CN109650184A - A kind of cable paying-off device - Google Patents
A kind of cable paying-off device Download PDFInfo
- Publication number
- CN109650184A CN109650184A CN201811534343.0A CN201811534343A CN109650184A CN 109650184 A CN109650184 A CN 109650184A CN 201811534343 A CN201811534343 A CN 201811534343A CN 109650184 A CN109650184 A CN 109650184A
- Authority
- CN
- China
- Prior art keywords
- cable
- paying
- card stop
- import
- exits
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
- B65H75/44—Constructional details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/34—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables
- B65H75/38—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks specially adapted or mounted for storing and repeatedly paying-out and re-storing lengths of material provided for particular purposes, e.g. anchored hoses, power cables involving the use of a core or former internal to, and supporting, a stored package of material
- B65H75/44—Constructional details
- B65H75/4418—Arrangements for stopping winding or unwinding; Arrangements for releasing the stop means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/34—Handled filamentary material electric cords or electric power cables
Landscapes
- Braking Arrangements (AREA)
Abstract
A kind of cable paying-off device, including wheel shape frame body, outgoing line device, the outgoing line device includes supporting frame, cable import and cable exits are provided on the supporting frame, card stop device is provided between the cable import and the cable exits, outlet computing device is provided on the cable import and/or the cable exits, brake gear is provided on the wheel shape frame body, the outlet computing device, the card stop device and the brake gear are connect with controller.The present invention is more fixed and accurate by the length that card stop device cooperates brake gear to make cable unwrapping wire.
Description
Technical field
The present invention relates to cable wiring constructing device technical fields, and in particular to a kind of cable paying-off device.
Background technique
Need to use cable paying-off device when cable wiring, traditional cable paying-off device is only a rotation
Cable is fixed on rotating turret by frame, and engineering staff needs to pull cable when cable, and the unwrapping wire length of traditional actinobacillus device is complete
The in-site measurement of engineering staff is examined, this process is very complicated, and cable weight is high so inertia is also big, this allows for working as work
When Cheng personnel stop outlet, cable still can continue to roll some angles under effect of inertia, and cable itself is unlike common
Electric wire is so soft, and the cable having more can be pushed directly forward during replying deformation, and it is every which results in engineering staffs
The cable of secondary needs can all have more some length, be cumbersome problem for engineering connection.
Summary of the invention
The object of the present invention is to provide a kind of cable paying-off device, the present invention cooperates brake gear to make by card stop device
The length of cable unwrapping wire is more fixed and accurate.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of cable paying-off device, packet
Wheel shape frame body, outgoing line device are included, the outgoing line device includes supporting frame, and cable import is provided on the supporting frame
With cable exits, be provided with card stop device between the cable import and the cable exits, the cable import and/
Or outlet computing device is provided on the cable exits, brake gear is provided on the wheel shape frame body, described goes out
Line computation device, the card stop device and the brake gear are connect with controller.
As a preference of the present invention, the outlet computing device includes rotating bracket, connection frame and friction pulley, it is described
Rotating bracket connect with one end of the connection frame by torsional spring, the other end of the connection frame and the friction rotation
Dynamic connection, spaced set is provided on the friction pulley multiple magnet steel, and the connection frame is towards the friction pulley one
Side is provided with Hall sensor.
As a preference of the present invention, the connection frame is provided with two panels altogether, the two sides of the friction pulley are provided with
The magnet steel.
As a preference of the present invention, being provided on the outside of the port of the cable import and the cable exits described
Outlet computing device.
As a preference of the present invention, being provided with comparator in the controller.
As a preference of the present invention, the downside of the cable import and the cable exits is provided with sliding panel.
As a preference of the present invention, the card stop device includes two sinciput cylinders setting up and down, the sinciput
The telescopic end of cylinder is provided with brake shoes.
As a preference of the present invention, sinciput cylinder described in upper and lower two shifts to install.
As a preference of the present invention, the brake shoes upper surface for being set to the card stop device of lower section is provided with
Movable pulley is provided with capacitor grid transducer, the capacitor grid transducer and the controller in the rotation axis of the movable pulley
It connects, is provided with alarm on the controller.
As a preference of the present invention, the card stop device starts prior to the brake gear, the card stop device
The starting time difference with the brake gear is 3~5s.
In conclusion the invention has the following beneficial effects:
The present invention, which possesses, can control cable and goes out line length, continue due to that can stop in inertia rotation process in cable
The advantages of line.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is outgoing line device structural schematic diagram of the invention;
Fig. 3 is structural schematic diagram of the invention;
Fig. 4 is movable pulley and capacitive sensor structure schematic diagram of the invention;
In figure:
1- wheel shape frame body;2- outgoing line device;1-1- wheel carrier;1-2- central rotating shaft;1-3- support frame;3- pedestal;1-4- spoke
Penetrate connecting rod;2-1- frame body;4- cable import;5- cable exits;2-2- card stop device;2-3- outlet computing device;2-4- control
Device processed;2-3-1- rotating bracket;2-3-2- connection frame;2-3-3- friction pulley;6- magnet steel;7- Hall sensor;8- sliding panel;2-
2-1- sinciput cylinder;2-2-2- brake shoes;9- movable pulley;10- capacitor grid transducer;11- alarm;12- brake gear;10-1-
Fixed end;The moved end 10-2-.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As shown in Figure 1 and Figure 2, the embodiment of the present invention includes for mounted in cable wheel shape frame body 1, for calculating wire length
The outgoing line device 2 of degree, wheel shape frame body 1 include central rotating shaft 1-2, wheel carrier 1-1 and support frame 1-3, and wheel carrier 1-1 is connected by radiation
Extension bar 1-4 is connect with central rotating shaft 1-2, and cable is wound on central rotating shaft 1-2, and central rotating shaft 1-2 is rotatably connected on support frame 1-3
Upper end, the lower end support frame 1-3 are provided with pedestal 3, and outgoing line device 2 is fixedly connected on the base 3, positioned at the outlet of wheel shape frame body 1
The front in direction, the present embodiment cable from the lower part outlet of wheel shape frame body 1, the cable import 4 of outlet height and outgoing line device 2
Height is consistent, and outgoing line device 2 includes supporting frame 2-1, is provided with cable import 4 and cable exits on supporting frame 2-1
5, it is provided between cable import 4 and cable exits 5 for by stopping outlet using the frictional force of brake rubber after clamping
Outlet computing device 2-3, the support frame of wheel shape frame body 1 are provided on card stop device 2-2, cable import 4 and/or cable exits 5
Be provided on 1-3 for card stop central rotating shaft 1-2 rotation brake gear 12, brake gear 12 be both using brake rubber will in
The mechanism that heart shaft 1-2 card stops, brake rubber are connect with telescopic cylinder, outlet computing device 2-3, card stop device 2-2 and brake
The telescopic cylinder of vehicle device 12 is connect with the controller 2-4 for being set to 2 top of outgoing line device, and controller 2-4 includes that length is defeated
The keyboard entered.When outlet reaches demand, card stop device 2-2 and brake gear 12 start work, stop outlet, and card stops filling
It sets 2-2 to start prior to brake gear 12, the starting time difference of card stop device 2-2 and brake gear 12 is 3~5s.
As shown in Fig. 2, outlet computing device of embodiment of the present invention 2-3 include rotating bracket 2-3-1, connection frame 2-3-2 with
And friction pulley 2-3-3, rotating bracket 2-3-1 are connect with one end of connection frame 2-3-2 by torsional spring, the deformation of torsional spring restores direction
Downwards, rotating bracket 2-3-1 is connected to above the port of cable import 4 and/or cable exits 5, the other end of connection frame 2-3-2
It is rotatablely connected with friction pulley 2-3-3, as shown in figure 3, spaced set is provided on friction pulley 2-3-3 multiple magnet steel 6, connection
Frame 2-3-2 is provided with Hall sensor 7 towards the side friction pulley 2-3-3, and Hall sensor 7 is connect with controller 2-4, controller
2-4 calculates line length out by the perimeter of friction pulley 2-3-3 and the signal of Hall sensor 7.Connection frame 2-3-2 is total
It is provided with two panels, the two sides of friction pulley 2-3-3 are provided with magnet steel 6, are provided with Hall sensor on two connection frame 2-3-2
7.Outlet computing device 2-3 is provided on the outside of the port of cable import 4 and cable exits 5.It is provided with and is used in controller 2-4
Compare the comparator of the output signal of two outlet computing device 2-3, comparator is for comparing the calculating knot for computing device occur
Fruit, so that calculated result is more accurate.The downside of cable import 4 and cable exits 5 is provided with sliding panel 8,8 surface of sliding panel
Smooth, frictional force is low.
As shown in Fig. 2, the card stop device 2-2 that the present invention implements includes two sinciput cylinder 2-2-1 setting up and down, it is preceding
The telescopic end of top gas cylinder 2-2-1 is provided with brake shoes 2-2-2, and brake shoes 2-2-2 includes fixed plate, and brake is adhesive in fixed plate
Rubber, brake rubber surface are provided with non-slip texture.Upper and lower two sinciput cylinders 2-2-1 is shifted to install, before being both two upper and lower
The longitudinal center line of the telescopic shaft of top gas cylinder 2-2-1 is not overlapped, and is one in front and one in back arranged, and a close cable import 4, one close
Cable exits 5.
As shown in figure 4, the embodiment of the present invention is set to the upper surface the brake shoes 2-2-2 setting of the card stop device 2-2 of lower section
There is movable pulley 9, capacitor grid transducer 10 is provided in the rotation axis of movable pulley 9, the end of rotation axis is provided with capacitor grid transducer 10
Moved end 10-2, the fixed end 10-1 of capacitor grid transducer 10 is fixedly installed on brake shoes 2-2-2, the surface of movable pulley 9, which is exposed, stops
The height of the upper surface of vehicle block 2-2-2 is greater than 0.5mm, is less than 1.5mm, and capacitor grid transducer 10 is connect with controller 2-4, controller
Alarm 11 is provided on 2-4.
At work, operator needs the length of unwrapping wire by keyboard to the present embodiment to controller 2-4 input, in unwrapping wire
In the process if there is card stop device 2-2 card to stop cable after length arrival demand first, is blocked after 3~5s by brake gear 12 and stop center
Shaft 1-2, if engineering staff can trigger capacitor grid transducer 10, alarm 11 issues at this time also not by stopping pulling at this time
Alarm reminds engineering staff to stop bracing wire operation.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (10)
1. a kind of cable paying-off device, it is characterised in that: including wheel shape frame body (1), outgoing line device (2), the outgoing line device
(2) include supporting frame (2-1), cable import (4) and cable exits (5) are provided on the supporting frame (2-1), it is described
Cable import (4) and the cable exits (5) between be provided with card stop device (2-2), the cable import (4) and/
Or be provided with outlet computing device (2-3) on the cable exits (5), brake dress is provided on the wheel shape frame body (1)
Set (12), the outlet computing device (2-3), the card stop device (2-2) and the brake gear (12) with
Controller (2-4) connection.
2. a kind of cable paying-off device according to claim 1: the outlet computing device (2-3) includes rotating bracket
(2-3-1), connection frame (2-3-2) and friction pulley (2-3-3), the rotating bracket (2-3-1) and the connection frame (2-
One end 3-2) is connected by torsional spring, and the other end and the friction pulley (2-3-3) rotation of the connection frame (2-3-2) connect
It connects, spaced set is provided on the friction pulley (2-3-3) to be had multiple magnet steel (6), the connection frame (2-3-2) direction
Friction pulley (2-3-3) side is provided with Hall sensor (7).
3. a kind of cable paying-off device according to claim 2: the connection frame (2-3-2) is provided with two panels altogether, institute
The two sides for the friction pulley (2-3-3) stated are provided with the magnet steel (6).
4. a kind of cable paying-off device according to claim 1: the cable import (4) and the cable exits
(5) the outlet computing device (2-3) is provided on the outside of port.
5. according to claim 1 or a kind of cable paying-off device: being provided with comparator in the controller (2-4).
6. a kind of cable paying-off device according to claim 1: the cable import (4) and the cable exits
(5) downside is provided with sliding panel (8).
7. a kind of cable paying-off device according to claim 1: the card stop device (2-2) includes two setting up and down
Sinciput cylinder (2-2-1), the telescopic end of the sinciput cylinder (2-2-1) is provided with brake shoes (2-2-2).
8. a kind of cable paying-off device according to claim 7: the dislocation of sinciput cylinder (2-2-1) described in upper and lower two is set
It sets.
9. a kind of cable paying-off device according to claim 7: being set to the institute of the card stop device (2-2) of lower section
The upper surface brake shoes (2-2-2) stated is provided with movable pulley (9), and capacitive grating biography is provided in the rotation axis of the movable pulley (9)
Sensor (10), the capacitor grid transducer (10) connect with the controller (2-4), are arranged on the controller (2-4)
There are alarm (11).
10. a kind of cable paying-off device according to claim 1: the card stop device (2-2) is prior to the brake
The starting time difference of device (12) starting, the card stop device (2-2) and the brake gear (12) is 3~5s.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811534343.0A CN109650184A (en) | 2018-12-14 | 2018-12-14 | A kind of cable paying-off device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811534343.0A CN109650184A (en) | 2018-12-14 | 2018-12-14 | A kind of cable paying-off device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109650184A true CN109650184A (en) | 2019-04-19 |
Family
ID=66114204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811534343.0A Pending CN109650184A (en) | 2018-12-14 | 2018-12-14 | A kind of cable paying-off device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109650184A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111725739A (en) * | 2020-05-23 | 2020-09-29 | 国网河北省电力有限公司邯郸供电分公司 | Novel overhead paying-off tool for guaranteeing consistent sag in distribution network engineering construction |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2357466A1 (en) * | 1976-07-08 | 1978-02-03 | Kabel Metallwerke Ghh | Automatic cable winding drum - has blocking mechanism through which cable is passed unlocked by pushbutton |
CN1903113A (en) * | 2005-07-28 | 2007-01-31 | 乐金电子(天津)电器有限公司 | Vacuum cleaner with automatic device for alarming power wire being drawn-out too long |
CN202332425U (en) * | 2011-12-12 | 2012-07-11 | 广东金联宇电缆实业有限公司 | Full-automatic quantity wire coiling machine |
CN202621775U (en) * | 2011-09-20 | 2012-12-26 | 陈全娟 | Cable length measuring and cutting machine |
CN203624718U (en) * | 2013-12-25 | 2014-06-04 | 天津水运工程勘察设计院 | Small-sized semi-automatic winding device |
CN204297819U (en) * | 2014-11-24 | 2015-04-29 | 国家电网公司 | The take-up and pay-off device that remote control and cable length calculate |
CN105836526A (en) * | 2016-04-29 | 2016-08-10 | 周丹 | Cable winding machine with automatic counting function |
CN106441013A (en) * | 2016-11-17 | 2017-02-22 | 桂林市晶瑞传感技术有限公司 | Roller distance measuring device with roller calibrating function |
CN107585642A (en) * | 2017-10-27 | 2018-01-16 | 国网河南省电力公司周口供电公司 | Distribution line power cable automatic retraction device |
CN107831532A (en) * | 2017-11-01 | 2018-03-23 | 中国矿业大学 | A kind of vertical blast hole geology detecting device |
CN207472145U (en) * | 2017-11-22 | 2018-06-08 | 桂林市晶瑞传感技术有限公司 | A kind of Rongshan typd digital band tape |
-
2018
- 2018-12-14 CN CN201811534343.0A patent/CN109650184A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2357466A1 (en) * | 1976-07-08 | 1978-02-03 | Kabel Metallwerke Ghh | Automatic cable winding drum - has blocking mechanism through which cable is passed unlocked by pushbutton |
CN1903113A (en) * | 2005-07-28 | 2007-01-31 | 乐金电子(天津)电器有限公司 | Vacuum cleaner with automatic device for alarming power wire being drawn-out too long |
CN202621775U (en) * | 2011-09-20 | 2012-12-26 | 陈全娟 | Cable length measuring and cutting machine |
CN202332425U (en) * | 2011-12-12 | 2012-07-11 | 广东金联宇电缆实业有限公司 | Full-automatic quantity wire coiling machine |
CN203624718U (en) * | 2013-12-25 | 2014-06-04 | 天津水运工程勘察设计院 | Small-sized semi-automatic winding device |
CN204297819U (en) * | 2014-11-24 | 2015-04-29 | 国家电网公司 | The take-up and pay-off device that remote control and cable length calculate |
CN105836526A (en) * | 2016-04-29 | 2016-08-10 | 周丹 | Cable winding machine with automatic counting function |
CN106441013A (en) * | 2016-11-17 | 2017-02-22 | 桂林市晶瑞传感技术有限公司 | Roller distance measuring device with roller calibrating function |
CN107585642A (en) * | 2017-10-27 | 2018-01-16 | 国网河南省电力公司周口供电公司 | Distribution line power cable automatic retraction device |
CN107831532A (en) * | 2017-11-01 | 2018-03-23 | 中国矿业大学 | A kind of vertical blast hole geology detecting device |
CN207472145U (en) * | 2017-11-22 | 2018-06-08 | 桂林市晶瑞传感技术有限公司 | A kind of Rongshan typd digital band tape |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111725739A (en) * | 2020-05-23 | 2020-09-29 | 国网河北省电力有限公司邯郸供电分公司 | Novel overhead paying-off tool for guaranteeing consistent sag in distribution network engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202994585U (en) | Simple horizontal type cable tension testing machine | |
CN206399736U (en) | A kind of experimental rig of bending stiffness | |
CN109650184A (en) | A kind of cable paying-off device | |
CN103759698B (en) | System and method for fast measuring perimeter deformation quantity of horizontal type strain strengthening vessel | |
CN116818235A (en) | Scaffold fastener torsional rigidity performance test equipment | |
CN211447850U (en) | Building engineering construction pay-off | |
CN105890665B (en) | Improve the automobile guy cable detection machine fictitious load assembly of measuring accuracy | |
CN207597843U (en) | A kind of Construction of High-rise extends cantilever arrangement | |
CN203811407U (en) | Mining winch performance testing device | |
CN110411772A (en) | Elevator no-load static state traction test detection method and device | |
CN104117551A (en) | Automatic steel coil loading device of uncoiling machine and steel coil loading method thereof | |
CN203053793U (en) | Hose detector | |
CN204638780U (en) | Steel band plate smoothing length measuring device | |
CN208625099U (en) | It is a kind of can automatic lifting supporter | |
CN207351683U (en) | A kind of jack detection device | |
CN203477812U (en) | Pedal displacement meter fixing device | |
CN210472037U (en) | Suspension system | |
CN206248475U (en) | A kind of safety belt drawstring stretching force detecting apparatus | |
CN104129631A (en) | An automatic weight detecting and separating device used on a production line | |
CN113029767A (en) | Textile fabric production elasticity detection device capable of timely preventing protection and detection method | |
CN209046108U (en) | A kind of power transformer lift mounting rack | |
CN205709185U (en) | The conducting mechanism of a kind of cable paying-off device and cable paying-off device | |
CN208150723U (en) | A kind of cage overspeed protective device based on radar velocity measurement | |
CN219636214U (en) | Automatic feeding device of ruler checking machine | |
CN204023278U (en) | Steel cord plays bulging checkout gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |
|
RJ01 | Rejection of invention patent application after publication |