CN109611061A - 一种漂浮下入筛管的方法 - Google Patents
一种漂浮下入筛管的方法 Download PDFInfo
- Publication number
- CN109611061A CN109611061A CN201811438313.XA CN201811438313A CN109611061A CN 109611061 A CN109611061 A CN 109611061A CN 201811438313 A CN201811438313 A CN 201811438313A CN 109611061 A CN109611061 A CN 109611061A
- Authority
- CN
- China
- Prior art keywords
- tubing string
- screen casing
- tripping
- internal layer
- washing pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007667 floating Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000005406 washing Methods 0.000 claims abstract description 35
- 238000007789 sealing Methods 0.000 claims abstract description 25
- 238000003780 insertion Methods 0.000 claims abstract description 23
- 230000037431 insertion Effects 0.000 claims abstract description 23
- 238000005553 drilling Methods 0.000 claims abstract description 5
- 238000004458 analytical method Methods 0.000 claims abstract description 4
- 239000012530 fluid Substances 0.000 claims abstract description 4
- 230000005484 gravity Effects 0.000 claims abstract description 4
- 238000012856 packing Methods 0.000 claims description 6
- 238000010008 shearing Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 abstract description 3
- 239000004576 sand Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000012966 insertion method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000017260 vegetative to reproductive phase transition of meristem Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
- E21B43/086—Screens with preformed openings, e.g. slotted liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/101—Setting of casings, screens, liners or the like in wells for underwater installations
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Dispersion Chemistry (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种漂浮下入筛管的方法,针对裸眼独立筛管防砂或裸眼砾石充填工艺,首先根据井眼轨迹、储层特性、钻井液比重确定筛管下入位置及筛管长度,在此基础上进行摩阻分析,计算下入筛管时所需的浮力,进而确定合适的双层冲管密闭环空体积,由此确定冲管的外径尺寸、长度等参数;然后依次下外层管柱、中层管柱、内层管柱,最后安装上封隔器,如此,中层管柱、内层管柱之间形成的密闭环空,可实现筛管管柱的漂浮下入,在内层管柱加压或打压时能够打开密封插头,保证内层管柱畅通,最大限度地减少摩阻力对筛管下入的影响,使筛管能够安全快速地下入,且能够实现边冲边下,从而使筛管管柱可以顺利下入到设计位置。
Description
技术领域
本发明属于石油天然气开采领域,涉及完井过程中的一种漂浮下入筛管的方法。
背景技术
大位移井技术是开发边际油田、减少钻井平台、提高海上油田整体开发效益的重要技术。大位移水平井的突出特点大位移水平井一般具有较长的水平段,施工过程中管柱受井眼摩擦影响较大。在大位移井完井下筛管作业中,由于筛管与套管、裸眼井壁之间的摩阻大,裸眼段长,导致筛管下入困难,筛管下入一旦遇阻,上部管柱难以施加有效的重量而完成下入,处理手段极其有限,且严重影响作业时效。筛管如果不能正常下入到位,轻则影响油气井产能,使高产井变为低效井,重则可能使井眼报废。筛管能否下到预定井深是大位移井成功的重要因素。
常规的筛管下入方法,由于下筛管时存在重量大或者大位移井大斜度、长稳斜段、井眼摩阻大的问题。无法有效降降低筛管浮重,将导致较大的摩阻,筛管较难下入到位。若能解决大位移长水平井及大斜度井筛管下入高摩阻问题,对于完井提质增效有着重要的实际意义。
发明内容
本发明的目的在于克服上述已有技术的不足,提供提供一种漂浮筛管下入方法,能够降低管柱与井壁之间的摩阻,实现边冲边下,从而使筛管可以顺利下入到设计位置。
为了实现上述目的,本发明采用的技术方案是:一种漂浮下入筛管的方法,其特征在于:包括如下步骤:S1:根据井眼轨迹、储层特性、钻井液比重确定筛管下入位置及筛管长度,在此基础上进行摩阻分析,计算下入筛管时所需的浮力,进而确定合适的双层冲管密闭环空体积,由此确定冲管的外径尺寸、长度等参数;S2:先下外层管柱:依次将浮鞋、密封筒、筛管连接后下入到井中并使最后下入的筛管上端的盲管坐落在井口;S3:再下入中层管柱:依次将内密封插头、冲管密封筒、中层冲管连接后下入到筛管内,并使使冲管坐落在最后下入的筛管上端的盲管上;S4:最后下内层管柱:将内密封插头、内层冲管连接后下入,并使内密封插头置于冲管密封筒处,同时,通过一冲管连接头将内层冲管及中层冲管连接;S5:将一封隔器分别与冲管连接头及盲管连接,内层冲管与冲管之间形成的密闭环空可实现筛管管柱的漂浮下入,在内层管柱加压或打压时能够打开密封插头,保证内管柱畅通,实现边冲边下。
进一步地,所述密封插头包括插筒和剪切球座,插筒和剪切球座之间通过剪切销钉固定连接,在内层管柱加压或管内正打压时,能够剪断剪切销钉并将剪切球座推入插筒底部。或者,所述密封插头包括插筒和安装在插筒下部的破裂盘,在内层管柱加压或管内正打压时,能够击碎破裂盘,使内层管柱畅通。
本发明的有益效果是:本发明的下入方法针对裸眼独立筛管防砂或裸眼砾石充填工艺,采用漂浮结构辅助筛管下入,能够利用在筛管内部建立的密闭环空,增加筛管的浮力,降低管柱与井壁之间的摩阻,最大限度地减少摩阻力对筛管下入的影响,使筛管能够安全快速地下入,且能够实现边冲边下,从而使筛管管柱可以顺利下入到设计位置。
附图说明
下面结合附图对本发明作进一步的详细说明。
图1为本发明的结构示意图。
图2为本发明中一种密封插头的结构示意图。
图3为本发明中另一种密封插头的结构示意图。
具体实施方式
如图1所示,本发明一种漂浮下入筛管的方法,包括如下步骤:S1:根据井眼轨迹、储层特性、钻井液比重确定筛管下入位置及筛管长度,在此基础上进行摩阻分析,计算下入筛管时所需的浮力,进而确定合适的双层冲管密闭环空体积,由此确定冲管的外径尺寸、长度等参数。
S2:先下外层管柱:依次将浮鞋1、密封筒2、筛管3连接后下入到井中并使最后下入的筛管上端的盲管坐落在井口。
S3:再下入中层管柱:依次将内密封插头5、冲管密封筒6、中层冲管7连接后下入到筛管3内,并使使冲管7坐落在最后下入的筛管上端的盲管上。
S4:最后下内层管柱:将内密封插头9、内层冲管10连接后下入,并使内密封插头9置于冲管密封筒6处,同时,通过一冲管连接头8将内层冲管10及中层冲管7连接。
S5:将一封隔器4分别与冲管连接头8及盲管连接,内层冲管10与冲管7之间形成的密闭环空可实现筛管管柱的漂浮下入,在内层管柱加压或打压时能够打开密封插头5,保证内层管柱畅通,实现边冲边下。
本实施例中,如图2所示,所述密封插头5采用如下结构,其包括插筒101和剪切球座102,插筒101和剪切球座102之间通过剪切销钉102固定连接,在内层管柱加压或管内正打压时,能够剪断剪切销钉102并将剪切球座103推入插筒101底部。
当然,实际生产时,密封插头5也可以采用另外的结构,如图3所示,密封插头5包括插筒201和安装在插筒下部的破裂盘102,在内层管柱加压或管内正打压时,能够击碎破裂盘202,实现内层管柱畅通。
以上内容仅用以说明本发明的技术方案,本领域的普通技术人员对本发明的技术方案进行的简单修改或者等同替换,均不脱离本发明技术方案的实质和范围。
Claims (3)
1.一种漂浮下入筛管的方法,其特征在于:包括如下步骤:
S1:根据井眼轨迹、储层特性、钻井液比重确定筛管下入位置及筛管长度,在此基础上进行摩阻分析,计算下入筛管时所需的浮力,进而确定合适的双层冲管密闭环空体积,由此确定冲管的外径尺寸、长度等参数;
S2:先下外层管柱:依次将浮鞋(1)、密封筒(2)、筛管(3)连接后下入到井中并使最后下入的筛管上端的盲管坐落在井口;
S3:再下入中层管柱:依次将内密封插头(5)、冲管密封筒(6)、中层冲管(7)连接后下入到筛管(3)内,并使使冲管(7)坐落在最后下入的筛管上端的盲管上;
S4:最后下内层管柱:将内密封插头(9)、内层冲管(10)连接后下入,并使内密封插头(9)置于冲管密封筒(6)处,同时,通过一冲管连接头(8)将内层冲管(10)及中层冲管(7)连接;
S5:将一封隔器(4)分别与冲管连接头(8)及盲管连接,内层冲管(10)与冲管(7)之间形成的密闭环空可实现筛管管柱的漂浮下入,在内层管柱加压或打压时能够打开密封插头(5),保证内层管柱畅通,实现边冲边下。
2.根据权利要求1所述的漂浮下入筛管的方法,其特征在于:所述密封插头(5)包括插筒(101)和剪切球座(102),插筒(101)和剪切球座(102)之间通过剪切销钉(102)固定连接,在内层管柱加压或管内正打压时,能够剪断剪切销钉(102)并将剪切球座(103)推入插筒(101)底部。
3.根据权利要求1所述的漂浮下入筛管的方法,其特征在于:所述密封插头(5)包括插筒(201)和安装在插筒下部的破裂盘(102),在内层管柱加压或管内正打压时,能够击碎破裂盘(202)使内层管柱畅通。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811438313.XA CN109611061B (zh) | 2018-11-29 | 2018-11-29 | 一种漂浮下入筛管的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811438313.XA CN109611061B (zh) | 2018-11-29 | 2018-11-29 | 一种漂浮下入筛管的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109611061A true CN109611061A (zh) | 2019-04-12 |
CN109611061B CN109611061B (zh) | 2021-03-02 |
Family
ID=66004826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811438313.XA Active CN109611061B (zh) | 2018-11-29 | 2018-11-29 | 一种漂浮下入筛管的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109611061B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374530A (zh) * | 2019-07-16 | 2019-10-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | 一种通过改变管内流体密度增加油管柱下入深度的方法 |
CN110439478A (zh) * | 2019-07-18 | 2019-11-12 | 中国石油天然气集团有限公司 | 内层套管为螺纹连接的双层组合套管结构及其装配方法 |
CN110500065A (zh) * | 2019-09-20 | 2019-11-26 | 德州众凯石油科技有限公司 | 油气井可漂浮下入的筛管结构 |
RU2812945C1 (ru) * | 2022-12-20 | 2024-02-05 | Илья Валерьевич Серебренников | Способ спуска хвостовика-фильтра в скважину с большим отклонением от вертикали |
Citations (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4231312A (en) * | 1978-08-21 | 1980-11-04 | Global Marine, Inc. | Flexible ocean upwelling pipe |
JPH09126353A (ja) * | 1995-10-30 | 1997-05-13 | Nippon Steel Corp | 浮力を利用して管を弧状に地中敷設する方法 |
CN2375839Y (zh) * | 1999-06-09 | 2000-04-26 | 赵万荣 | 增压防漏式可变浮力输油浮管 |
CA2309489A1 (en) * | 1999-05-28 | 2000-11-28 | Baker Hughes Incorporated | Downhole screen and method of manufacture |
US20030116324A1 (en) * | 2001-12-20 | 2003-06-26 | Exxonmobil Upstream Research Company | Installation of evacuated tubular conduits |
CN2667153Y (zh) * | 2003-10-30 | 2004-12-29 | 栾德民 | 浮动式防砂器 |
CN2886053Y (zh) * | 2006-01-24 | 2007-04-04 | 石凤岐 | 水平井套管入井减阻器 |
CN1994812A (zh) * | 2006-12-21 | 2007-07-11 | 中国科学院广州能源研究所 | 一种能躲避台风等自然灾害的漂浮式海洋装置 |
JP2007285317A (ja) * | 2006-04-12 | 2007-11-01 | Sekisui Chem Co Ltd | 管体 |
CN101649928A (zh) * | 2009-06-17 | 2010-02-17 | 钟爱民 | 气囊辅助安装管道的方法 |
CN201567960U (zh) * | 2009-12-16 | 2010-09-01 | 中国石油集团渤海钻探工程有限公司 | 漂浮下套管管串 |
CN101994880A (zh) * | 2009-08-06 | 2011-03-30 | Tpr非柏得两合公司 | 双层管 |
CN202132618U (zh) * | 2011-07-21 | 2012-02-01 | 沈家同 | 填充硬泡沫浮管 |
CN101782180B (zh) * | 2010-01-30 | 2012-12-05 | 徐国栋 | 一种流体力输送物料的管道及其制法 |
CN102943648A (zh) * | 2012-10-10 | 2013-02-27 | 中国石油集团长城钻探工程有限公司 | 一种运用于筛管完井的漂浮工具 |
US20140000906A1 (en) * | 2012-06-28 | 2014-01-02 | Scott Earl Williamson | Liner flotation system |
CN102650203B (zh) * | 2012-05-17 | 2015-05-27 | 安徽省煤田地质局第一勘探队 | 浮力阀及含该阀的瓦斯抽排孔工作套管的自平衡下管方法 |
CN105888574A (zh) * | 2016-05-27 | 2016-08-24 | 成都北方石油勘探开发技术有限公司 | 一种完井管柱 |
CN205605185U (zh) * | 2015-12-31 | 2016-09-28 | 山东科瑞石油工程技术研究院 | 新型控水筛管 |
CN106184658A (zh) * | 2016-08-25 | 2016-12-07 | 惠州市大隆科技有限公司 | 圆筒形浮动器件 |
CN106567691A (zh) * | 2016-10-11 | 2017-04-19 | 中国石油天然气股份有限公司 | 裸眼筛管用的作业方法以及管柱 |
US20170191352A1 (en) * | 2014-06-04 | 2017-07-06 | Absolute Completion Technologies Ltd. | Apparatus and methods for treating a wellbore screen |
CN106969199A (zh) * | 2017-06-05 | 2017-07-21 | 恒润集团有限公司 | 海底管道气囊装置及海底管道的安装方法 |
CN206860107U (zh) * | 2017-07-07 | 2018-01-09 | 天津华利保温建材有限公司 | 一种安装于海洋隔水管柱外部的浮力模块 |
CN207438017U (zh) * | 2017-06-30 | 2018-06-01 | 中国舰船研究设计中心 | 一种气囊式海水管路消声器 |
CN108644475A (zh) * | 2018-05-08 | 2018-10-12 | 胡振强 | 抗风浪疏浚管 |
-
2018
- 2018-11-29 CN CN201811438313.XA patent/CN109611061B/zh active Active
Patent Citations (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4231312A (en) * | 1978-08-21 | 1980-11-04 | Global Marine, Inc. | Flexible ocean upwelling pipe |
JPH09126353A (ja) * | 1995-10-30 | 1997-05-13 | Nippon Steel Corp | 浮力を利用して管を弧状に地中敷設する方法 |
CA2309489A1 (en) * | 1999-05-28 | 2000-11-28 | Baker Hughes Incorporated | Downhole screen and method of manufacture |
CN2375839Y (zh) * | 1999-06-09 | 2000-04-26 | 赵万荣 | 增压防漏式可变浮力输油浮管 |
US20030116324A1 (en) * | 2001-12-20 | 2003-06-26 | Exxonmobil Upstream Research Company | Installation of evacuated tubular conduits |
CN2667153Y (zh) * | 2003-10-30 | 2004-12-29 | 栾德民 | 浮动式防砂器 |
CN2886053Y (zh) * | 2006-01-24 | 2007-04-04 | 石凤岐 | 水平井套管入井减阻器 |
JP2007285317A (ja) * | 2006-04-12 | 2007-11-01 | Sekisui Chem Co Ltd | 管体 |
CN1994812A (zh) * | 2006-12-21 | 2007-07-11 | 中国科学院广州能源研究所 | 一种能躲避台风等自然灾害的漂浮式海洋装置 |
CN101649928A (zh) * | 2009-06-17 | 2010-02-17 | 钟爱民 | 气囊辅助安装管道的方法 |
CN101994880A (zh) * | 2009-08-06 | 2011-03-30 | Tpr非柏得两合公司 | 双层管 |
CN201567960U (zh) * | 2009-12-16 | 2010-09-01 | 中国石油集团渤海钻探工程有限公司 | 漂浮下套管管串 |
CN101782180B (zh) * | 2010-01-30 | 2012-12-05 | 徐国栋 | 一种流体力输送物料的管道及其制法 |
CN202132618U (zh) * | 2011-07-21 | 2012-02-01 | 沈家同 | 填充硬泡沫浮管 |
CN102650203B (zh) * | 2012-05-17 | 2015-05-27 | 安徽省煤田地质局第一勘探队 | 浮力阀及含该阀的瓦斯抽排孔工作套管的自平衡下管方法 |
US20140000906A1 (en) * | 2012-06-28 | 2014-01-02 | Scott Earl Williamson | Liner flotation system |
CN102943648A (zh) * | 2012-10-10 | 2013-02-27 | 中国石油集团长城钻探工程有限公司 | 一种运用于筛管完井的漂浮工具 |
US20170191352A1 (en) * | 2014-06-04 | 2017-07-06 | Absolute Completion Technologies Ltd. | Apparatus and methods for treating a wellbore screen |
CN205605185U (zh) * | 2015-12-31 | 2016-09-28 | 山东科瑞石油工程技术研究院 | 新型控水筛管 |
CN105888574A (zh) * | 2016-05-27 | 2016-08-24 | 成都北方石油勘探开发技术有限公司 | 一种完井管柱 |
CN106184658A (zh) * | 2016-08-25 | 2016-12-07 | 惠州市大隆科技有限公司 | 圆筒形浮动器件 |
CN106567691A (zh) * | 2016-10-11 | 2017-04-19 | 中国石油天然气股份有限公司 | 裸眼筛管用的作业方法以及管柱 |
CN106969199A (zh) * | 2017-06-05 | 2017-07-21 | 恒润集团有限公司 | 海底管道气囊装置及海底管道的安装方法 |
CN207438017U (zh) * | 2017-06-30 | 2018-06-01 | 中国舰船研究设计中心 | 一种气囊式海水管路消声器 |
CN206860107U (zh) * | 2017-07-07 | 2018-01-09 | 天津华利保温建材有限公司 | 一种安装于海洋隔水管柱外部的浮力模块 |
CN108644475A (zh) * | 2018-05-08 | 2018-10-12 | 胡振强 | 抗风浪疏浚管 |
Non-Patent Citations (3)
Title |
---|
EDDIE G 等: ""Providing Floating Capabilities in Latest-Generation Sand Screens"", 《SPE/PS/CHOA 117615》 * |
刘晓坡,廖前华,董建安: "漂浮接箍下套管技术在大位移井BZ34-1-D8h中的应用", 《石化技术》 * |
张恒,李春福,徐学军,杨文领,张立娜: "水平井割缝筛管下入强度研究", 《石油机械》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374530A (zh) * | 2019-07-16 | 2019-10-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | 一种通过改变管内流体密度增加油管柱下入深度的方法 |
CN110439478A (zh) * | 2019-07-18 | 2019-11-12 | 中国石油天然气集团有限公司 | 内层套管为螺纹连接的双层组合套管结构及其装配方法 |
CN110500065A (zh) * | 2019-09-20 | 2019-11-26 | 德州众凯石油科技有限公司 | 油气井可漂浮下入的筛管结构 |
CN110500065B (zh) * | 2019-09-20 | 2024-03-08 | 德州众凯石油科技有限公司 | 油气井可漂浮下入的筛管结构 |
RU2812945C1 (ru) * | 2022-12-20 | 2024-02-05 | Илья Валерьевич Серебренников | Способ спуска хвостовика-фильтра в скважину с большим отклонением от вертикали |
Also Published As
Publication number | Publication date |
---|---|
CN109611061B (zh) | 2021-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109611061A (zh) | 一种漂浮下入筛管的方法 | |
CN202108493U (zh) | 水平井水力喷射多簇分段压裂管柱 | |
CN110410021B (zh) | 一种用于气井的完井测试管柱和方法 | |
CN112855087A (zh) | 煤层气水平井系统改造方法 | |
CN201412133Y (zh) | 水平井多段拖动压裂工艺管柱 | |
CN100538003C (zh) | 膨胀式筛管悬挂方法 | |
CN105986795B (zh) | 煤层气水平井煤层改造方法 | |
CN109236186A (zh) | 新型钻井套管及大井眼多分支井快速钻完井方法 | |
CN204703876U (zh) | 一种桥式同心分注管柱 | |
CN101503955A (zh) | 分段完井方法及管柱 | |
CN205503073U (zh) | 一种水平井可退可捞式内切割装置 | |
CN107246254A (zh) | 一种煤系气u型井钻进及开发方法 | |
CN204283371U (zh) | 完井管柱 | |
CN206309353U (zh) | 一种分段砾石充填定位装置 | |
CN101886529B (zh) | 一种错断井修复打通道技术 | |
CN113216949B (zh) | 一种超深高压探井的试油及储层改造方法 | |
CN202108424U (zh) | 油井射孔压裂及排液一体化管柱 | |
CN107882515A (zh) | 一种套管悬空装置 | |
CN104420836B (zh) | 水平井分段坐封式井口流量法找水管柱及其找水方法 | |
CN106223898B (zh) | 一种二开水平井固完井一体化管柱装置 | |
CN104832113B (zh) | 一种自适应式井下液压扶正器及其扶正方法 | |
CN204186371U (zh) | 首段射孔套管滑套分段压裂工具管柱 | |
CN107989572A (zh) | 一种小井眼固井防砂完井一体化管柱及施工方法 | |
CN110617057A (zh) | 一种全管式井下测试管柱及其测试方法 | |
CN207598200U (zh) | 一种膨胀管分段施工液缸装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |