CN109596501A - Top board seepage experimental rig and method under the influence of a kind of dynamic load - Google Patents

Top board seepage experimental rig and method under the influence of a kind of dynamic load Download PDF

Info

Publication number
CN109596501A
CN109596501A CN201910086762.0A CN201910086762A CN109596501A CN 109596501 A CN109596501 A CN 109596501A CN 201910086762 A CN201910086762 A CN 201910086762A CN 109596501 A CN109596501 A CN 109596501A
Authority
CN
China
Prior art keywords
pressure
valve
water
shut
dynamic load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910086762.0A
Other languages
Chinese (zh)
Other versions
CN109596501B (en
Inventor
张向东
杨建军
张哲诚
高海洋
刘家顺
于昕言
魏学达
李永启
周林林
董泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201910086762.0A priority Critical patent/CN109596501B/en
Publication of CN109596501A publication Critical patent/CN109596501A/en
Application granted granted Critical
Publication of CN109596501B publication Critical patent/CN109596501B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/0806Details, e.g. sample holders, mounting samples for testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Biochemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Dispersion Chemistry (AREA)
  • Fluid Mechanics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

Top board seepage experimental rig and method under the influence of a kind of dynamic load, belong to mining engineering technical field.Top board seepage experimental rig under the influence of the dynamic load, including testing tank body, axis presses system, confining pressure system, big osmotic system, live load loading system, external frame and control system, control system includes confining pressure controller, axis pressure controller, big osmotic control device, live load set controller and data collector, the test method of top board seepage experimental rig under the influence of dynamic load, including step 1, foil gauge and embedded vibrating sensor are pasted in the side wall of top plate sample, step 2, top plate sample is installed, step 3, prepare before applying confining pressure, step 4, water of satisfying before big seepage tests is vented, step 5, start to test and acquires data, step 6, it resets, release, step 7, the disassembly of top plate sample.Top board seepage experimental rig and method can acquire data of the top plate sample when applying axis pressure, confining pressure, dynamic load and big seepage flow and supplying water simultaneously under the influence of the dynamic load.

Description

Top board seepage experimental rig and method under the influence of a kind of dynamic load
Technical field
The present invention relates to mining engineering technical field, in particular under the influence of a kind of dynamic load top board seepage experimental rig and Method.
Background technique
Water is widely distributed in coal measure strata, is generally divided into artesian water and Free water.Roadway excavation and driving destroy rock The stress of primary rock state of body, Stress relief change the structure and its occurrence patterns of rock mass in the process, are easy to cause back The flowing of water may cause water inrush accident if hydraulic pressure and water are larger.Research finds not only to cut in roof water flow event The weak intensity of balkstone, also reduces the intensity of prop, is easy to induce back deformation instability.
Seepage research tendency is from microcosmic mostly in rock mass or inside soil body water migration path and water transition process at present The physical and mechanical property variation expansion research of regional area.Due to being influenced by research object scaling, size, it is difficult pair Entire top plate there are the vulnerable areas of initial fissure with the preferable stable region of complete, fine and close physical and mechanical property relatively, in outside Research is unfolded to the stability of top board seepage situation and top plate entirety under dynamic effect, previous research can not obtain fragility simultaneously The collaborative variation in region and stability region.
Summary of the invention
Of the existing technology in order to solve the problems, such as, the present invention provides top board seepage test dresses under the influence of a kind of dynamic load It sets and method, data of the top plate sample when applying axis pressure, confining pressure, dynamic load and big seepage flow and supplying water, energy can be acquired simultaneously Enough research water abundant ground top plate dominated by initial fissure weak section coverage, Weakening degree and summarize crack form and shadow Ring range, the rule between Weakening degree, so be unfolded vulnerable areas under the influence of by lasting seepage flow, burst dynamic load unstability, Destroy the influence to outer rim stability region and top plate overall stability.
To achieve the goals above, the technical scheme is that
Top board seepage experimental rig under the influence of a kind of dynamic load, including experiment tank body, axis pressure system, confining pressure system, big seep Streaming system, live load loading system, external frame and control system;
The top of the experiment tank body is equipped with water outlet, and the bottom for testing tank body is equipped with water inlet, tests tank wall Lower part is equipped with first through hole, and the top for testing tank wall is equipped with the second through-hole, and that tests tank body is internally provided with top plate sample, Crack is equipped in the top plate sample, the side wall of top plate sample is equipped with foil gauge and vibrating sensor, sets above top plate sample There is upper protection board, the lower section of top plate sample is equipped with lower protection board, and the upper protection board and lower protection board are equipped with and the crack The through slot of face, the top of the upper protection board are equipped with upper infiltration pressure plate, and the lower section of the lower protection board is equipped with lower infiltration and adds Pressing plate, the upper protection board and upper infiltration pressure plate are equipped with corresponding seepage flow hole, the lower protection board and lower infiltration pressurization Plate is equipped with corresponding seepage flow hole, and the upper infiltration pressure plate and lower infiltration pressure plate are equipped with infiltration plate water diversion joint, institute The infiltration plate water diversion joint for stating infiltration pressure plate is connect by metal pressure-bearing water pipe with the water outlet, the lower infiltration pressurization The infiltration plate water diversion joint of plate is connect by metal pressure-bearing water pipe with the water inlet, the upper infiltration pressure plate, upper protection board, The external package oil removal rubber membrane of the entirety of top plate sample, lower protection board, lower infiltration pressure plate, foil gauge and vibrating sensor;
The axis pressure system includes upper load piston, loads jack, lower load piston and pressure sensor, described above to add The top that upper infiltration pressure plate is arranged in piston is carried, and is held and is connect by spool with the top of experiment tank body, upper load piston Top is equipped with load jack, and the lower section of lower infiltration pressure plate, and the bottom with experiment tank body is arranged in the lower load piston Connection is held by spool, the lower section of the lower load piston is equipped with pressure sensor;
The confining pressure system includes hydraulic oil tank, oil inlet pump group and oil return air pump, and the hydraulic oil tank passes through first respectively Confining pressure pipeline and the second confining pressure pipeline are connected to first through hole, and hydraulic oil tank is connected to by third confining pressure pipeline with the second through-hole, Oil inlet pump group and the first shut-off valve are provided on the first confining pressure pipeline, the second confining pressure pipeline is equipped with the second cut-off Valve, the third confining pressure pipeline are equipped with the 5th shut-off valve and third shut-off valve, and the 5th shut-off valve is positioned close to hydraulic The side of oil tank, the oil return air pump are arranged between the 5th shut-off valve and third shut-off valve, and by all around pressure pipeline with The connection of third confining pressure pipeline, described all around pressure pipeline be equipped with the 4th shut-off valve;
The big osmotic system includes catch basin, water inlet pump group, overflow valve, water feeding pressure sensor, water outlet hydraulic pressure sensing Device, first flowmeter and second flowmeter, the catch basin are connected to by the first seepage flow pipeline with water inlet, first seepage flow Overflow valve and water inlet pump group are provided on pipeline, the overflow valve is positioned close to the side of water inlet, and overflow valve passes through second Seepage flow pipeline is connected to catch basin, and water feeding pressure sensor is arranged in water inlet, and the water outlet passes through third seepage flow respectively Pipeline and the 4th seepage flow pipeline are connected to catch basin, and first flowmeter and the 6th cut-off are provided on the third seepage flow pipeline Valve is provided with second flowmeter and the 7th shut-off valve, the third seepage flow pipeline and the 4th seepage flow on the 4th seepage flow pipeline Pipeline is connect with water outlet hydraulic pressure sensor simultaneously close to the side of water outlet;
The live load loading system includes dynamic load telescopic arm and track pedestal, the top of the dynamic load telescopic arm and experiment The bottom of tank body connects, and the lower section of dynamic load telescopic arm is arranged in the track pedestal, and passes through with dynamic load telescopic arm multiple Ball row's connection;
The surrounding of experiment tank body is arranged in the external frame, and the column and track pedestal of the external frame are by using group Location nut connection is filled, the column of the external frame is equipped with multiple height-regulating spirals, described that spiral is turned up and tests tank body Side wall connection, the bottom of the external frame and track pedestal are arranged by ball and are connected;
The control system includes confining pressure controller, axis pressure controller, big osmotic control device, live load set controller and data Collector, the confining pressure controller are connect with oil inlet pump group, and the axis pressure controller is connect with load jack, the big seepage flow Controller is connect with overflow valve, and the live load set controller is connect with dynamic load telescopic arm, the data collector respectively with answer Become piece to connect with vibrating sensor.
The top plate sample is cylindrical structure, a diameter of 30~45cm, a height of 10~15cm, the aperture in the crack For 0.5~2.0mm, the angle of crack and horizontal direction is 65~90 °.
The foil gauge and vibrating sensor being provided at circumferentially spaced along top plate sample side wall same level height, the top The upper, middle and lower of plate sample side wall is respectively equipped with foil gauge and vibrating sensor.
The upper protection board and lower protection board are made of plasticity water proof material, and the through slot is identical as fracture opening, deep For 2.0mm.
The bottom of the experiment tank body is equipped with data string hole, and the foil gauge and vibrating sensor are logical with data collector Data line connection is crossed, the data line passes through data string hole.
Centre at the top of the track pedestal is equipped with groove one, and dynamic load telescopic arm bottom is equipped with and track pedestal The corresponding protrusion of groove one, the groove one of the track pedestal and the ball row that projects through of dynamic load telescopic arm bottom connect, It is surrounded by groove two at the top of the track pedestal, the groove two, which is arranged with dynamic load telescopic arm bottom by ball, to be connected, The side of the track pedestal is equipped with groove three, and connection is arranged by ball in the groove three and the bottom of external frame.
The first flowmeter and second flowmeter are arranged at close to the side of catch basin, and the range of first flowmeter is 1000ml/s~20000ml/s, the range of second flowmeter are 0.5ml/s~5000ml/s.
The top of the upper infiltration pressure plate is equipped with upper pressure plate groove corresponding with upper load piston, and the lower infiltration adds The bottom of pressing plate is equipped with lower pressure plate groove corresponding with lower load piston.
The bottom of the side wall and test tank body of the test tank body is connected by a snap, and the outside of the buckle is equipped with buckle Lantern ring.
The test method of top board seepage experimental rig under the influence of a kind of above-mentioned dynamic load, comprising the following steps:
Step 1: in the side wall stickup foil gauge of top plate sample and embedded vibrating sensor, the top of top plate sample side wall, Middle part and lower part are respectively equipped with foil gauge and vibrating sensor, foil gauge and vibrating sensor interval in same level Setting;
Step 2: installation top plate sample, is first fixed external frame and track pedestal with assembling location nut, by upper guarantor The through slot of the backplate and lower protection board crack face with top plate sample respectively, by the seepage flow hole of upper protection board and upper infiltration pressure plate It is corresponding, the seepage flow hole of lower protection board and lower infiltration pressure plate is corresponding, according to upper infiltration pressure plate, upper protection board, top plate sample, It is wrapped up, and is integrally placed on lower load piston with oil removal rubber membrane after the sequence alignment of lower protection board and lower infiltration pressure plate, Keep the lower pressure plate groove of lower infiltration pressure plate corresponding with lower load piston, foil gauge and vibrating sensor are passed through into data respectively Line is connect with data collector, it is upper infiltration pressure plate and it is lower infiltration pressure plate infiltration plate water diversion joint respectively with metal artesian water Pipe connection, the height-regulating spiral adjusted in external frame fall experiment tank body, make metal pressure-bearing water pipe and corresponding water inlet or out Buckle loading test tank wall and experiment tank body bottom junctions are put down buckle lantern ring by mouth of a river connection after alignment;
Step 3: preparing before applying confining pressure, it is first turned on the first shut-off valve, the second shut-off valve is closed, opens third cut-off Valve closes the 4th shut-off valve, opens the 5th shut-off valve, starts oil inlet pump group, and hydraulic oil tank is made to pass through first through hole to experimental tank Body internal filled liquid pressure oil, for providing radial confining pressure to top plate sample, after being full of hydraulic oil in experimental tank body, hydraulic oil via The outflow of second through-hole, flows back to hydraulic oil tank through third shut-off valve and the 5th shut-off valve, until the second through-hole no longer excludes bubble, really Recognize and empty in experimental tank body after air, temporarily ceases the work of oil inlet pump group, close the first shut-off valve, to the second through-hole no longer because of pressure After power oil spilling, third shut-off valve and the 5th shut-off valve are closed, opens the first shut-off valve;
Step 4: water exhaust of satisfying before big seepage tests, after preparing to axis pressure with confining pressure, starting water inlet pump group, to reality It tests tank body inner top panel sample and carries out full water exhaust, big osmotic system water supply enters experiment tank body by water inlet and flows out from water outlet, Until water outlet is not overflowing bubble, temporary close water inlet pump group;
Step 5: starting to test and acquire data, load jack pair top plate sample is controlled by axis pressure controller and is applied Axis pressure, and loading procedure axis pressure is recorded by pressure sensor in real time, oil inlet pump group is controlled to top plate by confining pressure controller Sample applies confining pressure, and confining pressure controller shows confining pressure in loading procedure, and records the deformation of top plate sample in real time by foil gauge Amount controls overflow valve by big osmotic control device and carries out big seepage flow water supply to top plate sample, and big osmotic control device shows water inlet Flow of inlet water records water inlet hydraulic pressure by water feeding pressure sensor, records water outlet hydraulic pressure by water outlet hydraulic pressure sensor, leads to First flowmeter or second flowmeter record water outlet water flow are crossed, to axis pressure, confining pressure, the deformation quantity of top plate sample, water inlet After mouthful flow of inlet water, water inlet hydraulic pressure, water outlet water flow and water outlet hydraulic pressure are relatively stable, assembling location nut is removed, Dynamic load telescopic arm is controlled by live load set controller, dynamic load is applied to experiment tank body, applied by vibrating sensor record dynamic The acceleration of dynamic load direction upper plate sample when load, meanwhile, control system acquire dynamic load apply when axis pressure, confining pressure, Deformation quantity, water inlet flow of inlet water, water inlet hydraulic pressure, water outlet water flow and the water outlet hydraulic pressure of top plate sample;
Step 6: resetting, release, dynamic load telescopic arm is resetted by live load set controller after experiment, is pacified again Dress assembling location nut, makes track pedestal keep opposing stationary with experiment tank body, and stopping load jack applies axis and presses and shrink Its lower surface makes it with upper load piston contact, not stop water inlet pump group work, open overflow valve and empty in top plate sample naturally Water stops the work of oil inlet pump group, closes the first shut-off valve, opens the 5th shut-off valve and third shut-off valve, first make with pressure hydraulic Oil flows back in hydraulic oil tank via the second through-hole, stablizes not after excessive after oil spilling, successively opens the second shut-off valve, closes the 5th Shut-off valve, open the 4th shut-off valve, start oil return air pump, make air enter in experimental tank body via the second through-hole make it is hydraulic in it Oil is through after confirmation first through hole is flowed out without hydraulic oil again, closing oil return in first through hole and the second shut-off valve hydraulic return oil tank Air pump is closed all shut-off valves after stable gas pressure, and is checked;
Step 7: top plate sample is dismantled, buckle lantern ring, removal buckle are successively removed after experiment, by the way that spiral is turned up Rise experiment tank body, removes top plate sample and remove oil removal rubber membrane.
Beneficial effects of the present invention:
Top board seepage experimental rig and method under the influence of a kind of dynamic load of the present invention are pressed system by axis, confining pressure system, are moved Load resisting systems and big seepage flow supply water the primary fissured roof that runs through of four pilot system simulations by tunneling construction, explosion, impact Big seepage coupling test under the influences such as ground pressure, earthquake can acquire top plate sample simultaneously and apply axis pressure, confining pressure, move Data when load and big seepage flow supply water realize the simulation of the compressive deformation to roof fragmented rock body, can effectively recognize With geology disturbance during announcement seam mining to top plate initial fissure structure evolution, and the influence to barrier outlet capacity, it is The research of roadway construction technical security is provided fundamental basis under the aqueous geological conditions in deep.
Detailed description of the invention
Fig. 1 is the overall structure diagram of top board seepage experimental rig under the influence of a kind of dynamic load provided by the invention;
Fig. 2 is that top plate sample provided by the invention places schematic diagram;
Fig. 3 is the structural schematic diagram of experiment tank body provided by the invention;
Fig. 4 is the schematic top plan view of experiment tank body provided by the invention;
Fig. 5 is the structural schematic diagram of live load loading system provided by the invention.
Wherein, 1, hydraulic oil tank;2, oil return air pump;3, oil inlet pump group;4, confining pressure controller;5-1, the first shut-off valve;5- 2, the second shut-off valve;5-3, third shut-off valve;5-4, the 4th shut-off valve;5-5, the 5th shut-off valve;5-6, the 6th shut-off valve;5-7, 7th shut-off valve;6, first through hole;7, the second through-hole;8, axis pressure controller;9, jack is loaded;10, catch basin;11, it intakes Pump group;12, overflow valve;13, big osmotic control device;14-1, water feeding pressure sensor;14-2, water outlet hydraulic pressure sensor;15-1, First flowmeter;15-2, second flowmeter;16, water inlet;17, water outlet;18, tank body is tested;19, track pedestal;20, outer Portion's frame;21, spiral is turned up;22, location nut is assembled;23, ball is arranged;24, dynamic load telescopic arm;25, live load set controller; 26, top plate sample;27, crack;28-1, upper protection board;28-2, lower protection board;29-1, upper infiltration pressure plate;29-2, lower infiltration Pressure plate;30, plate water diversion joint is permeated;31, metal pressure-bearing water pipe;32, oil removal rubber membrane;33, foil gauge;34, pressure sensing Device;35, spool is held;36-1, upper load piston;36-2, lower load piston;37, it buckles;38, lantern ring is buckled;40, data string hole; 41, data collector.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.? In description of the invention, it should be noted that term " on ", "lower", "inner", "outside" " front end ", " rear end ", " both ends ", " one The orientation or positional relationship of the instructions such as end ", " other end " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of The description present invention and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with spy Fixed orientation construction and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", " Three ", " the 4th ", " the 5th ", " the 6th ", " the 7th " etc. are used for description purposes only, and are not understood to indicate or imply relatively heavy The property wanted.Unless otherwise clearly defined and limited, term " installation ", " being provided with ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be fixed connection or may be dismantle connection, or integral connection;It can be mechanical connection, be also possible to Electrical connection;It can be directly connected, the connection inside two elements can also be can be indirectly connected through an intermediary.It is right For those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Of the existing technology in order to solve the problems, such as, as shown in Figures 1 to 5, the present invention provides a kind of influences of dynamic load Lower roof plate seepage flow test device, including it is experiment tank body 18, axis pressure system, confining pressure system, big osmotic system, live load loading system, outer Portion's frame 20 and control system;
The top for testing tank body 18 is equipped with water outlet 17, and the bottom of experiment tank body 18 is equipped with water inlet 16, tests tank body 18 The lower part of side wall is equipped with first through hole 6, and the top of experiment 18 side wall of tank body is equipped with the second through-hole 7, and the inside of experiment tank body 18 is set It is equipped with top plate sample 26, crack 27 is equipped in top plate sample 26, the side wall of top plate sample 26 is equipped with foil gauge 33 and vibrating sensing Device, the top of top plate sample 26 are equipped with upper protection board 28-1, and the lower section of top plate sample 26 is equipped with lower protection board 28-2, upper protection board 28-1 and lower protection board 28-2 is equipped with the through slot with 27 face of crack, and the top of upper protection board 28-1 is equipped with upper infiltration pressure plate It is equal that the lower section of 29-1, lower protection board 28-2 are equipped with lower infiltration pressure plate 29-2, upper protection board 28-1 and upper infiltration pressure plate 29-1 Equipped with corresponding seepage flow hole, lower protection board 28-2 and lower infiltration pressure plate 29-2 are equipped with corresponding seepage flow hole, upper infiltration Pressure plate 29-1 and lower infiltration pressure plate 29-2 is equipped with infiltration plate water diversion joint 30, and the infiltration plate of upper infiltration pressure plate 29-1 draws Water swivel 30 is connect by metal pressure-bearing water pipe 31 with water outlet 17, and the infiltration plate water diversion joint 30 of lower infiltration pressure plate 29-2 is logical It crosses metal pressure-bearing water pipe 31 to connect with water inlet 16, upper infiltration pressure plate 29-1, upper protection board 28-1, top plate sample 26, lower guarantor The external package oil removal rubber membrane 32 of the entirety of backplate 28-2, lower infiltration pressure plate 29-2, foil gauge 33 and vibrating sensor;
Axis pressure system includes upper load piston 36-1, loads jack 9, lower load piston 36-2 and pressure sensor 34, The top of upper infiltration pressure plate 29-1 is arranged in upper load piston 36-1, and holds 35 companies by spool with the top of experiment tank body 18 It connects, the top of upper load piston 36-1 is equipped with load jack 9, and lower load piston 36-2 is arranged in lower infiltration pressure plate 29-2's Lower section, and 35 connections are held by spool with the bottom of experiment tank body 18, the lower section of lower load piston 36-2 is equipped with pressure sensor 34;
Confining pressure system includes hydraulic oil tank 1, oil inlet pump group 3 and oil return air pump 2, and hydraulic oil tank 1 passes through the first confining pressure respectively Pipeline and the second confining pressure pipeline are connected to first through hole 6, and hydraulic oil tank 1 is connected to by third confining pressure pipeline with the second through-hole 7, the Oil inlet pump group 3 and the first shut-off valve 5-1 are provided on one confining pressure pipeline, the second confining pressure pipeline is equipped with the second shut-off valve 5-2, the Measurements of the chest, waist and hips pressure pipeline is equipped with the 5th shut-off valve 5-5 and third shut-off valve 5-3, the 5th shut-off valve 5-5 are positioned close to hydraulic oil tank 1 Side, oil return air pump 2 is arranged between the 5th shut-off valve 5-5 and third shut-off valve 5-3, and passes through all around pressure pipeline and the The connection of measurements of the chest, waist and hips pressure pipeline, all around pressure pipeline be equipped with the 4th shut-off valve 5-4;
Big osmotic system includes catch basin 10, water inlet pump group 11, overflow valve 12, water feeding pressure sensor 14-1, water outlet water Pressure sensor 14-2, first flowmeter 15-1 and second flowmeter 15-2, catch basin 10 pass through the first seepage flow pipeline and water inlet 16 are connected to, and overflow valve 12 and water inlet pump group 11 are provided on the first seepage flow pipeline, and overflow valve 12 is positioned close to water inlet 16 Side, overflow valve 12 are connected to by the second seepage flow pipeline with catch basin 10, and water feeding pressure sensor 14-1 is arranged in water inlet 16 Place, water outlet 17 are connected to catch basin 10 by third seepage flow pipeline and the 4th seepage flow pipeline respectively, are set on third seepage flow pipeline It is equipped with first flowmeter 15-1 and the 6th shut-off valve 5-6, second flowmeter 15-2 and the 7th section is provided on the 4th seepage flow pipeline Only valve 5-7, first flowmeter 15-1 and second flowmeter 15-2 are arranged at close to the side of catch basin 10, first flowmeter The range of 15-1 is 1000ml/s~20000ml/s, and the range of second flowmeter 15-2 is 0.5ml/s~5000ml/s, third Seepage flow pipeline and the 4th seepage flow pipeline are connect with water outlet hydraulic pressure sensor 14-2 simultaneously close to the side of water outlet 17;
Live load loading system includes dynamic load telescopic arm 24 and track pedestal 19, the top of dynamic load telescopic arm 24 and experimental tank The bottom of body 18 connects, and the lower section of dynamic load telescopic arm 24 is arranged in track pedestal 19, and passes through with dynamic load telescopic arm 24 more A 23 connection of ball row;
The surrounding of experiment tank body 18 is arranged in external frame 20, and the column and track pedestal 19 of external frame 20 are by using group It fills location nut 22 to connect, the column of external frame 20 is equipped with multiple height-regulating spirals 21, and spiral 21 and experiment tank body 18 is turned up Side wall connection, the bottom of external frame 20 arranges 23 by ball with track pedestal 19 and connect, and the lifting of experiment tank body 18 is by outer Spiral 21 is turned up on portion's frame 20 to be adjusted, in the Preparatory work of experiment stage, external frame 20 passes through assembling location nut 22 and rail Road pedestal 19 is connected with the stability of security reserve stage entirety;
Control system includes confining pressure controller 4, axis pressure controller 8, big osmotic control device 13,25 sum number of live load set controller According to collector 41, confining pressure controller 4 is connect with oil inlet pump group 3, and axis pressure controller 8 is connect with load jack 9, big osmotic control Device 13 is connect with overflow valve 12, and live load set controller 25 is connect with dynamic load telescopic arm 24, data collector 41 respectively with strain Piece 33 is connected with vibrating sensor.
In the present embodiment, control system uses the digital controller of EDC, passes through the confining pressure control in the digital controller of EDC Device 4, axis pressure controller 8, big osmotic control device 13, live load set controller 25 and data collector 41 processed carry out top plate sample 26 Control, the digital controller of EDC have multiple Measurement channels, can carry out closed-loop control, Er Qieke to wherein any one channel It in test to carry out conversion free of discontinuities to control channel, can individually work, can also be controlled by computer and carry out work Make.In the present embodiment, there is certain gap between upper load piston 36-1 when load jack 9 does not work, do not contact.Oil inlet Pump group 3 is positioned close to the side of hydraulic oil tank 1.As shown in figure 3, first through hole 6 be to experiment tank body 18 in oil inlet or to The hole of oil return in hydraulic oil tank 1, the second through-hole 7 are experiment 18 oil overflow hole of tank body or air inlet.Load jack 9 is installed in reality Test 18 top of tank body.The upper center of dynamic load telescopic arm 24 is arranged in pressure sensor 34.The infiltration of upper infiltration pressure plate 29-1 Saturating plate water diversion joint 30 is corresponding with the position of water outlet 17, and is connected by metal pressure-bearing water pipe 31, lower infiltration pressure plate 29-2 Infiltration plate water diversion joint 30 it is corresponding with the position of water inlet 16, and by metal pressure-bearing water pipe 31 connect, foil gauge 33 use KYOWA waterproof foil gauge 33, vibrating sensor use DK2250 integration vibrating sensor.
In the present embodiment, experiment 18 bottom of tank body is bolted with dynamic load telescopic arm 24, dynamic load telescopic arm 24 and rail Road pedestal 19 is by 23 contact of ball row, to guarantee that experiment tank body 18 can be smoothly flexible with following load when applying dynamic load Arm 24 vibrates, and track pedestal 19 and dynamic load telescopic arm 24 are connect by ball row 23, i.e., 19 upper surface of track pedestal and 24 lower surface of dynamic load telescopic arm is not directly contacted with, and only passes through 23 connection of ball row, equally, external frame 20 and track pedestal 19 Also only by 23 connection of ball row, the width of 19 groove two of track pedestal is 1mm more wide than the row of ball row 23, to ensure experimental tank Body 18 will not topple over, and spacing is 1mm to external frame 20 everywhere with track pedestal 19, with maintenance system monolithic stability, rail Road pedestal 19 is square cubic structure, and external frame 20 is square cubic frame corresponding with track pedestal 19.
In this fact Example, as shown in Figures 3 and 4, top plate sample 26 is cylindrical structure, and a diameter of 30~45cm is a height of 10~15cm, the aperture in crack 27 are 0.5~2.0mm, and crack 27 and the angle of horizontal direction are 65~90 °.Upper protection board 28- 1 and lower protection board 28-2 is made of plasticity water proof material, and through slot is identical as 27 aperture of crack, depth 2.0mm, upper protection board 28-1 and lower protection board 28-2 is equipped with the through slot with 27 face of crack, and upper protection board 28-1 and upper infiltration pressure plate 29-1 are all provided with There is corresponding seepage flow hole, lower protection board 28-2 and lower infiltration pressure plate 29-2 are equipped with corresponding seepage flow hole, formed water Access.As illustrated in fig. 1 and 2, foil gauge 33 and vibrating sensor are along the circumferentially-spaced of 26 side wall same level height of top plate sample Setting, the upper, middle and lower of 26 side wall of top plate sample is respectively equipped with foil gauge 33 and vibrating sensor.Test tank body 18 Bottom be equipped with data string hole 40, foil gauge 33 and vibrating sensor connect with data collector 41 by data line, data Line passes through data string hole 40.
In this fact Example, the top of experiment tank body 18 is equipped with upper load piston connecting hole, and upper load piston 36-1 passes through upper It loads piston connecting hole and 35 connections is held by spool with upper load piston connecting hole, the bottom of experiment tank body 18 is equipped with lower load Piston connecting hole, lower load piston 36-2 pass through lower load piston connecting hole and hold 35 by spool with lower load piston connecting hole Connection, the top of upper infiltration pressure plate 29-1 are equipped with upper pressure plate groove corresponding with upper load piston 36-1, lower infiltration pressurization The bottom of plate 29-2 is equipped with lower pressure plate groove corresponding with lower load piston 36-2, upper pressure plate groove and upper load piston The correspondingly-sized of 36-1 is identical, and lower pressure plate groove is identical as the lower load correspondingly-sized of piston 36-2, is lived with loading in guarantee Fill in 36-1 and the lower smooth transmission axle pressure of load piston 36-2.As shown in Fig. 2, the side wall of test tank body and the bottom of test tank body are logical 37 connection of buckle is crossed, the outside for buckling 37 is equipped with buckle lantern ring 38.In the present embodiment, the side wall and experiment tank body of tank body 18 are tested 18 bottoms are by 37 connection of buckle, and experiment tank body 18 is during installing or removing top plate sample 26, by adjusting external frame The height-regulating spiral 21 connecting on frame 20 with experiment 18 side wall of tank body realizes the lifting of experiment tank body 18, and experiment tank body 18 is down to experiment Behind 18 bottom of tank body, insertion buckle 37 simultaneously puts down buckle lantern ring 38 outside buckle 37, and buckle set is successively removed after experiment Ring 38 removes top plate sample 26 after removing buckle 37, promotion experiment tank body 18.
As shown in figure 5, the centre at 19 top of track pedestal is equipped with groove one, 24 bottom of dynamic load telescopic arm is equipped with and track The corresponding protrusion of groove one of pedestal 19, the groove one of track pedestal 19 and 24 bottom of dynamic load telescopic arm project through ball 23 connection of row, be surrounded by groove two, groove two and 24 bottom of dynamic load telescopic arm at 19 top of track pedestal are arranged by ball 23 connections, the side of track pedestal 19 are equipped with groove three, and groove three is connect with the bottom of external frame 20 by ball row 23.
The test method of top board seepage experimental rig under the influence of a kind of above-mentioned dynamic load, comprising the following steps:
Step 1: the side wall in top plate sample 26 pastes foil gauge 33 and embedded vibrating sensor, 26 side wall of top plate sample Upper, middle and lower be respectively equipped with foil gauge 33 and vibrating sensor, foil gauge 33 in same level and vibration Dynamic sensor distance setting;
Step 2: installation top plate sample 26, is first consolidated external frame 20 and track pedestal 19 with assembling location nut 22 It is fixed, by the through slot of upper protection board 28-1 and lower protection board 28-2 27 face of crack with top plate sample 26 respectively, by upper protection board The seepage flow hole of 28-1 and upper infiltration pressure plate 29-1 are corresponding, by the seepage flow hole pair of lower protection board 28-2 and lower infiltration pressure plate 29-2 It answers, according to upper infiltration pressure plate 29-1, upper protection board 28-1, top plate sample 26, lower protection board 28-2 and lower infiltration pressure plate 29- It is wrapped up, and is integrally placed on lower load piston 36-2 with oil removal rubber membrane 32 after 2 sequence alignment, make lower infiltration pressure plate The lower pressure plate groove of 29-2 is corresponding with lower load piston 36-2, by foil gauge 33 and vibrating sensor pass through respectively data line with Data collector 41 connect, it is upper infiltration pressure plate 29-1 and it is lower infiltration pressure plate 29-2 infiltration plate water diversion joint 30 respectively with gold Belong to pressure-bearing water pipe 31 to connect, adjusts the height-regulating spiral 21 in external frame 20 and fall experiment tank body 18, make metal pressure-bearing water pipe 31 It is connected with corresponding water inlet 16 or water outlet 17, buckle 37 loading test tank body, 18 side wall is connect with experiment 18 bottom of tank body Place puts down buckle lantern ring 38 after alignment;
Step 3: preparing before applying confining pressure, it is first turned on the first shut-off valve 5-1, the second shut-off valve 5-2 is closed, opens the Three shut-off valve 5-3, it closes the 4th shut-off valve 5-4, open the 5th shut-off valve 5-5, starting oil inlet pump group 3, pass through hydraulic oil tank 1 First through hole 6 is to experiment 18 internal filled liquid pressure oil of tank body, for providing radial confining pressure to top plate sample 26, in tank body 18 to be tested After hydraulic oil, hydraulic oil is flowed out via the second through-hole 7, flows back to hydraulic oil through third shut-off valve 5-3 and the 5th shut-off valve 5-5 Tank 1, until the second through-hole 7 no longer excludes bubble and temporarily ceases 3 work of oil inlet pump group in confirmation emptying experiment tank body 18 after air Make, close the first shut-off valve 5-1, after the second through-hole 7 no longer because of pressure oil spilling after, close third shut-off valve 5-3 and the 5th cut-off Valve 5-5 opens the first shut-off valve 5-1;
Step 4: water exhaust of satisfying before big seepage tests, after preparing to axis pressure with confining pressure, starting water inlet pump group 11 is right Experiment 18 inner top panel sample 26 of tank body carries out water exhaust of satisfying, and big osmotic system, which supplies water, enters experiment tank body 18 from out by water inlet 16 The mouth of a river 17 is flowed out, until water outlet 17 is not overflowing bubble, temporary close water inlet pump group 11;
Step 5: starting to test and acquire data, load jack 9 is controlled to top plate sample 26 by axis pressure controller 8 Apply axis pressure, and loading procedure axis pressure is recorded by pressure sensor 34 in real time, passes through confining pressure controller 4 and control oil inlet pump group 3 pairs of top plate samples 26 apply confining pressure, and confining pressure controller 4 shows confining pressure in loading procedure, and records top in real time by foil gauge 33 The deformation quantity of plate sample 26 controls overflow valve 12 by big osmotic control device 13 and carries out big seepage flow water supply to top plate sample 26, greatly Osmotic control device 13 shows water inlet flow of inlet water, records water inlet hydraulic pressure by water feeding pressure sensor 14-1, passes through water outlet Hydraulic pressure sensor 14-2 records water outlet hydraulic pressure, records water outlet water outlet by first flowmeter 15-1 or second flowmeter 15-2 Flow, to axis pressure, confining pressure, the deformation quantity of top plate sample 26, water inlet flow of inlet water, water inlet hydraulic pressure, water outlet water flow With water outlet hydraulic pressure it is relatively stable after, remove assembling location nut 22, pass through live load set controller 25 and control dynamic load telescopic arm 24 pairs of experiment tank bodies 18 apply dynamic load, and dynamic load direction upper plate sample 26 when applying dynamic load is recorded by vibrating sensor Acceleration, meanwhile, control system acquire dynamic load apply when axis pressure, confining pressure, the deformation quantity of top plate sample 26, water inlet into Water flow, water inlet hydraulic pressure, water outlet water flow and water outlet hydraulic pressure;
Step 6: resetting, release, reset dynamic load telescopic arm 24 by live load set controller 25 after experiment, weight New installation assembling location nut 22, makes track pedestal 19 keep opposing stationary with experiment tank body 18, stops load jack 9 and applies Axis is pressed and shrinking its lower surface contacts it with upper load piston 36-1, is stopped water inlet pump group 11 and is worked, opens overflow valve 12 Naturally water in top plate sample 26 is emptied, stops oil inlet pump group 3 and works, close the first shut-off valve 5-1, open the 5th shut-off valve 5- 5 and third shut-off valve 5-3, flows back to hydraulic oil with pressure in hydraulic oil tank 1 via the second through-hole 7, stablizes not outside to oil spilling After overflowing, the second shut-off valve 5-2 is successively opened, the 5th shut-off valve 5-5 is closed, opens the 4th shut-off valve 5-4, starts oil return air pump 2, Entering air in experiment tank body 18 via the second through-hole 7 returns to hydraulic oil in it through first through hole 6 and the second shut-off valve 5-2 In hydraulic oil tank 1, after confirmation first through hole is flowed out without hydraulic oil again, oil return air pump 2 is closed, closes all cut-offs after stable gas pressure Valve, and check;
Step 7: top plate sample 26 is dismantled, buckle lantern ring 38 is successively removed after experiment, removal buckle 37, passes through tune High spiral 21 rises experiment tank body 18, removes top plate sample 26 and removes oil removal rubber membrane 32.
In actual use, the top plate sample 26 of different 27 parameters of crack, a kind of dynamic load shadow through the invention are replaced It rings lower roof plate seepage flow test device to be tested, acquires top plate sample 26 when applying dynamic load simultaneously during the test respectively Axis pressure, confining pressure, the deformation quantity of top plate sample 26, water inlet flow of inlet water, water inlet hydraulic pressure, water outlet water flow, water outlet The data of saliva pressure and acceleration, the characters of deformation and failure of top plate sample 26 is dismantled and observed to top plate sample 26 after experiment, The evolutionary model of the mutual coupled relation of these data is analyzed, dynamic load is made at quantitative description and analysis 27 aperture of crack, inclination angle The Influencing Mechanism restored with lower roof plate stability and barrier outlet capacity.
In the present embodiment, in order to which quantitative study simulation 27 geometric shape of water-proof top plate initial fissure is to the shadow of seepage tests It rings, top plate sample 26 is designed as cylinder for the ease of axis pressure and the application of country rock, prefabricated one up and down inside it 0.5~2.0mm of aperture, the prefabricated crack 27 that inclination angle is 65~90 ° are tried with simulating coal seam water-proof top plate initial fissure 27 in crack Sample die inside is uniformly coated with one layer of lubricating oil, fixes prefabricated crack steel plate, injects the similar top plate examination of the non-hydrophilic prepared 26 material of sample, preferably concrete after vibration uniformly, extract prefabricated crack steel after 27 channel sample reaches some strength after crack Plate, for 24 hours demoulding after initial set are placed in maintenance in water, full water, paste foil gauge 33 in the side wall of top plate sample 26 and embedded vibration passes The upper, middle and lower of sensor, 26 side wall of top plate sample is respectively equipped with foil gauge 33 and vibrating sensor, in same level Foil gauge 33 and the setting of vibrating sensor interval on face.
Water of satisfying in this fact Example, before big seepage tests is vented, and carries out full water exhaust to experiment 18 inner top panel sample 26 of tank body, I.e. top plate sample 26 is completely immersed in water water 48 hours naturally full, and big osmotic system, which supplies water, enters experiment tank body 18 by water inlet 16 It is flowed out from water outlet 17, until water outlet 17 is not overflowing bubble, temporary close water inlet pump group 11 passes through big osmotic control device 13 Control overflow valve 12 according to predetermined inflow supply water, starting water inlet pump group 11, more than inflow part after overflow valve 12 It returns in catch basin 10, then flows through water feeding pressure sensor 14-1 continuous collecting number by separating a tributary before water inlet 16 According to water supply is formed inside top plate specimen prefabricated crack 27 after access flows out from water outlet 17, and water outlet flows through water outlet hydraulic pressure Sensor 14-2 flows into first flowmeter 15-1 and second flowmeter 15-2 parallel with one another, and in the initial stage, top plate tries seepage flow Measure larger, flow measurement at this time the 6th shut-off valve 5-6 of opening, the 7th shut-off valve 5-7 of closing, by first flowmeter 15-1 to out Mouth of a river water flow is monitored, and 26 internal crack 27 of top plate sample deforms under load action in experimentation, and big seepage flow is logical Road sectional area reduces, and seepage discharge reduces, and when flow is reduced to 5000ml/s or less, closes the 6th shut-off valve 5-6, opens the 7th Shut-off valve 5-7 continues to be monitored water outlet water flow by second flowmeter 15-2, and seepage flow water outlet, which finally flows back to, to catchment Slot 10.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. top board seepage experimental rig under the influence of a kind of dynamic load, which is characterized in that press system, confining pressure including experiment tank body, axis System, big osmotic system, live load loading system, external frame and control system;
The top of the experiment tank body is equipped with water outlet, and the bottom for testing tank body is equipped with water inlet, tests the lower part of tank wall Equipped with first through hole, the top for testing tank wall is equipped with the second through-hole, and that tests tank body is internally provided with top plate sample, described Crack is equipped in top plate sample, the side wall of top plate sample is equipped with foil gauge and vibrating sensor, and the top of top plate sample is equipped with upper The lower section of protection board, top plate sample is equipped with lower protection board, and the upper protection board and lower protection board are equipped with and the crack face Through slot, the top of the upper protection board is equipped with upper infiltration pressure plate, and the lower section of the lower protection board is equipped with lower infiltration pressure plate, The upper protection board and upper infiltration pressure plate are equipped with corresponding seepage flow hole, and the lower protection board and lower infiltration pressure plate are all provided with There is corresponding seepage flow hole, the upper infiltration pressure plate and lower infiltration pressure plate are equipped with infiltration plate water diversion joint, the upper infiltration The infiltration plate water diversion joint of saturating pressure plate is connect by metal pressure-bearing water pipe with the water outlet, the infiltration of the lower infiltration pressure plate Saturating plate water diversion joint is connect by metal pressure-bearing water pipe with the water inlet, the upper infiltration pressure plate, upper protection board, top plate examination The external package oil removal rubber membrane of the entirety of sample, lower protection board, lower infiltration pressure plate, foil gauge and vibrating sensor;
The axis pressure system includes upper load piston, load jack, lower load piston and pressure sensor, and the upper load is lived The top of upper infiltration pressure plate is arranged in plug, and is held and connect by spool with the top of experiment tank body, the top of upper load piston Equipped with load jack, the lower section of lower infiltration pressure plate is arranged in the lower load piston, and passes through with the bottom of experiment tank body Spool holds connection, and the lower section of the lower load piston is equipped with pressure sensor;
The confining pressure system includes hydraulic oil tank, oil inlet pump group and oil return air pump, and the hydraulic oil tank passes through the first confining pressure respectively Pipeline and the second confining pressure pipeline are connected to first through hole, and hydraulic oil tank is connected to by third confining pressure pipeline with the second through-hole, described Oil inlet pump group and the first shut-off valve are provided on first confining pressure pipeline, the second confining pressure pipeline is equipped with the second shut-off valve, institute Third confining pressure pipeline is stated equipped with the 5th shut-off valve and third shut-off valve, the 5th shut-off valve is positioned close to hydraulic oil tank Side, the oil return air pump are arranged between the 5th shut-off valve and third shut-off valve, and by all around pressure pipeline enclose with third Pressure pipeline connection, described all around pressure pipeline be equipped with the 4th shut-off valve;
The big osmotic system includes catch basin, water inlet pump group, overflow valve, water feeding pressure sensor, water outlet hydraulic pressure sensor, the Flow meters and second flowmeter, the catch basin are connected to by the first seepage flow pipeline with water inlet, the first seepage flow pipeline On be provided with overflow valve and water inlet pump group, the overflow valve is positioned close to the side of water inlet, and overflow valve passes through the second seepage flow Pipeline is connected to catch basin, and water feeding pressure sensor is arranged in water inlet, and the water outlet passes through third seepage flow pipeline respectively It is connected to the 4th seepage flow pipeline with catch basin, is provided with first flowmeter and the 6th shut-off valve, institute on the third seepage flow pipeline It states and is provided with second flowmeter and the 7th shut-off valve on the 4th seepage flow pipeline, the third seepage flow pipeline and the 4th seepage flow pipeline lean on The side of nearly water outlet is connect with water outlet hydraulic pressure sensor simultaneously;
The live load loading system includes dynamic load telescopic arm and track pedestal, top and the experiment tank body of the dynamic load telescopic arm Bottom connection, the track pedestal is arranged in the lower section of dynamic load telescopic arm, and passes through multiple balls with dynamic load telescopic arm Row's connection;
The surrounding of experiment tank body is arranged in the external frame, and the column of the external frame is with track pedestal by being set with group Position nut connection, the column of the external frame are equipped with multiple height-regulating spirals, the side wall that spiral is turned up and tests tank body Connection, the bottom of the external frame and track pedestal are arranged by ball and are connected;
The control system includes confining pressure controller, axis pressure controller, big osmotic control device, live load set controller and data acquisition Device, the confining pressure controller are connect with oil inlet pump group, and the axis pressure controller is connect with load jack, the big osmotic control Device is connect with overflow valve, and the live load set controller is connect with dynamic load telescopic arm, the data collector respectively with foil gauge It is connected with vibrating sensor.
2. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the top plate sample For cylindrical structure, a diameter of 30~45cm, a height of 10~15cm, the aperture in the crack is 0.5~2.0mm, crack with The angle of horizontal direction is 65~90 °.
3. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the foil gauge and Vibrating sensor is provided at circumferentially spaced along top plate sample side wall same level height, the top of the top plate sample side wall, in Portion and lower part are respectively equipped with foil gauge and vibrating sensor.
4. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the upper protection board It is made with lower protection board of plasticity water proof material, the through slot is identical as fracture opening, depth 2.0mm.
5. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the experiment tank body Bottom be equipped with data string hole, the foil gauge and vibrating sensor connect with data collector by data line, the number Data string hole is passed through according to line.
6. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the track pedestal The centre at top is equipped with groove one, and dynamic load telescopic arm bottom is equipped with protrusion corresponding with the groove one of track pedestal, institute The ball row that projects through of the groove one and dynamic load telescopic arm bottom of stating track pedestal connects, four at the top of the track pedestal It is equipped with groove two week, the groove two, which is arranged with dynamic load telescopic arm bottom by ball, to be connected, and the side of the track pedestal is set Fluted three, connection is arranged by ball in the groove three and the bottom of external frame.
7. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the first flow Meter and second flowmeter are arranged at close to the side of catch basin, and the range of first flowmeter is 1000ml/s~20000ml/s, The range of second flowmeter is 0.5ml/s~5000ml/s.
8. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the upper infiltration adds The top of pressing plate is equipped with upper pressure plate groove corresponding with upper load piston, and the bottom of the lower infiltration pressure plate is equipped with to be added with lower Carry the corresponding lower pressure plate groove of piston.
9. top board seepage experimental rig under the influence of dynamic load according to claim 1, which is characterized in that the test tank body Side wall and test the bottom of tank body and be connected by a snap, the outside of the buckle is equipped with buckle lantern ring.
10. the test method of top board seepage experimental rig under the influence of dynamic load described in claim 1, comprising the following steps:
Step 1: the side wall in top plate sample pastes foil gauge and embedded vibrating sensor, top, the middle part of top plate sample side wall It is respectively equipped with foil gauge and vibrating sensor with lower part, the foil gauge and vibrating sensor interval in same level are set It sets;
Step 2: installation top plate sample, is first fixed external frame and track pedestal with assembling location nut, by upper protection board With the through slot of lower protection board respectively with the crack face of top plate sample, by the seepage flow hole pair of upper protection board and upper infiltration pressure plate Answer, the seepage flow hole of lower protection board and lower infiltration pressure plate is corresponding, according to upper infiltration pressure plate, upper protection board, top plate sample, under It is wrapped up, and is integrally placed on lower load piston with oil removal rubber membrane after the sequence alignment of protection board and lower infiltration pressure plate, made The lower pressure plate groove of lower infiltration pressure plate is corresponding with lower load piston, and foil gauge and vibrating sensor are passed through data line respectively Connect with data collector, it is upper infiltration pressure plate and it is lower infiltration pressure plate infiltration plate water diversion joint respectively with metal pressure-bearing water pipe Connection, the height-regulating spiral adjusted in external frame fall experiment tank body, make metal pressure-bearing water pipe and corresponding water inlet or water outlet Mouth connection will buckle loading test tank wall and experiment tank body bottom junctions, buckle lantern ring is put down after alignment;
Step 3: preparing before applying confining pressure, it is first turned on the first shut-off valve, the second shut-off valve is closed, opens third shut-off valve, closes It closes the 4th shut-off valve, open the 5th shut-off valve, start oil inlet pump group, hydraulic oil tank is made to pass through first through hole to experiment tank interior Filling liquid pressure oil, for providing radial confining pressure to top plate sample, after being full of hydraulic oil in experimental tank body, hydraulic oil is logical via second Hole outflow, flows back to hydraulic oil tank through third shut-off valve and the 5th shut-off valve, until the second through-hole no longer excludes bubble, confirmation is emptied In experimental tank body after air, the work of oil inlet pump group is temporarily ceased, the first shut-off valve is closed, to the second through-hole no longer because of pressure oil spilling Afterwards, third shut-off valve and the 5th shut-off valve are closed, the first shut-off valve is opened;
Step 4: water exhaust of satisfying before big seepage tests, after preparing to axis pressure with confining pressure, starting water inlet pump group, to experimental tank Internal top plate sample carries out full water exhaust, and big osmotic system water supply enters experiment tank body by water inlet and flows out from water outlet, until Water outlet is not overflowing bubble, temporary close water inlet pump group;
Step 5: starting to test and acquire data, load jack pair top plate sample is controlled by axis pressure controller and applies axis pressure, And loading procedure axis pressure is recorded by pressure sensor in real time, oil inlet pump group is controlled by confining pressure controller, top plate sample is applied Add confining pressure, confining pressure controller shows confining pressure in loading procedure, and records the deformation quantity of top plate sample in real time by foil gauge, passes through Big osmotic control device control overflow valve carries out big seepage flow water supply to top plate sample, and big osmotic control device shows water inlet feed water flow Amount records water inlet hydraulic pressure by water feeding pressure sensor, records water outlet hydraulic pressure by water outlet hydraulic pressure sensor, passes through first Flowmeter or second flowmeter record water outlet water flow, to axis pressure, confining pressure, the deformation quantity of top plate sample, water inlet water inlet After flow, water inlet hydraulic pressure, water outlet water flow and water outlet hydraulic pressure are relatively stable, assembling location nut is removed, by dynamic Load controller controls dynamic load telescopic arm and applies dynamic load to experiment tank body, when recording application dynamic load by vibrating sensor The acceleration of dynamic load direction upper plate sample, meanwhile, control system acquires axis pressure, confining pressure, top plate examination when dynamic load applies Deformation quantity, water inlet flow of inlet water, water inlet hydraulic pressure, water outlet water flow and the water outlet hydraulic pressure of sample;
Step 6: resetting, release, dynamic load telescopic arm is resetted by live load set controller after experiment, reinstalls group Location nut is filled, track pedestal is made to keep opposing stationary with experiment tank body, stopping load jack applies axis and presses and shrink under it Surface makes it with upper load piston contact, not stop water inlet pump group work, open overflow valve and empty water in top plate sample naturally, Stop the work of oil inlet pump group, close the first shut-off valve, open the 5th shut-off valve and third shut-off valve, first make hydraulic oil with pressure via Second through-hole flows back in hydraulic oil tank, stablizes not after excessive after oil spilling, successively opens the second shut-off valve, closes the 5th cut-off Valve opens the 4th shut-off valve, starts oil return air pump, and entering air in experimental tank body via the second through-hole passes through hydraulic oil in it In first through hole and the second shut-off valve hydraulic return oil tank, after confirmation first through hole is flowed out without hydraulic oil again, oil return air pump is closed, All shut-off valves are closed after stable gas pressure, and are checked;
Step 7: top plate sample is dismantled, buckle lantern ring, removal buckle are successively removed after experiment, by the way that spiral is turned up Tank body is tested, top plate sample is removed and removes oil removal rubber membrane.
CN201910086762.0A 2019-01-29 2019-01-29 Roof seepage test device and method under influence of dynamic load Active CN109596501B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910086762.0A CN109596501B (en) 2019-01-29 2019-01-29 Roof seepage test device and method under influence of dynamic load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910086762.0A CN109596501B (en) 2019-01-29 2019-01-29 Roof seepage test device and method under influence of dynamic load

Publications (2)

Publication Number Publication Date
CN109596501A true CN109596501A (en) 2019-04-09
CN109596501B CN109596501B (en) 2023-08-22

Family

ID=65966941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910086762.0A Active CN109596501B (en) 2019-01-29 2019-01-29 Roof seepage test device and method under influence of dynamic load

Country Status (1)

Country Link
CN (1) CN109596501B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082277A (en) * 2019-05-28 2019-08-02 辽宁工程技术大学 It is a kind of can periodic perturbation three axis multiphase porous flow experimental rig of coal petrography and test method
CN112903460A (en) * 2021-02-04 2021-06-04 太原理工大学 Device and method for testing multi-row group column single-shaft bearing of inclined goaf under disturbance influence
CN114279934A (en) * 2021-12-28 2022-04-05 中国海洋大学 Island reef water-rich calcareous sandy soil stratum grouting simulation and permeability test device and method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510140A (en) * 2015-11-30 2016-04-20 合肥通用机械研究院 Pressure bursting test system and method for low-temperature deep-cooling pressure vessels and pipelines
CN106013034A (en) * 2016-07-06 2016-10-12 天津大学 Saturated soft soil vibration centrifugal infiltration instrument
CN106018242A (en) * 2016-07-06 2016-10-12 天津大学 Saturated soft soil centrifugal infiltration device
CN106644892A (en) * 2017-02-28 2017-05-10 武汉科技大学 Loadable permeability test device
CN106768840A (en) * 2016-12-21 2017-05-31 辽宁工程技术大学 A kind of dynamic water lifting sand experiment device and method simulated under seepage flow effect of vibration
CN106908365A (en) * 2017-01-23 2017-06-30 华北水利水电大学 One kind is adopted dynamic circuit breaker and splits rock cranny dynamically closure seepage simulation experimental rig and method
CN106990031A (en) * 2017-05-27 2017-07-28 辽宁工程技术大学 Coal seam containing gas Percolation Law experimental study method under one kind vibration Excavation
CN207007659U (en) * 2017-05-27 2018-02-13 辽宁工程技术大学 A kind of axle servo seepage apparatus of coal seam containing gas dynamic disturbances fluid structurecoupling three
CN108333328A (en) * 2018-02-07 2018-07-27 南京科兴新材料科技有限公司 Subgrade soil displacement field and the visual experimental rig of seepage field and test method under a kind of seepage flow dynamic load by vehicle
CN108548766A (en) * 2018-04-10 2018-09-18 武汉理工大学 Rock mass transient unloading infiltration pressing response simulation experimental rig based on magnetoelectricity control
CN108645707A (en) * 2018-05-08 2018-10-12 华东交通大学 Soil pressure calculation device and method under a kind of simulation steady seepage and oscillatory load
CN108751022A (en) * 2018-04-28 2018-11-06 四川大学 A kind of loading platform of rock mechanics test

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510140A (en) * 2015-11-30 2016-04-20 合肥通用机械研究院 Pressure bursting test system and method for low-temperature deep-cooling pressure vessels and pipelines
CN106013034A (en) * 2016-07-06 2016-10-12 天津大学 Saturated soft soil vibration centrifugal infiltration instrument
CN106018242A (en) * 2016-07-06 2016-10-12 天津大学 Saturated soft soil centrifugal infiltration device
CN106768840A (en) * 2016-12-21 2017-05-31 辽宁工程技术大学 A kind of dynamic water lifting sand experiment device and method simulated under seepage flow effect of vibration
CN106908365A (en) * 2017-01-23 2017-06-30 华北水利水电大学 One kind is adopted dynamic circuit breaker and splits rock cranny dynamically closure seepage simulation experimental rig and method
CN106644892A (en) * 2017-02-28 2017-05-10 武汉科技大学 Loadable permeability test device
CN106990031A (en) * 2017-05-27 2017-07-28 辽宁工程技术大学 Coal seam containing gas Percolation Law experimental study method under one kind vibration Excavation
CN207007659U (en) * 2017-05-27 2018-02-13 辽宁工程技术大学 A kind of axle servo seepage apparatus of coal seam containing gas dynamic disturbances fluid structurecoupling three
CN108333328A (en) * 2018-02-07 2018-07-27 南京科兴新材料科技有限公司 Subgrade soil displacement field and the visual experimental rig of seepage field and test method under a kind of seepage flow dynamic load by vehicle
CN108548766A (en) * 2018-04-10 2018-09-18 武汉理工大学 Rock mass transient unloading infiltration pressing response simulation experimental rig based on magnetoelectricity control
CN108751022A (en) * 2018-04-28 2018-11-06 四川大学 A kind of loading platform of rock mechanics test
CN108645707A (en) * 2018-05-08 2018-10-12 华东交通大学 Soil pressure calculation device and method under a kind of simulation steady seepage and oscillatory load

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
夏才初;钱鑫;桂洋;庄小清;喻强锋;张亮;: "多功能岩石节理全剪切渗流耦合试验系统研制与应用", 岩石力学与工程学报, no. 10 *
孙琦;张向东;张淑坤;卫星;母倩雯;: "多向荷载作用下采空区顶板-矿柱流变力学模型", 防灾减灾工程学报, no. 05, pages 679 - 684 *
张向东;刘功勋;栾茂田;: "辽西地区风积土冻融特性与冻融过程结构性演变规律试验研究", 岩石力学与工程学报, no. 1, pages 2946 - 2952 *
张国新;葛劭卿;陈平;: "岩石裂隙中非恒定渗流与变形耦合作用的DDA方法", 西安石油大学学报(自然科学版), no. 02, pages 6 - 10 *
熊祥斌;张楚汉;王恩志;: "岩石单裂隙稳态渗流研究进展", 岩石力学与工程学报, no. 09 *
雷进生;李申;武增琳;姚奇;曾有为;: "剪切位移作用下随机裂隙面渗流特性试验研究", 岩石力学与工程学报, no. 2, pages 3898 - 3905 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110082277A (en) * 2019-05-28 2019-08-02 辽宁工程技术大学 It is a kind of can periodic perturbation three axis multiphase porous flow experimental rig of coal petrography and test method
CN110082277B (en) * 2019-05-28 2021-05-18 辽宁工程技术大学 Coal rock triaxial multiphase seepage test device capable of periodically disturbing and test method
CN112903460A (en) * 2021-02-04 2021-06-04 太原理工大学 Device and method for testing multi-row group column single-shaft bearing of inclined goaf under disturbance influence
CN114279934A (en) * 2021-12-28 2022-04-05 中国海洋大学 Island reef water-rich calcareous sandy soil stratum grouting simulation and permeability test device and method
CN114279934B (en) * 2021-12-28 2023-10-17 中国海洋大学 Island reef water-rich calcareous sandy soil stratum grouting simulation and permeability test device and method

Also Published As

Publication number Publication date
CN109596501B (en) 2023-08-22

Similar Documents

Publication Publication Date Title
CN103995097B (en) A kind of test method and device of simulating jacking construction initiation stratum deformation
CN106353120B (en) Simulate the experimental rig and method of tunnel internal water pressure
CN109596501A (en) Top board seepage experimental rig and method under the influence of a kind of dynamic load
CN110082218A (en) A kind of tunnel lining structural model test device and test method
KR100199297B1 (en) Method and apparatus for subterranean load cell testing
CN108951717A (en) A kind of Multifunctional pile base model test box device and its application method
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN106872334B (en) Device and method for simulating water bursting and mud bursting excavation
CN209460106U (en) Top board seepage experimental rig under the influence of a kind of dynamic load
CN108088982A (en) Simulate the Experimental Method in Laboratory of fine grained seepage inflow erosion inside deep aquifers sand
CN108036985B (en) Device and method for manufacturing split grouting slurry vein and detecting permeability coefficient
CN211505504U (en) Test device for simulating tunnel crossing water-rich fault gushing water
CN105842140A (en) Experiment system for water and sand seepage of fractured rock mass
CN110258550B (en) Concrete prefabricated dado of manual hole digging pile and construction method
CN110441159A (en) The simulation test device and method of borehole wall bearer properties under hydraulic coupling action
CN108444885B (en) Tunnel filling structure seepage, erosion and stress coupling instability test device and method
CN105672378B (en) Simulate the excavation of foundation pit model test apparatus of artesian head lifting
CN112414853B (en) Water pressure testing method for water-containing fracture under blasting impact
CN205080013U (en) Coarse -grained soil seepage flow direct shear test device
CN200988957Y (en) Water pressure measuring device for underground pressure-bearing water
CN106226022A (en) A kind of underground civil defense engineering anti-nuclear blast experimental system for simulating and experimental technique
CN111006993A (en) Stability detection device for gangue cemented filling material and use method thereof
CN206916800U (en) The sinking bucket foundation soil body changes experimental rig
CN109827883B (en) Test device and test method for simulating stability study of pile-row support foundation pit under deep foundation pit engineering pipeline rupture working condition
CN210797676U (en) Device for simulating overall process of foundation pit inrush disaster

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant