CN109598997A - Construction safety training education system based on BIM in conjunction with VR - Google Patents

Construction safety training education system based on BIM in conjunction with VR Download PDF

Info

Publication number
CN109598997A
CN109598997A CN201811339902.2A CN201811339902A CN109598997A CN 109598997 A CN109598997 A CN 109598997A CN 201811339902 A CN201811339902 A CN 201811339902A CN 109598997 A CN109598997 A CN 109598997A
Authority
CN
China
Prior art keywords
bim
3dmax
module
programming
bim model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811339902.2A
Other languages
Chinese (zh)
Inventor
吕臻
李成
张永攀
陈贤国
李晓龙
李强
唐颖
张海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201811339902.2A priority Critical patent/CN109598997A/en
Publication of CN109598997A publication Critical patent/CN109598997A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/011Arrangements for interaction with the human body, e.g. for user immersion in virtual reality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/31Programming languages or programming paradigms
    • G06F8/315Object-oriented languages
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Human Computer Interaction (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Computing Systems (AREA)
  • Computer Hardware Design (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the construction safety training education system based on BIM in conjunction with VR, which includes Revit modeling module, 3Dmax optimization processing module and UE4 programming module;Project under construction BIM model is established using Revit modeling module, pass through output model FBX file in Revit modeling module, FBX file is imported into 3Dmax optimization processing module, processing optimization is carried out to project under construction BIM model using the 3Dmax in 3Dmax optimization processing module, FBX file is continued to output by the 3Dmax in 3Dmax optimization processing module, it imported into UE4 programming module and carries out VR programming, it is realized by way of importing BIM model to UE4 programming module and quickly updates BIM model, the safety experience point of programming production BIM model is customized according to the danger source of live physical presence.Safe experience personnel wear VR glasses in VR scene, and mutual virtual portrait can be seen in VR scene, are operated by a main controllers, remaining personage is led to experience VR effect together.

Description

Construction safety training education system based on BIM in conjunction with VR
Technical field
The present invention relates to architectural engineering personnel safety administrative skill fields, specifically, being related to the safety training based on BIM+VR Instruct educational system.
Background technique
With the rapid development of Building Trade in China, many large complicated engineering projects are increasing, the safe shape of building trade Gesture is more and more severeer, and the safety education and training in building construction process increasingly becomes a major issue being concerned.With Society be constantly progressive, the concept of safety in production has been rooted in the hearts of the people, and requirement of the people to safety in production is also higher and higher.? How the building trade of Frequent Accidents guarantees that the personal safety of construction personnel is the cardinal task that unit in charge of construction is concerned about.
For a long time, domestic unit in charge of construction carries out safety training by traditional approach, and inefficiency is cut into excessively high a, work Industry personnel's ability to accept difference causes result of training undesirable, using BIM+VR technology, based on real Training Environment, with heavy The mode of immersion carries out construction simulation rehearsal, safety training, allow operating personnel it is on the spot in person place oneself in the midst of various complicated, difficulty not Among one production reality environment, the virtual training of high emulation is carried out under the premise of ensuring personal safety, can be mentioned significantly High training quality simultaneously reduces training cost simultaneously.
Summary of the invention
For the defect for overcoming conventional security training, the present invention provides a kind of safety education training system based on BIM+VR, Safety education and training is carried out to Construction of Engineering Projects personnel.
To achieve the above object, the present invention uses following scheme for the construction safety training education based on BIM in conjunction with VR System, as shown in Fig. 1, the system include Revit modeling module, 3Dmax optimization processing module and UE4 programming module;It utilizes Revit modeling module establishes project under construction BIM model, by output model FBX file in Revit modeling module, FBX file It imported into 3Dmax optimization processing module, project under construction BIM model is carried out using the 3Dmax in 3Dmax optimization processing module Processing optimization, continues to output FBX file by the 3Dmax in 3Dmax optimization processing module, imported into UE4 programming module simultaneously VR programming is carried out, is realized by way of importing BIM model to UE4 programming module and quickly updates BIM model, according to scene The danger source of physical presence customizes the safety experience point of programming production BIM model.
In Revit modeling module, according to project under construction design drawing and actual conditions, 1:1 project BIM model is established, The construction site BIM model comprising facing each danger source such as side hole danger, model are established using BIM modeling software Revit software Precision at least needs LOD300 or more, and BIM model is exported as FBX file.
In 3Dmax module, FBX file derived in Revit imports in 3Dmax, material, scene to BIM model Light optimizes, and adds VR scene, such as the sun and sky, improves the validity of BIM model, at the same to the face of BIM model into Row processing reduces the quantity in face, and reduction BIM model renders performance requirement when showing to computer hardware in UE4 programming module, By treated, model exports FBX file again.
In UE4 programming module, by FBX file derived from 3Dmax, UE4 platform is imported, is realized practical with scene in VR scene The same display effect of situation.Kept for update every month with construction speed model simultaneously primary, it is ensured that experience in VR scene Be all construction site physical presence danger source place, improve safety training experience effect, increase safety of workers prevention awareness.
The production of VR safety experience point is carried out using the illusory engine platform of UE4, safety experience carries out more with project process Newly, guarantee that safety experience point matches with project actual danger source, while realizing the synchronous On-line funchon of more people in local area network, Can see mutual virtual portrait in VR scene, increase the interactivity of safety training, UE4 platform include front end Scenario Design and Two parts are programmed, programming mainly divides blueprint and C Plus Plus two parts.
Detailed description of the invention
Fig. 1 the technology of the present invention module map;
Fig. 2 present system schematic diagram;
Fig. 3 experiences safely point schematic diagram.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
A kind of safety education training system based on BIM+VR shown in the principle implemented such as 2 present system of attached drawing, uses Revit establishes project BIM model, is handled using 3Dmax project BIM model, and 4 platform of UnrealEngine carries out VR Programming realizes modularization quickly more new model by way of importing BIM model to UE4 platform, is actually deposited according to scene Danger source customize programming production safety experience point.
According to Project design drawing and actual conditions, 1:1 project BIM model is established, it is soft using BIM modeling software revit Part is established comprising facing the construction site BIM model of each danger source such as side hole danger, model accuracy at least need LOD300 and with On, model is imported in 3Dmax and is handled, then model imports UE4 platform by treated, realizes that same scene is in fact in VR scene The same display effect of border situation.VR model is the same with on-site actual situations, and specific danger source experience point is consistent with scene, and protects Update is held, more new content includes the information such as project process, Project design change.If this moon is in the dangerous source in certain, then The safety experience point at this is set up in VR experience scene, next month, (such as hole was not present in danger source at this according to field condition Closure, combustible material transfer etc.), then removal is updated in model or transfer danger source experiences point, it is ensured that is experienced in VR scene To be all construction site physical presence danger source place, improve safety training experience effect, increase safety of workers prevention meaning Know.
The production of VR safety experience point is carried out using the illusory engine platform of UE4, safety experience carries out more with project process Newly, guarantee that safety experience point matches with project actual danger source, while realizing the synchronous On-line funchon of more people in local area network, Can see mutual virtual portrait in VR scene, increase the interactivity of safety training, UE4 platform include front end Scenario Design and Two parts are programmed, programming mainly divides blueprint and C Plus Plus two parts.
UE4 platform includes front end Scenario Design, starts default and enters project front door, is manipulated in front door by handle Open experience point selection interface.Selection interface includes two kinds of experience mode and educational pattern and multinomial safety experience point Selection is classified to danger source and safety experience point in selection interface, is divided according to the type of danger source and project process Different, it can choose a certain independent experience point of experience, can also be experienced under current project actual conditions according to project process Safety experience point.Experience mode is oneself operating experience entirely safe experience of the process, and educational pattern is the view by the third party Angle watches computer-robot and completes entire experience of the process.
The programming of UE4 platform is main to be realized, in the corresponding operation of experience scenario triggered accordingly, is entering each experience point When, play the corresponding voice introduction of experience point, it can be seen that the aperture of each experience point activates safety experience such as Fig. 3 into aperture After (such as: fire fire-fighting is safely in experience, and into aperture, the flitch before role can be on fire) safety experience activation, correspondence is had Voice subtitle prompt in next step operate.
Safe experience personnel wear VR glasses in VR scene, are operated by handle, realize the function such as movement, command selection Energy;The synchronous On-line funchon of more people in local area network is realized simultaneously, and mutual virtual portrait can be seen in VR scene, it is main by one Controllers operation, leads remaining personage to experience VR effect together.

Claims (6)

1. the construction safety training education system based on BIM in conjunction with VR, it is characterised in that: the system includes Revit modeling mould Block, 3Dmax optimization processing module and UE4 programming module;Project under construction BIM model is established using Revit modeling module, is passed through Output model FBX file in Revit modeling module imported into FBX file in 3Dmax optimization processing module, excellent using 3Dmax The 3Dmax changed in processing module carries out processing optimization to project under construction BIM model, by 3Dmax optimization processing module 3Dmax continues to output FBX file, imported into UE4 programming module and carry out VR programming, by importing BIM model to UE4 The mode of programming module, which is realized, quickly updates BIM model, customizes programming production BIM mould according to the danger source of live physical presence The safety experience point of type.
2. the construction safety training education system according to claim 1 based on BIM in conjunction with VR, it is characterised in that: In Revit modeling module, according to project under construction design drawing and actual conditions, 1:1 project BIM model is established, is modeled using BIM Software Revit software establishes the construction site BIM model comprising facing each danger source such as side hole danger, and model accuracy at least needs LOD300 or more exports BIM model for FBX file.
3. the construction safety training education system according to claim 1 based on BIM in conjunction with VR, it is characterised in that: In 3Dmax optimization processing module, FBX file derived in Revit imports in 3Dmax, material, scene lamp to BIM model Light optimizes, and adds VR scene, improves the validity of BIM model, while handling the face of BIM model, reduces face Quantity reduces when BIM model render performance in UE4 programming module to the performance requirement of computer hardware, then general's treated mould Type exports FBX file.
4. the construction safety training education system according to claim 1 based on BIM in conjunction with VR, it is characterised in that: UE4 In programming module, by FBX file derived from 3Dmax, UE4 platform is imported, is realized the same with on-site actual situations in VR scene Display effect;Kept for update every month with construction speed model simultaneously primary, it is ensured that is experienced in VR scene is all construction Safety training experience effect is improved in the place of live physical presence danger source, increases safety of workers prevention awareness.
5. the construction safety training education system according to claim 1 based on BIM in conjunction with VR, it is characterised in that: benefit The production that VR experiences safely point is carried out with the illusory engine platform of UE4, safety experience point is updated with project process, guarantee safety Experience point matches with project actual danger source, while realizing the synchronous On-line funchon of more people in local area network, in VR scene It can see mutual virtual portrait, increase the interactivity of safety training, UE4 platform includes front end Scenario Design and programming two Point, programming mainly divides blueprint and C Plus Plus two parts.
6. the construction safety training education system according to claim 1 based on BIM in conjunction with VR, it is characterised in that: peace Entirety tests personnel and wears VR glasses in VR scene, is operated by handle, realizes mobile, command selection function;Realization office simultaneously The synchronous On-line funchon of more people, mutual virtual portrait can be seen in VR scene, is operated by a main controllers in the net of domain, Remaining personage is led to experience VR effect together.
CN201811339902.2A 2018-11-12 2018-11-12 Construction safety training education system based on BIM in conjunction with VR Pending CN109598997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811339902.2A CN109598997A (en) 2018-11-12 2018-11-12 Construction safety training education system based on BIM in conjunction with VR

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811339902.2A CN109598997A (en) 2018-11-12 2018-11-12 Construction safety training education system based on BIM in conjunction with VR

Publications (1)

Publication Number Publication Date
CN109598997A true CN109598997A (en) 2019-04-09

Family

ID=65957630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811339902.2A Pending CN109598997A (en) 2018-11-12 2018-11-12 Construction safety training education system based on BIM in conjunction with VR

Country Status (1)

Country Link
CN (1) CN109598997A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347245A (en) * 2019-06-18 2019-10-18 武汉大学 A kind of construction site safety training method and system based on virtual reality
CN110648564A (en) * 2019-09-26 2020-01-03 北京金河水务建设集团有限公司 Construction safety education device based on BIM and VR technique
CN111383339A (en) * 2020-03-25 2020-07-07 中国十七冶集团有限公司 BIM + MR-based structural steel bar inspection method
CN113688603A (en) * 2021-09-09 2021-11-23 深圳须弥云图空间科技有限公司 Model file processing method and device, storage medium and electronic equipment
CN113838195A (en) * 2021-10-20 2021-12-24 南京澳博工业智能科技研究院有限公司 Simulation modeling method for cement clinker processing
CN115795923A (en) * 2023-02-06 2023-03-14 中交第四航务工程勘察设计院有限公司 VR technology-based multifunctional virtual simulation method and system for container terminal
US11663375B2 (en) * 2019-05-03 2023-05-30 Willow Technology Corporation Pty Ltd Configuration of a digital twin for a building or other facility via BIM data extraction and asset register mapping

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN106485978A (en) * 2016-12-26 2017-03-08 中国建筑第八工程局有限公司 Safety based on virtual reality technology experiences educational method
CN107609237A (en) * 2017-08-29 2018-01-19 中国三冶集团有限公司 The interim layout drawing in technical bid job site based on BIM quickly goes out drawing method
CN107993389A (en) * 2017-11-29 2018-05-04 湖南大学 A kind of construction site safe early warning method and system based on BIM models
CN108470105A (en) * 2018-03-27 2018-08-31 湖南大学 A method of Dynamic Construction programming is carried out based on BIM+3S+VR technologies and underground engineering case base system
CN108492382A (en) * 2018-04-10 2018-09-04 中国建筑局(集团)有限公司 VR visual construction bottom crossing method and system
CN108537892A (en) * 2017-03-01 2018-09-14 黎志毅 The method that threedimensional model and contextual data are automatically imported UE4
CN108629846A (en) * 2018-03-30 2018-10-09 江苏建筑职业技术学院 The safety education system of construction project danger identifing source based on VR

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN106485978A (en) * 2016-12-26 2017-03-08 中国建筑第八工程局有限公司 Safety based on virtual reality technology experiences educational method
CN108537892A (en) * 2017-03-01 2018-09-14 黎志毅 The method that threedimensional model and contextual data are automatically imported UE4
CN107609237A (en) * 2017-08-29 2018-01-19 中国三冶集团有限公司 The interim layout drawing in technical bid job site based on BIM quickly goes out drawing method
CN107993389A (en) * 2017-11-29 2018-05-04 湖南大学 A kind of construction site safe early warning method and system based on BIM models
CN108470105A (en) * 2018-03-27 2018-08-31 湖南大学 A method of Dynamic Construction programming is carried out based on BIM+3S+VR technologies and underground engineering case base system
CN108629846A (en) * 2018-03-30 2018-10-09 江苏建筑职业技术学院 The safety education system of construction project danger identifing source based on VR
CN108492382A (en) * 2018-04-10 2018-09-04 中国建筑局(集团)有限公司 VR visual construction bottom crossing method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邱贵聪,杨洁,陈一鸣: "BIM+VR、AR应用研究", 《土木建筑工程信息技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11663375B2 (en) * 2019-05-03 2023-05-30 Willow Technology Corporation Pty Ltd Configuration of a digital twin for a building or other facility via BIM data extraction and asset register mapping
CN110347245A (en) * 2019-06-18 2019-10-18 武汉大学 A kind of construction site safety training method and system based on virtual reality
CN110648564A (en) * 2019-09-26 2020-01-03 北京金河水务建设集团有限公司 Construction safety education device based on BIM and VR technique
CN111383339A (en) * 2020-03-25 2020-07-07 中国十七冶集团有限公司 BIM + MR-based structural steel bar inspection method
CN113688603A (en) * 2021-09-09 2021-11-23 深圳须弥云图空间科技有限公司 Model file processing method and device, storage medium and electronic equipment
CN113688603B (en) * 2021-09-09 2024-06-04 深圳须弥云图空间科技有限公司 Model file processing method and device, storage medium and electronic equipment
CN113838195A (en) * 2021-10-20 2021-12-24 南京澳博工业智能科技研究院有限公司 Simulation modeling method for cement clinker processing
CN113838195B (en) * 2021-10-20 2024-01-23 南京澳博工业智能科技研究院有限公司 Simulation modeling method for cement clinker processing
CN115795923A (en) * 2023-02-06 2023-03-14 中交第四航务工程勘察设计院有限公司 VR technology-based multifunctional virtual simulation method and system for container terminal

Similar Documents

Publication Publication Date Title
CN109598997A (en) Construction safety training education system based on BIM in conjunction with VR
CN108268128A (en) A kind of safety in production emergency preplan 3DVR virtual reality drilling systems
Filigenzi et al. Virtual reality for mine safety training
CN104850709A (en) Three-dimensional simulation method for construction of architectural decoration project
CN110070624B (en) Urban geomorphology feature identification method based on VR combined with eye movement tracking
CN106781777A (en) The architecture tutoring system that a kind of actual situation is combined
WO2008057603A8 (en) System and method for providing online education
CN113362671A (en) Marine nuclear emergency drilling simulation system and drilling method
Sørensen The development of augmented reality as a tool in architectural and urban design
CN108401316A (en) A kind of Office lighting systems based on sensing technology
Grabowski et al. The use of virtual reality in the training of professionals: with the example of firefighters
CN103886132A (en) Warning simulation method for unsafe acts in coal mines
CN110490980A (en) A kind of Virtual Construction template information processing system and method based on fixation and recognition
Wang et al. Design and implementation of three-dimensional virtual tour guide training system based on Unity3D
Schumacher Tectonic articulation: Making engineering logics speak
Dugdale et al. Introduction to the minitrack on ict and artificial intelligence for crisis and emergency management
Su et al. Virtual Reality Simulation of Equipment Training Based on Unity3D
CN112163265A (en) Immersion type roaming visual analysis method and device based on BIM technology and storage medium
Moloney Between Art and Architecture: The Interactive Skin
Al-Tameemi et al. Automation in architecture and its effect on the regeneration of traditional buildings: Al-Shawi House as a case study
Liu et al. Ar mechanical-guiding assembly system
Dong et al. The Simulation and Research of Steel-Work Construction Based on Fuzor
Borsotti et al. An atlas of" architectural design for existing buildings": towards a definition of founding design actions.
Holst et al. Performative tectonics
Sposito Nuovi approcci per l'architettura contemporanea.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191115

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Applicant after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Applicant after: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: Room B901 and 916, No. 10 Xinghuo Road, Science City, Fengtai District, Beijing, 100124

Applicant before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409