CN109595014A - A kind of bolting with wire mesh method - Google Patents
A kind of bolting with wire mesh method Download PDFInfo
- Publication number
- CN109595014A CN109595014A CN201811313906.3A CN201811313906A CN109595014A CN 109595014 A CN109595014 A CN 109595014A CN 201811313906 A CN201811313906 A CN 201811313906A CN 109595014 A CN109595014 A CN 109595014A
- Authority
- CN
- China
- Prior art keywords
- bolting
- net
- wire mesh
- tunnel
- mesh sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 18
- 239000011435 rock Substances 0.000 claims abstract description 8
- 238000004873 anchoring Methods 0.000 claims description 7
- 229910003460 diamond Inorganic materials 0.000 claims description 4
- 239000010432 diamond Substances 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000005553 drilling Methods 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 239000011347 resin Substances 0.000 description 4
- 229920005989 resin Polymers 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000000877 morphologic effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/152—Laggings made of grids or nettings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
- E21D21/0053—Anchoring-bolts in the form of lost drilling rods
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The invention belongs to Roadway Support Technology fields, disclose a kind of bolting with wire mesh method, it include: the position that bolting with wire mesh is needed according to tunnel, first piece of throwing the net is close to one nation of tunnel, mesh sheet center is withstood with mechanized equipment drilling large arm, start to drill and seamed pipe anchoring-bolt is installed wherein, mesh sheet and rock mass is fixed with anchor;Spacing arrangement second is overlapped according to mesh sheet to throw the net piece, and the described second center for throwing the net piece is then fixed with anchor;Be overlapped compress described first throw the net piece and described second throw the net piece overlapping regions, then the corner areas of overlapping regions is anchored on rock mass with anchor pole by net overlap joint;It repeats the above steps, it is a gang of to top plate from tunnel, then bolting with wire mesh construction is completed from the top plate to another nation in tunnel.Method provided by the invention simplifies the process of existing bolting with wire mesh, raising efficiency and reliability.
Description
Technical field
The present invention relates to Roadway Support Technology field, in particular to a kind of bolting with wire mesh method.
Background technique
As the exploitation of domestic open air trestle is increasing, the bolting with wire mesh in underground excavation tunnel is used widely.It is existing
Have in technology, big machinery bolting with wire mesh is gradually instead of artificial construction, it is intended to reduce labor intensity, promote operating efficiency.
But it is practical it is affected in, in order to ensure anchor bolt construction quality, preparation of construction operation is more complex, needs manually to measure
Tunnel marks anchor pole position, looks for the preparations such as drilling construction to operate mark, so that the advantage performance of mechanized operation does not come out,
It can not play equipment and answer effective percentage.In addition to this, there is also bolting with wire mesh accessories and construction efficiency to mismatch, mesh sheet overlaps not
The problems such as firm, influences the globality of bolting with wire mesh.
Summary of the invention
The present invention provides a kind of bolting with wire mesh method, solve in the prior art mechanization bolting with wire mesh efficiency by manual operation
Limitation, the insecure technical problem of supporting quality.
In order to solve the above technical problems, the present invention provides a kind of bolting with wire mesh methods, comprising:
First piece of throwing the net is close to one nation of tunnel, is drilled with mechanized equipment by the position that bolting with wire mesh is needed according to tunnel
Large arm withstands mesh sheet center, starts to drill and installs seamed pipe anchoring-bolt wherein, mesh sheet and rock mass is fixed with anchor;
Spacing arrangement second is overlapped according to mesh sheet to throw the net piece, and the described second center for throwing the net piece is then fixed with anchor;
Be overlapped compress described first throw the net piece and described second throw the net piece overlapping regions, then will with anchor pole by net overlap joint
The corner areas of overlapping regions is anchored on rock mass;
It repeats the above steps, it is a gang of to top plate from tunnel, then complete bolting with wire mesh to another nation in tunnel from the top plate and apply
Work.
Further, adjacent described first throw the net piece and described second throw the net piece center seamed pipe anchoring-bolt and anchor
Gu the layout of two anchor poles of the corner areas of overlapping regions is diamond shape layout.
Further, when executing bolting with wire mesh, the length direction of mesh sheet and the axial direction in tunnel are consistent;
Wherein, the width A of mesh sheet, length B, the anchor pole spacing a on netting width direction, the side length of element c of mesh sheet with
And mesh sheet overlapping regions lap of splice n should meet following relationship:
A=a+nc, B=2a+nc.
Further, the mesh sheet uses reinforced mesh.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The bolting with wire mesh method provided in the embodiment of the present application is replaced by mesh sheet shape and is marked, improves construction efficiency,
To reduce before construction with ruler measurement palisades spacing and the step of make marks;Anchor pole spacing is ensured to a certain extent, is improved
Construction efficiency;By anchor pole, mesh sheet and overlapped that mode forms firm overall structure;Instead of traditional net and net overlap joint iron
Silk modes, the operating efficiency such as ties and is also improved.Resin anchor is replaced using seamed pipe anchoring-bolt, construction procedure compared with having lacked 3 steps,
Efficiency significantly improves.Seamed pipe anchoring-bolt protruded length is fixed, and anchor force squeezes into i.e. anchoring and comes into force, and quality is secure, ensures simultaneously
The safety of hot work in progress personnel.On the other hand, supporting expense reduces.
Detailed description of the invention
Fig. 1 is the schematic illustration of bolting with wire mesh method provided by the invention.
Specific embodiment
The embodiment of the present application solves mechanization bolting with wire mesh efficiency in the prior art by providing a kind of bolting with wire mesh method
It is limited by manual operation, the insecure technical problem of supporting quality.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper
It states technical solution to be described in detail, it should be understood that the specific features in the embodiment of the present invention and embodiment are to the application skill
The detailed description of art scheme, rather than the restriction to technical scheme, in the absence of conflict, the embodiment of the present application
And the technical characteristic in embodiment can be combined with each other.
Referring to Fig. 1, a kind of bolting with wire mesh method, comprising:
The position that bolting with wire mesh is needed according to tunnel throws the net the abutting of piece 1 to one nation of tunnel for first, is drilled with mechanized equipment
Large arm withstands mesh sheet center, starts to drill and installs the first seamed pipe anchoring-bolt 4 placed in the middle wherein, mesh sheet and rock mass is fixed with anchor;
Spacing arrangement second is overlapped according to mesh sheet to throw the net piece 2, the described second center for throwing the net piece is then fixed with anchor, i.e.,
Using above-mentioned mechanical method, seamed pipe anchoring-bolt 5 in second is anchored;
Be overlapped compress described first throw the net piece 1 and described second throw the net piece 2 overlapping regions, then pass through net overlap joint anchor pole
3 are anchored at the corner areas of overlapping regions on rock mass, that is, anchor to form two anchorings in the corner areas of overlapping regions
Point;
It repeats the above steps, it is a gang of to top plate from tunnel, then complete bolting with wire mesh to another nation in tunnel from the top plate and apply
Work.
In the above process, using mesh sheet as the medium of label, borehole anchorage process is instructed by its morphological feature, to keep away
The complicated measurement of mechanized operation, the processes such as label, the efficiency of elevating mechanismization operation are exempted from.Anchor is ensured to a certain extent
Distance between tie rods improves construction efficiency;By anchor pole, mesh sheet and overlapped that mode forms firm overall structure;Instead of tradition
Net and net overlap joint modes, the operating efficiency such as tie with iron wire and are also improved.
On the other hand, existing frequently-used resin anchor is replaced using seamed pipe anchoring-bolt, resin anchor construction procedure is divided into: bored
Six steps such as m- laying mesh sheet-installation pallet when hole-dispensing Anchor Agent-installation anchor pole-waiting anchoring;And seamed pipe anchoring-bolt construction step
It is rapid: three steps such as lapping-drilling-installation anchor pole (band pallet).3 steps are lacked compared with six present steps, efficiency significantly improves.
Seamed pipe anchoring-bolt protruded length is fixed, and anchor force squeezes into i.e. anchoring and comes into force, and quality is secure, while ensuring and applying
The safety of worker person.On the other hand, supporting expense reduces.
In general, adjacent described first throw the net piece 1 and described second throw the net piece 2 center seamed pipe anchoring-bolt and
The layout of two anchor poles of the corner areas of overlapping regions is anchored as diamond shape layout.
It is, the first seamed pipe anchoring-bolt 4, the second seamed pipe anchoring-bolt 5 placed in the middle and described two net overlap joint anchor poles 3 placed in the middle
The diamond structure of formation rule promotes the reliability of anchoring.
Further, when executing bolting with wire mesh, the length direction of mesh sheet and the axial direction in tunnel are consistent;
Wherein, the width A of mesh sheet, length B, the anchor pole spacing a on netting width direction, the side length of element c of mesh sheet with
And mesh sheet overlapping regions lap of splice n should meet following relationship:
A=a+nc, B=2a+nc.Consequently facilitating the specification of mesh sheet, the design of spacing of anchor pole etc..
In general, the mesh sheet uses reinforced mesh.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The bolting with wire mesh method provided in the embodiment of the present application is replaced by mesh sheet shape and is marked, improves construction efficiency,
To reduce before construction with ruler measurement palisades spacing and the step of make marks;Anchor pole spacing is ensured to a certain extent, is improved
Construction efficiency;By anchor pole, mesh sheet and overlapped that mode forms firm overall structure;Instead of traditional net and net overlap joint iron
Silk modes, the operating efficiency such as ties and is also improved.Resin anchor is replaced using seamed pipe anchoring-bolt, construction procedure compared with having lacked 3 steps,
Efficiency significantly improves.Seamed pipe anchoring-bolt protruded length is fixed, and anchor force squeezes into i.e. anchoring and comes into force, and quality is secure, ensures simultaneously
The safety of hot work in progress personnel.On the other hand, supporting expense reduces.
It should be noted last that the above specific embodiment is only used to illustrate the technical scheme of the present invention and not to limit it,
Although being described the invention in detail referring to example, those skilled in the art should understand that, it can be to the present invention
Technical solution be modified or replaced equivalently, without departing from the spirit and scope of the technical solution of the present invention, should all cover
In the scope of the claims of the present invention.
Claims (4)
1. a kind of bolting with wire mesh method characterized by comprising
First piece of throwing the net is close to one nation of tunnel by the position that bolting with wire mesh is needed according to tunnel, is drilled large arm with mechanized equipment
Mesh sheet center is withstood, start to drill and seamed pipe anchoring-bolt is installed wherein, mesh sheet and rock mass is fixed with anchor;
Spacing arrangement second is overlapped according to mesh sheet to throw the net piece, and the described second center for throwing the net piece is then fixed with anchor;
Be overlapped compress described first throw the net piece and described second throw the net piece overlapping regions, then will be overlapped by net overlap joint anchor pole
The corner areas in region is anchored on rock mass;
It repeats the above steps, it is a gang of to top plate from tunnel, then bolting with wire mesh construction is completed from the top plate to another nation in tunnel.
2. bolting with wire mesh method as described in claim 1, it is characterised in that: adjacent described first is thrown the net piece and described second
The layout of two anchor poles of the center seamed pipe anchoring-bolt of piece and the corner areas of anchoring overlapping regions of throwing the net is diamond shape layout.
3. bolting with wire mesh method as described in claim 1, it is characterised in that: when executing bolting with wire mesh, the length side of mesh sheet
Unanimously to the axial direction with tunnel;
Wherein, the width A of mesh sheet, length B, the anchor pole spacing a on netting width direction, the side length of element c and net of mesh sheet
Oblique cut grafting region lap of splice n should meet following relationship:
A=a+nc, B=2a+nc.
4. bolting with wire mesh method as described in claim 1, it is characterised in that: the mesh sheet uses reinforced mesh.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811313906.3A CN109595014B (en) | 2018-11-06 | 2018-11-06 | Anchor net supporting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811313906.3A CN109595014B (en) | 2018-11-06 | 2018-11-06 | Anchor net supporting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109595014A true CN109595014A (en) | 2019-04-09 |
CN109595014B CN109595014B (en) | 2021-05-25 |
Family
ID=65957560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811313906.3A Active CN109595014B (en) | 2018-11-06 | 2018-11-06 | Anchor net supporting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109595014B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905559A (en) * | 2019-11-30 | 2020-03-24 | 赵雪莲 | Roof supporting anchor net compactor |
CN113107524A (en) * | 2021-04-06 | 2021-07-13 | 淮北市平远软岩支护工程技术有限公司 | Supporting method for roadway specially used for treating rock burst and application |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010099777A3 (en) * | 2009-03-06 | 2011-04-14 | Dr. Klaus Schulte Gmbh Chemisch Technische Fabrikation | Lagging mat for underground mining and tunneling |
CN103244158A (en) * | 2013-05-08 | 2013-08-14 | 中国矿业大学 | Reinforced structure that anchor beam net integration was strutted |
CN106401605A (en) * | 2016-12-16 | 2017-02-15 | 安徽理工大学 | U-shaped steel reinforced composite anchor net support structure for high-stress soft rock tunnel of deep well and construction method thereof |
CN206092025U (en) * | 2016-07-21 | 2017-04-12 | 淮南矿业(集团)有限责任公司 | Quick -witted bolting with wire mesh mechanism is constructed in colliery shield in pit |
CN107654247A (en) * | 2017-09-22 | 2018-02-02 | 中国矿业大学 | A kind of sliding structure area pole loose thick coal layer coal roadway tunneling is met head on anti-top coal leakage method for leakage |
-
2018
- 2018-11-06 CN CN201811313906.3A patent/CN109595014B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010099777A3 (en) * | 2009-03-06 | 2011-04-14 | Dr. Klaus Schulte Gmbh Chemisch Technische Fabrikation | Lagging mat for underground mining and tunneling |
CN103244158A (en) * | 2013-05-08 | 2013-08-14 | 中国矿业大学 | Reinforced structure that anchor beam net integration was strutted |
CN206092025U (en) * | 2016-07-21 | 2017-04-12 | 淮南矿业(集团)有限责任公司 | Quick -witted bolting with wire mesh mechanism is constructed in colliery shield in pit |
CN106401605A (en) * | 2016-12-16 | 2017-02-15 | 安徽理工大学 | U-shaped steel reinforced composite anchor net support structure for high-stress soft rock tunnel of deep well and construction method thereof |
CN107654247A (en) * | 2017-09-22 | 2018-02-02 | 中国矿业大学 | A kind of sliding structure area pole loose thick coal layer coal roadway tunneling is met head on anti-top coal leakage method for leakage |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905559A (en) * | 2019-11-30 | 2020-03-24 | 赵雪莲 | Roof supporting anchor net compactor |
CN110905559B (en) * | 2019-11-30 | 2022-04-29 | 赵雪莲 | Roof supporting anchor net compactor |
CN113107524A (en) * | 2021-04-06 | 2021-07-13 | 淮北市平远软岩支护工程技术有限公司 | Supporting method for roadway specially used for treating rock burst and application |
Also Published As
Publication number | Publication date |
---|---|
CN109595014B (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061771B (en) | Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof | |
CN206396816U (en) | A kind of blower foundation various dimensions ruggedized construction | |
CN104405399A (en) | Construction method for excavating support body in tunnel by crossing quicksand stratum | |
CN109595014A (en) | A kind of bolting with wire mesh method | |
CN107091101A (en) | Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site | |
CN110424383A (en) | A kind of Spiral digging machine combination side chisel head excavates square pile construction method | |
CN107893665B (en) | A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron | |
CN109403985A (en) | The gate-type of pole weak broken wall rock layer is caunched engineering method | |
CN103147778A (en) | Method for lane development and support in extremely crushed rock stratum | |
CN107575237A (en) | A kind of subsurface excavation method is combined the construction method of construction subway station with shield method | |
CN105019472B (en) | Composite fender pile for building basement | |
CN103939115A (en) | Semi-subsurface excavation method construction shed tunnel method and structure | |
CN109958455B (en) | A kind of safety of coal mines method | |
CN108374674B (en) | Six pilot tunnels, 12 step Underground Space Excavation method for protecting support | |
CN201406687Y (en) | Deep foundation pit supporting structure | |
KR20080096629A (en) | Puzzle type block reinforcement method | |
KR101297679B1 (en) | Self-supporting Temporary Structure Using Steel Wire And Method Of The Same | |
CN105507330A (en) | Foundation pit support structure and construction method thereof | |
CN109518722A (en) | The short underpass structure and its construction method of newly-built basement and existing subway station | |
CN104612728A (en) | Roadway supporting method for forming cross point by penetrating through existing roadway | |
CN105019400B (en) | Compound supporting pile structure | |
CN209413910U (en) | Cavern for being assembled in push pipe auger | |
CN203905045U (en) | Moving foundation of hoisting machine | |
JPH0464697A (en) | Construction of tunneling space | |
CN208184748U (en) | Wear the ruggedized construction of building in a kind of shield tunnel short distance side |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |