CN109610886A - 一种用于深基坑竖井笼梯从上往下安装的施工方法 - Google Patents
一种用于深基坑竖井笼梯从上往下安装的施工方法 Download PDFInfo
- Publication number
- CN109610886A CN109610886A CN201811484975.0A CN201811484975A CN109610886A CN 109610886 A CN109610886 A CN 109610886A CN 201811484975 A CN201811484975 A CN 201811484975A CN 109610886 A CN109610886 A CN 109610886A
- Authority
- CN
- China
- Prior art keywords
- fission
- section
- mounting rack
- seperated
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G27/00—Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Ladders (AREA)
Abstract
一种用于深基坑竖井笼梯从上往下安装的施工方法,笼梯由数节结构相同的分体构成,该施工方法将数节分体从上往下拼接,将安装架固定在深基坑的上面,扩大了分体拼接成笼梯的安装空间,拼接过程具有快速、简单之特点,减少了拼接难度,保证了施工进度,提高了施工人员的拼接安全性。
Description
技术领域
本发明属于基坑笼梯安装施工技术领域,尤其是一种用于深基坑竖井笼梯从上往下安装的施工方法。
背景技术
深基坑在结构施工完成后需要进行结构模板及脚手架拆除,同时需要提供垂直人行通道至底部施工作业面,这些都需要在深基坑一侧临时安装笼梯。
笼梯是由数节结构相同的分体通过上下结合面拼接而成,每节所述分体采用角钢焊接成长方体,所述分体中间采用钢板焊接有楼梯踏板,所述长方体四周采用铁丝网焊接,所述长方体顶部及底部四周角钢按照一定间距设有连接孔。
第一节所述分体四周外侧与双拼工钢焊接架设在深基坑楼梯预留孔内或围护结构侧面,随着深基坑深度的增大其第二节所述分体吊装至第一节所述分体底部并放置在深基坑,然后将第二节所述分体顶部通过手拉葫芦拉至第一节所述分体底部并通过所述连接孔进行联接。依次类推根据深基坑深度的不断下降,第三节所述分体及其第N节所述分体依照上述对接方式完成笼梯整体拼接,每隔10m左右固定一节所述分体在围护结构侧面。
上述分体拼接成笼梯的方式是从下往上安装一个过程,多节分体均处于悬挂状态。
上述笼梯在安装时会产生如下问题:
1、施工人员需要进行高空作业,增加了坠落风险。
2、安装速度慢,影响深基坑施工进度。
3、由于所述分体是从下往上拼接,安装难度大,并且需要不断转换手拉葫芦的吊装位置。
4、随着深基坑深度不断下降,所述分体底部不具备存放条件。
发明内容
为解决上述问题,本发明提供一种用于深基坑竖井笼梯从上往下安装的施工方法,该施工方法保证了笼梯安装速度、防止施工人员坠落风险、减少笼梯的对接难度。
为实现上述发明目的,本发明采用如下技术方案:
一种用于深基坑竖井笼梯从上往下安装的施工方法,笼梯是由数节结构相同的分体并通过上下结合面拼接而成,每节所述分体采用角钢焊接成长方体,所述分体中间采用钢板焊接有楼梯踏板,所述长方体四周采用铁丝网焊接,所述长方体顶部及底部四周角钢安照一定间距设有联接孔,该施工方法使用到安装架,其特征是:
安装架呈长方体并由H型钢焊接而成,安装架的内部空间尺寸大于所述分体外部尺寸,在安装架的各立柱与其顶部之间焊接有加固斜钢撑,安装架顶部的两个长边H型钢上分别对称焊接有各四个钢板吊装孔,在安装架底部的两个长边H型钢上分别对应配置有数个插槽且所述插槽配有插销,安装架底部伸出的四个立柱端面分别焊接固定钢板,每块所述固定钢板设置数个联接孔;
将安装架整体吊装至深基坑结构楼梯的预留螺栓上并通过所述联接孔将安装架联接固定,或是将安装架吊装至深基坑一侧的双拼工钢上并通过所述联接孔和螺栓将安装架联接固定,再通过各所述吊装孔连接手拉葫芦;
将第一节所述分体从安装架顶部吊至安装架内的所述插槽处并将所述插销插在第一节所述分体的上部两个长边角钢内,再将第二节所述分体吊至第一节所述分体顶部并通过第二节所述分体底部的联接孔以及第一节所述分体顶部的联接孔进行拼接联接,拼接联接后将四个手拉葫芦的挂钩分别挂在第一节所述分体顶部的四角,然后同时拉紧四个手拉葫芦使第一节所述分体和第二节所述分体向上抬起,抬起过程中取出所述插销,再同时松动四个手拉葫芦使第一节所述分体和第二节所述分体向下移位至第二节所述分体的上部两个长边角钢内并插入插销完成第一节所述分体和第二节所述分体的拼接过程;
根据上述第二节所述分体从上与下面第一节所述分体拼接过程,能够实施第三节所述分体从上与下面第二节所述分体的拼接,依次类推根据深基坑的深度就能够实施最后一节所述分体从上与下面上一节所述分体的拼接,当数节所述分体的总高超过10m时其中一节所述分体固定在深基坑围护结构面,至此完成深基坑竖井笼梯从上往下拼接的施工全过程。
由于采用如上所述技术方案,本发明产生如下积极效果:
1、本发明将安装架固定在深基坑的上面,扩大了所述分体拼接成笼梯的安装空间,具有施工操作方便、提高拼接施工人员的安全性之特点。
2、本发明拼接数节所述分体使从上往下的施工过程,拼接过程快速、简单,减少了拼接难度,保证了施工进度。
具体实施方式
本发明是一种用于深基坑竖井笼梯从上往下安装的施工方法,该施工方法将数节所述分体从上往下拼接,拼接过程具有快速、简单之特点,减少了拼接难度,保证了施工进度。
有关笼梯的具体结构以及安装架的具体结构参见所述技术方案,不另赘述。
当笼梯从上往下安装施工前,先将安装架整体吊装至深基坑结构楼梯的预留螺栓上并通过所述联接孔将安装架联接固定,或是将安装架吊装至深基坑一侧的双拼工钢上并通过所述联接孔和螺栓将安装架联接固定,将两个工字钢拼焊在一起称其为双拼工钢,再通过各所述吊装孔连接手拉葫芦。
从上往下拼接时,将第一节所述分体从安装架顶部吊至安装架内的所述插槽处并将所述插销插在第一节所述分体的上部两个长边角钢内,再将第二节所述分体吊至第一节所述分体顶部并通过第二节所述分体底部的联接孔以及第一节所述分体顶部的联接孔进行拼接联接,拼接联接后将四个手拉葫芦的挂钩分别挂在第一节所述分体顶部的四角,然后同时拉紧四个手拉葫芦使第一节所述分体和第二节所述分体向上抬起,抬起过程中取出所述插销,再同时松动四个手拉葫芦使第一节所述分体和第二节所述分体向下移位至第二节所述分体的上部两个长边角钢内并插入插销完成第一节所述分体和第二节所述分体的拼接过程。
根据上述第二节所述分体从上与下面第一节所述分体拼接过程,能够实施第三节所述分体从上与下面第二节所述分体的拼接,依次类推根据深基坑的深度就能够实施最后一节所述分体从上与下面上一节所述分体的拼接,当数节所述分体的总高超过10m时其中一节所述分体固定在深基坑围护结构面,至此完成深基坑竖井笼梯从上往下拼接的施工全过程,从该施工全过程可以明显看出:将安装架固定在深基坑的上面,扩大了所述分体拼接成笼梯的安装空间,具有施工操作方便、提高拼接施工人员的安全性之特点。
Claims (1)
1.一种用于深基坑竖井笼梯从上往下安装的施工方法,笼梯是由数节结构相同的分体并通过上下结合面拼接而成,每节所述分体采用角钢焊接成长方体,所述分体中间采用钢板焊接有楼梯踏板,所述长方体四周采用铁丝网焊接,所述长方体顶部及底部四周角钢安照一定间距设有联接孔,该施工方法使用到安装架,其特征是:
安装架呈长方体并由H型钢焊接而成,安装架的内部空间尺寸大于所述分体外部尺寸,在安装架的各立柱与其顶部之间焊接有加固斜钢撑,安装架顶部的两个长边H型钢上分别对称焊接有各四个钢板吊装孔,在安装架底部的两个长边H型钢上分别对应配置有数个插槽且所述插槽配有插销,安装架底部伸出的四个立柱端面分别焊接固定钢板,每块所述固定钢板设置数个联接孔;
将安装架整体吊装至深基坑结构楼梯的预留螺栓上并通过所述联接孔将安装架联接固定,或是将安装架吊装至深基坑一侧的双拼工钢上并通过所述联接孔和螺栓将安装架联接固定,再通过各所述吊装孔连接手拉葫芦;
将第一节所述分体从安装架顶部吊至安装架内的所述插槽处并将所述插销插在第一节所述分体的上部两个长边角钢内,再将第二节所述分体吊至第一节所述分体顶部并通过第二节所述分体底部的联接孔以及第一节所述分体顶部的联接孔进行拼接联接,拼接联接后将四个手拉葫芦的挂钩分别挂在第一节所述分体顶部的四角,然后同时拉紧四个手拉葫芦使第一节所述分体和第二节所述分体向上抬起,抬起过程中取出所述插销,再同时松动四个手拉葫芦使第一节所述分体和第二节所述分体向下移位至第二节所述分体的上部两个长边角钢内并插入插销完成第一节所述分体和第二节所述分体的拼接过程;
根据上述第二节所述分体从上与下面第一节所述分体拼接过程,能够实施第三节所述分体从上与下面第二节所述分体的拼接,依次类推根据深基坑的深度就能够实施最后一节所述分体从上与下面上一节所述分体的拼接,当数节所述分体的总高超过10m时其中一节所述分体固定在深基坑围护结构面,至此完成深基坑竖井笼梯从上往下拼接的施工全过程。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811484975.0A CN109610886A (zh) | 2018-12-06 | 2018-12-06 | 一种用于深基坑竖井笼梯从上往下安装的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811484975.0A CN109610886A (zh) | 2018-12-06 | 2018-12-06 | 一种用于深基坑竖井笼梯从上往下安装的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109610886A true CN109610886A (zh) | 2019-04-12 |
Family
ID=66006133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811484975.0A Pending CN109610886A (zh) | 2018-12-06 | 2018-12-06 | 一种用于深基坑竖井笼梯从上往下安装的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109610886A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112125238A (zh) * | 2020-08-05 | 2020-12-25 | 中石化宁波工程有限公司 | 一种竖井内钢梁的施工安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2244546Y (zh) * | 1995-11-20 | 1997-01-08 | 江汉建筑工程机械厂 | 施工升降机吊笼自顶升加节装置 |
US6907957B1 (en) * | 2002-06-25 | 2005-06-21 | Arthur Allen Couch | Trench shield ladder |
CN104533106A (zh) * | 2014-12-22 | 2015-04-22 | 天津二建建筑工程有限公司 | 单层立体预制随基坑开挖装配下沉式施工爬梯及施工方法 |
CN107939068A (zh) * | 2017-12-25 | 2018-04-20 | 中铁四局集团第二工程有限公司 | 一种基坑悬挂通道装置 |
CN108412229A (zh) * | 2018-03-15 | 2018-08-17 | 中国三峡建设管理有限公司 | 自升式旋转爬梯 |
-
2018
- 2018-12-06 CN CN201811484975.0A patent/CN109610886A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2244546Y (zh) * | 1995-11-20 | 1997-01-08 | 江汉建筑工程机械厂 | 施工升降机吊笼自顶升加节装置 |
US6907957B1 (en) * | 2002-06-25 | 2005-06-21 | Arthur Allen Couch | Trench shield ladder |
CN104533106A (zh) * | 2014-12-22 | 2015-04-22 | 天津二建建筑工程有限公司 | 单层立体预制随基坑开挖装配下沉式施工爬梯及施工方法 |
CN107939068A (zh) * | 2017-12-25 | 2018-04-20 | 中铁四局集团第二工程有限公司 | 一种基坑悬挂通道装置 |
CN108412229A (zh) * | 2018-03-15 | 2018-08-17 | 中国三峡建设管理有限公司 | 自升式旋转爬梯 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112125238A (zh) * | 2020-08-05 | 2020-12-25 | 中石化宁波工程有限公司 | 一种竖井内钢梁的施工安装方法 |
CN112125238B (zh) * | 2020-08-05 | 2021-11-30 | 中石化宁波工程有限公司 | 一种竖井内钢梁的施工安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102661054B (zh) | 平面钢桁架整体提升中的侧向加固结构及整体提升方法 | |
CN101537976B (zh) | 双塔桅巨型自升降起重设备及其跟携吊装方法 | |
CN106437130A (zh) | 一种用于超高层建筑施工的内顶外爬式模架施工平台 | |
EP3647512A1 (en) | Self-climbing device for vertical and quasi-vertical concrete surfaces | |
CN106400951A (zh) | 一种超高层建筑的水平与竖向结构同步施工方法 | |
CN106988299B (zh) | 装配式钢筋笼下放架及钢筋笼的下放方法 | |
CN214220561U (zh) | 建筑倾斜立面变向轨式吊篮施工平台 | |
CN104060840A (zh) | 使用螺栓球桁架提升机提升大跨度穹顶网架的施工方法 | |
CN109184190A (zh) | 爬升与承载一体化的梁式液压爬升平台及其安装方法 | |
CN109898848A (zh) | 一种爬升式整体钢平台模架体系及其施工方法 | |
CN206233541U (zh) | 一种用于超高层建筑施工的内顶外爬式模架施工平台 | |
CN107142954B (zh) | 一种整体吊装的钢吊箱吊装系统及其吊装方法 | |
CN109610886A (zh) | 一种用于深基坑竖井笼梯从上往下安装的施工方法 | |
CN106121040A (zh) | 一种焊接格构柱装置及焊接方法 | |
CN210439705U (zh) | 一种预制混凝土叠合板吊装装置 | |
CN210529495U (zh) | 一种桥梁工程用升降作业设备 | |
CN107268971B (zh) | 一种超高层建筑物的双重自提升式外爬架及应用方法 | |
CN102561689A (zh) | 悬挑提升脚手架的施工方法 | |
CN109252656A (zh) | 高层建筑爬升模板及组装、灌注和提升方法 | |
CN108625800B (zh) | 一种用于竖井施工的多功能井架 | |
CN202689498U (zh) | 简易建筑外墙可升降脚手架 | |
CN213449427U (zh) | 用于沉井井孔内的垂直升降结构 | |
CN108083131B (zh) | 一种三角桁架式桩腿外部吊装装置 | |
CN104746860A (zh) | 一种倒锥壳水塔斜拉模架的水箱空中现浇方法 | |
CN221073407U (zh) | 用于建筑外立面施工的可移动式简易吊篮结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190412 |