CN109604499B CN201811359985.1A CN201811359985A CN109604499B CN 109604499 B CN109604499 B CN 109604499B CN 201811359985 A CN201811359985 A CN 201811359985A CN 109604499 B CN109604499 B CN 109604499B
Authority
CN
China
Prior art keywords
bottom die
unit
die
replacing
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811359985.1A
Other languages
Chinese (zh)
Other versions
CN109604499A (en
Inventor
杨静
马国云
翟林
蒋耀亮
孙学娟
韩国泰
龚勋
岳怀宇
刘世雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Sino German University of Applied Sciences
Original Assignee
Tianjin Sino German University of Applied Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Sino German University of Applied Sciences filed Critical Tianjin Sino German University of Applied Sciences
Priority to CN201811359985.1A priority Critical patent/CN109604499B/en
Publication of CN109604499A publication Critical patent/CN109604499A/en
Application granted granted Critical
Publication of CN109604499B publication Critical patent/CN109604499B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor
    • B21J13/03Die mountings

Abstract

The invention belongs to the field of cold heading dies, and particularly relates to a method for quickly positioning and replacing a bottom die, wherein a device for quickly replacing the bottom die is used and comprises a movable die unit, a static die unit matched with the movable die unit and a moving unit; when the device is used, the moving die unit and the static die unit are adjusted in precision on line, then the device is placed at a specified position, and the moving unit is used for moving the element and the static die unit to the installation position. The bottom die replacing device is simple and reasonable in structure, improves bottom die replacing efficiency, simplifies bottom die replacing steps, improves equipment utilization rate, reduces enterprise cost, and is very obvious in application effect.

Description

Method for quickly positioning and replacing bottom die
Technical Field
The invention belongs to the field of cold heading dies, and particularly relates to a method for quickly positioning and replacing a bottom die.
Background
At present, cold heading equipment in fastener production uses manpower to put a die in when changing the die, and is adjusted by oneself. Sometimes, due to the fact that production arrangement needs to be changed frequently, due to the fact that changing time is too long, and the investment of personnel needs to be increased. Resulting in longer production period and great labor loss. Particularly, the profit is reduced for tasks of various varieties and small batches.
The problem of mold replacement is solved by improving a mold replacement method, so that the mold can be rapidly replaced, the product precision needs to be ensured, and the mold is safely and firmly installed.
Summary of the existing production problems:
1. the traditional die change process needs manual operation through observation, is complex in installation, wastes time and labor, and has great potential safety hazards.
2. Workers move around to find and take tools, materials and the like, and much time and labor cost are wasted.
3. The traditional die change process has long and complicated die change time and seriously influences the production efficiency and the machine utilization rate.
4. The traditional die change process is easy to cause die damage and has large potential safety hazard.
With the increasing market competition, fasteners are updated more and more quickly, stock varieties are more and more, the conditions of multiple varieties, medium and small batches and mixed flow just-in-time production in production become mainstream, and particularly, for enterprises matched with the automobile industry, for example, fasteners are taken as examples, and qualified products are required to be provided for different automobile models in parallel and just in time. Therefore, the interval time of the die replacement is shorter and shorter, namely, the frequency of the die replacement is higher and higher, the downtime of the corresponding cold header is greatly increased, the production efficiency and the machine utilization rate are seriously influenced, the delivery cycle is prolonged, and the large investment cannot be effectively returned.
The current situation arouses the attention of manufacturers for producing and using the cold heading machine in China, and if the problem of rapid die change is not effectively solved in cold heading processing automation, the automation degree of other production links is higher, so that the utilization rate of equipment and the production efficiency are difficult to be fully improved. This problem has been substantially solved in industrially developed countries, namely: a rapid die change system is employed. The quick die changing system has strong practicability and wide application range, can be used for various cold heading machines of companies, is not available for quick die changing equipment, and a skilled worker needs to complete die changing within 7-8 hours, thus occupying too long working time. If the rapid die changing equipment is adopted, the fast die changing equipment only needs to occupy about 20 minutes on line, and other work can be finished under the line, so that the production efficiency is greatly improved. The quick replacement mechanism can greatly improve the production efficiency of the fastener industry.
Disclosure of Invention
The invention aims to provide a method for quickly positioning and replacing a bottom die.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for quickly positioning and replacing a bottom die uses a quick bottom die replacing device, wherein the quick bottom die replacing device comprises a movable die unit, a static die unit matched with the movable die unit and a moving unit; the moving unit comprises a vertical moving unit and a horizontal moving unit;
the vertical moving unit comprises an inverted U-shaped plate, a movable die mounting plate and a static die mounting plate which are respectively arranged at the bottom ends of two sides of the U-shaped plate, a vertical air cylinder rod connected with the U-shaped plate and a vertical air cylinder connected with a vertical air cylinder piston rod; the movable die mounting plate is connected with the movable die unit through a plurality of movable die vacuum chucks; the static mould mounting plate is connected with the static mould unit through a plurality of static mould vacuum suckers;
the horizontal moving unit comprises an L-shaped plate, a moving plate connected with two ends of the L-shaped plate, a horizontal cylinder rod connected with the moving plate and a horizontal cylinder connected with the horizontal cylinder rod; the L-shaped plate is connected with the U-shaped plate through a vertical rail;
when the device is used, the precision of the movable mould unit and the static mould unit is adjusted on line, then the movable mould unit and the static mould unit are placed at a specified position, and the movable mould unit and the static mould unit are moved to the installation position by using the moving unit.
The movable die unit comprises a bottom die positioning plate and a plurality of bottom die quick-change mechanisms connected with the bottom die positioning plate; the bottom die quick-change mechanism comprises a bottom die mounting plate, a bottom die, an upper pressing block, a lower pressing block and an upper adjusting bolt, wherein the upper pressing block and the lower pressing block are fixed on the bottom die mounting plate and are respectively arranged on the upper side and the lower side of the bottom die; the upper and lower adjusting bolts penetrate through the prefabricated holes in the upper portion of the bottom die mounting plate and the upper pressing block and are in threaded connection with the bottom die.
The lower end of the horizontal cylinder is provided with a horizontal mounting plate; and a horizontal guide rail is arranged on the horizontal mounting plate and is used for horizontal movement of the L-shaped plate.
The number of the vacuum suction cups is 8, and the vacuum suction cups are respectively arranged above the movable mould unit and the static mould unit.
And adjusting bolts are arranged at the left end and the right end of the upper pressing block.
The upper pressing block and the lower pressing block are respectively fixed with the bottom die mounting plate by using an upper locking nut and a lower locking nut.
And a through hole is formed in the bottom die positioning plate and used for installing a zero point positioning system.
Compared with the prior art, the invention has the beneficial effects that:
the bottom die replacing device is simple and reasonable in structure, improves bottom die replacing efficiency, simplifies bottom die replacing steps, improves equipment utilization rate, reduces enterprise cost, and is very obvious in application effect.
Drawings
FIG. 1 is a schematic view of the overall structure of the quick bottom die replacing device of the present invention;
FIG. 2 is a schematic structural diagram of a moving die unit according to the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings and preferred embodiments.
A method for quickly positioning and replacing a bottom die, which uses a quick bottom die replacing device, and fig. 1-2 shows the quick bottom die replacing device, which comprises a movable die unit, a static die unit matched with the movable die unit, and a moving unit; the moving unit comprises a vertical moving unit and a horizontal moving unit; the vertical moving unit comprises an inverted U-shaped plate 14, a movable die mounting plate 12 and a fixed die mounting plate 13 which are respectively arranged at the bottom ends of two sides of the U-shaped plate, a vertical cylinder rod 15 connected with the U-shaped plate and a vertical cylinder 22 connected with a piston rod of the vertical cylinder; the movable mould mounting plate is connected with the movable mould unit through a plurality of movable mould vacuum chucks 10; the static mould mounting plate is connected with the static mould unit through a plurality of static mould vacuum suckers 11; the horizontal moving unit comprises an L-shaped plate 17, a moving plate 23 connected with two ends of the L-shaped plate, a horizontal cylinder rod 20 connected with the moving plate, and a horizontal cylinder 21 connected with the horizontal cylinder rod; the L-shaped plate is connected with the U-shaped plate through a vertical rail 16. The horizontal cylinder is fixed on the L-shaped plate 17. The lower end of the horizontal cylinder is provided with a horizontal mounting plate 19; the horizontal mounting plate is provided with a horizontal guide rail 18 for horizontal movement of the L-shaped plate. The number of the vacuum suckers is 8, and the vacuum suckers are respectively arranged above the movable mould unit and the static mould unit; when the device is used, the precision of the movable mould unit and the static mould unit is adjusted on line, then the movable mould unit and the static mould unit are placed at a specified position, and the movable mould unit and the static mould unit are moved to the installation position by using the moving unit.
The movable die unit comprises a bottom die positioning plate 1 and a plurality of bottom die quick-change mechanisms connected with the bottom die positioning plate; the bottom die quick-change mechanism comprises a bottom die mounting plate 2, an upper pressing block 24, a lower pressing block 25 and an upper and lower adjusting bolt 3, wherein the bottom die 7 is fixed on the bottom die mounting plate and is respectively arranged on the upper side and the lower side of the bottom die; the upper and lower adjusting bolts penetrate through the prefabricated holes in the upper portion of the bottom die mounting plate and the upper pressing block and are in threaded connection with the bottom die 7. And adjusting bolts are arranged at the left end and the right end of the upper pressing block. The upper pressing block and the lower pressing block are respectively fixed with the bottom die mounting plate by using an upper locking nut 4 and a lower locking nut 8. And a through hole is formed in the bottom die positioning plate and used for installing a zero point positioning system.
The working principle of this application does: the movable mould unit and the static membrane unit of this application carry out the precision adjustment through artifical line down respectively, and it is the adjusting bolt at both ends about the last briquetting of accessible die block unit specifically, adjusting bolt and upper and lower lock nut and lower part lock nut carry out the precision adjustment to it. The adjusted static die unit and the adjusted movable die unit are placed on a specified table board; and starting an equipment button, enabling the equipment to be driven by the air cylinder from an original position to move down to be in contact with the movable mould unit and the static mould unit, and positioning and clamping the movable mould and the static mould by using the vacuum chuck. After clamping, the movable mould unit and the static mould unit are driven by the air cylinder to move linearly upwards to corresponding positions, then horizontally move forwards to a specified position to stop, and then vertically move downwards to enter the installation positions of the movable mould unit and the static mould unit. Zero positioning systems are arranged among the movable mould unit, the static mould unit and the mounting plate, and accurate positioning can be carried out. And the moving die unit and the static die unit after being in place send signals to the vacuum chuck through the sensors, the vacuum chuck is loosened, and the air cylinder drives the vacuum chuck to retreat to the original position.
The above description is only a preferred embodiment of the present invention, and for those skilled in the art, the present invention should not be limited by the description of the present invention, which should be interpreted as a limitation.

Claims (7)

1. A method for quickly positioning and replacing a bottom die is characterized in that a device for quickly replacing the bottom die is used, and the device for quickly replacing the bottom die comprises a movable die unit, a static die unit matched with the movable die unit and a moving unit; the moving unit comprises a vertical moving unit and a horizontal moving unit;
the vertical moving unit comprises an inverted U-shaped plate, a movable die mounting plate and a static die mounting plate which are respectively arranged at the bottom ends of two sides of the U-shaped plate, a vertical air cylinder rod connected with the U-shaped plate and a vertical air cylinder connected with a vertical air cylinder piston rod; the movable die mounting plate is connected with the movable die unit through a plurality of movable die vacuum chucks; the static mould mounting plate is connected with the static mould unit through a plurality of static mould vacuum suckers;
the horizontal moving unit comprises an L-shaped plate, a moving plate connected with two ends of the L-shaped plate, a horizontal cylinder rod connected with the moving plate and a horizontal cylinder connected with the horizontal cylinder rod; the L-shaped plate is connected with the U-shaped plate through a vertical rail;
when the device is used, the precision of the movable mould unit and the static mould unit is adjusted on line, then the movable mould unit and the static mould unit are placed at a specified position, and the movable mould unit and the static mould unit are moved to the installation position by using the moving unit.
2. The method for quickly positioning and replacing the bottom die according to claim 1, wherein the movable die unit comprises a bottom die positioning plate and a plurality of bottom die quick-change mechanisms connected with the bottom die positioning plate; the bottom die quick-change mechanism comprises a bottom die mounting plate, a bottom die, an upper pressing block, a lower pressing block and an upper adjusting bolt, wherein the upper pressing block and the lower pressing block are fixed on the bottom die mounting plate and are respectively arranged on the upper side and the lower side of the bottom die; the upper and lower adjusting bolts penetrate through the prefabricated holes in the upper portion of the bottom die mounting plate and the upper pressing block and are in threaded connection with the bottom die.
3. The method for quickly positioning and replacing the bottom die according to claim 1, wherein a horizontal mounting plate is arranged at the lower end of the horizontal cylinder; and a horizontal guide rail is arranged on the horizontal mounting plate and is used for horizontal movement of the L-shaped plate.
4. The method for rapidly positioning and replacing the bottom die according to claim 1, wherein the number of the vacuum chucks is 8, and the vacuum chucks are respectively arranged above the movable die unit and the stationary die unit.
5. The method for quickly positioning and replacing the bottom die according to claim 2, wherein the left end and the right end of the upper pressing block are provided with adjusting bolts.
6. The method for rapidly positioning and replacing the bottom die according to claim 2, wherein the upper pressing block and the lower pressing block are fixed to the bottom die mounting plate by using an upper locking nut and a lower locking nut, respectively.
7. The method for quickly positioning and replacing the bottom die according to claim 2, wherein a through hole is formed in the bottom die positioning plate for installing a zero point positioning system.
CN201811359985.1A 2018-11-15 2018-11-15 Method for quickly positioning and replacing bottom die Active CN109604499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811359985.1A CN109604499B (en) 2018-11-15 2018-11-15 Method for quickly positioning and replacing bottom die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811359985.1A CN109604499B (en) 2018-11-15 2018-11-15 Method for quickly positioning and replacing bottom die

Publications (2)

Publication Number Publication Date
CN109604499A CN109604499A (en) 2019-04-12
CN109604499B true CN109604499B (en) 2020-04-24

Family

ID=66003971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811359985.1A Active CN109604499B (en) 2018-11-15 2018-11-15 Method for quickly positioning and replacing bottom die

Country Status (1)

Country Link
CN (1) CN109604499B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681765A (en) * 2019-09-25 2020-01-14 徐州市奥仕捷电子机箱有限公司 Perforating device suitable for computer machine case

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203390137U (en) * 2013-06-04 2014-01-15 宁波思进机械股份有限公司 Mold base structure of cold header
CN203495117U (en) * 2013-09-17 2014-03-26 宁波腾工精密机械制造有限公司 Semi-automatic die change assisting mechanical arm of cold header
CN103769520A (en) * 2014-01-08 2014-05-07 宁波腾工精密机械制造有限公司 Cluster-type quick mold replacing system for cold headers
CN203751220U (en) * 2014-01-08 2014-08-06 宁波腾工精密机械制造有限公司 Cluster-type quick die change system for cold heading machines
CN205393429U (en) * 2016-03-30 2016-07-27 浙江东雄重工有限公司 Slider mechanism of eight station cold heading machines
CN205393426U (en) * 2016-03-30 2016-07-27 浙江东雄重工有限公司 Total assembly devices of eight station cold heading machines
CN207823847U (en) * 2017-10-09 2018-09-07 宁波众允机械科技有限公司 A kind of cold headers die-replacing structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203390137U (en) * 2013-06-04 2014-01-15 宁波思进机械股份有限公司 Mold base structure of cold header
CN203495117U (en) * 2013-09-17 2014-03-26 宁波腾工精密机械制造有限公司 Semi-automatic die change assisting mechanical arm of cold header
CN103769520A (en) * 2014-01-08 2014-05-07 宁波腾工精密机械制造有限公司 Cluster-type quick mold replacing system for cold headers
CN203751220U (en) * 2014-01-08 2014-08-06 宁波腾工精密机械制造有限公司 Cluster-type quick die change system for cold heading machines
CN205393429U (en) * 2016-03-30 2016-07-27 浙江东雄重工有限公司 Slider mechanism of eight station cold heading machines
CN205393426U (en) * 2016-03-30 2016-07-27 浙江东雄重工有限公司 Total assembly devices of eight station cold heading machines
CN207823847U (en) * 2017-10-09 2018-09-07 宁波众允机械科技有限公司 A kind of cold headers die-replacing structure

Also Published As

Publication number Publication date
CN109604499A (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN109604499B (en) Method for quickly positioning and replacing bottom die
CN204277515U (en) A kind of lathe tool of wheel processing
CN102873398B (en) Radius highly synchronous and precise broaching processing method for double bearing bushes and automation device
CN112620417B (en) High-precision flexible forming bending die
CN110666037A (en) Progressive die mechanism for punching and blanking
CN107617693B (en) A kind of reciprocating punching molding machine
CN201776341U (en) Movable die holder-type U-shaped beam flange plate punching machine
CN202045524U (en) Fixture used for groove clamping machine
CN102358014B (en) Injection-molding workpiece-taking manipulator brace for sedan bumper
CN208744646U (en) Multifunction clamping device
CN110899759A (en) Punching equipment for production line of mold factory
CN211758283U (en) Quick die change mechanism of cold heading machine off-line
CN220162768U (en) Automatic tile cutting machine
CN220805677U (en) Cutting device for die manufacturing
CN219191423U (en) Clamp mould for fixing pipeline
CN212705534U (en) Multi-station auxiliary supporting device
CN210334035U (en) Processing equipment for side bending forming of agricultural machine blade
CN215786028U (en) High-precision hardware mould
CN213703203U (en) Die assembly tool
CN217802753U (en) Mould for manufacturing fan blade
CN217943693U (en) Semidry gypsum block forming equipment
CN210651499U (en) Fast assembly die set
CN219507016U (en) Automatic blanking device for laths
CN216226361U (en) Television backboard stamping die
CN216882831U (en) Pneumatic tool for machining motor shell of full electric forklift

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant