CN109625811A - The sliding platform removed for pipeline under the conditions of complex space - Google Patents

The sliding platform removed for pipeline under the conditions of complex space Download PDF

Info

Publication number
CN109625811A
CN109625811A CN201710930010.9A CN201710930010A CN109625811A CN 109625811 A CN109625811 A CN 109625811A CN 201710930010 A CN201710930010 A CN 201710930010A CN 109625811 A CN109625811 A CN 109625811A
Authority
CN
China
Prior art keywords
slideway
support platform
bracket
conditions
complex space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710930010.9A
Other languages
Chinese (zh)
Inventor
王豪华
王养伟
黄金能
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710930010.9A priority Critical patent/CN109625811A/en
Publication of CN109625811A publication Critical patent/CN109625811A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of sliding platforms removed for pipeline under the conditions of complex space, this sliding platform includes steel plate roadbed box, support platform, slideway, roller-way, bracket, fixing seat and chain block, support platform is vertical at steel plate roadbed box, slideway is spaced and parallel to be set to support platform top surface, roller-way is spaced and parallel inside slideway and vertical with slideway, bracket is located at ramp surface, fixing seat is set to support platform end two sides, and chain block is set to the hook end connecting bracket of fixing seat and chain block.This sliding platform solves the difficulty of pipeline Demolition Construction operation under the conditions of complex space, and removed pipeline is removed complex space by this sliding platform, effectively improves construction operation efficiency.

Description

The sliding platform removed for pipeline under the conditions of complex space
Technical field
The present invention relates to a kind of sliding platforms removed for pipeline under the conditions of complex space.
Background technique
In steel mill's blast funnace hot blast stove overhaul engineering, it is necessary to be transformed to former flue, vacate position and guarantee to create The construction location of hot-blast stove, and during hot-blast stove overhaul, former hot blast stove system need to keep operating normally.Usual flue is total Weight is up to 65.8 tons, and pipe diameter is Φ 4200mm, wherein having exhaust piping, surface to have blast furnace immediately below 43.2 tons of pipelines Gas piping, coke oven gas pipe, cold air duct, cable testing bridge etc..The construction space condition leads to not using normally hanging The flue among various pipes is removed and be mounted on to vehicle lifting mode, and flue is removed and the operation of installation Time only has 3 hours.Therefore the operating condition has seriously affected going on smoothly for overhaul engineering, brings certain be stranded to construction operation It is difficult.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of sliding removed for pipeline under the conditions of complex space is flat Platform, this sliding platform solve the difficulty of pipeline Demolition Construction operation under the conditions of complex space, will be torn open by this sliding platform Except pipeline removes complex space, construction operation efficiency is effectively improved.
In order to solve the above technical problems, sliding platform of the present invention for pipeline under the conditions of complex space to be removed includes steel plate Subgrade case, support platform, slideway, roller-way, bracket, fixing seat and chain block, the support platform are vertical at the steel plate Subgrade case, the slideway is spaced and parallel to be set to the support platform top surface, the roller-way be set to inside the slideway and with cunning Road is vertical, and the bracket is located at the ramp surface, and the fixing seat is set to support platform end two sides, described to pull calabash Reed is set to the fixing seat and the hook end of chain block connects the bracket.
Further, the support platform includes plane framework, several support posts and several stiffener plates, described several It supports column interval vertical to be set between the plane framework and steel plate roadbed box, several stiffener plate inclinations are set to the branch It supports between column and plane framework.
Further, the slideway is made of the channel steel for being welded in the support platform top surface, and the roller-way is that heavy wall is seamless Steel pipe.
Since the sliding platform that the present invention is removed for pipeline under the conditions of complex space uses above-mentioned technical proposal, i.e. this sliding Platform includes steel plate roadbed box, support platform, slideway, roller-way, bracket, fixing seat and chain block, and support platform is vertical at Steel plate roadbed box, slideway is spaced and parallel to be set to support platform top surface, and roller-way is spaced and parallel to be set to inside slideway and hang down with slideway Directly, bracket is located at ramp surface, and fixing seat is set to support platform end two sides, and chain block is set to fixing seat and chain block Hook end connecting bracket.This sliding platform solves the difficulty of pipeline Demolition Construction operation under the conditions of complex space, by this cunning It moves platform and removed pipeline is removed into complex space, effectively improve construction operation efficiency.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the sliding platform floor map that the present invention is removed for pipeline under the conditions of complex space;
Fig. 2 is the elevational schematic view of this sliding platform;
Fig. 3 is this sliding platform middle slideway, roller-way and bracket schematic diagram.
Specific embodiment
Embodiment is as shown in Figure 1, Figure 2 and Figure 3, and the present invention is used for the sliding platform packet of pipeline dismounting under the conditions of complex space Steel plate roadbed box 1, support platform 2, slideway 3, roller-way 4, bracket 5, fixing seat 6 and chain block 7 are included, the support platform 2 is hung down It is directly set to the steel plate roadbed box 1, the slideway 3 is spaced and parallel to be set to 2 top surface of support platform, and the roller-way 4 is set to institute The inside of slideway 3 and vertical with slideway 3 is stated, the bracket 5 is located at 3 surface of slideway, and the fixing seat 6 is set on the support 2 end two sides of platform, the chain block 7 is set to the fixing seat 6 and the hook end of chain block 7 connects the bracket 5.
Preferably, the support platform 2 includes plane framework 21, several support posts 22 and several stiffener plates 23, institute It states several 22 interval verticals of support post to be set between the plane framework 21 and steel plate roadbed box 1, several stiffener plates 23 inclinations are set between the support post 22 and plane framework 21.
Preferably, the slideway 3 is made of the channel steel for being welded in 2 top surface of support platform, the roller-way 4 be heavy wall without Stitch steel pipe.
When the flue of steel mill's blast funnace hot blast stove overhaul engineering removes operation, flue is cut into pieces first, Then this sliding platform is erected below the flue side that need to be removed, bracket 5 is moved on slideway 3 by roller-way 4 The flue 8 being cut into pieces, is slowly seated on bracket 5,5 load-bearing flue gas of bracket by 8 lower section of flue by jack Pipeline 8 and the rolling for avoiding flue 8, steel plate roadbed box 1 is used to disperse the weight of flue as pedestal, by setting Bracket 5 is pulled in the chain block of 2 end two sides fixing seat 6 of support platform, so that bracket 5 removes cigarette along slideway 3 on roller-way 4 Flue 8 can be hung scene by loop wheel machine, realize quickly tearing open for flue 8 by the constrained position that feed channel 8 lifts It removes.
This sliding platform structure is simple, and making material can be taken on the spot using materials such as conventional H profile steel, channel steel, angle steel Material reduces cost of manufacture;And this sliding platform is lower to operating technology personnel requirement, has certain lifting technique ability energy Operation is not necessarily to special equipment;Sliding platform, which makes and sets up operation not, influences the normal production of blast-furnace equipment;Pipeline Demolition Construction Operating efficiency is high, and this sliding platform two obtains at one stroke at the same time as construction operation platform, saved operating expenses.Through reality Border application shows that this sliding is flat using the time-consuming dismounting and lifting that whole flues can be completed for 2.5 hours of this sliding platform Platform is suitble to the construction operation of limited space, the large-scale pipeline that can not implement lifting, equipment up and down.

Claims (3)

1. a kind of sliding platform removed for pipeline under the conditions of complex space, it is characterised in that: this sliding platform includes steel plate Subgrade case, support platform, slideway, roller-way, bracket, fixing seat and chain block, the support platform are vertical at the steel plate Subgrade case, the slideway is spaced and parallel to be set to the support platform top surface, the roller-way be set to inside the slideway and with cunning Road is vertical, and the bracket is located at the ramp surface, and the fixing seat is set to support platform end two sides, described to pull calabash Reed is set to the fixing seat and the hook end of chain block connects the bracket.
2. the sliding platform according to claim 1 removed for pipeline under the conditions of complex space, it is characterised in that: described Support platform includes plane framework, several support posts and several stiffener plates, and several support post interval verticals are set to Between the plane framework and steel plate roadbed box, several stiffener plates inclination be set to the support post and plane framework it Between.
3. the sliding platform according to claim 1 removed for pipeline under the conditions of complex space, it is characterised in that: described Slideway is made of the channel steel for being welded in the support platform top surface, and the roller-way is thick-walled seamless steel pipes.
CN201710930010.9A 2017-10-09 2017-10-09 The sliding platform removed for pipeline under the conditions of complex space Pending CN109625811A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710930010.9A CN109625811A (en) 2017-10-09 2017-10-09 The sliding platform removed for pipeline under the conditions of complex space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710930010.9A CN109625811A (en) 2017-10-09 2017-10-09 The sliding platform removed for pipeline under the conditions of complex space

Publications (1)

Publication Number Publication Date
CN109625811A true CN109625811A (en) 2019-04-16

Family

ID=66051008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710930010.9A Pending CN109625811A (en) 2017-10-09 2017-10-09 The sliding platform removed for pipeline under the conditions of complex space

Country Status (1)

Country Link
CN (1) CN109625811A (en)

Similar Documents

Publication Publication Date Title
CN106435087B (en) A kind of converter vaporization flue piecewise combination installation method
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN105238420A (en) Coke oven riser tube replacement apparatus and coke oven riser tube replacement method
CN103993745B (en) A kind of conversion beam integral hoisting device for rapid and hanging method thereof
CN104003287A (en) Umbrella type variable diameter platform device for industry kiln
CN105369002A (en) Repair tooling of hot-blast branch pipe lining of hot-blast furnace and repair method thereof
WO2006070922A1 (en) Method of dismantling blast furnace body
CN207275602U (en) The sliding platform removed for pipeline under the conditions of complex space
CN106766929B (en) Independent hot-blast stove on-bne repair Nai Cai transportation system and repair method
CN109625811A (en) The sliding platform removed for pipeline under the conditions of complex space
CN102399925A (en) Method for replacing cooling wall of blast furnace
CN105438982A (en) A rapid replacing method of a grate of a hot-blast stove of a blast furnace
CN106586912A (en) Group air heating furnace on-line overhauling refractory material transport system and overhauling method
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN104560065B (en) False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute
CN102410725B (en) Material guiding device, cupola furnace body, and cupola furnace body provided with material guiding device
CN106016233A (en) Boiler roof with long span and fewer welding spots and hoisting method for boiler roof
CN109810716B (en) Construction method for simultaneously replacing bracket brick and cooling section masonry of dry quenching furnace
CN202361783U (en) Charging system of cupola furnace
CN205556728U (en) Combination rack is built by laying to converter lining
CN109630129B (en) Method for receiving rectangular pipe jacking machine under condition of no lining structure of subway station
CN208520221U (en) Constant supporting spring hanger and melting furnace module for steam-water pipe
CN205635664U (en) Blast furnace iron notch dust collector
CN207177924U (en) A kind of pulp shooting machine dedusting integrating device
JP5169034B2 (en) Coke dry fire extinguishing equipment construction and repair method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination