage medium.
Background technology
Economic rapid development makes power grid scale constantly expand, and networking power equipment quantity is growing day by day, needs to manage
Huge electric power data analyzes the power informations such as status of electric power.Power information tool is analyzed by electric power data
There is comprehensively and accurately feature, the production efficiency and the efficiency of management of work about electric power can be effectively improved.But realizing process of the present invention
In, inventor has found that at least there are the following problems in the prior art:Domestic power grid industry relative closure, many external electric power numbers
It is not particularly suited for domestic electric system according to analysis new technology.In addition, electric power data is mainly obtained by modes such as ammeters at present
It takes, the data obtained in this way are not comprehensive enough.Therefore, the power information obtained is also not accurate and comprehensive enough.
Invention content
Based on this, the present invention provides the power informations based on work ticket to determine method, apparatus, computer equipment and storage
Medium can therefrom excavate comprehensive and accurate power information by the analysis to work ticket, improve the production efficiency of work about electric power
And the efficiency of management.
The content of the embodiment of the present invention is as follows:
A kind of power information based on work ticket determines method, includes the following steps:Determine that multiple work about electric power tickets include
Multiple elements;Determine the incidence relation between the multiple element and preset multiple dimensions;It receives one-dimensional for certain
The triggering command of degree;According to the triggering command and the incidence relation, corresponding element is obtained from preset work ticket database
The electric power data of element;Include the multiple element and the corresponding electric power data of each element in the work ticket database,
The corresponding electric power data of each element is obtained according to the multiple work about electric power ticket;According to the electric power data, obtain described more
Power information corresponding with the dimension in a work about electric power ticket.
It is described according to the triggering command and the incidence relation in one of the embodiments, from preset work ticket
Before the step of obtaining the electric power data of corresponding element in database, further include:It is obtained from multiple work about electric power tickets respectively each
The corresponding electric power data of a element, according to preset algorithm to invalid data, duplicate data and/or the mistake in the electric power data
Accidentally data are handled;Work ticket database is established according to the element and the treated electric power data.
It is described according to the triggering command and the incidence relation in one of the embodiments, from preset work ticket
The step of electric power data of corresponding element is obtained in database, including:It is determined according to the triggering command and the incidence relation
With the associated element of corresponding dimension, the electric power data of the associated element is obtained from preset work ticket data.
The triggering command received for certain dimension in one of the embodiments,;According to the triggering command and
The incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, including:Reception is directed to
The affiliated management unit of equipment, work about electric power ticket attribute, working time, workload, part of appliance, personnel depaly information, other lists
The triggering command of the fitness of position or the dimension of switching manipulation information;According to the triggering command and the incidence relation, from pre-
If work ticket database in obtain corresponding power transformation station name, work ticket number, work responsible person, staff, work appoint
Business, operation equipment, job site, initial time, the end time, process of work and/or equipment running status element
Electric power data.
The triggering command received for certain dimension in one of the embodiments, according to the triggering command and
The incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, obtain
To in the multiple work about electric power ticket the step of power information corresponding with the dimension, including:Receive for workload
One triggering command;According to the first triggering command and the incidence relation, work is obtained from preset work ticket database
Personnel, task, initial time and end time electric power data, obtain the first electric power data;To the first electric power number
According to being analyzed, the workload needed for corresponding task is obtained.
The triggering command received for certain dimension in one of the embodiments, according to the triggering command and
The incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, obtain
To in the multiple work about electric power ticket the step of power information corresponding with the dimension, including:It receives and believes for personnel depaly
Second triggering command of breath;According to second triggering command and the incidence relation, obtained from preset work ticket database
The electric power data for taking power transformation station name, staff and process of work obtains the second electric power data;To second electric power
Data are analyzed, and the personnel depaly information of corresponding substation is obtained.
The triggering command received for certain dimension in one of the embodiments, according to the triggering command and
The incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, obtain
To in the multiple work about electric power ticket the step of power information corresponding with the dimension, including:It receives and believes for switching manipulation
The third triggering command of breath is obtained according to the third triggering command and the incidence relation from preset work ticket database
The electric power data for taking task, operating equipment and equipment running status, obtains third electric power data;To the third electric power number
According to being analyzed, the switching manipulation information of corresponding equipment is obtained.
It is described according to the electric power data in one of the embodiments, obtain in the multiple work about electric power ticket with institute
The step of stating dimension corresponding power information, including:To the numerical values recited of the electric power data, data amount check and/or frequency into
Row analysis, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
It is described according to the electric power data in one of the embodiments, obtain in the multiple work about electric power ticket with institute
After the step of stating dimension corresponding power information, further include:According to the power information, estimate within following a period of time with
The corresponding power information of the dimension.
Correspondingly, the embodiment of the present invention provides a kind of power information determining device based on work ticket, including:Element determines
Module, the multiple elements for including for determining multiple work about electric power tickets;Relationship determination module, for determine the multiple element with
Incidence relation between preset multiple dimensions;Data acquisition module, for receiving the triggering command for certain dimension,
According to the triggering command and the incidence relation, the electric power data of corresponding element is obtained from preset work ticket database;
Include that the multiple element and the corresponding electric power data of each element, each element are corresponding in the work ticket database
Electric power data is obtained according to the multiple work about electric power ticket;And information determination module, for according to the electric power data, obtaining
To power information corresponding with the dimension in the multiple work about electric power ticket.
The above-mentioned power information based on work ticket determines method and device, determines preset dimensional information and work about electric power
Incidence relation between the element that ticket includes, after receiving the triggering command for certain dimension, from preset work poll
According to the electric power data for obtaining corresponding element in library, to electric power data obtain the power information of corresponding dimension after analyzing.Electricity
It is the important list in power production process in power work ticket, contains a large amount of useful power generation data.By to electric power
The analysis of work ticket can therefrom excavate the electric power data of various aspects, obtain comprehensive and accurate power information.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the processor realize following steps when executing the computer program:Determine that multiple work about electric power tickets include
Multiple elements;Determine the incidence relation between the multiple element and preset multiple dimensions;It receives one-dimensional for certain
The triggering command of degree;According to the triggering command and the incidence relation, corresponding element is obtained from preset work ticket database
The electric power data of element;Include the multiple element and the corresponding electric power data of each element in the work ticket database,
The corresponding electric power data of each element is obtained according to the multiple work about electric power ticket;According to the electric power data, obtain described more
Power information corresponding with the dimension in a work about electric power ticket.
Above computer equipment, by can therefrom excavate the electric power data of various aspects to the analysis of work about electric power ticket,
Obtain comprehensive and accurate power information.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
Following steps are realized when row:Determine multiple elements that multiple work about electric power tickets include;It determines the multiple element and presets
Multiple dimensions between incidence relation;Receive the triggering command for certain dimension;According to the triggering command and the pass
Connection relationship obtains the electric power data of corresponding element from preset work ticket database;Include in the work ticket database
The multiple element and the corresponding electric power data of each element, the corresponding electric power data of each element is according to the multiple electric power
Work ticket obtains;According to the electric power data, power information corresponding with the dimension in the multiple work about electric power ticket is obtained.
Above computer readable storage medium storing program for executing, by the electricity that can therefrom excavate various aspects to the analysis of work about electric power ticket
Force data obtains comprehensive and accurate power information.
Description of the drawings
Fig. 1 is the applied environment figure for determining method in one embodiment based on the power information of work ticket;
Fig. 2 is the flow diagram for determining method in one embodiment based on the power information of work ticket;
Fig. 3 is work about electric power ticket information visuallization schematic diagram in one embodiment;
Fig. 4 is the flow diagram for determining method in another embodiment based on the power information of work ticket;
Fig. 5 is the visualization schematic diagram of power information in one embodiment;
Fig. 6 is the structure diagram of the power information determining device based on work ticket in one embodiment.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Power information provided by the present application based on work ticket determines that method can be applied to computer as shown in Figure 1 and set
In standby.The computer equipment can be server, and internal structure chart can be as shown in Figure 1.The computer equipment includes passing through
Processor, memory, network interface and the database of system bus connection.Wherein, the processor of the computer equipment is for carrying
For calculating and control ability.The memory of the computer equipment includes non-volatile memory medium, built-in storage.This is non-volatile
Storage medium is stored with operating system, computer program and database.The built-in storage is the behaviour in non-volatile memory medium
The operation for making system and computer program provides environment.The database of the computer equipment is for storing the data such as electric power data.
The network interface of the computer equipment is used to communicate by network connection with external terminal.The computer program is held by processor
To realize a kind of determination method in pavement disease region when row.
It will be understood by those skilled in the art that structure shown in Fig. 1, is only tied with the relevant part of application scheme
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
May include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
The embodiment of the present invention provides a kind of power information based on work ticket and determines method, apparatus, computer equipment and deposit
Storage media.It is described in detail separately below.
In one embodiment, as shown in Fig. 2, providing a kind of power information based on work ticket determines method, including
Following steps:
S201, multiple elements that multiple work about electric power tickets include are determined.
Optionally, the content of the work about electric power ticket may include:Work ticket number, work responsible person, responsible person ID, work
Class member, member id, number of members, job site and action, projected operating times, work finish time, scope of power outage,
The content of the elements such as comment, these electric power after safety measure, work permit people, work ticket signed by, work ticket approver, power transmission
Data type is more, quantity is more, contains a large amount of useful work about electric power data, passes through point of the electric power data to these most originals
Analysis can obtain the power information of various aspects.
The sample of work about electric power ticket is as shown in Table 1 and Table 2.Work about electric power ticket packet is can be seen that from the content of the two tables
Contain multiple elements and the corresponding electric power data of these elements, electric power data corresponding for task, specific, concrete
Work the objects such as targeted accumulator, wind turbine.Task can be determined by the analysis of the electric power data to task
Therefore targeted power equipment etc. can determine and the relevant power information of power equipment well.
1 work ticket sample of table
2 work ticket sample (above connecing table 1) of table
This step obtains a large amount of work about electric power ticket, integrates the element that these work about electric power tickets are included, determine need into
The element of row analysis.These elements can be the summation for various types of elements that all work about electric power tickets include.
Optionally, the element that each work about electric power ticket is included can also be consistent, therefore, the realization process of this step
It can be to determine the element that one of work about electric power ticket is included.
S202, incidence relation between the multiple element and preset multiple dimensions is determined.
This step determines each element in work about electric power ticket and the incidence relation between each dimension.
Optionally, the data volume that includes due to work about electric power ticket is big, type is various, and the present embodiment is from different dimensions
To determine power information, multi dimensional analysis of the realization to work about electric power ticket.These dimensions can be according to power production process
Demand determines, can also be determined by the conclusion obtained to the preliminary analysis of work about electric power ticket.
Optionally, preset dimension may include the affiliated management unit of equipment, work about electric power ticket attribute, working time, work
Measure, part of appliance, personnel depaly information, the fitness of other unit, switching manipulation information, profession, grass-roots unit, time etc.
Dimension.It is of course also possible to for other dimensions.The embodiment of the present invention is not limited specific dimension.
There may be interrelated between different elements in work about electric power ticket.The data of some elements must be with other yuan
The data of element, which are integrated, can just be better achieved data analysis, and such as initial time and end time, they are used alone and are only capable of
As soon as indicating a moment, a certain item work about electric power required by task of completion can determine that if be combined with the time at another moment
Time, and then determine to information such as workloads.Certainly, there is also the data that can be used alone, these data can be used as single
An only dimension is analyzed, can also be with other elements to combination.
It is alternatively possible to using each element of work about electric power ticket as a dimension, determine that each element is corresponding
Power information.
Optionally, a dimension may only exist a corresponding element, it is also possible to which there are multiple corresponding members
Element.These incidence relations can be stored in mapping table, be stored in work ticket database.
S203, the triggering command for being directed to certain dimension is received;According to the triggering command and the incidence relation, from default
Work ticket database in obtain corresponding element electric power data;Include the multiple element in the work ticket database with
And the corresponding electric power data of each element, the corresponding electric power data of each element are obtained according to the multiple work about electric power ticket.
In this step, associated element is determined according to the triggering command of reception, and from preset work ticket database
It is middle to obtain corresponding electric power data.
Optionally, work ticket database is for storing the element and the corresponding electricity of each element that work about electric power ticket includes
The database of force data.By work ticket database, user need to only provide the element that need to be inquired, you can from the work ticket database
It is middle to obtain corresponding electric power data.
S204, according to the electric power data, obtain corresponding with dimension electric power letter in the multiple work about electric power ticket
Breath.
In this step, acquired electric power data is analyzed, and then obtains the power information of corresponding dimension.
Optionally, multiple triggering command can also be received, and the electric power of multiple dimensions is obtained according to these triggering commands
Information.The embodiment of the present invention is not limited the number of triggering command.
Optionally, the electric power letter of all dimensions associated therewith after receiving a certain triggering command, can also be determined
Breath realizes the determination of the power information to multiple dimensions simultaneously.
Economic rapid development makes power grid scale constantly expand, and the power equipment quantity of networking is also growing day by day, therefore,
Utilities Electric Co. and power department need to manage huge power equipment data.
Work ticket is the writ for permitting working on electrical equipment and system software, and executes and ensure safe practice
The written foundation of measure.One shift can only arrange a task within the same time, issue a work ticket.Work
Make range with an electric connecting member to be limited.Electric connecting member refers to connecing to bus rod, and match Denso mounted on a certain
It sets room, switch place, within the scope of transformer room, be connected to the general name of equipment in same electric loop.Including breaker, keep apart
Pass, voltage transformer and current transformer etc..If several tasks need to give same shift when executing, for prevent from working
Time, place and safety measure are got wrong and cause the accident, and can only first arrange one of task, issue work responsible person one and open
Work ticket.After work ticket is withdrawn in task completion, then arranges second task and issue second work ticket.Operator on duty wants
After being connected to work ticket, the safety measure proposed on censorship ticket whether complete.It was found that when wrong or query, it should be to label
People is sent out to propose.Responsible person construct after receiving task, task and safety measure that relevant personnel research institute should be organized to propose
And necessary preparation is performed before going into operation according to mission requirements.
From the foregoing it can be that work ticket is the important list in power production process, a large amount of useful electric power are contained
Creation data.But work ticket is only preserved as the record of the course of work at present, not yet to the data of work ticket and its accumulate
The huge data value contained is excavated.
The present embodiment is therefrom excavated the electric power data of various aspects, is obtained by the analysis to multiple work about electric power tickets
Comprehensive and accurate power information.Electric power data is obtained from preset work ticket database, can directly and accurately get target
Data can targetedly obtain different power informations simultaneously for different triggering commands, can effectively improve electric power letter
The determination efficiency of breath.
In one embodiment, described according to the triggering command and the incidence relation, from preset work ticket data
Before the step of obtaining the electric power data of corresponding element in library, further include:Respectively each member is obtained from multiple work about electric power tickets
The corresponding electric power data of element, according to preset algorithm to invalid data, duplicate data and/or the error number in the electric power data
According to being handled;Work ticket database is established according to the element and the treated electric power data.
Optionally, after obtaining electric power data in numerous work about electric power tickets, therefrom removal may influence electric power data
Invalid data and duplicate data, and correct wrong data therein.So that in work ticket database, each electric power data has
Corresponding element, each element also have corresponding electric power data.Therefore, inquired element energy later is positioned
Determine corresponding electric power data.
Optionally, the present embodiment further includes obtaining the element of multiple work about electric power tickets and the corresponding electricity of each element again
Force data, the step of being updated to work ticket database according to these elements and electric power data.
The present embodiment is accomplished that the process for establishing work ticket database.According to treated electric power data and each
Corresponding element establishes work ticket database.Later, when needing to obtain electric power data, understanding its corresponding element can be direct
Required electric power data is inquired from work ticket database, and there is higher efficiency.
In one embodiment, described according to the triggering command and the incidence relation, from preset work ticket data
The step of electric power data of corresponding element is obtained in library, including:According to the triggering command and the incidence relation determine with it is right
The associated element of dimension is answered, the electric power data of the associated element is obtained from preset work ticket data.
Optionally, the detailed process of the present embodiment realization can be:Determine that triggering command institute is right according to triggering command first
The dimension answered;Mapping table is inquired, element corresponding with the dimension is determined according to the incidence relation in mapping table;According to these elements
Corresponding electric power data is obtained from work ticket database.Such data acquisition facilitates direct.
The present embodiment determines required electric power data according to predetermined incidence relation and work ticket database, number
It is convenient and efficient according to acquisition process.
In one embodiment, the triggering command received for certain dimension;According to the triggering command and described
Incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, including:It receives and is directed to equipment
Affiliated management unit, work about electric power ticket attribute, working time, workload, part of appliance, personnel depaly information, other unit
The triggering command of the dimension of fitness or switching manipulation information;According to the triggering command and the incidence relation, from preset
Corresponding power transformation station name, work ticket number, work responsible person, staff, task, behaviour are obtained in work ticket database
Make the electric power number of the element of equipment, job site, initial time, end time, process of work and/or equipment running status
According to.
In the present embodiment, when preset dimension specifically includes the affiliated management unit of equipment, work about electric power ticket attribute, work
Between, the dimensions such as workload, part of appliance, personnel depaly information, the fitness of other unit, switching manipulation information.
Optionally, the affiliated management unit of equipment can refer to according to substation management institute, patrol the units such as fibrillar center, substation.
Work about electric power ticket attribute refers to the first work ticket and Second Working Ticket.Pass through the use of both work tickets
Whether situation needs to power off during can determining electric operating, and then can be given birth to from danger and to resident to task
The angle of influence living is analyzed.
Working time refers to completing the time (minute, hour, number of days etc.) needed for a job.Specifically, according to work
Power information is determined over the day:Statistics participates in the real work number of days of the not commensurate of a certain work, or according to different number of days
Count the access times of work about electric power ticket.
Part of appliance refers to the parts etc. of power equipment.It overhauls, replace when in task including execution task
The information such as the parts changed can determine whether the corresponding component of corresponding power equipment often goes wrong by these information.
In addition it can determine the need for replacing component for the importance of the power equipment from the component or whether need to purchase
New power equipment.Furthermore, it is possible to obtain the information such as the manufacturer of each equipment, model, and then which producer can be analyzed
Which component be frequently necessary to overhaul;For a certain producer, it may be determined that the equipment of which model of the producer was one section of past
Time inner part part record of examination is more.
Workload refers to completing the information such as staff and the working time needed for a certain task.By to work
The analysis that work is measured can determine that commensurate is not directed to the required manpower of different operating and time, and then can instruct personnel depaly
With the arrangement of working time.
The fitness of other unit refers to that a certain unit completes the cooperation whether a certain task needs other unit.
Not commensurate can be obtained by the electric power data of this dimension and is directed to the quantity that different operating needs development cooperating, in turn
It can instruct the allotment etc. of personnel.
The dimension can also include safety measure, and defined safety measure and peace are used when by executing task
The implementation effect of full measure, it may be determined that the safe implementation capacity of each work about electric power unit.
In the present embodiment, the element that work about electric power ticket includes specifically is power transformation station name, work ticket number, works and be responsible for
People, staff, task, operation equipment, job site, initial time, end time, process of work, equipment fortune
The elements such as row state.
Optionally, after obtaining multiple work about electric power tickets, can according to work about electric power ticket content to work about electric power ticket into
Row statistics and comparison.Such as come the quantity of statistical work ticket, obtained power information such as Fig. 3 institutes from grass-roots unit and operation profession
Show, Fig. 3 is work about electric power ticket information visuallization schematic diagram.
The present embodiment determines the dimension corresponding to triggering command according to triggering command first, according to predetermined association
Relationship determines element corresponding with the dimension, and then corresponding electric power data is obtained from work ticket database.Pass through multiple dimensions
Degree and multiple members usually determine electric power data and carry out targetedly data analysis for each dimension, accurately can comprehensively obtain
The power information for taking each dimension improves the production efficiency and the efficiency of management of work about electric power.
In one embodiment, the triggering command received for certain dimension, according to the triggering command and described
Incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, institute is obtained
The step of stating power information corresponding with the dimension in multiple work about electric power tickets, including:It receives and is touched for the first of workload
Send instructions;According to the first triggering command and the incidence relation, obtained from preset work ticket database staff,
Task, initial time and the electric power data of end time, obtain the first electric power data;First electric power data is carried out
Analysis obtains the workload needed for corresponding task.
The present embodiment is when receiving the triggering command for workload, according to the determination of predetermined incidence relation and work
The corresponding element of work amount, as:Staff, task, initial time and end time;It is obtained from work ticket database
The electric power data of corresponding element is taken, and these electric power datas are analyzed, finds out rule therein, determines and completes a certain work
The workload of required by task (working time, * staff just can be obtained workload).Realization process is simple and convenient, succinct intuitive
Ground determines the workload needed for different operating.
In one embodiment, the triggering command received for certain dimension, according to the triggering command and described
Incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, institute is obtained
The step of stating power information corresponding with the dimension in multiple work about electric power tickets, including:It receives for personnel depaly information
Second triggering command;According to second triggering command and the incidence relation, obtains and become from preset work ticket database
Power station title, staff and process of work electric power data, obtain the second electric power data;To second electric power data
It is analyzed, obtains the personnel depaly information of corresponding substation.
The present embodiment is true according to predetermined incidence relation when receiving the triggering command for personnel depaly information
Fixed element corresponding with personnel depaly information, as:Power transformation station name, staff and process of work;From work ticket
The electric power data of corresponding element is obtained in database, and these electric power datas are analyzed, and is found out rule therein, has been determined
At the personnel depaly information of corresponding substation.By determining the personnel depaly information of different substation, which power transformation can determine that
Which the undermanned transformer station personnel redundancy stood, and then the allotment to personnel may be implemented, improve the efficiency of work about electric power.
In one embodiment, the triggering command received for certain dimension, according to the triggering command and described
Incidence relation obtains the electric power data of corresponding element from preset work ticket database;According to the electric power data, institute is obtained
The step of stating power information corresponding with the dimension in multiple work about electric power tickets, including:It receives for switching manipulation information
Third triggering command obtains work according to the third triggering command and the incidence relation from preset work ticket database
The electric power data made task, operate equipment and equipment running status, obtains third electric power data;To the third electric power data into
Row analysis obtains the switching manipulation information of corresponding equipment.
The present embodiment is true according to predetermined incidence relation when receiving the triggering command for switching manipulation information
Fixed element corresponding with switching manipulation information, as:Task, operation equipment and equipment running status;From work poll
According to the electric power data of acquisition corresponding element in library, and these electric power datas are analyzed, find out rule therein, determined and complete
The switching manipulation information of corresponding equipment.Realization process is simple and convenient, succinctly intuitively determines the switching manipulation letter of distinct device
Breath.For switch that is long-term motionless and often acting, state may be all bad.So the switching manipulation data for passing through work ticket
Can from management data angle come discovering device there are the problem of.
In one embodiment, described according to the electric power data, obtain in the multiple work about electric power ticket with the dimension
The step of spending corresponding power information, including:The numerical values recited of the electric power data, data amount check and/or frequency are divided
Analysis, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
Optionally, the detailed process of the present embodiment realization can be:Electric power number corresponding for staff this element
According to counting each staff, determine the number and frequency of each person works, and calculate and complete needed for a certain task
Staff.
Optionally, the detailed process of the present embodiment realization can also be:For the electric power number of initial time and end time
According to, both determining difference, and then obtain completing the time needed for a certain work.Furthermore it is possible to initial time at the end of
Between counted, determine the beginning and ending time needed for corresponding task.
The present embodiment is handled electric power data according to the concrete form of electric power data, obtains corresponding power information.
Data handling procedure is simple, can effectively improve the efficiency of power information determination.
In one embodiment, described according to the electric power data, obtain in the multiple work about electric power ticket with the dimension
After the step of spending corresponding power information, further include:According to the power information, estimate within following a period of time with it is described
The corresponding power information of dimension.
Optionally, the rule that power information is presented within the past period can be summarized according to obtained power information,
Determine the period of the power information.Therefore, the power information in following a period of time can be predicted according to the period.
Optionally, work about electric power ticket can also be predicted, automatically generates the work ticket in following a period of time.
The present embodiment estimates following power information by the power information of gained, reduces and is manually carried out to data
The process of analysis is handled, while work ticket can be automatically generated, guidance is provided to following work about electric power, effectively improves electric power work
The efficiency of work.
In one embodiment, as shown in figure 4, providing a kind of power information based on work ticket determines method, including with
Lower step:
S401, multiple elements that multiple work about electric power tickets include are determined.
S402, incidence relation between the multiple element and preset multiple dimensions is determined.
S403, the corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm
Invalid data, duplicate data and wrong data in the electric power data is handled.
S404, work ticket database is established according to the element and the treated electric power data.
S405, the triggering command for being directed to certain dimension is received;According to the triggering command and the incidence relation, from described
The electric power data of corresponding element is obtained in work ticket database.
S406, according to the electric power data, obtain corresponding with dimension electric power letter in the multiple work about electric power ticket
Breath.
The present embodiment is therefrom excavated the electric power data of various aspects, is obtained by the analysis to multiple work about electric power tickets
Comprehensive and accurate power information.Electric power data is obtained from preset work ticket database, can directly and accurately get target
Data can targetedly obtain different power informations simultaneously for different triggering commands, can effectively improve electric power letter
The determination efficiency of breath.
The above method in order to better understand, one detailed below the present invention is based on the determinations of the power information of work ticket
The application example of method.
Acquire the work about electric power ticket information of grid company decades.These electric power data disks are the grid company records of production
Initial data, data volume is more and the data precision is high.
1) multiple elements that multiple work about electric power tickets include are determined;Determine the multiple element and preset multiple dimensions
Incidence relation between degree.
2) triggering command for this dimension of workload is received;According to the triggering command and the incidence relation, from
The electric power of corresponding element (staff, task, initial time and end time) is obtained in preset work ticket database
Data.
3) working time completed needed for the task is determined according to initial time and end time, when calculating the work
Between product with staff, you can obtain completing the workload needed for the task.
4) determine that other substations complete the workload needed for same task, by the workload needed for different substation
It is compared, can therefrom determine the higher or lower substation of working efficiency.
5) it obtains to show these power informations, the electric power of multiple dimensions by visual mode after electric power data
Information visuallization schematic diagram is as shown in Figure 5.
It should be noted that for each method embodiment above-mentioned, describes, be all expressed as a series of for simplicity
Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the described action sequence, because according to
According to the present invention, certain steps may be used other sequences or be carried out at the same time.
Determine that the identical thought of method, the present invention also carry based on the power information based on work ticket in above-described embodiment
For the power information determining device based on work ticket, which can be used for executing the above-mentioned power information determination side based on work ticket
Method.For convenience of description, in the structural schematic diagram of the power information determining device embodiment based on work ticket, illustrate only with
The relevant part of the embodiment of the present invention, it will be understood by those skilled in the art that the restriction of schematic structure not structure twin installation, it can
To include either combining certain components or different components arrangement than illustrating more or fewer components.
As described in Figure 6, include that element determining module 601, relationship determine mould based on the power information determining device of work ticket
Block 602, data acquisition module 603 and information determination module 604, detailed description are as follows:
Element determining module 601, the multiple elements for including for determining multiple work about electric power tickets.
Relationship determination module, for determining the incidence relation between the multiple element and preset multiple dimensions
602。
Data acquisition module 603, for receiving the triggering command for being directed to certain dimension, according to the triggering command and described
Incidence relation obtains the electric power data of corresponding element from preset work ticket database;Include in the work ticket database
There are the multiple element and a corresponding electric power data of each element, the corresponding electric power data of each element is according to the multiple electricity
Power work ticket obtains.
And information determination module 604, for according to the electric power data, obtain in the multiple work about electric power ticket with
The corresponding power information of the dimension.
The present embodiment determines the incidence relation between preset dimensional information and the element that work about electric power ticket includes, and is connecing
After receiving the triggering command for certain dimension, the electric power data of corresponding element is obtained from preset work ticket database, it is right
Electric power data obtained after analyzing the power information of corresponding dimension.It is important in power production process in work about electric power ticket
List contains a large amount of useful power generation data.Various aspects can be therefrom excavated by the analysis to work about electric power ticket
Electric power data, obtain comprehensive and accurate power information.
In one embodiment, the shown power information determining device based on work ticket further includes:Data processing module,
For obtaining the corresponding electric power data of each element from multiple work about electric power tickets respectively, according to preset algorithm to the electric power
Invalid data, duplicate data and/or wrong data in data are handled;Database module, for according to the member
The plain and described treated electric power data establishes work ticket database.
In one embodiment, the data acquisition module 603 is additionally operable to be associated with described according to the triggering command
System's determination and the associated element of corresponding dimension, obtain the electric power number of the associated element from preset work ticket data
According to.
In one embodiment, the data acquisition module 603, including:Command reception submodule is set for receiving to be directed to
Standby affiliated management unit, work about electric power ticket attribute, working time, workload, part of appliance, personnel depaly information, other unit
Fitness or switching manipulation information dimension triggering command;Data acquisition submodule, for according to the triggering command and
The incidence relation obtains corresponding power transformation station name from preset work ticket database, work ticket number, works and be responsible for
People, task, operates equipment, job site, initial time, end time, process of work and/or sets staff
The electric power data of the element of standby operating status.
In one embodiment, the power information determining device based on work ticket further includes:First data processing mould
Block, for receiving the first triggering command for workload;According to the first triggering command and the incidence relation, from default
Work ticket database in obtain staff, task, initial time and end time electric power data, obtain first electricity
Force data;First electric power data is analyzed, the workload needed for corresponding task is obtained.
In one embodiment, the power information determining device based on work ticket further includes:Second data processing mould
Block, for receiving the second triggering command for personnel depaly information;According to second triggering command and the incidence relation,
Obtained from preset work ticket database power transformation station name, staff and process of work electric power data, obtain the
Two electric power datas;Second electric power data is analyzed, the personnel depaly information of corresponding substation is obtained.
In one embodiment, the power information determining device based on work ticket further includes:Third data processing mould
Block, for receiving the third triggering command for being directed to switching manipulation information, according to the third triggering command and the incidence relation,
The electric power data for obtaining task from preset work ticket database, operating equipment and equipment running status, obtains third
Electric power data;The third electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, described information determining module 604 is additionally operable to the numerical values recited to the electric power data, number
It is analyzed according to number and/or frequency, obtains power information corresponding with the dimension in the multiple work about electric power ticket.
In one embodiment, the power information determining device based on work ticket further includes:Information estimates module,
For according to the power information, estimating the power information corresponding with the dimension within following a period of time.
It should be noted that the power information determining device based on work ticket of the present invention with the present invention based on work ticket
Power information determine method correspond, the above-mentioned power information based on work ticket determine method embodiment illustrate skill
Suitable for the embodiment of the power information determining device based on work ticket, particular content can join for art feature and advantage
See the narration in the method for the present invention embodiment, details are not described herein again, hereby give notice that.
In addition, in the embodiment of the power information determining device based on work ticket of above-mentioned example, each program module
Logical partitioning is merely illustrative of, can be as needed in practical application, such as the configuration requirement of corresponding hardware or soft
The convenient of the realization of part considers, above-mentioned function distribution is completed by different program modules, i.e., by the electricity based on work ticket
The internal structure of force information determining device is divided into different program modules, to complete all or part of work(described above
Energy.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor realize following steps when executing computer program:Determine multiple electricity
Multiple elements that power work ticket includes;Determine the incidence relation between the multiple element and preset multiple dimensions;It connects
The triggering command narrowed to certain dimension;According to the triggering command and the incidence relation, from preset work ticket database
The middle electric power data for obtaining corresponding element;Include that the multiple element and each element correspond in the work ticket database
Electric power data, the corresponding electric power data of each element obtains according to the multiple work about electric power ticket;According to the electric power data,
Obtain power information corresponding with the dimension in the multiple work about electric power ticket.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the triggering
Instruction and the incidence relation, before in preset work ticket database the step of the electric power data of acquisition corresponding element, also
Including:The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to the electricity
Invalid data, duplicate data and/or wrong data in force data are handled;According to the element and described treated
Electric power data establishes work ticket database.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the triggering
Instruction and the incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, including:Root
According to the triggering command and incidence relation determination and the associated element of corresponding dimension, obtained from preset work ticket data
Take the electric power data of the associated element.
In one embodiment, following steps are also realized when processor executes computer program:It is described to receive for a certain
The triggering command of dimension;According to the triggering command and the incidence relation, obtains and correspond to from preset work ticket database
The step of electric power data of element, including:It receives for the affiliated management unit of equipment, work about electric power ticket attribute, working time, work
It measures, the triggering command of the dimension of part of appliance, personnel depaly information, the fitness of other unit or switching manipulation information;Root
According to the triggering command and the incidence relation, corresponding power transformation station name, work are obtained from preset work ticket database
Ticket number, work responsible person, staff, task, operation equipment, job site, initial time, end time, work
The electric power data of the element of performance and/or equipment running status.
In one embodiment, following steps are also realized when processor executes computer program:It is described to receive for a certain
The triggering command of dimension is obtained from preset work ticket database and is corresponded to according to the triggering command and the incidence relation
The electric power data of element;According to the electric power data, electric power corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of information, including:Receive the first triggering command for workload;It is associated with described according to the first triggering command
System, from preset work ticket database obtain staff, task, initial time and end time electric power data,
Obtain the first electric power data;First electric power data is analyzed, the workload needed for corresponding task is obtained.
In one embodiment, following steps are also realized when processor executes computer program:It is described to receive for a certain
The triggering command of dimension is obtained from preset work ticket database and is corresponded to according to the triggering command and the incidence relation
The electric power data of element;According to the electric power data, electric power corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of information, including:Receive the second triggering command for personnel depaly information;According to second triggering command and described
Incidence relation, obtained from preset work ticket database power transformation station name, staff and process of work electric power number
According to obtaining the second electric power data;Second electric power data is analyzed, the personnel depaly information of corresponding substation is obtained.
In one embodiment, following steps are also realized when processor executes computer program:It is described to receive for a certain
The triggering command of dimension is obtained from preset work ticket database and is corresponded to according to the triggering command and the incidence relation
The electric power data of element;According to the electric power data, electric power corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of information, including:The third triggering command for switching manipulation information is received, according to the third triggering command and described
Incidence relation, the electric power data for obtaining task from preset work ticket database, operating equipment and equipment running status,
Obtain third electric power data;The third electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the electric power
Data, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:To the electric power number
According to numerical values recited, data amount check and/or frequency analyzed, obtain corresponding with the dimension in the multiple work about electric power ticket
Power information.
In one embodiment, following steps are also realized when processor executes computer program:It is described according to the electric power
Data further include after the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket:According to institute
Power information is stated, the power information corresponding with the dimension within following a period of time is estimated.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program realizes following steps when being executed by processor:Determine multiple elements that multiple work about electric power tickets include;It determines described more
Incidence relation between a element and preset multiple dimensions;Receive the triggering command for certain dimension;According to described
Triggering command and the incidence relation obtain the electric power data of corresponding element from preset work ticket database;The work
Include the multiple element and the corresponding electric power data of each element in ticket data library, the corresponding electric power data of each element
It is obtained according to the multiple work about electric power ticket;According to the electric power data, obtain in the multiple work about electric power ticket with the dimension
Spend corresponding power information.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described to be touched according to described
Send instructions and the incidence relation, before in preset work ticket database the step of the electric power data of acquisition corresponding element,
Further include:The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to described
Invalid data, duplicate data and/or wrong data in electric power data are handled;According to the element and the process processing
Electric power data establish work ticket database.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described to be touched according to described
The step of sending instructions and the incidence relation, the electric power data of corresponding element obtained from preset work ticket database, including:
According to the triggering command and incidence relation determination and the associated element of corresponding dimension, from preset work ticket data
Obtain the electric power data of the associated element.
In one embodiment, following steps are also realized when computer program is executed by processor:Described receive is directed to certain
The triggering command of dimension;According to the triggering command and the incidence relation, the acquisition pair from preset work ticket database
The step of answering the electric power data of element, including:Receive for the affiliated management unit of equipment, work about electric power ticket attribute, the working time,
The triggering command of workload, part of appliance, personnel depaly information, the dimension of the fitness of other unit or switching manipulation information;
According to the triggering command and the incidence relation, corresponding power transformation station name, work are obtained from preset work ticket database
Make ticket number, work responsible person, staff, task, operation equipment, job site, initial time, end time, work
Make the electric power data of the element of performance and/or equipment running status.
In one embodiment, following steps are also realized when computer program is executed by processor:Described receive is directed to certain
The triggering command of dimension, according to the triggering command and the incidence relation, the acquisition pair from preset work ticket database
Answer the electric power data of element;According to the electric power data, electricity corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of force information, including:Receive the first triggering command for workload;According to the first triggering command and the association
Relationship, from preset work ticket database obtain staff, task, initial time and end time electric power number
According to obtaining the first electric power data;First electric power data is analyzed, the workload needed for corresponding task is obtained.
In one embodiment, following steps are also realized when computer program is executed by processor:Described receive is directed to certain
The triggering command of dimension, according to the triggering command and the incidence relation, the acquisition pair from preset work ticket database
Answer the electric power data of element;According to the electric power data, electricity corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of force information, including:Receive the second triggering command for personnel depaly information;According to second triggering command and institute
State incidence relation, obtained from preset work ticket database power transformation station name, staff and process of work electric power
Data obtain the second electric power data;Second electric power data is analyzed, the personnel depaly letter of corresponding substation is obtained
Breath.
In one embodiment, following steps are also realized when computer program is executed by processor:Described receive is directed to certain
The triggering command of dimension, according to the triggering command and the incidence relation, the acquisition pair from preset work ticket database
Answer the electric power data of element;According to the electric power data, electricity corresponding with the dimension in the multiple work about electric power ticket is obtained
The step of force information, including:The third triggering command for switching manipulation information is received, according to the third triggering command and institute
Incidence relation is stated, the electric power number for obtaining task from preset work ticket database, operating equipment and equipment running status
According to obtaining third electric power data;The third electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described according to the electricity
Force data, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:To the electric power
Numerical values recited, data amount check and/or the frequency of data are analyzed, obtain in the multiple work about electric power ticket with the dimension pair
The power information answered.
In one embodiment, following steps are also realized when computer program is executed by processor:It is described according to the electricity
Force data further includes after the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket:According to
The power information estimates the power information corresponding with the dimension within following a period of time.
It will appreciated by the skilled person that realizing all or part of flow in above-described embodiment method, being can
It is completed with instructing relevant hardware by computer program, the program can be stored in a computer-readable storage and be situated between
In matter, sells or use as independent product.The more specific example (non-exhaustive list) of computer-readable medium includes
Below:Electrical connection section (electronic device) with one or more wiring, portable computer diskette box (magnetic device), arbitrary access
Memory (RAM), read-only memory (ROM), erasable edit read-only storage (EPROM or flash memory), optical fiber dress
It sets and portable optic disk read-only storage (CDROM).It can be printed on it in addition, computer-readable medium can even is that
The paper of described program or other suitable media, because can be for example by carrying out optical scanner to paper or other media, then
It is handled electronically to obtain described program, then by it into edlin, interpretation or when necessary with other suitable methods
Storage is in computer storage.
It should be appreciated that each section of the present invention can be realized with hardware, software, firmware or combination thereof.Above-mentioned
In embodiment, software that multiple steps or method can in memory and by suitable instruction execution system be executed with storage
Or firmware is realized.It, and in another embodiment, can be under well known in the art for example, if realized with hardware
Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal
Discrete logic, with suitable combinational logic gate circuit application-specific integrated circuit, programmable gate array (PGA), scene
Programmable gate array (FPGA) etc..
The term " comprising " and " having " of the embodiment of the present invention and their any deformations, it is intended that cover non-exclusive
Including.Such as contain series of steps or the process, method, system, product or equipment of (module) unit are not limited to
The step of listing or unit, but further include the steps that optionally not listing or unit, or further include optionally for these
The intrinsic other steps of process, method, product or equipment or unit.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, should not be understood as to the scope of the claims of the present invention
Limitation.It should be pointed out that for those of ordinary skill in the art, without departing from the inventive concept of the premise,
Various modifications and improvements can be made, these are all within the scope of protection of the present invention.Therefore, the protection domain of patent of the present invention
It should be determined by the appended claims.
Claims (10)
1. a kind of power information based on work ticket determines method, which is characterized in that include the following steps:
Determine multiple elements that multiple work about electric power tickets include;
Determine the incidence relation between the multiple element and preset multiple dimensions;
Receive the triggering command for certain dimension;According to the triggering command and the incidence relation, from preset work ticket
The electric power data of corresponding element is obtained in database;Include the multiple element and each member in the work ticket database
The corresponding electric power data of element, the corresponding electric power data of each element are obtained according to the multiple work about electric power ticket;
According to the electric power data, power information corresponding with the dimension in the multiple work about electric power ticket is obtained.
2. the power information according to claim 1 based on work ticket determines method, which is characterized in that described in the basis
Triggering command and the incidence relation, from preset work ticket database obtain corresponding element electric power data the step of it
Before, further include:
The corresponding electric power data of each element is obtained from multiple work about electric power tickets respectively, according to preset algorithm to the electric power
Invalid data, duplicate data and/or wrong data in data are handled;
Work ticket database is established according to the element and the treated electric power data.
3. the power information according to claim 1 based on work ticket determines method, which is characterized in that described in the basis
Triggering command and the incidence relation, from preset work ticket database the step of the electric power data of acquisition corresponding element, packet
It includes:
According to the triggering command and incidence relation determination and the associated element of corresponding dimension, from preset work poll
According to the middle electric power data for obtaining the associated element.
4. the power information according to claim 1 based on work ticket determines method, which is characterized in that the reception is directed to
The triggering command of certain dimension;According to the triggering command and the incidence relation, obtained from preset work ticket database
The step of electric power data of corresponding element, including:
It receives for the affiliated management unit of equipment, work about electric power ticket attribute, working time, workload, part of appliance, personnel depaly
The triggering command of the dimension of information, the fitness of other unit or switching manipulation information;
According to the triggering command and the incidence relation, corresponding power transformation station name is obtained from preset work ticket database
Claim, work ticket number, work responsible person, staff, task, operation equipment, job site, initial time, at the end of
Between, the electric power data of the element of process of work and/or equipment running status.
5. the power information according to claim 4 based on work ticket determines method, which is characterized in that the reception is directed to
The triggering command of certain dimension is obtained according to the triggering command and the incidence relation from preset work ticket database
The electric power data of corresponding element;According to the electric power data, obtain corresponding with the dimension in the multiple work about electric power ticket
The step of power information, including:
Receive the first triggering command for workload;According to the first triggering command and the incidence relation, from preset
In work ticket database obtain staff, task, initial time and end time electric power data, obtain the first electric power
Data;First electric power data is analyzed, the workload needed for corresponding task is obtained;
And/or
Receive the second triggering command for personnel depaly information;According to second triggering command and the incidence relation, from
Obtained in preset work ticket database power transformation station name, staff and process of work electric power data, obtain second
Electric power data;Second electric power data is analyzed, the personnel depaly information of corresponding substation is obtained;
And/or
The third triggering command for switching manipulation information is received, according to the third triggering command and the incidence relation, from
The electric power data for obtaining task in preset work ticket database, operating equipment and equipment running status obtains third electricity
Force data;The third electric power data is analyzed, the switching manipulation information of corresponding equipment is obtained.
6. the power information according to claim 1 based on work ticket determines method, which is characterized in that described in the basis
Electric power data, the step of obtaining power information corresponding with the dimension in the multiple work about electric power ticket, including:
The numerical values recited of the electric power data, data amount check and/or frequency are analyzed, the multiple work about electric power ticket is obtained
In power information corresponding with the dimension.
7. the power information according to any one of claims 1 to 6 based on work ticket determines method, which is characterized in that institute
The step of stating according to the electric power data, obtaining power information corresponding with the dimension in the multiple work about electric power ticket it
Afterwards, further include:
According to the power information, the power information corresponding with the dimension within following a period of time is estimated.
8. a kind of power information determining device based on work ticket, which is characterized in that including:
Element determining module, the multiple elements for including for determining multiple work about electric power tickets;
Relationship determination module, for determining the incidence relation between the multiple element and preset multiple dimensions;
Data acquisition module is associated with according to the triggering command with described for receiving the triggering command for certain dimension
System obtains the electric power data of corresponding element from preset work ticket database;Include described in the work ticket database
Multiple elements and the corresponding electric power data of each element, the corresponding electric power data of each element is according to the multiple work about electric power
Ticket obtains;
And information determination module, for according to the electric power data, obtain in the multiple work about electric power ticket with the dimension
Corresponding power information.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, which is characterized in that the processor is realized when executing the computer program described in any one of claim 1 to 7
Method the step of.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of claim 1 to 7 any one of them method is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810276749.7A CN108564261A (en) | 2018-03-30 | 2018-03-30 | Method, apparatus and computer equipment are determined based on the power information of work ticket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810276749.7A CN108564261A (en) | 2018-03-30 | 2018-03-30 | Method, apparatus and computer equipment are determined based on the power information of work ticket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108564261A true CN108564261A (en) | 2018-09-21 |
Family
ID=63533575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810276749.7A Pending CN108564261A (en) | 2018-03-30 | 2018-03-30 | Method, apparatus and computer equipment are determined based on the power information of work ticket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108564261A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111049263A (en) * | 2019-11-29 | 2020-04-21 | 广东电网有限责任公司 | Power dispatching anti-error checking device and system |
CN111768089A (en) * | 2020-06-19 | 2020-10-13 | 广东电网有限责任公司 | Work ticket auditing method, device, equipment and storage medium |
CN112382901A (en) * | 2020-11-02 | 2021-02-19 | 珠海优特电力科技股份有限公司 | Device quick grounding method, quick grounding control device and quick grounding device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101034349A (en) * | 2007-04-06 | 2007-09-12 | 西安万年科技实业有限公司 | Data base application system development platform based on functional design |
CN101763583A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Work sheet management module for EAM system of power plant |
-
2018
- 2018-03-30 CN CN201810276749.7A patent/CN108564261A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101034349A (en) * | 2007-04-06 | 2007-09-12 | 西安万年科技实业有限公司 | Data base application system development platform based on functional design |
CN101763583A (en) * | 2009-09-17 | 2010-06-30 | 宁波北电源兴电力工程有限公司 | Work sheet management module for EAM system of power plant |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111049263A (en) * | 2019-11-29 | 2020-04-21 | 广东电网有限责任公司 | Power dispatching anti-error checking device and system |
CN111049263B (en) * | 2019-11-29 | 2022-02-15 | 广东电网有限责任公司 | Power dispatching anti-error checking device and system |
CN111768089A (en) * | 2020-06-19 | 2020-10-13 | 广东电网有限责任公司 | Work ticket auditing method, device, equipment and storage medium |
CN111768089B (en) * | 2020-06-19 | 2024-05-07 | 广东电网有限责任公司 | Work ticket auditing method, device, equipment and storage medium |
CN112382901A (en) * | 2020-11-02 | 2021-02-19 | 珠海优特电力科技股份有限公司 | Device quick grounding method, quick grounding control device and quick grounding device |
CN112382901B (en) * | 2020-11-02 | 2023-03-10 | 珠海优特电力科技股份有限公司 | Device quick grounding method, quick grounding control device and quick grounding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108573342A (en) | State evaluating method, device, computer equipment and the storage medium of power equipment | |
Pradeep et al. | CIM-based connectivity model for bus-branch topology extraction and exchange | |
US8738351B2 (en) | Historic storage of dual layer power grid connectivity model | |
WO2015176451A1 (en) | Topologic display method and device | |
CN108564261A (en) | Method, apparatus and computer equipment are determined based on the power information of work ticket | |
CN107317394A (en) | Dispatching anti-misoperation method, device and system | |
CN108090165A (en) | A kind of acquisition methods of the collection of illustrative plates variation based on embedded chart database | |
CN110489407A (en) | Data filling mining method, apparatus, computer equipment and storage medium | |
CN113283096B (en) | Method for acquiring distribution network line account data and analyzing abnormal data and related device | |
CN105119282A (en) | On-line calculation system and method for theoretical line loss of power grid | |
CN112288303A (en) | Method and device for determining line loss rate | |
CN109064104A (en) | Material equipment management method, system and terminal device | |
CN109817319A (en) | Equipment operation state statistical analysis system platform and equipment operation state method for real-time monitoring and system | |
CN105264446B (en) | For the instrument and method being connected with surveillance and monitoring and control arrangement | |
CN104599195B (en) | The electrical equipment information displaying method and system of Electric Power Marketing System | |
CN111884337A (en) | Method for carrying out configuration management on switching parameters of power distribution network | |
CN107577769A (en) | A kind of method for digging and system for measuring expert data | |
CN111597166B (en) | Power database model construction method, device, computer equipment and storage medium | |
CN101441454A (en) | Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method | |
CN112614017B (en) | Power failure information management system, power failure information management method, and storage medium | |
CN104881822A (en) | Evaluation method, device and system | |
CN114994401A (en) | Line loss abnormity detection method and device | |
CN114049082A (en) | Power grid technical improvement overhaul cost data structuring method | |
CN109508798A (en) | A kind of power equipment check method and system | |
Moore et al. | Integrating information systems in electric utilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180921 |