CN109583719A - A kind of method of the route shift adjustment of the through trip of public transport - Google Patents

A kind of method of the route shift adjustment of the through trip of public transport Download PDF

Info

Publication number
CN109583719A
CN109583719A CN201811365001.0A CN201811365001A CN109583719A CN 109583719 A CN109583719 A CN 109583719A CN 201811365001 A CN201811365001 A CN 201811365001A CN 109583719 A CN109583719 A CN 109583719A
Authority
CN
China
Prior art keywords
passenger flow
bus
route
getting
name
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811365001.0A
Other languages
Chinese (zh)
Other versions
CN109583719B (en
Inventor
马荣叶
高技
张亮
张守田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ho Whale Cloud Computing Polytron Technologies Inc
Original Assignee
Ho Whale Cloud Computing Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ho Whale Cloud Computing Polytron Technologies Inc filed Critical Ho Whale Cloud Computing Polytron Technologies Inc
Priority to CN201811365001.0A priority Critical patent/CN109583719B/en
Publication of CN109583719A publication Critical patent/CN109583719A/en
Application granted granted Critical
Publication of CN109583719B publication Critical patent/CN109583719B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q50/40

Abstract

The method of the route shift adjustment of the through trip of the public transport that the present invention designs, analyze the starting point gone on a journey in the period of working day (or nonworkdays) route and destination, it analyzes what wherein public transport was gone directly, calculates through passenger flow in get on or off the bus passenger flow number and the through passenger flow sum of each website;Through passenger flow accounts for 30% or more of the route passenger flow, uniformly or non-uniformly according to Trip distribution, large passenger flow website (15% or more/through number of getting off that the through number of getting on the bus accounts for through passenger flow of getting on the bus account for go directly get off 15% or more of passenger flow) is spatially centralised or decentralised, judge the load factor situation of the period route, various increase or decrease shift to make, open special line, merge the adjustable strategies such as small passenger flow website.

Description

A kind of method of the route shift adjustment of the through trip of public transport
Technical field
The invention belongs to Operator Specific Service field more particularly to a kind of sides of the route shift adjustment of the through trip of public transport Method.
Background technique
Public transport company adjusts public bus network rule of thumb to repetition circuit (public transport and subway are overlapped section) analysis at present, Effect is not satisfactory, and the skill for going out repetition circuit client's trip characteristics by big data analysis has been given in the development of current computer technology Art is directed toward, to provide the removal the smallest scheme of redundancy public bus network negative effect, is plugged into passenger in conjunction with individual trip law-analysing Practical OD point, analyze working day (or nonworkdays) route a period in go on a journey starting point and destination, point Public transport is through, public transport and Public Transport Transfer, public transport and track transfer are through, Public Transport Transfer track changes to these four situations of public transport again, And it is made adjustment the decision of route shift according to different concrete conditions.
Summary of the invention
The present invention is intended to provide a kind of method of the route shift adjustment of the through trip of public transport.
To realize the above-mentioned technical purpose, the present invention uses following technical scheme, a kind of route shift of the through trip of public transport The method of adjustment analyzes the starting point gone on a journey in the period of working day (or nonworkdays) route and destination, point Analyse what wherein public transport was gone directly, which comprises the following steps:
Step S1, bus trip is not changed to, i.e., Trip chain is TRANSPOT_TYPE=2, PAYMENT_ORDER=1 And the record of IS_OVER=Y;
Step S2, through passenger flow is calculated in get on or off the bus passenger flow number and the through passenger flow sum of each website;
Step S3, through passenger flow accounts for 30% or more of the route passenger flow, and in each station on-board and off-board uniform amount, i.e. passenger flow (get on the bus+get off) variance then calculates the average load factor of the period route less than 0.1, when load factor > 120%, should increase class Secondary, the limit value of variance can be adjusted according to data cases;When load factor < 50%, shift should be reduced, shift is reduced and combines practical class Secondary adjustment guarantees that minimum shift of dispatching a car, 50%≤load factor≤120% can keep status;
Step S4, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e., passenger flow (get on the bus+under Vehicle) variance is greater than 0.1, and (the through number of getting on the bus accounts for 15% or more/number of getting off of going directly of through passenger flow of getting on the bus to large passenger flow website Account for and through get off 15% or more of passenger flow) spatially concentrate, judge the load factor of the period route, works as load factor > 120% When, it can be for routes such as large passenger flow release of section local train, special line, main station express bus;When load factor < 50%, shift should be reduced; 50%≤load factor≤120% can keep status;
Step S5, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e., passenger flow (get on the bus+under Vehicle) variance is greater than 0.1, and (the through number of getting on the bus accounts for 15% or more/number of getting off of going directly of through passenger flow of getting on the bus to large passenger flow website Account for and through get off 15% or more of passenger flow) spatially disperse, judge the load factor of the period route, works as load factor > 120% When, the strategy for merging small passenger flow website can be taken for this situation;When load factor < 50%, shift should be reduced;50%≤fully loaded Rate≤120% can keep status;
Step S6, through passenger flow account for the 30% of the route passenger flow hereinafter, route and shift adjustment should in conjunction with other factors into Row.
Preferably, the transit trip chain information TD_PUBLIC_TRIP_CHAIN table deposit extracted in step S1 Data are by following format: Name is entity number, and Code ENTITY_NUM, Data Type is VARCHAR2 (50);Name is The means of payment, Code PAYMENT_TYPE, Data Type are CHAR [1], 1-IC card, the mobile terminal 2-;Name is payment of getting on the bus Flowing water is recorded, Code PAYMENT_SN, Data Type is VARCHAR2 (50);Name is payment sequence number, and Code is PAYMENT_ORDER, Data Type are NUMBER (2), and each Y is later again since 1;Name is Site ID of getting on the bus, Code It is NUMBER [9] for UP_STATION_ID, Data Type;Name is to get on the bus the time of payment, Code UP_PAYMENT_ TIME, Data Type are DATE;To be get-off stop ID, Code DOWN_STATION_ID, Data Type are Name NUMBER (9), exceptional value 000000000;Name is the time getting off, and Code DOWN_PAYMENT_TIME, Data Type are DATE, exceptional value 1900/00/00/00/00/00;Name is route ID, and Code LINE_ID, Data Type is NUMBER [9];Name is once whether trip is completed, and Code IS_OVER, Data Type is CHAR (1), Y, N;Name is traffic work Has type, Code TRANSPOT_TYPE, Data Type is CHAR (1), 1-subway, 2-bus, 3-taix, 4-bike; Name is entry time, and Code UPDATE_TIME, Data Type is DATE.
Preferably, the calculation method of passenger flow variance are as follows: calculate website and get on the bus number+number of getting off, obtain each website Passenger flow qsn;Calculate website passenger flow mean valueI.e. the sum of all website passenger flows of the route are divided by website sum;It calculates Passenger flow variance
The method of the route shift adjustment of the through trip of the public transport that the present invention designs, analyzes working day (or nonworkdays) one What wherein public transport was gone directly analyzed in the starting point gone on a journey in one period of a route and destination, calculate through passenger flow at each station Get on or off the bus passenger flow number and the through passenger flow sum of point;Through passenger flow accounts for 30% or more of the route passenger flow, equal according to Trip distribution Even or uneven, (15% or more/number of getting off of going directly that the through number of getting on the bus accounts for through passenger flow of getting on the bus accounts for directly large passenger flow website Up to 15% or more of passenger flow of getting off) it is spatially centralised or decentralised, the load factor situation of the period route is judged, to make It is various to increase or decrease shift, open special line, merge the adjustable strategies such as small passenger flow website.
Detailed description of the invention
Fig. 1 is the flow chart of the method for the present invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, the connection being also possible to inside two elements can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term.
A kind of side of the route shift adjustment of the through trip of public transport according to an embodiment of the present invention is described referring to Fig. 1 Method, analyzes the starting point gone on a journey in the period of working day (or nonworkdays) route and destination, and analysis is wherein public What friendship was gone directly, which comprises the following steps:
Step S1, bus trip is not changed to, i.e., Trip chain is TRANSPOT_TYPE=2, PAYMENT_ORDER=1 And the record of IS_OVER=Y;
Step S2, through passenger flow is calculated in get on or off the bus passenger flow number and the through passenger flow sum of each website;
Step S3, through passenger flow accounts for 30% or more of the route passenger flow, and in each station on-board and off-board uniform amount, i.e. passenger flow (get on the bus+get off) variance then calculates the average load factor of the period route less than 0.1, when load factor > 120%, should increase class Secondary, the limit value of variance can be adjusted according to data cases;When load factor < 50%, shift should be reduced, shift is reduced and combines practical class Secondary adjustment guarantees that minimum shift of dispatching a car, 50%≤load factor≤120% can keep status;
Step S4, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e., passenger flow (get on the bus+under Vehicle) variance is greater than 0.1, and (the through number of getting on the bus accounts for 15% or more/number of getting off of going directly of through passenger flow of getting on the bus to large passenger flow website Account for and through get off 15% or more of passenger flow) spatially concentrate, judge the load factor of the period route, works as load factor > 120% When, it can be for routes such as large passenger flow release of section local train, special line, main station express bus;When load factor < 50%, shift should be reduced; 50%≤load factor≤120% can keep status;
Step S5, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e., passenger flow (get on the bus+under Vehicle) variance is greater than 0.1, and (the through number of getting on the bus accounts for 15% or more/number of getting off of going directly of through passenger flow of getting on the bus to large passenger flow website Account for and through get off 15% or more of passenger flow) spatially disperse, judge the load factor of the period route, works as load factor > 120% When, the strategy for merging small passenger flow website can be taken for this situation;When load factor < 50%, shift should be reduced;50%≤fully loaded Rate≤120% can keep status;
Step S6, through passenger flow account for the 30% of the route passenger flow hereinafter, route and shift adjustment should in conjunction with other factors into Row.
Preferably, the transit trip chain information TD_PUBLIC_TRIP_CHAIN table deposit extracted in step S1 Data are by following format: Name is entity number, and Code ENTITY_NUM, Data Type is VARCHAR2 (50);Name is The means of payment, Code PAYMENT_TYPE, Data Type are CHAR [1], 1-IC card, the mobile terminal 2-;Name is payment of getting on the bus Flowing water is recorded, Code PAYMENT_SN, Data Type is VARCHAR2 (50);Name is payment sequence number, and Code is PAYMENT_ORDER, Data Type are NUMBER (2), and each Y is later again since 1;Name is Site ID of getting on the bus, Code It is NUMBER [9] for UP_STATION_ID, Data Type;Name is to get on the bus the time of payment, Code UP_PAYMENT_ TIME, Data Type are DATE;To be get-off stop ID, Code DOWN_STATION_ID, Data Type are Name NUMBER (9), exceptional value 000000000;Name is the time getting off, and Code DOWN_PAYMENT_TIME, Data Type are DATE, exceptional value 1900/00/00/00/00/00;Name is route ID, and Code LINE_ID, Data Type is NUMBER [9];Name is once whether trip is completed, and Code IS_OVER, Data Type is CHAR (1), Y, N;Name is traffic work Has type, Code TRANSPOT_TYPE, Data Type is CHAR (1), 1-subway, 2-bus, 3-taix, 4-bike; Name is entry time, and Code UPDATE_TIME, Data Type is DATE.
Preferably, the calculation method of passenger flow variance are as follows: calculate website and get on the bus number+number of getting off, obtain each website Passenger flow qsn;Calculate website passenger flow mean valueI.e. the sum of all website passenger flows of the route are divided by website sum;It calculates Passenger flow variance
The method of the route shift adjustment of the through trip of the public transport that the present invention designs, analyzes working day (or nonworkdays) one What wherein public transport was gone directly analyzed in the starting point gone on a journey in one period of a route and destination, calculate through passenger flow at each station Get on or off the bus passenger flow number and the through passenger flow sum of point;Through passenger flow accounts for 30% or more of the route passenger flow, equal according to Trip distribution Even or uneven, (15% or more/number of getting off of going directly that the through number of getting on the bus accounts for through passenger flow of getting on the bus accounts for directly large passenger flow website Up to 15% or more of passenger flow of getting off) it is spatially centralised or decentralised, the load factor situation of the period route is judged, to make It is various to increase or decrease shift, open special line, merge the adjustable strategies such as small passenger flow website.
In the description of this specification, the description meaning of reference term " one embodiment ", " example " or " some examples " etc. Refer to that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or show Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples It can be combined in any suitable manner.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that: not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (3)

1. a kind of method of the route shift adjustment of the through trip of public transport, the one of analysis working day (or nonworkdays) route What wherein public transport was gone directly analyzed in the starting point gone on a journey in a period and destination, which comprises the following steps:
Step S1, bus trip is not changed to, i.e., Trip chain is TRANSPOT_TYPE=2, PAYMENT_ORDER=1 and IS_ The record of OVER=Y;
Step S2, through passenger flow is calculated in get on or off the bus passenger flow number and the through passenger flow sum of each website;
Step S3, through passenger flow accounts for 30% or more of the route passenger flow, and in each station on-board and off-board uniform amount, i.e., passenger flow (get on the bus+ Get off) variance less than 0.1, then calculates the average load factor of the period route, when load factor > 120%, frequency increase is answered, side The limit value of difference can be adjusted according to data cases;When load factor < 50%, shift should be reduced, shift is reduced and combines practical shift tune It is whole, guarantee that minimum shift of dispatching a car, 50%≤load factor≤120% can keep status;
Step S4, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e. passenger flow (get on the bus+get off) Variance is greater than 0.1, and (15% or more/number of getting off of going directly that the through number of getting on the bus accounts for through passenger flow of getting on the bus accounts for large passenger flow website It is through to get off 15% or more of passenger flow) spatially concentrate, judge the load factor of the period route, works as load factor > 120% When, it can be for routes such as large passenger flow release of section local train, special line, main station express bus;When load factor < 50%, shift should be reduced; 50%≤load factor≤120% can keep status;
Step S5, through passenger flow accounts for 30% or more of the route passenger flow, and Trip distribution is uneven, i.e. passenger flow (get on the bus+get off) Variance is greater than 0.1, and (15% or more/number of getting off of going directly that the through number of getting on the bus accounts for through passenger flow of getting on the bus accounts for large passenger flow website It is through to get off 15% or more of passenger flow) spatially disperse, judge the load factor of the period route, works as load factor > 120% When, the strategy for merging small passenger flow website can be taken for this situation;When load factor < 50%, shift should be reduced;50%≤fully loaded Rate≤120% can keep status;
Step S6, through passenger flow accounts for the 30% of the route passenger flow hereinafter, route and shift adjustment should be carried out in conjunction with other factors.
2. the method according to claim 1, wherein the transit trip chain information TD_ extracted in step S1 The data of PUBLIC_TRIP_CHAIN table deposit are by following format: Name is entity number, Code ENTITY_NUM, Data Type is VARCHAR2 (50);Name is the means of payment, and Code PAYMENT_TYPE, Data Type is CHAR [1], 1-IC Card, the mobile terminal 2-;Name is payment record flowing water of getting on the bus, and Code PAYMENT_SN, Data Type is VARCHAR2 (50); Name is payment sequence number, and Code PAYMENT_ORDER, Data Type is NUMBER (2), is opened again from 1 after each Y Begin;Name is Site ID of getting on the bus, and Code UP_STATION_ID, Data Type is NUMBER [9];Name is when getting on the bus to pay Between, Code UP_PAYMENT_TIME, Data Type is DATE;Name be get-off stop ID, Code DOWN_ STATION_ID, Data Type are NUMBER (9), exceptional value 000000000;Name is time getting off, Code DOWN_ PAYMENT_TIME, Data Type are DATE, exceptional value 1900/00/00/00/00/00;Name is route ID, and Code is LINE_ID, Data Type are NUMBER [9];Name is once whether trip is completed, and Code IS_OVER, Data Type are CHAR (1), Y, N;Name is type of vehicle, and Code TRANSPOT_TYPE, Data Type is CHAR (1), 1- Subway, 2-bus, 3-taix, 4-bike;Name is entry time, and Code UPDATE_TIME, Data Type is DATE.
3. the method according to claim 1, wherein the calculation method of passenger flow variance are as follows: calculate website and get on the bus people It count+gets off number, obtains the passenger flow q of each websitesn;Calculate website passenger flow mean valueThat is all websites of the route The sum of passenger flow is divided by website sum;Calculate passenger flow variance
CN201811365001.0A 2018-11-16 2018-11-16 Method for adjusting line shifts of bus direct travel Active CN109583719B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811365001.0A CN109583719B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus direct travel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811365001.0A CN109583719B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus direct travel

Publications (2)

Publication Number Publication Date
CN109583719A true CN109583719A (en) 2019-04-05
CN109583719B CN109583719B (en) 2024-04-26

Family

ID=65922764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811365001.0A Active CN109583719B (en) 2018-11-16 2018-11-16 Method for adjusting line shifts of bus direct travel

Country Status (1)

Country Link
CN (1) CN109583719B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101824A (en) * 2020-11-09 2020-12-18 浙江工商职业技术学院 Public traffic management method and system based on big data
CN113705903A (en) * 2021-08-31 2021-11-26 重庆市凤筑科技有限公司 OD derivation method based on urban public transport comprehensive model

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103198565A (en) * 2013-04-12 2013-07-10 王铎源 Charge and passenger flow information acquisition method for bus IC (integrated circuit) cards
CN105913653A (en) * 2016-06-27 2016-08-31 华南理工大学 Public transport intelligent vehicle planning and scheduling system and public transport intelligent vehicle planning and scheduling method under cloud platform environment
CN106504518A (en) * 2016-11-24 2017-03-15 浙江交通职业技术学院 The dispatching method that a kind of city bus are cooperateed with long-distance passenger transportation
CN106781432A (en) * 2016-11-16 2017-05-31 青岛海信网络科技股份有限公司 A kind of method and device of public traffic vehicles schedule
WO2018023331A1 (en) * 2016-08-01 2018-02-08 中国科学院深圳先进技术研究院 System and method for real-time evaluation of service index of regular public buses
CN108806302A (en) * 2018-05-23 2018-11-13 青岛海信网络科技股份有限公司 A kind of vehicle dispatching method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103198565A (en) * 2013-04-12 2013-07-10 王铎源 Charge and passenger flow information acquisition method for bus IC (integrated circuit) cards
CN105913653A (en) * 2016-06-27 2016-08-31 华南理工大学 Public transport intelligent vehicle planning and scheduling system and public transport intelligent vehicle planning and scheduling method under cloud platform environment
WO2018023331A1 (en) * 2016-08-01 2018-02-08 中国科学院深圳先进技术研究院 System and method for real-time evaluation of service index of regular public buses
CN106781432A (en) * 2016-11-16 2017-05-31 青岛海信网络科技股份有限公司 A kind of method and device of public traffic vehicles schedule
CN106504518A (en) * 2016-11-24 2017-03-15 浙江交通职业技术学院 The dispatching method that a kind of city bus are cooperateed with long-distance passenger transportation
CN108806302A (en) * 2018-05-23 2018-11-13 青岛海信网络科技股份有限公司 A kind of vehicle dispatching method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘颂: "城市公交单一线路优化研究", 《中国优秀硕士学位论文全文数据库信息科技辑》, no. 2014, 15 December 2014 (2014-12-15), pages 1 - 61 *
苏薇: "城市公交组合调度模型研究", 《中国优秀硕士学位论文全文数据库信息科技辑》, no. 2016, 15 January 2016 (2016-01-15), pages 1 - 55 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101824A (en) * 2020-11-09 2020-12-18 浙江工商职业技术学院 Public traffic management method and system based on big data
CN113705903A (en) * 2021-08-31 2021-11-26 重庆市凤筑科技有限公司 OD derivation method based on urban public transport comprehensive model

Also Published As

Publication number Publication date
CN109583719B (en) 2024-04-26

Similar Documents

Publication Publication Date Title
Wang et al. Passenger demand oriented train scheduling and rolling stock circulation planning for an urban rail transit line
CN109583633A (en) A kind of method of public transport and the route shift adjustment of Public Transport Transfer trip
Yin et al. Energy-efficient metro train rescheduling with uncertain time-variant passenger demands: An approximate dynamic programming approach
CN103956041B (en) A kind of bus dispatching system and control method thereof
CN109461306A (en) A kind of calculation method of public transit vehicle load factor
CN111401614B (en) Dynamic passenger flow distribution method and system for urban rail transit
Shi et al. Operations design of modular vehicles on an oversaturated corridor with first-in, first-out passenger queueing
Wang et al. Train scheduling and circulation planning in urban rail transit lines
WO2019003672A1 (en) Transit demand forecasting device and transit demand forecasting method
CN109583719A (en) A kind of method of the route shift adjustment of the through trip of public transport
Sierpiński et al. Use of GSM Technology as the Support to Manage the Modal Distribution in the Cities
CN107451690A (en) A kind of intelligent route planning system
Deng et al. Reduce bus bunching with a real-time speed control algorithm considering heterogeneous roadway conditions and intersection delays
CN109615180A (en) A kind of analysis method of public bus network website demand and supply
CN111859718A (en) Method and system for calculating congestion coefficient of regional multi-standard rail transit station
Yuan et al. Decomposition and approximate dynamic programming approach to optimization of train timetable and skip-stop plan for metro networks
Yang et al. Optimization of station-skip in a cyclic express subway service
CN109544917A (en) A kind of optimization method at bus departure interval
CN109583715A (en) A kind of method of public transport and the through route shift adjustment gone on a journey of track transfer
Kontelj et al. Transport Modelling of Freight Flows Accordance to Investments: Case Study of Slovenian Railways
CN109615178A (en) A kind of method that Public Transport Transfer track changes to the route shift adjustment of bus trip again
CN110009924A (en) A kind of calculation method of bus station lifting amount
Zhang et al. Short-term forecasting of passenger flow on the metro platform using an improved Kalman filtering method
CN109583716A (en) A kind of calculation method of public bus network website OD amount
CN111931386A (en) Method and system for calculating congestion coefficient of regional multi-standard rail traffic interval

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant