CN211447850U - Building engineering construction pay-off - Google Patents

Building engineering construction pay-off Download PDF

Info

Publication number
CN211447850U
CN211447850U CN201922281583.0U CN201922281583U CN211447850U CN 211447850 U CN211447850 U CN 211447850U CN 201922281583 U CN201922281583 U CN 201922281583U CN 211447850 U CN211447850 U CN 211447850U
Authority
CN
China
Prior art keywords
fixedly connected
pay
push rod
electric push
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922281583.0U
Other languages
Chinese (zh)
Inventor
白利琴
崔留兵
郑旭阳
宋要辉
戎森杰
谭银龙
王晓峰
叶飞
郭相军
郝志强
岳忆铭
郭凌杰
李廷秀
于小辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dongfang Construction Group Development Co ltd
Original Assignee
Henan Dongfang Construction Group Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dongfang Construction Group Development Co ltd filed Critical Henan Dongfang Construction Group Development Co ltd
Priority to CN201922281583.0U priority Critical patent/CN211447850U/en
Application granted granted Critical
Publication of CN211447850U publication Critical patent/CN211447850U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering construction pay-off relates to building engineering technical field. It comprises a bottom plate; four bolts are arranged on the outer side of the upper end of the bottom plate; the bolts are all in threaded connection with the bottom plate; the lower ends of the bolts are rotatably connected with self-locking universal wheels through rotating shafts; the upper end of the bottom plate is fixedly connected with an electric push rod; the front end of the electric push rod is fixedly connected with a level gauge; the upper end of the electric push rod is fixedly connected with a connecting frame; the right side of the electric push rod is fixedly connected with a slide rail at the right end of the connecting frame. The utility model has the advantages that: during the use, conveniently remove fixed adaptation and adapt to various ground, the supplementary construction of level unwrapping wire adjusts adaptation height, prevents to tie a knot.

Description

Building engineering construction pay-off
Technical Field
The utility model relates to a building engineering technical field.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. And often use pay-off during the building engineering construction, traditional pay-off function singleness, function not single is fixed with regard to inconvenient removal, can not adapt to ground moreover, and inconvenient horizontal unwrapping wire is used, and the construction is assisted to inconvenient horizontal unwrapping wire, and when not co-altitude or need the height-adjusting carry out the unwrapping wire, traditional also inconvenient regulation adaptation, inconvenient use knots easily when receiving the line moreover, and it is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the technique that exists is not enough to the aforesaid, provides a building engineering construction pay-off. During the use, conveniently remove fixed adaptation and adapt to various ground, the supplementary construction of level unwrapping wire adjusts adaptation height, prevents to tie a knot.
The utility model adopts the technical proposal that: the construction paying-off device for the building engineering comprises a bottom plate; four bolts are arranged on the outer side of the upper end of the bottom plate; the bolts are all in threaded connection with the bottom plate; the lower ends of the bolts are rotatably connected with self-locking universal wheels through rotating shafts; the upper end of the bottom plate is fixedly connected with an electric push rod; the front end of the electric push rod is fixedly connected with a level gauge; the upper end of the electric push rod is fixedly connected with a connecting frame; the right end of the electric push rod is fixedly connected with a slide rail; the right end of the slide rail is connected with a slide block in a vertical sliding manner; a jacking bolt matched with the slide rail is arranged on the upper side of the right end of the slide block; the lower end of the jacking bolt is fixedly connected with two pay-off plates; a pay-off shaft is rotatably connected between the two pay-off plates through a rotating shaft; the lower end of the rotating shaft penetrates through the upper end of the pay-off plate at the lower part, and the lower end of the rotating shaft is fixedly connected with a control handle; a positioning wire is wound on the outer side of the direction shaft; a transverse conduit is arranged on the right of the rotating shaft; the upper end and the lower end of the guide pipe are respectively fixedly connected with the two pay-off plates through a bracket; the right end of the positioning line penetrates through the guide pipe, and the right end of the positioning line is fixedly connected with a limiting block; the other end of the positioning line is fixedly connected with the rotating shaft; the front end of the conduit is fixedly connected with a laser line lamp.
Further optimize this technical scheme, a building engineering construction pay-off's the bolt outside is provided with anti-skidding line.
Further optimize this technical scheme, a building engineering construction pay-off's slide rail front end is provided with the size line.
The utility model discloses compare with traditional pay-off, its beneficial effect lies in:
1. the self-locking universal wheel is convenient to move and fix; the cooperation of the electric push rod, the level gauge, the bolt, the self-locking universal wheel and the bottom plate facilitates the auxiliary construction of horizontal paying-off, and the electric push rod is convenient to be always used as a horizontal reference, can adapt to various grounds and is convenient to carry out horizontal paying-off;
2. the positioning line is horizontal, so that the positioning line is convenient to cooperate with the positioning line for construction; the electric push rod, the connecting frame, the sliding rail and the sliding block are matched, so that the height can be conveniently adjusted, and the electric push rod is suitable for horizontal positioning of construction at different heights;
3. the matching of the handle, the rotating shaft, the paying-off shaft and the positioning wire is controlled to prevent knotting, and the wire is taken up after passing through the guide pipe, so that the use is convenient;
4. the anti-skid lines are arranged on the outer side of the bolt, so that the friction force is increased, and the use is convenient; the slide rail front end is provided with the size line, conveniently observes the size and uses.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is another schematic structural diagram of the present invention;
in the figure, 1, a bottom plate; 2. a bolt; 3. a self-locking universal wheel; 4. an electric push rod; 5. a level gauge; 6. a connecting frame; 7. a slide rail; 8. a slider; 9. jacking the bolt; 10. a pay-off plate; 11. a pay-off shaft; 12. a control handle; 13. a rotating shaft; 14. positioning a line; 15. a conduit; 16. a support; 17. a limiting block; 18. a laser line lamp; 19. anti-skid lines; 20. dimension lines.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1-2, a construction work payoff device includes a base plate 1; the outer side of the upper end of the bottom plate 1 is provided with four bolts 2; the bolts 2 are in threaded connection with the bottom plate 1; the lower ends of the bolts 2 are rotatably connected with self-locking universal wheels 3 through rotating shafts; the upper end of the bottom plate 1 is fixedly connected with an electric push rod 4; the front end of the electric push rod 4 is fixedly connected with a level meter 5; the upper end of the electric push rod 4 is fixedly connected with a connecting frame 6; a slide rail 7 is fixedly connected to the right end of the connecting frame 6 on the right side of the electric push rod 4; the right end of the slide rail 7 is vertically connected with a slide block 8 in a sliding manner; a jacking bolt 9 matched with the slide rail 7 is arranged on the upper side of the right end of the slide block 8; the lower end of the jacking bolt 9 is fixedly connected with two pay-off plates 10 at the right end of the sliding opening; a pay-off shaft 11 is rotatably connected between the two pay-off plates 10 through a rotating shaft 13; the lower end of the rotating shaft 13 penetrates through the upper end of the pay-off plate 10 at the lower part, and the lower end of the rotating shaft 13 is fixedly connected with a control handle 12; a positioning wire 14 is wound outside the direction shaft; a transverse conduit 15 is arranged on the right of the rotating shaft 13; the upper end and the lower end of the guide pipe 15 are respectively fixedly connected with the two pay-off plates 10 through a bracket 16; the right end of the positioning line 14 penetrates through the guide pipe 15, and the right end of the positioning line 14 is fixedly connected with a limiting block 17; the other end of the positioning line 14 is fixedly connected with the rotating shaft 13; the front end of the conduit 15 is fixedly connected with a laser line lamp 18; the outer side of the bolt 2 is provided with anti-skid grains 19; the front end of the slide rail 7 is provided with a dimension line 20.
When the device is used, the device is moved to a construction position through the self-locking universal wheel 3, and then paying-off auxiliary construction is carried out, so that the self-locking universal wheel 3 is convenient to move, use and fix; after the fixing is finished, the level 5 on the electric push rod 4 is observed, if the level is not horizontal, the bolt 2 is rotated, the self-locking universal wheel 3 and the bottom plate 1 are driven to obliquely move when the bolt 2 rotates, and the bolt can move to the level displayed by the level 5, so that the line is laid, the level is absolute, the use is convenient, the bolt 2 and the self-locking universal wheel 3 can be conveniently used as a horizontal reference all the time, and the adjustable arrangement of the bolt 2 and the self-locking universal wheel 3 can adapt to various grounds and is convenient for horizontal line laying;
then, sliding a sliding block 8 on a sliding rail 7, moving the sliding block 8 to a proper position, fixing the sliding block 8 by using a puller bolt 9, dragging a limiting block 17 at the moment, driving a positioning line 14 to move by the limiting block 17, moving the positioning line 14 at the moment through a guide pipe 15, moving the positioning line 14 to be matched with the ray by observing the ray emitted by a laser marking lamp 18 on the guide pipe 15, matching the level of a level gauge 5 with the ray of the laser marking lamp 18, and enabling the positioning line 14 to be horizontal at the moment so as to be convenient for being matched with the positioning line 14 for construction;
when the wire is taken up after use, the traditional wire taking-up is easy to wind and knot, at the moment, the control handle 12 drives the rotating shaft 13 to rotate, the rotating shaft 13 drives the paying-off shaft 11 to rotate, the positioning wire 14 on the paying-off shaft 11 is wound when the paying-off shaft 11 rotates, the positioning wire 14 is conveniently wound and taken back on the paying-off shaft 11, when the positioning wire 14 is taken back through the guide pipe 15, the guide pipe 15 firstly limits the positioning wire 14, so that the guide pipe 15 only can pass through one positioning wire 14, the positioning wire 14 is one when reaching the paying-off shaft 11, the knot is not tied during winding, the wire taking-up is carried out after passing through the guide pipe 15, and the use is convenient;
the electric push rod 4 is started, the electric push rod 4 drives the slide rail 7 to move through the connecting frame 6, and the slide block 8 on the slide rail 7 can move accordingly, so that the height is conveniently adjusted, and the electric push rod is suitable for horizontal positioning of construction at different heights;
the utility model discloses electric putter adopts the model to be U10, laser marking lamp adoption model is SGJG 1.

Claims (3)

1. The utility model provides a building engineering construction pay-off which characterized in that: comprises a bottom plate (1); the outer side of the upper end of the bottom plate (1) is provided with four bolts (2); the bolts (2) are in threaded connection with the bottom plate (1); the lower ends of the bolts (2) are rotatably connected with self-locking universal wheels (3) through rotating shafts; the upper end of the bottom plate (1) is fixedly connected with an electric push rod (4); the front end of the electric push rod (4) is fixedly connected with a level meter (5); the upper end of the electric push rod (4) is fixedly connected with a connecting frame (6); a slide rail (7) is fixedly connected to the right end of the connecting frame (6) on the right side of the electric push rod (4);
the right end of the slide rail (7) is vertically connected with a slide block (8) in a sliding manner; a puller bolt (9) matched with the slide rail (7) is arranged on the upper side of the right end of the slide block (8); the lower end of the puller bolt (9) is fixedly connected with two pay-off plates (10) at the right end of the sliding opening; a pay-off shaft (11) is rotatably connected between the two pay-off plates (10) through a rotating shaft (13); the lower end of the rotating shaft (13) penetrates through the upper end of the pay-off plate (10) at the lower part, and the lower end of the rotating shaft (13) is fixedly connected with a control handle (12); a positioning wire (14) is wound outside the direction shaft; a transverse conduit (15) is arranged on the right of the rotating shaft (13); the upper end and the lower end of the guide pipe (15) are respectively fixedly connected with the two pay-off plates (10) through a bracket (16); the right end of the positioning line (14) penetrates through the guide pipe (15), and the right end of the positioning line (14) is fixedly connected with a limiting block (17); the other end of the positioning line (14) is fixedly connected with the rotating shaft (13); the front end of the conduit (15) is fixedly connected with a laser line lamp (18).
2. The construction payoff device of claim 1, wherein: the outer side of the bolt (2) is provided with anti-skid grains (19).
3. The construction payoff device of claim 1, wherein: the front end of the slide rail (7) is provided with a dimension line (20).
CN201922281583.0U 2019-12-18 2019-12-18 Building engineering construction pay-off Active CN211447850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922281583.0U CN211447850U (en) 2019-12-18 2019-12-18 Building engineering construction pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922281583.0U CN211447850U (en) 2019-12-18 2019-12-18 Building engineering construction pay-off

Publications (1)

Publication Number Publication Date
CN211447850U true CN211447850U (en) 2020-09-08

Family

ID=72304766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922281583.0U Active CN211447850U (en) 2019-12-18 2019-12-18 Building engineering construction pay-off

Country Status (1)

Country Link
CN (1) CN211447850U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049442A (en) * 2020-09-11 2020-12-08 湖北汇宜建设工程有限公司 Building construction engineering wall building equipment
CN113818701A (en) * 2021-10-13 2021-12-21 广东蕉岭建筑工程集团有限公司 Building block positioning and paying-off device
CN114941419A (en) * 2022-06-22 2022-08-26 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049442A (en) * 2020-09-11 2020-12-08 湖北汇宜建设工程有限公司 Building construction engineering wall building equipment
CN112049442B (en) * 2020-09-11 2022-05-06 广东聚源建设集团有限公司 Building construction engineering wall building equipment
CN113818701A (en) * 2021-10-13 2021-12-21 广东蕉岭建筑工程集团有限公司 Building block positioning and paying-off device
CN114941419A (en) * 2022-06-22 2022-08-26 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof
CN114941419B (en) * 2022-06-22 2024-03-01 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof

Similar Documents

Publication Publication Date Title
CN211447850U (en) Building engineering construction pay-off
CN203690811U (en) Multifunctional cable laying and paying-off apparatus for cable drum
WO2017197731A1 (en) Self-vertical positioning pole erection device and construction method thereof
CN210763592U (en) Pipe laying and paying-off device for hydraulic engineering
CN209554495U (en) A kind of power ampere puts line apparatus
CN104882828A (en) Power cable paying-off device
CN110797804B (en) Cable pipe port multidirectional pulley auxiliary tool
CN105776044B (en) Hooks coupling universal coupling dismounting special hanger and its application method on a kind of vertical mill
CN204633226U (en) Cable laying cable coaster
CN204633224U (en) A kind of power cable wire dispenser
CN211056431U (en) Railway wire barrow convenient to use
CN218472627U (en) Auxiliary straightening and laying device for cable
CN110282486A (en) Power construction actinobacillus device
KR100928346B1 (en) Digital Pulling Machine with Automatic Control
CN211056399U (en) Be used for interval cable unwrapping wire auxiliary device
CN211670545U (en) Cable laying stringing auxiliary device
CN210326718U (en) Highway unwrapping wire structure is striden to distribution network
CN210447104U (en) Operation fixing device for general surgery department
RU138511U1 (en) ELECTRIC SUPPORT JACK
CN219779626U (en) Wire installation traction mechanism
CN208135598U (en) Power construction automatic paying-off device
CN208439469U (en) A kind of binding apparatus after wire rod rolled product wire drawing
CN206841278U (en) A kind of new-type electric pole handling device
CN220950612U (en) Loose unwrapping wire equipment is prevented
CN219348896U (en) Automatic sediment sedimentation rate measuring and alarming device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant