CN109631839A - A method of bridge pier settlement observation in water is carried out using total station - Google Patents

A method of bridge pier settlement observation in water is carried out using total station Download PDF

Info

Publication number
CN109631839A
CN109631839A CN201910068287.4A CN201910068287A CN109631839A CN 109631839 A CN109631839 A CN 109631839A CN 201910068287 A CN201910068287 A CN 201910068287A CN 109631839 A CN109631839 A CN 109631839A
Authority
CN
China
Prior art keywords
observation
bridge pier
total station
station
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910068287.4A
Other languages
Chinese (zh)
Inventor
樊国良
靳海彦
张伟莹
刘彬
蒋新龙
赵飞
赵一飞
李其峰
高杰
张燕礼
卜东兴
王有鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201910068287.4A priority Critical patent/CN109631839A/en
Publication of CN109631839A publication Critical patent/CN109631839A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention discloses a kind of method for carrying out bridge pier settlement observation in water using total station, the following steps are included: in the case where bridge two sides are no both wired, two control points are respectively established in river two sides, and an observation station is built at the observation position among two control points, or, in the case where bridge, which only has side, both not wired, two control points are being established without river bank corresponding to both wired sides, and build two observation stations at the observation position among two control points;Two observation marks of interval setting, observation mark are corresponding with observation station on each bridge pier;Absolute altitude is led into control point using precision level, total station is set on observation station, the sedimentation of bridge pier is obtained by the height change between total station survey observation mark and control point.Not only it ensure that the demand of settlement observation, but also improved the efficiency of settlement observation, while reliably, easily and fast.

Description

A method of bridge pier settlement observation in water is carried out using total station
Technical field
The present invention relates to settlement observation technical fields, it particularly relates to a kind of heavy using bridge pier in total station progress water The method of observation drops.
Background technique
Observation of the tradition for pier stud observation mark in water at present, can only use two methods through the inspection of the scene of a crime: one, using existing The trestle set up of construction, is observed by second grade leveling requirement, then because of trestle stability when observation, Construction traffic row on trestle It sails and personnel shuttles and walk about influence, not can guarantee measurement accuracy and reach second grade leveling requirement.Two, it is such as set up using pier stud two sides flat Platform observation, because bridge span away from be unequal span, then be unable to satisfy " High Speed Rail Projects specifications of surveys ", " country one, second grade leveling survey Gauge model " in requirement of the second-order levelling front-and rear-view away from≤50 meters.According to the above, this both of which can not be implemented.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For above-mentioned technical problem in the related technology, the present invention proposes a kind of using bridge pier sedimentation in total station progress water The method of observation solves the demand of bridge pier settlement observation in special line for passenger trains large watershed river, and improves settlement observation Efficiency.Simultaneously reliably, easily and fast.
To realize the above-mentioned technical purpose, the technical scheme of the present invention is realized as follows:
A method of bridge pier settlement observation in water is carried out using total station, comprising the following steps:
Control point and observation station is arranged in S1, wherein in the case where bridge two sides are no both wired, respectively establishes in river two sides Two control points, and the observation station is built at the observation position among two control points, alternatively, in bridge Beam only has side without establishing two controls without river bank corresponding to both wired sides in the case where both wired Point, and two observation stations are built at the observation position among two control points;
Observation mark is arranged in S2, wherein two observation marks of interval setting, the observation mark and the observation station phase on each bridge pier It is corresponding;
Absolute altitude is led to the control point using precision level by S3, and total station is arranged on the observation station, by described complete Instrument of standing measures the height change between the observation mark and the control point to obtain the sedimentation of the bridge pier.
Further, in S2, two observation marks are located on the cross section of the same bridge pier.
Further, in S3, absolute altitude is led to the control point by second grade leveling requirement by the precision level.
Further, in S3, the every 6 months repetition measurements in control point are primary.
Further, in S3, when the observation mark uses forced centering mark, the total station is surveyed using second grade leveling Amount method measures the sedimentation of the bridge pier.
Further, in S3, when the observation mark uses prism, the total station uses Trigonometric Leveling pair The sedimentation of the bridge pier measures.
Further, the prism is fixed on the bridge pier by L-shaped prism connecting rod.
Further, in S3, when First Observation, carries out in such a way that annexed leveling line is surveyed back and forth, remaining observation The mode of Shi Caiyong annexed leveling line carries out.
Further, when clicking through annexed leveling line observation using the control, the total station is placed in described On control point, used using the observation mark as turning point.
Beneficial effects of the present invention: bridge pier settlement observation can be realized by carrying out settlement observation to bridge pier in water using total station It is general, it not only ensure that the demand of settlement observation, but also improve the efficiency of settlement observation, while reliably, easily and fast.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 be according to embodiments of the present invention it is described bridge two sides without it is both wired when the layout drawing put of control;
Fig. 2 be according to embodiments of the present invention it is described bridge only side without it is both wired when the layout drawing put of control.
In figure:
1, control point;2, observation station;3, observation mark;4, both wired;5, bridge pier.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
As shown in Figs. 1-2, a kind of use total station according to embodiments of the present invention carries out bridge pier settlement observation in water Method, comprising the following steps:
Control point 1 and observation station 2 is arranged in S1, wherein bridge two sides without both wired 4 in the case where, it is each in river two sides Two control points 1 are established, and build the observation station 2 at the observation position among two control points 1, or Person is establishing two without river bank corresponding to both wired 4 sides in the case where bridge only has side without both wired 4 A control point 1, and two observation stations 2 are built at the observation position among two control points 1;
Observation mark 3 is arranged in S2, wherein two observation marks 3 of interval setting on each bridge pier 5, the observation mark 3 and the observation It stands 2 corresponding;
Absolute altitude is led to the control point 1 using precision level by S3, total station is arranged on the observation station 2, by described Height change between observation mark 3 and the control point 1 described in total station survey obtains the sedimentation of the bridge pier 5.
In one particular embodiment of the present invention, in S2, two observation marks 3 are located at the same bridge pier 5 On cross section.
In one particular embodiment of the present invention, in S3, the precision level is by second grade leveling requirement by absolute altitude Lead to the control point 1.
In one particular embodiment of the present invention, in S3,1 every 6 months repetition measurements of control point are primary.
In one particular embodiment of the present invention, described when the observation mark 3 is using forced centering mark in S3 Total station measures the sedimentation of the bridge pier 5 using second-order levelling method.
In one particular embodiment of the present invention, in S3, when the observation mark 3 is using prism, the total station is adopted The sedimentation of the bridge pier 5 is measured with Trigonometric Leveling.
In one particular embodiment of the present invention, the prism is fixed on the bridge pier 5 by L-shaped prism connecting rod On.
In one particular embodiment of the present invention, in S3, what when First Observation surveyed back and forth according to annexed leveling line Mode carries out, remaining time is carried out by the way of annexed leveling line when observing.
In one particular embodiment of the present invention, when being observed using the control point 1 into annexed leveling line, by institute It states total station to be placed on the control point 1, the observation mark 3 is used as turning point.
In order to facilitate above-mentioned technical proposal of the invention is understood, below by way of specifically used mode to above-mentioned skill of the invention Art scheme is described in detail.
The present invention is observed bridge pier 5 using total station.According to field condition, in the river two of first segment route bridge Bank respectively establishes two control points 1, and absolute altitude is led to control point 1, two control points 1 by second grade leveling requirement with precision level Need to build a measuring platform at intermediate observation position.
The side of second segment route bridge has existing line not to be able to satisfy to establish two observations control in river two sides respectively The measurement scheme of point 1, to meet in-site measurement technical requirements, at the scene without burying two on the riverbank of both wired bridge side A control point 1, and absolute altitude is led into control point 1 by second grade leveling requirement with precision level.Observation among two control points 1 Need to build two measuring platforms at position.
Control point 1 should do stability test when using, and using stable or metastable point as the reference of sedimentation and deformation Point, and the point that should have certain amount solid and reliable is as a means of check.Sedimentation and deformation observation is wanted using national second-order levelling technology It asks, assesses detailed rules for the implementation testing in conjunction with sedimentation.It is observed back and forth using two-way line, observation is respectively formed closure checking condition every time.Often It before secondary observation, should test correction to used instrument and equipment, and retain inspection record.
Sedimentation and deformation observational network elevation controls net system using Construction Elevation.The every 6 months repetition measurements in control point 1 are primary.
Due to field condition observation limitation (due to being limited by the conditions such as bridge pier 5 and river bank relative position, individual bridge piers 5 are greater than 50m etc. at a distance from riverbank), when observation, is unable to satisfy second-order levelling instrument main technical requirements (front and back parallax Transfinite≤1.5m, minimum height of sighting line >=0.5m, front and back add up sight difference≤6.0m, sight length≤50m etc.), therefore use not Measuring appratus height and prism it is high height difference difference EDM-height measurement method transmitting.For the accuracy for ensuring settling data, It must be carried out using the method for retainer instrument, fixed survey station installation position.
, bridge pier 5 settle point observation using high precision total station (range error ± 1mm/km, angle error be 0.5 "), use The measurement method of triangulated height carries out testing.Specific requirement is as follows:
1. the cloudy day should be selected to be observed as far as possible to reduce the influence of refractive power, vertical angle observation preferably after sunrise 2h to sunset It is carried out when target imaging is clear during preceding 2h.
2. position number is at 4 more than the survey time, forced centering target repeats installation error and is less than 0.2mm.
3. temperature and air pressure when being observed strictly records input, temperature is accurate to 0.2 DEG C, air pressure 0.5hPa.
It 4. instrument sets station location and strictly fixes every time, should be arranged on fixed job control point 1, set station twice and survey height The difference of difference should be less than 1mm.
5. observing in route design, reduces to the greatest extent and set station number or reduce route distance, be conducive to precision controlling, avoid separate The vertical adjustment precision of the distortion monitoring points of job control point 1 transfinites.
6. should re-start observation when the settling amount of adjacent observation cycle occurs abnormal and be carried out with last time measurement result Comparison, if two times result is not met, check the stability of job control point 1 immediately, translocation datum mark is needed to be examined when necessary It surveys.Such as find that job control point 1 or datum mark have sinkage that will observe data and report assessment unit, to carry out datum mark or The height value of job control point 1 is modified.Then settlement observation is carried out according to revised datum mark or job control point 1 again And calculate sedimentation value.
7. performance data presses the observation of engineering sedimentation and deformation and assessment database under unified format typing line.
The method of the present invention for carrying out bridge pier settlement observation in water using total station is specific as follows:
1. observation mark 3 is arranged, in order to meet the needs of deformation observation, need that observation mark 3 is arranged on bridge pier 5.
(1) each bridge pier 5 is respectively provided with two observation marks 3, and two observation marks 3 are located at same bridge cross-section.
(2) observation mark 3 is embedded at left and right sides of bridge pier.Height is arranged on bridge pier in this section observation mark 3 and riverbank is tall and big The position being approximately equal.
2. observation mark 3 can use prism and L shape prism connecting rod.
3. setting station triangulated height method in order to carry out normal sinking deformation monitoring preferably with centre, using high-precision The scheme that total station measures uses the total station automatic Observation of exploitation when measurement if observation mark 3 uses forced centering mark Program sets up total station in settlement monitoring on the riverbank of bridge pier horizontal path two sides, and bridge pier buries forced centering observation monument, Forced centering mark height and total station antenna height are contour, with observation mark 3 substantially with high, control when the height at control point 1 is embedded System point 1 is measured after position chooses using second-order levelling method, and the control point 1 of riverbank two sides should carry out translocation, It individually completes monitoring net and establishes work, if observation mark 3 is connected by prism when total station is measured using Trigonometric Leveling Extension bar and prism are constituted, the stringent naturalization of the elevation at control point 1 to prism centers.
The observation mark 3 of bridge pier divides or so line to be observed respectively, and (one of control point 1 is named as by taking left side as an example CPII036, another control point 1 are named as GCPII037, and bridge pier 5 is successively named as 319 ~ 323, the observation mark 3 on the left of bridge pier It is named as D1), the Free Station first between CPII036 to 323D1 observes CPII036~319D1;319D1~320D1; 32D1~321D1;321D1~322D1;Height difference between 322D1~323D1;It is freely set between GCPII037 to 219D1 again It stands, observes GCPII037~323D1;323D1~322D1;322D1~321D1;321D1~320D1;320D1~319D1 it Between height difference, form a route, each observation station 2 adjusts height of instrument and carries out independent observation twice, and independent observation is formed twice Round-trip measurement.
The present invention should be carried out in First Observation (zero observation) in such a way that annexed leveling line is surveyed back and forth, according to " building Build deformation measurement specification " requirement: " deformation measurement it is supplied only seasonally, it reflects a certain moment deformable body relative to control point 1 Deformation extent or deformation tendency, answer this First Observation (initial value) be whole deformation observation basic data, should conscientiously observe, Carefully review increases observed quantity, carries out twice with precision independent observation, to guarantee that First Observation achievement has enough precision and can By property." remaining time observation can be carried out by the way of annexed leveling line.
The observation route of bridge pier 5 carries out annexed leveling line observation using the control point on riverbank in water, will in observation Total station is placed on riverbank control point 1, and the observation mark 3 on bridge pier is used as turning point.Annexed leveling line, which has measured, to be closed In CPII036 and GCPII037.
In conclusion carrying out settlement observation to bridge pier in water using total station by means of above-mentioned technical proposal of the invention The general of bridge pier settlement observation can be achieved, not only ensure that the demand of settlement observation, but also improve the efficiency of settlement observation, while can It leans on, easily and fast.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of method for carrying out bridge pier settlement observation in water using total station, which comprises the following steps:
Control point (1) and observation station (2) is arranged in S1, wherein in the case where bridge two sides no both wired (4), in river Two control points (1) are respectively established in two sides, and build described in one at the intermediate observation position of two control points (1) Observation station (2), alternatively, in the case where bridge only has side without both wired (4), corresponding to no both wired (4) side River bank establish two control points (1), and build two at the intermediate observation position of two control points (1) The observation station (2);
S2 be arranged observation mark (3), wherein on each bridge pier (5) interval setting two observation marks (3), the observation mark (3) with The observation station (2) is corresponding;
Absolute altitude is led to the control point (1) using precision level by S3, and total station is arranged on the observation station (2), passes through Height change between observation mark described in the total station survey (3) and the control point (1) obtains the heavy of the bridge pier (5) Drop.
2. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S2 In, two observation marks (3) are located on the cross section of the same bridge pier (5).
3. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S3 In, absolute altitude is led to the control point (1) by second grade leveling requirement by the precision level.
4. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S3 In, the every 6 months repetition measurements of control point (1) are primary.
5. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S3 In, when the observation mark (3) uses forced centering mark, the total station is using second-order levelling method to the bridge pier (5) sedimentation measures.
6. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S3 In, when the observation mark (3) uses prism, the total station uses sedimentation of the Trigonometric Leveling to the bridge pier (5) It measures.
7. the method according to claim 6 for carrying out bridge pier settlement observation in water using total station, which is characterized in that described Prism is fixed on the bridge pier (5) by L-shaped prism connecting rod.
8. the method according to claim 1 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in S3 In, when First Observation, carries out in such a way that annexed leveling line is surveyed back and forth, using annexed leveling line when remaining observation Mode carries out.
9. the method according to claim 8 for carrying out bridge pier settlement observation in water using total station, which is characterized in that in benefit When being observed with the control point (1) into annexed leveling line, the total station is placed on the control point (1), it will be described Observation mark (3) is used as turning point.
CN201910068287.4A 2019-01-24 2019-01-24 A method of bridge pier settlement observation in water is carried out using total station Pending CN109631839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910068287.4A CN109631839A (en) 2019-01-24 2019-01-24 A method of bridge pier settlement observation in water is carried out using total station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910068287.4A CN109631839A (en) 2019-01-24 2019-01-24 A method of bridge pier settlement observation in water is carried out using total station

Publications (1)

Publication Number Publication Date
CN109631839A true CN109631839A (en) 2019-04-16

Family

ID=66063460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910068287.4A Pending CN109631839A (en) 2019-01-24 2019-01-24 A method of bridge pier settlement observation in water is carried out using total station

Country Status (1)

Country Link
CN (1) CN109631839A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260840A (en) * 2019-06-28 2019-09-20 中铁大桥局集团有限公司 The measurement method and system of long bridge bridge pier absolute settlement amount over strait
CN111609833A (en) * 2020-05-26 2020-09-01 武汉弘泰建筑工程质量检测有限公司 Settlement observation method for high-rise building
CN111721260A (en) * 2020-06-01 2020-09-29 上海勘察设计研究院(集团)有限公司 High-precision light beam method settlement measurement method based on i-angle error correction of level gauge
CN111750827A (en) * 2020-06-29 2020-10-09 中设设计集团股份有限公司 Wide-water-area large-span pier settlement observation method
CN112033355A (en) * 2020-07-30 2020-12-04 河北建设勘察研究院有限公司 Method for monitoring settlement of pier stud in underpinning of bridge pile foundation
CN112556643A (en) * 2020-11-30 2021-03-26 中铁大桥局集团第二工程有限公司 Elevation measurement method for settlement observation of pier in water
CN113280787A (en) * 2021-05-24 2021-08-20 山东大学 Bridge linear detection method based on opposite side height difference measurement
CN113324516A (en) * 2021-05-25 2021-08-31 东南大学 Method for monitoring vertical displacement precise triangular elevation of pier in water
CN114046770A (en) * 2021-09-22 2022-02-15 中国铁建大桥工程局集团有限公司 Marine settlement observation and measurement method
CN114166174A (en) * 2021-11-10 2022-03-11 中铁二十局集团第一工程有限公司 Deformation monitoring system and method for steel truss girder slideway support
CN114199125A (en) * 2021-11-25 2022-03-18 中交三公局第二工程有限公司 Method for measuring plane position of original bridge in expanded bridge
CN115112089A (en) * 2022-06-24 2022-09-27 中交第二航务工程局有限公司 Device and method for observing settlement of cross-sea high-speed railway bridge

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100698540B1 (en) * 2004-04-13 2007-03-21 김창근 The settlement measurement reinforcement system that use settlement measuring device
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100698540B1 (en) * 2004-04-13 2007-03-21 김창근 The settlement measurement reinforcement system that use settlement measuring device
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何习平: "《测量技术基础(第2版)》", 31 October 2004 *
孙国红: ""桥梁工程墩台基础沉降观测技术探讨"", 《建筑技术开发》 *
蔺爱军: ""高速铁路大跨度桥梁水中墩变形监测技术研究"", 《桥梁》 *
郭祚界: "《高速铁路客运专线线下工程沉降变形无砟轨道铺设条件评估实践与应用》", 31 July 2015 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110260840A (en) * 2019-06-28 2019-09-20 中铁大桥局集团有限公司 The measurement method and system of long bridge bridge pier absolute settlement amount over strait
CN110260840B (en) * 2019-06-28 2021-06-29 中铁大桥局集团有限公司 Method and system for measuring absolute settlement of bridge pier of cross-sea long bridge
CN111609833A (en) * 2020-05-26 2020-09-01 武汉弘泰建筑工程质量检测有限公司 Settlement observation method for high-rise building
CN111609833B (en) * 2020-05-26 2021-12-31 武汉弘泰建筑工程质量检测有限公司 Settlement observation method for high-rise building
CN111721260A (en) * 2020-06-01 2020-09-29 上海勘察设计研究院(集团)有限公司 High-precision light beam method settlement measurement method based on i-angle error correction of level gauge
CN111721260B (en) * 2020-06-01 2022-03-01 上海勘察设计研究院(集团)有限公司 High-precision light beam method settlement measurement method based on i-angle error correction of level gauge
CN111750827B (en) * 2020-06-29 2021-11-30 华设设计集团股份有限公司 Wide-water-area large-span pier settlement observation method
CN111750827A (en) * 2020-06-29 2020-10-09 中设设计集团股份有限公司 Wide-water-area large-span pier settlement observation method
CN112033355A (en) * 2020-07-30 2020-12-04 河北建设勘察研究院有限公司 Method for monitoring settlement of pier stud in underpinning of bridge pile foundation
CN112556643A (en) * 2020-11-30 2021-03-26 中铁大桥局集团第二工程有限公司 Elevation measurement method for settlement observation of pier in water
CN112556643B (en) * 2020-11-30 2022-06-24 中铁大桥局集团第二工程有限公司 Elevation measurement method for settlement observation of pier in water
CN113280787A (en) * 2021-05-24 2021-08-20 山东大学 Bridge linear detection method based on opposite side height difference measurement
CN113324516A (en) * 2021-05-25 2021-08-31 东南大学 Method for monitoring vertical displacement precise triangular elevation of pier in water
CN114046770A (en) * 2021-09-22 2022-02-15 中国铁建大桥工程局集团有限公司 Marine settlement observation and measurement method
CN114166174A (en) * 2021-11-10 2022-03-11 中铁二十局集团第一工程有限公司 Deformation monitoring system and method for steel truss girder slideway support
CN114199125A (en) * 2021-11-25 2022-03-18 中交三公局第二工程有限公司 Method for measuring plane position of original bridge in expanded bridge
CN115112089A (en) * 2022-06-24 2022-09-27 中交第二航务工程局有限公司 Device and method for observing settlement of cross-sea high-speed railway bridge
CN115112089B (en) * 2022-06-24 2023-04-21 中交第二航务工程局有限公司 Cross-sea high-speed railway bridge settlement observation device and observation method thereof

Similar Documents

Publication Publication Date Title
CN109631839A (en) A method of bridge pier settlement observation in water is carried out using total station
CN104316024B (en) Simple cascading camera chain measuring method and system for monitoring multipoint settlement
CN103499340B (en) Measurement device and measurement method for vertical great-height difference height transmission
CN110260840B (en) Method and system for measuring absolute settlement of bridge pier of cross-sea long bridge
CN102251478B (en) Control method for synchronous construction survey of pylons and beams of cable-stayed bridge
CN101504272B (en) Video recorder network shooting measurement method and apparatus for large structure attitude and displacement deformation
CN102607516B (en) Method for measuring standard elevation in nuclear power engineering
CN109297463B (en) River-crossing leveling method
CN114046770A (en) Marine settlement observation and measurement method
CN112556643B (en) Elevation measurement method for settlement observation of pier in water
CN103115610B (en) Be applicable to the leveling measuring method of composite level
JP6695451B2 (en) Dual system type inter-observation multi-level traverse survey method
CN108253930A (en) One kind has runed more river subway tunnel TERM DEFORMATION monitoring method
CN110186426A (en) A kind of remote triangulated height river-crossing leveling method
CN109900244A (en) A kind of hydrostatic level wide range multistage series sys-tems
CN108917706B (en) GNSS leveling method
CN102493296B (en) Method for measuring longspan steel truss girder rail control network
CN209512835U (en) A kind of hydrostatic level wide range multistage series sys-tems
CN106017444A (en) Independent monitoring method for construction verticality of super-high building
CN202793375U (en) Ruler-composite level gauge for dual-couple type observation
CN104316027B (en) Composite level own-side height determination method
CN113551643B (en) River-crossing leveling method and system
CN102121825A (en) Method for measuring river-crossing levelling altitude difference by using GPS (global positioning system)
CN112900265B (en) Continuous steel beam installation line shape control method
CN114812520A (en) Method and system for setting and measuring three-dimensional control network for high-speed magnetic levitation track installation measurement and control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416