CN107451690A - A kind of intelligent route planning system - Google Patents

A kind of intelligent route planning system Download PDF

Info

Publication number
CN107451690A
CN107451690A CN201710633618.5A CN201710633618A CN107451690A CN 107451690 A CN107451690 A CN 107451690A CN 201710633618 A CN201710633618 A CN 201710633618A CN 107451690 A CN107451690 A CN 107451690A
Authority
CN
China
Prior art keywords
congestion
evaluation
pricing
represent
route planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710633618.5A
Other languages
Chinese (zh)
Inventor
韦玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yixin Intelligent Technology Co Ltd
Original Assignee
Shenzhen Yixin Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yixin Intelligent Technology Co Ltd filed Critical Shenzhen Yixin Intelligent Technology Co Ltd
Priority to CN201710633618.5A priority Critical patent/CN107451690A/en
Publication of CN107451690A publication Critical patent/CN107451690A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • G06Q50/40

Abstract

The invention provides a kind of intelligent route planning system, subsystem, route planning subsystem and display device are obtained including congestion-pricing management subsystem, information of vehicles, the congestion-pricing management subsystem is used for the congestion-pricing standard for obtaining section, the information of vehicles obtains the positional information that subsystem is used for collection vehicle, the route planning subsystem plans route that the display device is used for the route for showing planning according to the congestion-pricing standard in section and the positional information of vehicle.Beneficial effects of the present invention are:Route is planned according to the positional information of the congestion-pricing standard in section and vehicle, optimizes urban traffic conditions, improves civic trip experience.

Description

A kind of intelligent route planning system
Technical field
The present invention relates to route planning technical field, and in particular to a kind of intelligent route planning system.
Background technology
Traffic congestion is unavoidable problem during urban development, with China's urbanization, motorization, modernize into Journey quickly propels, and the construction for growing beyond road traffic facility of Urban traffic demand, traffic congestion is increasingly serious, how to have Effect control and alleviation traffic congestion are extremely urgent.
On the one hand, congestion-pricing measure is using economic lever regulation and control transport need, by adjusting Trip Costs guiding trip Decision-making so that the external cost of traffic trip obtains the compensation of value, has significantly for alleviating traffic congestion in having put into practice Effect.On the other hand, how science, which carries out route planning, turns into the important means that traveler avoids congestion.
The content of the invention
A kind of in view of the above-mentioned problems, the present invention is intended to provide intelligent route planning system.
The purpose of the present invention is realized using following technical scheme:
A kind of intelligent route planning system is provided, including congestion-pricing manages subsystem, information of vehicles obtains subsystem, Route planning subsystem and display device, the congestion-pricing management subsystem are used for the congestion-pricing standard for obtaining section, institute State information of vehicles and obtain the positional information that subsystem is used for collection vehicle, the route planning subsystem is received according to the congestion in section Expense standard and the positional information of vehicle plan that route the display device is used for the route for showing planning.
Beneficial effects of the present invention are:Route is advised according to the positional information of the congestion-pricing standard in section and vehicle Draw, optimize urban traffic conditions, improve civic trip experience.
Brief description of the drawings
Using accompanying drawing, the invention will be further described, but the embodiment in accompanying drawing does not form any limit to the present invention System, for one of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to the following drawings Other accompanying drawings.
Fig. 1 is the structural representation of the present invention;
Reference:
Congestion-pricing management subsystem 1, information of vehicles obtain subsystem 2, route planning subsystem 3, display device 4.
Embodiment
The invention will be further described with the following Examples.
Referring to Fig. 1, a kind of intelligent route planning system of the present embodiment, including congestion-pricing management subsystem 1, vehicle letter Breath obtains subsystem 2, route planning subsystem 3 and display device 4, and the congestion-pricing management subsystem 1 is used to obtain section Congestion-pricing standard, the information of vehicles obtains the positional information that subsystem 2 is used for collection vehicle, the route planning subsystem System 3 plans route that the display device 4 is used to show according to the congestion-pricing standard in section and the positional information of vehicle The route of planning.
The present embodiment is planned route according to the congestion-pricing standard in section and the positional information of vehicle, optimizes city City's traffic, improve civic trip experience.
Preferably, the positional information of the vehicle is the positional information obtained by GPS.
The positional information that this preferred embodiment obtains is more accurate, is favorably improved route planning precision.
Preferably, the display device 4 is high-definition display screen.
The display of this preferred embodiment route becomes apparent from, and improves Consumer's Experience.
Preferably, the congestion-pricing management subsystem 1 includes the first necessity evaluation module, the second feasibility assessment mould Block, the 3rd congestion Cost Evaluation module and the 4th price determination module, the first necessity evaluation module are used to hand over city Logical jam situation is evaluated, and the second feasibility assessment module is used to evaluate the feasibility of urban congestion charge, The 3rd congestion Cost Evaluation module is used to evaluate traffic congestion cost, and the 4th price determination module is used for root Determine to gather around according to the evaluation of the first necessity evaluation module, the second feasibility assessment module and the 3rd congestion Cost Evaluation module Stifled expenses standard;The second feasibility assessment module includes an evaluation unit, second evaluation unit and overall merit unit, Evaluation unit is used to evaluate public transport development, and the second evaluation unit is used to support the common people Situation is evaluated, and the overall merit unit is used for the evaluation according to an evaluation unit and second evaluation unit to city The feasibility of city's congestion-pricing is evaluated.
The present embodiment congestion-pricing manages subsystem and the feasibility of jam situation and charge is evaluated, according to evaluation feelings Condition determines traffic congestion situation and expenses standard, and accurate scientific basis is provided for congestion-pricing.
Preferably, it is described that urban traffic blocking situation is evaluated, be specially:Establish traffic congestion evaluation function:In above-mentioned formula, L1Represent road network flow, L2Represent road network average travel time, L3Table Show road network average travel, L4Represent road network design speed per hour, S1The congested link mileage of peak period in road network is represented, S is represented The total kilometrage in all sections in road network, EH represent traffic congestion evaluation of estimate;Traffic congestion evaluation of estimate is bigger, then carries out congestion-pricing Necessity it is bigger.
This preferred embodiment congestion-pricing management subsystem considers urban transportation situation, and the necessity of congestion-pricing is entered Accurate objective appraisal is gone, specifically, by establishing traffic congestion evaluation function, at the quantization for realizing traffic congestion situation Reason, the formulation for follow-up congestion-pricing standard provide Objective support.
It is described that public transport development is evaluated, be specially:Establish public transport evaluation function: In above-mentioned formula, G1Represent the length for the road that every square kilometre of area public bus network passes through, G2 Represent public bus network total length, G3Represent the length of every square kilometre of area public bus network, V1When representing that public transport is averagely run Speed, β represent public transport punctuality rate, YW1Represent public transport evaluation of estimate;It is described to support situation to evaluate the common people, specifically For:Establish the common people and support evaluation function:In above-mentioned formula, M1Represent the common people to current The satisfaction rate of traffic, M2Represent the supporting rate of congestion-pricing, YW2Represent that the common people support evaluation of estimate;It is described that urban congestion is received The feasibility of expense is evaluated, and is specially:Establish feasibility assessment function:On State in formula, EM represents feasibility assessment value;Feasibility assessment value is bigger, then the feasibility for carrying out congestion-pricing is bigger.
This preferred embodiment congestion-pricing management subsystem considers common people's wish, and the feasibility of congestion-pricing is carried out Accurate objective appraisal, specifically, supporting evaluation function by establishing public transport evaluation function and the common people, realize public friendship Logical development and the common people support the quantification treatment of situation, and the formulation for follow-up congestion-pricing standard provides Objective support.
Preferably, it is described that traffic congestion cost is evaluated, be specially:Establish cost evaluation function:LG=t × (y+ H)+W, in above-mentioned formula, t represents the time delays that traffic congestion is brought, and y represents traveler hourly average wage, and H represents unit The oil consumption price of time, W represent that LG represents cost evaluation of estimate because traffic congestion brings the cost of traffic accident;Cost is commented Value is bigger, then congestion-pricing standard is higher.
This preferred embodiment congestion-pricing management subsystem considers traffic congestion cost, specifically, by establishing cost Evaluation function, consider time cost, energy cost and social cost that traffic congestion is brought, improve follow-up congestion-pricing The science of standard formulation.
Preferably, the determination congestion-pricing standard, it is specially:Step 1, to traffic congestion evaluation of estimate and feasibility assessment Value is normalized;Step 2, expenses standard CS is determined using following formula:CS=0.5+EH ' × EM '+LG, in above-mentioned formula, EH ', EM ' represent the congestion evaluation of estimate and feasibility assessment value after normalization respectively.
This preferred embodiment congestion-pricing manages subsystem and carries out normalizing to traffic congestion evaluation of estimate and feasibility assessment value Change is handled, and eliminates the influence that different variables are calculated expense, it is determined that during expenses standard, has considered traffic congestion evaluation The influence of value, feasibility assessment value and Cost Evaluation value, the expenses standard more science of formulation, is also easier to be received by the common people.
Preferably, the congestion-pricing management subsystem also includes electronic passport, identifier and toll administration center, institute State electronic passport be arranged on vehicle full position, the identifier be arranged on congestion-pricing section and with the toll administration Center is connected, and the vehicle for entering congestion-pricing section is identified by electronic passport, and recognition result is uploaded into receipts Take administrative center, the congestion-pricing standard that the toll administration center determines according to the 4th price determination module is entered to vehicle Row charge.
This preferred embodiment realizes the congestion-pricing of vehicle by electronic passport, identifier and toll administration center.
Since departure place, route planning is carried out to five destinations using the intelligent route planning system of the present invention, respectively For destination 1, destination 2, destination 3, destination 4, destination 5, route planning time and Trip Costs are counted, together Existing route planning system is compared, caused to have the beneficial effect that shown in table:
The route planning time shortens Trip Costs reduce
Destination 1 29% 28%
Destination 2 27% 25%
Destination 3 26% 25%
Destination 4 25% 26%
Destination 5 24% 24%
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than the present invention is protected The limitation of scope is protected, although being explained with reference to preferred embodiment to the present invention, one of ordinary skill in the art should Work as understanding, technical scheme can be modified or equivalent substitution, without departing from the reality of technical solution of the present invention Matter and scope.

Claims (9)

1. a kind of intelligent route planning system, it is characterised in that obtain subsystem including congestion-pricing management subsystem, information of vehicles System, route planning subsystem and display device, the congestion-pricing management subsystem are used for the congestion-pricing standard for obtaining section, The information of vehicles obtains the positional information that subsystem is used for collection vehicle, and the route planning subsystem is according to the congestion in section Expenses standard and the positional information of vehicle plan that route the display device is used for the route for showing planning.
2. intelligent route planning system according to claim 1, it is characterised in that the positional information of the vehicle is to pass through The positional information that GPS is obtained.
3. intelligent route planning system according to claim 2, it is characterised in that the display device is that high definition is shown Screen.
4. intelligent route planning system according to claim 3, it is characterised in that the congestion-pricing manages subsystem bag Include the first necessity evaluation module, the second feasibility assessment module, the 3rd congestion Cost Evaluation module and the 4th price and determine mould Block, the first necessity evaluation module are used to evaluate urban traffic blocking situation, the second feasibility assessment mould Block be used for urban congestion charge feasibility evaluate, the 3rd congestion Cost Evaluation module be used for traffic congestion into This is evaluated, and the 4th price determination module is used for according to the first necessity evaluation module, the second feasibility assessment The evaluation of module and the 3rd congestion Cost Evaluation module determines congestion-pricing standard;The second feasibility assessment module includes one Secondary evaluation unit, second evaluation unit and overall merit unit, an evaluation unit are used for public transport development Evaluated, the second evaluation unit is used to support situation to evaluate the common people, and the overall merit unit is used for basis The feasibility that the evaluation of evaluation unit and second evaluation unit is charged to urban congestion is evaluated.
5. intelligent route planning system according to claim 4, it is characterised in that described to enter to urban traffic blocking situation Row evaluation, it is specially:Establish traffic congestion evaluation function:In above-mentioned formula, L1Represent Road network flow, L2Represent road network average travel time, L3Represent road network average travel, L4Represent road network design speed per hour, S1Table Show the congested link mileage of peak period in road network, S represents the total kilometrage in all sections in road network, and EH represents traffic congestion evaluation Value;Traffic congestion evaluation of estimate is bigger, then the necessity for carrying out congestion-pricing is bigger.
6. intelligent route planning system according to claim 5, it is characterised in that described to enter to public transport development Row evaluation, it is specially:Establish public transport evaluation function:In above-mentioned formula, G1 Represent the length for the road that every square kilometre of area public bus network passes through, G2Represent public bus network total length, G3Represent every square of public affairs Accumulate the length of public bus network, V in the inside1Represent that public transport averagely runs speed per hour, β represents public transport punctuality rate, YW1Represent public Traffic Evaluation value altogether;It is described to support situation to evaluate the common people, be specially:Establish the common people and support evaluation function: In above-mentioned formula, M1Represent the common people to the satisfaction rate of current traffic, M2Represent congestion-pricing Supporting rate, YW2Represent that the common people support evaluation of estimate;The feasibility to urban congestion charge is evaluated, and is specially:Establish Feasibility assessment function:In above-mentioned formula, EM represents feasibility assessment value;Can Row evaluation of estimate is bigger, then the feasibility for carrying out congestion-pricing is bigger.
7. intelligent route planning system according to claim 6, it is characterised in that described to comment traffic congestion cost Valency, it is specially:Establish cost evaluation function:LG=t × (y+H)+W, in above-mentioned formula, t represents the time that traffic congestion is brought Delay, y represent traveler hourly average wage, and H represents the oil consumption price of unit interval, and W is represented because traffic congestion is brought The cost of traffic accident, LG represent cost evaluation of estimate;Cost Evaluation value is bigger, then congestion-pricing standard is higher.
8. intelligent route planning system according to claim 7, it is characterised in that the determination congestion-pricing standard, tool Body is:Step 1, traffic congestion evaluation of estimate and feasibility assessment value are normalized;Step 2, using following formula determine receive Take standard CS:CS=0.5+EH ' × EM '+LG, in above-mentioned formula, EH ', EM ' represent the congestion evaluation of estimate after normalization respectively With feasibility assessment value.
9. intelligent route planning system according to claim 8, it is characterised in that the congestion-pricing management subsystem is also Including electronic passport, identifier and toll administration center, the electronic passport is arranged on the full position of vehicle, the knowledge Other device is arranged on congestion-pricing section and is connected with the toll administration center, by electronic passport to entering congestion-pricing road The vehicle of section is identified, and recognition result is uploaded into toll administration center, and the toll administration center is according to the described 4th The congestion-pricing standard that price determination module determines is charged to vehicle.
CN201710633618.5A 2017-07-28 2017-07-28 A kind of intelligent route planning system Pending CN107451690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710633618.5A CN107451690A (en) 2017-07-28 2017-07-28 A kind of intelligent route planning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710633618.5A CN107451690A (en) 2017-07-28 2017-07-28 A kind of intelligent route planning system

Publications (1)

Publication Number Publication Date
CN107451690A true CN107451690A (en) 2017-12-08

Family

ID=60489649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710633618.5A Pending CN107451690A (en) 2017-07-28 2017-07-28 A kind of intelligent route planning system

Country Status (1)

Country Link
CN (1) CN107451690A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107240253A (en) * 2017-07-28 2017-10-10 韦德永 A kind of urban traffic blocking management system
CN107944807A (en) * 2017-12-27 2018-04-20 广西师范学院 Logistic management system
CN110648411A (en) * 2019-10-29 2020-01-03 哈尔滨工业大学 Road congestion charging system and method based on mileage distribution
CN111886611A (en) * 2018-01-31 2020-11-03 北美日产公司 Computing framework for batch route planning for autonomous vehicles
US11482111B2 (en) 2019-07-17 2022-10-25 Uber Technologies, Inc. Computing timing intervals for vehicles through directional route corridors
US11948464B2 (en) 2017-11-27 2024-04-02 Uber Technologies, Inc. Real-time service provider progress monitoring

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102184578A (en) * 2011-04-15 2011-09-14 江苏怡和科技股份有限公司 Urban traffic jam charging system
CN106052709A (en) * 2016-05-16 2016-10-26 腾讯科技(深圳)有限公司 Congestion information processing method and device
CN106504530A (en) * 2016-10-31 2017-03-15 合肥工业大学 A kind of user's trip route induction and managing and control system and its method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102184578A (en) * 2011-04-15 2011-09-14 江苏怡和科技股份有限公司 Urban traffic jam charging system
CN106052709A (en) * 2016-05-16 2016-10-26 腾讯科技(深圳)有限公司 Congestion information processing method and device
CN106504530A (en) * 2016-10-31 2017-03-15 合肥工业大学 A kind of user's trip route induction and managing and control system and its method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴栋栋 等: ""北京交通拥堵引起的生态经济价值损失评估"", 《生态经济》 *
姜毅 等: ""小城市公共交通服务评价指标体系"", 《交通科技与经济》 *
张智勇 等: "《交通拥堵收费研究》", 28 February 2014 *
郑淑鉴 等: ""国内外交通拥堵评价指标计算方法研究"", 《公路与汽运》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107240253A (en) * 2017-07-28 2017-10-10 韦德永 A kind of urban traffic blocking management system
US11948464B2 (en) 2017-11-27 2024-04-02 Uber Technologies, Inc. Real-time service provider progress monitoring
CN107944807A (en) * 2017-12-27 2018-04-20 广西师范学院 Logistic management system
CN111886611A (en) * 2018-01-31 2020-11-03 北美日产公司 Computing framework for batch route planning for autonomous vehicles
US11482111B2 (en) 2019-07-17 2022-10-25 Uber Technologies, Inc. Computing timing intervals for vehicles through directional route corridors
US11854404B2 (en) 2019-07-17 2023-12-26 Uber Technologies, Inc. Computing timing intervals for vehicles through directional route corridor
CN110648411A (en) * 2019-10-29 2020-01-03 哈尔滨工业大学 Road congestion charging system and method based on mileage distribution
CN110648411B (en) * 2019-10-29 2021-09-03 哈尔滨工业大学 Road congestion charging system and method based on mileage distribution

Similar Documents

Publication Publication Date Title
CN107451690A (en) A kind of intelligent route planning system
Deng et al. Bus Rapid Transit implementation in Beijing: An evaluation of performance and impacts
CN107679654B (en) Parking scale pre-estimation control system and implementation method
CN106781490A (en) Urban highway traffic analysis & appraisement on operation system
CN104575050B (en) A kind of fast road ramp intellectual inducing method and device based on Floating Car
CN106601005B (en) A kind of municipal intelligent traffic abductive approach based on RFID and wechat platform
CN103150762A (en) Taxi carpool pricing system, pricing method and booking method thereof
CN106991824A (en) Charge station's vehicle queue Forecasting Methodology
CN105070078B (en) Dynamic route guidance method based on vehicle-to-vehicle communication
Diab et al. The farside story: measuring the benefits of bus stop location on transit performance
CN106056944A (en) Traveling environment evaluation system and traveling environment evaluation method
Santos 14. The London experience1
Leeman The reduction of queues through the use of price
CN109461218A (en) It is a kind of that the current expense method of payment of high speed and system are determined based on GPS positioning information
Nohekhan et al. Investigating the impacts of I-66 Inner Beltway dynamic tolling system
US20180308350A1 (en) A method and system to identify congestion root cause and recommend possible mitigation measures based on cellular data and related applications thereof
CN109584560A (en) A kind of traffic control adjusting method and system based on freeway traffic detection
CN105528890A (en) A taxi carpooling method suitable for large-scale transportation hubs
CN116090785B (en) Custom bus planning method for two stages of large-scale movable loose scene
CN105070060B (en) A kind of urban road traffic state method of discrimination based on public transport vehicle-mounted gps data
Fields et al. Relieving congestion by adding road capacity and tolling
CN106846814A (en) A kind of taxi is dynamically by the method to set up of point
Kontelj et al. Transport Modelling of Freight Flows Accordance to Investments: Case Study of Slovenian Railways
Palakurthy et al. Trip generation rates at park-and-ride facilities with regional bus and light rail service: A supplement to ITE trip generation data
CN109523294A (en) A kind of taxi sharing charging method based on husky Puli's algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208