CN109615178A - A kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again - Google Patents

A kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again Download PDF

Info

Publication number
CN109615178A
CN109615178A CN201811364696.0A CN201811364696A CN109615178A CN 109615178 A CN109615178 A CN 109615178A CN 201811364696 A CN201811364696 A CN 201811364696A CN 109615178 A CN109615178 A CN 109615178A
Authority
CN
China
Prior art keywords
route
public transport
passenger flow
traffic capacity
vehicle flowrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811364696.0A
Other languages
Chinese (zh)
Other versions
CN109615178B (en
Inventor
马荣叶
高技
张亮
张守田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ho Whale Cloud Computing Polytron Technologies Inc
Original Assignee
Ho Whale Cloud Computing Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ho Whale Cloud Computing Polytron Technologies Inc filed Critical Ho Whale Cloud Computing Polytron Technologies Inc
Priority to CN201811364696.0A priority Critical patent/CN109615178B/en
Publication of CN109615178A publication Critical patent/CN109615178A/en
Application granted granted Critical
Publication of CN109615178B publication Critical patent/CN109615178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Traffic Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The method that the Public Transport Transfer track that the present invention designs changes to the route shift adjustment of bus trip again, analyze the starting point gone on a journey in the period of working day (or nonworkdays) route and destination, wherein Public Transport Transfer track changes to bus trip again for analysis, if such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is less than 15km, considers from opening straightforward line between origin-to-destination;If such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is greater than 15km, and period vehicle load factor > 120%, then merges the small passenger flow website of the route and transfer route;Such passenger flow accounts for the 80% of the route passenger flow hereinafter, then other situations is combined to be adjusted.

Description

A kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again
Technical field
The invention belongs to the route classes that bus trip is changed in public transport field more particularly to a kind of Public Transport Transfer track again The method of secondary adjustment.
Background technique
Public transport company adjusts public bus network rule of thumb to repetition circuit (public transport and subway are overlapped section) analysis at present, Effect is not satisfactory, and the skill for going out repetition circuit client's trip characteristics by big data analysis has been given in the development of current computer technology Art is directed toward, to provide the removal the smallest scheme of redundancy public bus network negative effect, is plugged into passenger in conjunction with individual trip law-analysing Practical OD point, analyze working day (or nonworkdays) route a period in go on a journey starting point and destination, point Public transport is through, public transport and Public Transport Transfer, public transport and track transfer are through, Public Transport Transfer track changes to these four situations of public transport again, And it is made adjustment the decision of route shift according to different concrete conditions.
Summary of the invention
The present invention is intended to provide a kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again.For reality Existing above-mentioned technical purpose, the present invention use following technical scheme, and a kind of Public Transport Transfer track changes to the route class of bus trip again The method of secondary adjustment analyzes the starting point gone on a journey in the period of working day (or nonworkdays) route and destination, Wherein Public Transport Transfer track changes to bus trip again for analysis, comprising the following steps:
Step S1, the record of public transport is changed to again by Public Transport Transfer track, number of transfer is 2 and its above;
Step S2, such volume of the flow of passengers is calculated;
If step S3, such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is less than 15km, considers from Point is to opening straightforward line between terminal;
Step S4, it is directed to OD pairs of peak period super large, the routes such as major station cable release, special line, local train can be opened, but needs to keep away Open traffic capacity bottleneck road;Extract the corresponding website of getting on the bus of super large OD amount, get-off stop, shortest distance connection route, meter Calculate the traffic capacity in each section, public transport vehicle flowrate on connection route;
Step S5, it when the min traffic capacity≤max public transport vehicle flowrate, needs to be replaced with the section for being greater than the min traffic capacity Min traffic capacity section is changed, it, can be using the small passenger flow website of merging if the section that can not replace, not can increase special line Strategy;
Step S6, when the min traffic capacity > max public transport vehicle flowrate, special line and its shift is added, recalculates bus Flow compares the traffic capacity and public transport vehicle flowrate again, when the min traffic capacity > max public transport vehicle flowrate, can take special line And shift;If the min traffic capacity≤max public transport vehicle flowrate, shift is adjusted, until the min traffic capacity >=max public transport wagon flow Amount takes final special line trend and shift;
If step S7, such passenger flow accounts for 80% or more of the route passenger flow, and average trip distance is greater than 15km, and this when Section vehicle load factor > 120% then merges the small passenger flow website of the route and transfer route;
Step S8, such passenger flow accounts for the 80% of the route passenger flow hereinafter, then other situations is combined to be adjusted.
Preferably, a possibility that step S8 is adjusted by way of frequency increase, for needing frequency increase Route, calculate its Bus transit capacity through road, if the traffic capacity meet, frequency increase;If the traffic capacity is unsatisfactory for, It then needs to take other measures;Obtain the bus stop traffic capacity C that the route is passed throughIt stands, unit :/h;Calculate each public transport The flow of All other routes on station, public transport vehicle flowrate BIt stands=sum (All other routes shift), unit :/h;Then the route is logical Row ability CLine=min (CIt stands-BIt stands), unit :/h;From public transport shift statistical form, the shift number of the route, the public affairs of the route are obtained Hand over vehicle flowrate BLine=route shift number;If BLine<CLine, export CLine;Otherwise it cannot increase departure frequency.
The method that the Public Transport Transfer track that the present invention designs changes to the route shift adjustment of bus trip again, analyzes working day The starting point gone on a journey in one period of (or nonworkdays) route and destination, wherein Public Transport Transfer track changes again for analysis Multiply bus trip, if such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is less than 15km, considers from starting point To opening straightforward line between terminal;If such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is greater than 15km, And period vehicle load factor > 120% then merges the small passenger flow website of the route and transfer route;Such passenger flow accounts for this The 80% of route passenger flow is hereinafter, then combine other situations to be adjusted.
Detailed description of the invention
Fig. 1 is the flow chart of the method for the present invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, the connection being also possible to inside two elements can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term.
The route that a kind of Public Transport Transfer track according to an embodiment of the present invention changes to bus trip again is described referring to Fig. 1 The method of shift adjustment, analyzes the starting point and purpose gone on a journey in the period of working day (or nonworkdays) route Ground, wherein Public Transport Transfer track changes to bus trip again for analysis, comprising the following steps:
Step S1, the record of public transport is changed to again by Public Transport Transfer track, number of transfer is 2 and its above;
Step S2, such volume of the flow of passengers is calculated;
If step S3, such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is less than 15km, considers from Point is to opening straightforward line between terminal;
Step S4, it is directed to OD pairs of peak period super large, the routes such as major station cable release, special line, local train can be opened, but needs to keep away Open traffic capacity bottleneck road;Extract the corresponding website of getting on the bus of super large OD amount, get-off stop, shortest distance connection route, meter Calculate the traffic capacity in each section, public transport vehicle flowrate on connection route;
Step S5, it when the min traffic capacity≤max public transport vehicle flowrate, needs to be replaced with the section for being greater than the min traffic capacity Min traffic capacity section is changed, it, can be using the small passenger flow website of merging if the section that can not replace, not can increase special line Strategy;
Step S6, when the min traffic capacity > max public transport vehicle flowrate, special line and its shift is added, recalculates bus Flow compares the traffic capacity and public transport vehicle flowrate again, when the min traffic capacity > max public transport vehicle flowrate, can take special line And shift;If the min traffic capacity≤max public transport vehicle flowrate, shift is adjusted, until the min traffic capacity >=max public transport wagon flow Amount takes final special line trend and shift;
If step S7, such passenger flow accounts for 80% or more of the route passenger flow, and average trip distance is greater than 15km, and this when Section vehicle load factor > 120% then merges the small passenger flow website of the route and transfer route;
Step S8, such passenger flow accounts for the 80% of the route passenger flow hereinafter, then other situations is combined to be adjusted.
Preferably, a possibility that step S8 is adjusted by way of frequency increase, for needing frequency increase Route, calculate its Bus transit capacity through road, if the traffic capacity meet, frequency increase;If the traffic capacity is unsatisfactory for, It then needs to take other measures;Obtain the bus stop traffic capacity C that the route is passed throughIt stands, unit :/h;Calculate each public transport The flow of All other routes on station, public transport vehicle flowrate BIt stands=sum (All other routes shift), unit :/h;Then the route is logical Row ability CLine=min (CIt stands-BIt stands), unit :/h;From public transport shift statistical form, the shift number of the route, the public affairs of the route are obtained Hand over vehicle flowrate BLine=route shift number;If BLine<CLine, export CLine;Otherwise it cannot increase departure frequency.
The method that the Public Transport Transfer track that the present invention designs changes to the route shift adjustment of bus trip again, analyzes working day The starting point gone on a journey in one period of (or nonworkdays) route and destination, wherein Public Transport Transfer track changes again for analysis Multiply bus trip, if such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is less than 15km, considers from starting point To opening straightforward line between terminal;If such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is greater than 15km, And period vehicle load factor > 120% then merges the small passenger flow website of the route and transfer route;Such passenger flow accounts for this The 80% of route passenger flow is hereinafter, then combine other situations to be adjusted.
In the description of this specification, the description meaning of reference term " one embodiment ", " example " or " some examples " etc. Refer to that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or show Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples It can be combined in any suitable manner.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (2)

1. a kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again, analysis working day (or inoperative Day) starting point gone on a journey in period of route and destination, wherein Public Transport Transfer track is changed to public transport again and is gone out for analysis Capable, which comprises the following steps:
Step S1, the record of public transport is changed to again by Public Transport Transfer track, number of transfer is 2 and its above;
Step S2, such volume of the flow of passengers is calculated;
If step S3, such passenger flow accounts for 80% or more of the route passenger flow, and average trip distance is less than 15km, consider from starting point to Straightforward line is opened between terminal;
Step S4, it is directed to OD pairs of peak period super large, the routes such as major station cable release, special line, local train can be opened, but needs to avoid leading to Row ability bottleneck road;The corresponding website of getting on the bus of super large OD amount, get-off stop are extracted, shortest distance connection route calculates connection The traffic capacity in each section, public transport vehicle flowrate on logical route;
Step S5, it when the min traffic capacity≤max public transport vehicle flowrate, needs with the section replacement min greater than the min traffic capacity It traffic capacity section can be using the plan for merging small passenger flow website if the section that can not replace, not can increase special line Slightly;
Step S6, when the min traffic capacity > max public transport vehicle flowrate, special line and its shift is added, recalculates public transport vehicle flowrate, Compare the traffic capacity and public transport vehicle flowrate again, when the min traffic capacity > max public transport vehicle flowrate, special line and class can be taken It is secondary;If the min traffic capacity≤max public transport vehicle flowrate, adjustment shift is adopted until the min traffic capacity >=max public transport vehicle flowrate Take final special line trend and shift;
If step S7, such passenger flow accounts for 80% or more of the route passenger flow, average trip distance is greater than 15km, and the period vehicle Load factor > 120% then by the route and is changed to the small passenger flow website of route and is merged;
Step S8, such passenger flow accounts for the 80% of the route passenger flow hereinafter, then other situations is combined to be adjusted.
2. the method according to claim 1, wherein step S8 be adjusted by way of frequency increase can Can property calculate its Bus transit capacity of the institute through road for needing the route of frequency increase, if traffic capacity satisfaction, increases Overtime work time;If the traffic capacity is unsatisfactory for, need to take other measures;Obtain the bus stop traffic capacity that the route is passed through CIt stands, unit :/h;Calculate the flow of All other routes on each bus stop, public transport vehicle flowrate BIt stands(classes of All other routes of=sum It is secondary), unit :/h;The then traffic capacity C of the routeLine=min (CIt stands-BIt stands), unit :/h;From public transport shift statistical form, obtain Take the shift number of the route, the public transport vehicle flowrate B of the routeLine=route shift number;If BLine<CLine, export CLine;Otherwise cannot Increase departure frequency.
CN201811364696.0A 2018-11-16 2018-11-16 Method for adjusting line shifts of bus transfer track transfer bus trip Active CN109615178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811364696.0A CN109615178B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus transfer track transfer bus trip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811364696.0A CN109615178B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus transfer track transfer bus trip

Publications (2)

Publication Number Publication Date
CN109615178A true CN109615178A (en) 2019-04-12
CN109615178B CN109615178B (en) 2024-04-09

Family

ID=66003215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811364696.0A Active CN109615178B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus transfer track transfer bus trip

Country Status (1)

Country Link
CN (1) CN109615178B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630440A (en) * 2009-06-01 2010-01-20 北京交通大学 Operation coordination optimizing method of common public transit connecting with urban rail transit and system thereof
KR20110131872A (en) * 2010-06-01 2011-12-07 박태진 Method and control system of reducing vacant rate on the public transportation
CN106097226A (en) * 2016-06-20 2016-11-09 华南理工大学 City Routine Transit Network Design method based on Hierarchical Programming
CN106448233A (en) * 2016-08-19 2017-02-22 大连理工大学 Big data based bus route time table collaborative optimization method
CN106504518A (en) * 2016-11-24 2017-03-15 浙江交通职业技术学院 The dispatching method that a kind of city bus are cooperateed with long-distance passenger transportation
CN106530680A (en) * 2016-12-02 2017-03-22 东南大学 Combined service method of bus routes based on express buses
CN106651034A (en) * 2016-12-23 2017-05-10 中山大学 Public traffic line network planning method
CN106652434A (en) * 2016-12-02 2017-05-10 东南大学 Bus dispatching method based on rail transit coordination

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630440A (en) * 2009-06-01 2010-01-20 北京交通大学 Operation coordination optimizing method of common public transit connecting with urban rail transit and system thereof
KR20110131872A (en) * 2010-06-01 2011-12-07 박태진 Method and control system of reducing vacant rate on the public transportation
CN106097226A (en) * 2016-06-20 2016-11-09 华南理工大学 City Routine Transit Network Design method based on Hierarchical Programming
CN106448233A (en) * 2016-08-19 2017-02-22 大连理工大学 Big data based bus route time table collaborative optimization method
CN106504518A (en) * 2016-11-24 2017-03-15 浙江交通职业技术学院 The dispatching method that a kind of city bus are cooperateed with long-distance passenger transportation
CN106530680A (en) * 2016-12-02 2017-03-22 东南大学 Combined service method of bus routes based on express buses
CN106652434A (en) * 2016-12-02 2017-05-10 东南大学 Bus dispatching method based on rail transit coordination
CN106651034A (en) * 2016-12-23 2017-05-10 中山大学 Public traffic line network planning method

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
况丽娟;: "城市轨道交通环线规划及案例分析", 地下工程与隧道, no. 02 *
毛志宏, 牛惠民: "城市公交系统结构合理性的研究", 兰州交通大学学报, no. 01 *
王佳冬;袁振洲;: "考虑乘客出行习惯的公交线网优化方法", 交通信息与安全, no. 04 *
陆原;曾滢;郭晟;: "快速公交系统模式研究――以广州市BRT试验线系统为例", 城市交通, no. 05 *
鲁寒宇;陈玲娟;张兆钦;许凯;: "轨道交通沿线常规公交线路优化方法", 物流技术, no. 01 *
黄练;唐小淋;林钰龙;詹承志;: "基于一卡通数据的公交客流时空特征分析――以深圳为例", 中国高新技术企业, no. 17 *

Also Published As

Publication number Publication date
CN109615178B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
Yang et al. The implications of high-speed railways on air passenger flows in China
CN109583633A (en) A kind of method of public transport and the route shift adjustment of Public Transport Transfer trip
CN103218670B (en) Urban railway traffic random passenger flow loading method
CN109461306A (en) A kind of calculation method of public transit vehicle load factor
Nakagawa et al. Reevaluation of Japanese high-speed rail construction: recent situation of the north corridor Shinkansen and its way to completion
CN107451690A (en) A kind of intelligent route planning system
CN105277202A (en) Vehicle path planning method and system
Börjesson et al. Not invented here: Transferability of congestion charges effects
Jeng et al. A high-definition traffic performance monitoring system with the inductive loop detector signature technology
CN109615180A (en) A kind of analysis method of public bus network website demand and supply
Gallo et al. A multimodal approach to bus frequency design
CN109583719A (en) A kind of method of the route shift adjustment of the through trip of public transport
CN107146413A (en) A kind of smart city service platform
CN105550785B (en) One kind being based on the matched hinge feeder bus sytem setting sites method of transfer ability
CN109615178A (en) A kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again
CN104573067B (en) A kind of tramcar and BRT gauze comprehensive wiring methods
CN105427394B (en) Congestion-pricing optimum toll rate based on trial-and-error method and motor vehicle flow determines method
CN109583715A (en) A kind of method of public transport and the through route shift adjustment gone on a journey of track transfer
CN109461305A (en) A kind of calculation method of the bus stop traffic capacity
CN109636120A (en) The analysis method for needing the true OD of website is crossed in a kind of public transport
Kontelj et al. Transport Modelling of Freight Flows Accordance to Investments: Case Study of Slovenian Railways
Li et al. Combined modal split and assignment model for the multimodal transportation network of the economic circle in China
Ranjbari et al. A Mathematical Optimization Model for Solving the Intercity Transit Network Design Problem
CN109598417A (en) A kind of calculation method of public transit vehicle breakpoint boarding amount and averagely the ratio between boarding amount
CN109376946A (en) A kind of calculation method of the ratio between public transport section transfer amount and alternate route residual capacity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant