CN109655745A CN201910044787.4A CN201910044787A CN109655745A CN 109655745 A CN109655745 A CN 109655745A CN 201910044787 A CN201910044787 A CN 201910044787A CN 109655745 A CN109655745 A CN 109655745A
Authority
CN
China
Prior art keywords
count value
control module
test
circuit breaker
main circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910044787.4A
Other languages
Chinese (zh)
Inventor
黎莎
魏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LISAI TECHNOLOGY Co Ltd
Original Assignee
WUHAN LISAI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LISAI TECHNOLOGY Co Ltd filed Critical WUHAN LISAI TECHNOLOGY Co Ltd
Priority to CN201910044787.4A priority Critical patent/CN109655745A/en
Publication of CN109655745A publication Critical patent/CN109655745A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers

Abstract

The invention discloses the test devices and test method of a kind of main circuit breaker time parameter.The test device of main circuit breaker time parameter includes: test power supply, and discrete host and slave, wherein, host includes the first control module, the first system clock source, first power supply, first wireless communication module, first control module includes first timer, first sync cap, first test interface and power interface, slave includes the second control module, second system clock source, second power supply, second wireless communication module, second control module includes second timer, second sync cap and the second test interface, first sync cap is connected with the second sync cap by synchronizing cable.Technical solution provided in an embodiment of the present invention connects host and slave without using test cable, and then reduces the weight and volume of test equipment, improves the convenience and testing efficiency of test equipment test.

Description

A kind of test device and test method of main circuit breaker time parameter
Technical field
The present embodiments relate to the test device of parameter testing technology more particularly to a kind of main circuit breaker time parameter and Test method.
Background technique
Main circuit breaker is one of locomotive core high voltage component, is acted frequently during locomotive operation, the direct shadow of performance The traffic safety of train is rung, locomotive needs often to detect during operation the performance parameter of main circuit breaker.
Main circuit breaker includes control terminal and motion end, and control terminal is installed on intra-locomotive, and motion end is installed on vent external Roof on, operating personnel can intra-locomotive easily pass through operation control terminal realize motion end state change.It is existing In the test process of technology, control terminal and motion end need to be connected using test cable, since test cable need to bypass compartment, Length is larger, causes the overall weight of test equipment larger, and volume is larger, and cable length is long, and needs to connect on the spot, so that surveying The test convenience for trying equipment is poor, and testing efficiency is lower.
Summary of the invention
The present invention provides the test device and test method of a kind of main circuit breaker time parameter, to reduce the weight of test equipment Amount and volume, improve the test convenience and testing efficiency of test equipment.
In a first aspect, the embodiment of the invention provides a kind of test devices of main circuit breaker time parameter, comprising:
Test power supply and discrete host and slave;
Wherein, the host includes the first control module, the first system clock source, the first power supply, the first channel radio Module is interrogated, first control module and the first system clock source, first power supply and described first are wirelessly Communication module connection, first power supply and the first system clock source and first wireless communication module connect It connects;First control module includes first timer, the first sync cap, the first test interface and power interface;The electricity Source interface is connect by high-voltage power-line with the test power supply, and first test interface is used for through conducting wire and is tested main disconnected The control terminal of road device connects;
The slave includes the second control module, second system clock source, the second power supply, the second wireless telecommunications mould Block, second control module and the second system clock source, second power supply and second wireless telecommunications Module connection, second power supply are connect with the second system clock source and second wireless communication module;Institute Stating the second control module includes second timer, the second sync cap and the second test interface;Second test interface is used for It is connect by conducting wire with the motion end of tested main circuit breaker;
In the synchronous phase of the first timer and the second timer, first sync cap and described second Sync cap is connected by synchronizing cable.
Second aspect, the embodiment of the invention also provides a kind of test method of main circuit breaker time parameter, use is above-mentioned The test device of main circuit breaker time parameter described in first aspect carries out, comprising:
The first timer and the second timer start simultaneously;
It is logical to the power supply of the control terminal of the tested main circuit breaker that first control module successively controls the test power supply Road switch closing and switch opening is respectively adopted the first timer and is counted, and record in the supply access switch closing and switch opening The first count value and the second count value obtained;
Second control module detects that the motion end of tested main circuit breaker generates the to close a floodgate to the supply access It when one response action, is counted using the second timer, and records the third count value of acquisition;The second control mould Block detects that the motion end of tested main circuit breaker is generated to the second response action of the supply access separating brake or is sequentially generated When third response action and four response actions, the second timer is respectively adopted and is counted, and records the 4th of acquisition the Count value or the 5th count value and the 6th count value;
Second control module passes through wireless communication mode for the third count value and the 4th counting or third Count value, the 5th count value and the 6th count value are transmitted to first control module;
First control module is according to the multiple count values and first count value that receive and the second count value Obtain the time parameter of the tested main circuit breaker.
Technical solution provided in an embodiment of the present invention, by the way that first timer and the first synchronous port are arranged in host, Second timer and the second synchronous port are set in slave, the first timing when so that test starting, in the first control module Second timer in device and the second control module can be opened simultaneously, and generate respectively in the control terminal of tested main circuit breaker The motion end of trigger action and tested main circuit breaker is counted when generating corresponding response action, in addition, being set in host The first wireless communication module and the second wireless communication module for being set in slave can establish the nothing between host and slave Line connection, the count value for the second timer that slave is stored are transferred to host, and then host can be according to the The count value of one timer and the count value of second timer obtain the time parameter of tested main circuit breaker.Relative to existing skill Art, the test device with above structure connects host and slave without using test cable, and then reduces test equipment Weight and volume improves the convenience and testing efficiency of test equipment test.
Detailed description of the invention
In order to more clearly illustrate the technical scheme of the exemplary embodiment of the present invention, below to required in description embodiment The attached drawing to be used does a simple introduction.Obviously, the attached drawing introduced is present invention a part of the embodiment to be described Attached drawing, rather than whole attached drawings without creative efforts, may be used also for those of ordinary skill in the art To obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of structural schematic diagram of the test device of main circuit breaker time parameter provided in an embodiment of the present invention;
Fig. 2 is a kind of flow diagram of the test method of main circuit breaker time parameter provided in an embodiment of the present invention.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention rather than limiting the invention.It also should be noted that in order to just In description, only some but not all contents related to the present invention are shown in the drawings.Exemplary reality is being discussed in greater detail It should be mentioned that some exemplary embodiments are described as the processing or method described as flow chart before applying example.Although Operations (or step) are described as the processing of sequence by flow chart, but many of these operations can be by concurrently, concurrently Ground is implemented simultaneously.In addition, the sequence of operations can be rearranged.The processing when its operations are completed can be by It terminates, it is also possible to have the additional step being not included in attached drawing.It is described processing can correspond to method, function, regulation, Subroutine, subprogram etc..
Fig. 1 is a kind of structural schematic diagram of the test device of main circuit breaker time parameter provided in an embodiment of the present invention.Such as Shown in Fig. 1, the test device of main circuit breaker time parameter includes testing power supply 300 and discrete host 100 and slave 200, Wherein, the host 100 includes the first control module 140, the first system clock source 110, the first power supply 120, the first nothing Line communication module 130, first control module 140 and the first system clock source 110, first power supply 120 And first wireless communication module 130 connects, first power supply 120 and the first system clock source 110 with And first wireless communication module 130 connects, first control module 140 is synchronized including first timer 141, first and is connect The 144, first test interface 142 of mouth and power interface 143, the power interface 143 pass through high-voltage power-line and test electricity Source 300 connects, and first test interface 142 is used to connect by conducting wire with the control terminal of tested main circuit breaker.The slave 200 include the second control module 240, second system clock source 210, the second power supply 220, the second wireless communication module 230, Second control module 240 and the second system clock source 210, second power supply 220 and second nothing Line communication module 230, second power supply 220 and the second system clock source 210 and second wireless telecommunications Module 230 connects, and second control module 240 includes that second timer 241, the second sync cap 245 and the second test connect Mouth 242, second test interface 242 are used to connect by conducting wire with the motion end of tested main circuit breaker.It is fixed described first When device 141 and the second timer 241 synchronous phase, first sync cap 144 and second sync cap 245 It is connected by synchronizing cable.
It should be noted that the first control module 140 while the control terminal with test power supply 300 and tested main circuit breaker Connection can control opening and closing of the test power supply 300 to the control terminal supply access of tested main circuit breaker.It is noticeable It is that when above-mentioned supply access is opened, test power supply 300 powers to the control terminal of tested main circuit breaker, generates tested main circuit breaker The corresponding trigger action of control terminal, specially closing operation;When above-mentioned supply access is closed, test power supply 300 stops to quilt The control terminal power supply for surveying main circuit breaker, generates the corresponding trigger action of control terminal of tested main circuit breaker, specially opens a sluice gate to operate.
It should also be noted that, the first sync cap 144 forms timer synchronization letter after connecting with the second sync cap 245 Number transmission channel, and then realize that first timer 141 is synchronous with second timer 241, the transmission channel is only same in timer It uses during step, therefore, can be disconnected after simultaneously operating, so that the first sync cap of connection 144 and second is same The line of step interface 245 will not influence the placement of host 100 and slave 200.
In addition, the setting of the first wireless communication module 130 and the second wireless communication module 230 is so that host 100 and slave 200 can establish wireless connection, without using entity line carry out test information transmission so that 200 phase of main body and slave To independence, it both can be conveniently placed in corresponding position, without influencing each other.
In the present embodiment, the timer in host 100 and slave 200 is both contained in control module, so that the volume of being not necessarily to Outer setting timer reduces host 100 and number of components that slave 200 includes, is conducive to subtracting for integrated testability device volume It is small.
Technical solution provided in this embodiment, by the way that the end synchronous with first of first timer 141 is arranged in host 100 Mouthful, second timer 241 and the second synchronous port are set in slave 200, when so that test starting, the first control module 140 In first timer 141 and the second control module 240 in second timer 241 can be opened simultaneously, and respectively in quilt The motion end of the control terminal generation trigger action and tested main circuit breaker of surveying main circuit breaker carries out when generating corresponding response action It counts, in addition, be set in host 100 first wireless communication module 130 and the second wireless telecommunications for being set in slave 200 Module 230 can establish the wireless connection between host 100 and slave 200, enable slave 200 stored second to determine When device 241 count value be transferred to host 100, and then host 100 can be fixed according to the count value of first timer 141 and second When device 241 count value obtain the time parameter of tested main circuit breaker.Compared with the existing technology, the test with above structure fills It sets and connects host 100 and slave 200 without using test cable, and then reduce the weight and volume of test equipment, improve The convenience and testing efficiency of test equipment test.
Illustratively, the first system clock source 110 and the second system clock source 210 can be constant temperature crystalline substance Vibration.
It should be noted that the first system clock source 110 and second system clock source 210 are using identical for convenient for counting The constant-temperature crystal oscillator of parameter.It will not occur more significantly to change since constant-temperature crystal oscillator stability is good, in test process, and then be promoted The accuracy of test structure.
Optionally, the test power supply 300 can be dc-battery module, output voltage 110V.It is understood that In the other embodiments of the present embodiment, the type and output of test power supply 300 can also be reasonably selected according to actual needs Voltage.
Optionally, the working frequency phase of first wireless communication module 130 and second wireless communication module 230 It together, can be 315M or 433M.
It should be noted that the wireless connection that working frequency is established between 315M or the wireless communication module of 433M is by gold The influence for belonging to roof is smaller, and data transmission bauds is very fast, is conducive to accelerate test speed.
Fig. 2 is a kind of flow diagram of the test method of main circuit breaker time parameter provided in an embodiment of the present invention.It should Test method is carried out using the test device of main circuit breaker time parameter described in any embodiment of that present invention, as shown in Fig. 2, main The test method of breaker time parameter specifically includes as follows:
Step 1, the first timer and the second timer start simultaneously.
It illustratively, can also include: described the before the first timer and the second timer start simultaneously One control module sends synchronization signal to second control module.
Step 2, first control module successively control the test control terminal of the power supply to the tested main circuit breaker Supply access switch closing and switch opening is respectively adopted the first timer and is counted in the supply access switch closing and switch opening, And record the first count value and the second count value of acquisition.
Step 3, second control module detect that the motion end of tested main circuit breaker is generated and close to the supply access It when the first response action of lock, is counted using the second timer, and records the third count value of acquisition, described second Control module detects that the motion end of tested main circuit breaker is generated to the second response action of the supply access separating brake or successively When the third response action of generation and four response actions, the second timer is respectively adopted and is counted, and records acquisition The 4th count value or the 5th count value and the 6th count value.
It should be noted that main circuit breaker includes line vacuum circuit breaker and line air blast circuit breaker according to structure difference, wherein The time parameter of line vacuum circuit breaker includes closing time and opening time, and the time parameter of line air blast circuit breaker includes when closing a floodgate Between, opening time and delay time.
Specifically, on-off of the line vacuum circuit breaker using a main contact control high voltage supply, therefore switch closing and switch opening is equal The movement of a corresponding main contacts.And line air blast circuit breaker is using the logical of main contact and disconnecting switch co- controlling high voltage power supply Disconnected, under original state, main contact closure, disconnecting switch is disconnected, so that the non-off-state of overall performance, when combined floodgate is tested, main touching Head state is constant, disconnecting switch closure, therefore when the disconnecting switch closing moment of the motion end of main circuit breaker and control terminal combined floodgate The difference carved is the closing time of main circuit breaker.And during the opening process, main contact and disconnecting switch can be opened successively, main open circuit The difference that the main contact of the motion end of device opens moment and control terminal separating brake moment is opening time, the motion end of main circuit breaker every Leaving and closing the difference for opening moment and control terminal separating brake moment is delay time.
In conclusion different according to the type of main circuit breaker, in separating brake test, the count value number of second timer is not Together, in line vacuum circuit breaker, the count value number of second timer is 1, in line air blast circuit breaker, the counting of second timer Being worth number is 2.
Step 4, second control module are counted the third count value and the described 4th by wireless communication mode, Or third count value, the 5th count value and the 6th count value are transmitted to first control module.
Optionally, second control module is counted the third count value and the described 4th by wireless communication mode Several or third count value, the 5th count value and the 6th count value may be used also before being transmitted to first control module To include: to establish the host and the slave by first wireless communication module and second wireless communication module It is wirelessly connected.
It should be noted that when the time for establishing above-mentioned wireless connection can be to test beginning, or the second control Before module data to be transmitted, can rationally it be arranged according to the actual situation, the present embodiment is not specifically limited in this embodiment.
Step 5, first control module are according to the multiple count values and first count value and second received Count value obtains the time parameter of the tested main circuit breaker.
Illustratively, multiple count values that first control module receives are the third count value and the described 4th When count value, the time parameter includes closing time and opening time.Multiple countings that first control module receives Value is the third count value, the 5th count value and when six count value, the time parameter include closing time, Opening time and delay time.
Correspondingly, multiple count values that first control module receives are the third count value and the 4th meter When numerical value, first control module is obtained according to the multiple count values and first count value that receive and the second count value The tested main circuit breaker time parameter may include: using the difference of the third count value and first count value as The closing time, using the difference of the 4th count value and second count value as the opening time.
Alternatively, multiple count values that first control module receives are the third count value, the 5th counting Value and when six count value, first control module according to the multiple count values and first count value received with And second count value to obtain the time parameter of the tested main circuit breaker may include: by the third count value and described first The difference of count value is as the closing time, using the difference of the 5th count value and second count value as when the separating brake Between, using the difference of the 6th count value and the 5th count value as the delay time.
Technical solution provided in this embodiment, by the way that first timer and the first synchronous port are arranged in host, in pair Setting second timer and the second synchronous port in machine, when so that test starting, first timer in the first control module and Second timer in second control module can be opened simultaneously, and generate triggering in the control terminal of tested main circuit breaker respectively The motion end of movement and tested main circuit breaker is counted when generating corresponding response action, in addition, being set to the in host One wireless communication module and the second wireless communication module being set in slave can establish wirelessly connecting between host and slave It connects, the count value for the second timer that slave is stored is transferred to host, and then host can be fixed according to first When device count value and the count value of second timer obtain the time parameter of tested main circuit breaker.Compared with the existing technology, have There is the test device of above structure to connect host and slave without using test cable, so reduce test equipment weight and Volume improves the convenience and testing efficiency of test equipment test.
Note that the above is only a better embodiment of the present invention and the applied technical principle.It will be appreciated by those skilled in the art that The invention is not limited to the specific embodiments described herein, be able to carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out by above embodiments to the present invention It is described in further detail, but the present invention is not limited to the above embodiments only, without departing from the inventive concept, also It may include more other equivalent embodiments, and the scope of the invention is determined by the scope of the appended claims.

Claims (10)

1. a kind of test device of main circuit breaker time parameter characterized by comprising
Test power supply and discrete host and slave;
Wherein, the host includes the first control module, the first system clock source, the first power supply, the first wireless telecommunications mould Block, first control module and the first system clock source, first power supply and first wireless telecommunications Module connection, first power supply are connect with the first system clock source and first wireless communication module;Institute Stating the first control module includes first timer, the first sync cap, the first test interface and power interface;The power interface It is connect by high-voltage power-line with the test power supply, first test interface is used for through conducting wire and tested main circuit breaker Control terminal connection;
The slave includes the second control module, second system clock source, the second power supply, the second wireless communication module, institute It states the second control module and the second system clock source, second power supply and second wireless communication module connects It connects, second power supply is connect with the second system clock source and second wireless communication module;Described second Control module includes second timer, the second sync cap and the second test interface;Second test interface is used for by leading Line is connect with the motion end of tested main circuit breaker;
In the synchronous phase of the first timer and the second timer, first sync cap is synchronous with described second Interface is connected by synchronizing cable.
2. test device according to claim 1, which is characterized in that the first system clock source and the second system Clock source is constant-temperature crystal oscillator.
3. test device according to claim 1, which is characterized in that the test power supply is dc-battery module, output Voltage is 110V.
4. test device according to claim 1, which is characterized in that first wireless communication module and second nothing The working frequency of line communication module is identical, is 315M or 433M.
5. a kind of test method of main circuit breaker time parameter, using the described in any item main circuit breakers of the claims 1-4 The test device of time parameter carries out characterized by comprising
The first timer and the second timer start simultaneously;
First control module successively controls the test power supply and closes to the control terminal supply access of the tested main circuit breaker Lock and separating brake are respectively adopted the first timer and are counted, and record acquisition in the supply access switch closing and switch opening The first count value and the second count value;
Second control module detects that the motion end of tested main circuit breaker generates the first sound to close a floodgate to the supply access It when should act, is counted using the second timer, and records the third count value of acquisition;The second control module inspection Measure the third that the motion end of tested main circuit breaker generates the second response action to the supply access separating brake or is sequentially generated When response action and four response actions, the second timer is respectively adopted and is counted, and records the 4th of acquisition and count Value or the 5th count value and the 6th count value;
Second control module is counted the third count value and the described 4th by wireless communication mode or third counts Value, the 5th count value and the 6th count value are transmitted to first control module;
First control module is obtained according to the multiple count values and first count value that receive and the second count value The time parameter of the tested main circuit breaker.
6. test method according to claim 5, which is characterized in that multiple countings that first control module receives When value is the third count value and four count value, the time parameter includes closing time and opening time;
Multiple count values that first control module receives are the third count value, the 5th count value and described the When six count values, the time parameter includes closing time, opening time and delay time.
7. test method according to claim 6, which is characterized in that multiple countings that first control module receives When value is the third count value and four count value, first control module according to multiple count values for receiving with The time parameter that first count value and the second count value obtain the tested main circuit breaker includes:
Using the difference of the third count value and first count value as the closing time;
Using the difference of the 4th count value and second count value as the opening time.
8. test method according to claim 6, which is characterized in that multiple countings that first control module receives When value is the third count value, the 5th count value and six count value, first control module is according to reception To multiple count values and first count value and the second count value obtain the time parameter packet of the tested main circuit breaker It includes:
Using the difference of the third count value and first count value as the closing time;
Using the difference of the 5th count value and second count value as the opening time;
Using the difference of the 6th count value and the 5th count value as the delay time.
9. test method according to claim 5, which is characterized in that the first timer and the second timer are same Before Shi Qidong, further includes:
First control module sends synchronization signal to second control module.
10. test method according to claim 5, which is characterized in that second control module passes through wireless telecommunications side Formula by the third count value and it is described 4th count or third count value, the 5th count value and the 6th count value It is transmitted to before first control module, further includes:
The nothing of the host and the slave is established by first wireless communication module and second wireless communication module Line connection.
CN201910044787.4A 2019-01-17 2019-01-17 A kind of test device and test method of main circuit breaker time parameter Pending CN109655745A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910044787.4A CN109655745A (en) 2019-01-17 2019-01-17 A kind of test device and test method of main circuit breaker time parameter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910044787.4A CN109655745A (en) 2019-01-17 2019-01-17 A kind of test device and test method of main circuit breaker time parameter

Publications (1)

Publication Number Publication Date
CN109655745A true CN109655745A (en) 2019-04-19

Family

ID=66119881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910044787.4A Pending CN109655745A (en) 2019-01-17 2019-01-17 A kind of test device and test method of main circuit breaker time parameter

Country Status (1)

Country Link
CN (1) CN109655745A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112768320A (en) * 2020-12-27 2021-05-07 常熟开关制造有限公司(原常熟开关厂) Circuit breaker setting parameter rapid transplanting method, mobile terminal and circuit breaker controller

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202512211U (en) * 2012-04-06 2012-10-31 宁夏电力公司银川供电局 Timer for trip outlet time of relay protection device
CN105182229A (en) * 2015-09-22 2015-12-23 郑贵林 Electric power switch action time dynamic measurement method and application, and electric power switch AC zero crossing point accurate control method and application
CN105676118A (en) * 2016-01-08 2016-06-15 镇江华东电力设备制造厂有限公司 Measuring system and measuring method for measuring actuation time of high-voltage circuit breaker of non-load transformer loop
CN205374686U (en) * 2016-01-08 2016-07-06 镇江华东电力设备制造厂有限公司 Unloaded transformer return circuit high voltage circuit breaker operate time measurement system
CN106249140A (en) * 2016-09-29 2016-12-21 北京慧智神光科技有限公司 A kind of method and device for detecting breaker actuation time and speed of action
CN106291024A (en) * 2016-08-02 2017-01-04 广西云涌科技有限公司 A kind of chopper test ammeter box of function when possessing survey
CN206848434U (en) * 2017-05-31 2018-01-05 河南省高压电器研究所 A kind of device for measuring the high-voltage circuit-breaker switching on-off time
CN108037450A (en) * 2018-01-03 2018-05-15 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker automatic detection device and detection method
CN207742309U (en) * 2018-01-03 2018-08-17 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker automatic detection device
CN207832967U (en) * 2017-12-22 2018-09-07 海南电网有限责任公司 It is a kind of portable to take control breaker performance test case

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202512211U (en) * 2012-04-06 2012-10-31 宁夏电力公司银川供电局 Timer for trip outlet time of relay protection device
CN105182229A (en) * 2015-09-22 2015-12-23 郑贵林 Electric power switch action time dynamic measurement method and application, and electric power switch AC zero crossing point accurate control method and application
CN105676118A (en) * 2016-01-08 2016-06-15 镇江华东电力设备制造厂有限公司 Measuring system and measuring method for measuring actuation time of high-voltage circuit breaker of non-load transformer loop
CN205374686U (en) * 2016-01-08 2016-07-06 镇江华东电力设备制造厂有限公司 Unloaded transformer return circuit high voltage circuit breaker operate time measurement system
CN106291024A (en) * 2016-08-02 2017-01-04 广西云涌科技有限公司 A kind of chopper test ammeter box of function when possessing survey
CN106249140A (en) * 2016-09-29 2016-12-21 北京慧智神光科技有限公司 A kind of method and device for detecting breaker actuation time and speed of action
CN206848434U (en) * 2017-05-31 2018-01-05 河南省高压电器研究所 A kind of device for measuring the high-voltage circuit-breaker switching on-off time
CN207832967U (en) * 2017-12-22 2018-09-07 海南电网有限责任公司 It is a kind of portable to take control breaker performance test case
CN108037450A (en) * 2018-01-03 2018-05-15 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker automatic detection device and detection method
CN207742309U (en) * 2018-01-03 2018-08-17 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker automatic detection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112768320A (en) * 2020-12-27 2021-05-07 常熟开关制造有限公司(原常熟开关厂) Circuit breaker setting parameter rapid transplanting method, mobile terminal and circuit breaker controller

Similar Documents

Publication Publication Date Title
CN103106168B (en) Automatic serial port protection circuit
CN103069526B (en) Circuit breaker phase control switch system and circuit breaker control unit
CN104579623B (en) System and method during a kind of secondary equipment in power system network pair
CN103792419A (en) Synchronous sampling method achieving hybrid access of analog quantity and digital quantity
CN209624731U (en) One or two fusion panel switches integration transmission agency detection systems
CN109655745A (en) A kind of test device and test method of main circuit breaker time parameter
CN106603338B (en) Intelligent terminal response time testing method, device and system
EP0078517A2 (en) Protective relay system and sampling synchronizing method therefor
CN110708206A (en) Method and equipment for measuring air interface time delay of base station
CN111722102A (en) Instrument and method for analyzing action reliability of 252kV GIS internal isolation switch
JPS6336589B2 (en)
CN104215859A (en) Satellite electronic load testing method
CN202758008U (en) Performance testing device of trip outlet contact of relay protection device
Serizawa et al. SDH-based time synchronous system for power system communications
CN209387803U (en) A kind of partial discharge monitoring system with self-checking function
CN202617149U (en) High-precision IP (Internet Protocol) network one-way time delay measuring device
CN208257398U (en) A kind of power grid differential protection
CN113037247A (en) Digital filtering system and method for long-time interference signal
US2342318A (en) Electrical timing circuit
CN209342818U (en) A kind of hand-held secondary circuit capacitance tester
CN113253105B (en) High-voltage switch action characteristic measuring system
CN115174455A (en) ARINC664 switch starting time testing method based on asynchronous clock
Bao-wei et al. Research on the scheme of the sample synchronization scheme for optical differential protection scheme in merge unit
RU184683U1 (en) ETHERNET POWERLINK NETWORK RESINCHRONIZER
SU1638661A1 (en) Device for measuring resistance of electrical network insulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication