CN109595003A - 一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 - Google Patents
一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 Download PDFInfo
- Publication number
- CN109595003A CN109595003A CN201910069628.XA CN201910069628A CN109595003A CN 109595003 A CN109595003 A CN 109595003A CN 201910069628 A CN201910069628 A CN 201910069628A CN 109595003 A CN109595003 A CN 109595003A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- lining
- relief panel
- lined
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 230000008093 supporting effect Effects 0.000 title claims abstract description 46
- 238000009412 basement excavation Methods 0.000 claims abstract description 82
- 239000011435 rock Substances 0.000 claims abstract description 78
- 239000007788 liquid Substances 0.000 claims abstract description 47
- 239000000945 filler Substances 0.000 claims abstract description 46
- 238000005520 cutting process Methods 0.000 claims abstract description 34
- 239000004746 geotextile Substances 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 107
- 239000010959 steel Substances 0.000 claims description 107
- 238000000034 method Methods 0.000 claims description 21
- 230000008569 process Effects 0.000 claims description 14
- 239000004567 concrete Substances 0.000 claims description 13
- 239000004576 sand Substances 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 11
- 238000007569 slipcasting Methods 0.000 claims description 9
- 238000004088 simulation Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- BVPWJMCABCPUQY-UHFFFAOYSA-N 4-amino-5-chloro-2-methoxy-N-[1-(phenylmethyl)-4-piperidinyl]benzamide Chemical compound COC1=CC(N)=C(Cl)C=C1C(=O)NC1CCN(CC=2C=CC=CC=2)CC1 BVPWJMCABCPUQY-UHFFFAOYSA-N 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 239000011378 shotcrete Substances 0.000 claims description 3
- 230000006641 stabilisation Effects 0.000 claims description 3
- 238000011105 stabilization Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 230000006378 damage Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 101100008047 Caenorhabditis elegans cut-3 gene Proteins 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 239000006185 dispersion Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000001687 destabilization Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069628.XA CN109595003B (zh) | 2019-01-24 | 2019-01-24 | 一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069628.XA CN109595003B (zh) | 2019-01-24 | 2019-01-24 | 一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109595003A true CN109595003A (zh) | 2019-04-09 |
CN109595003B CN109595003B (zh) | 2020-09-01 |
Family
ID=65964711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910069628.XA Active CN109595003B (zh) | 2019-01-24 | 2019-01-24 | 一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109595003B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110094215A (zh) * | 2019-05-30 | 2019-08-06 | 三峡大学 | 非牛顿流体衬砌支护结构及施工方法 |
CN110318773A (zh) * | 2019-06-21 | 2019-10-11 | 三峡大学 | 可调磁力的门式流质衬砌围岩卸压装置及施工方法 |
CN110836120A (zh) * | 2019-11-07 | 2020-02-25 | 山东大学 | 适用于穿越活断层的自监测调节的隧道衬砌结构及施工方法 |
CN111594223A (zh) * | 2020-06-12 | 2020-08-28 | 河海大学 | 一种可吸收锚固体时效变形的让压结构及其支护方法 |
CN112177632A (zh) * | 2020-09-27 | 2021-01-05 | 三峡大学 | 一种用于隧道直接施加二次衬砌支护的装置及方法 |
CN112963169A (zh) * | 2021-02-25 | 2021-06-15 | 西华大学 | 一种隧道开挖大变形强支护装置 |
CN113738394A (zh) * | 2021-09-11 | 2021-12-03 | 中建铁路投资建设集团有限公司 | 开挖支护加固结构和开挖支护加固装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2097566C1 (ru) * | 1996-04-16 | 1997-11-27 | Институт горного дела СО РАН | Способ крепления горных выработок в условиях напряженного состояния массива |
CN101644160A (zh) * | 2009-06-05 | 2010-02-10 | 中国科学院武汉岩土力学研究所 | 高地应力软岩卸压施工方法 |
CN204691784U (zh) * | 2015-06-25 | 2015-10-07 | 甘肃省建设投资(控股)集团总公司 | 一种地铁车站抗震隔墙 |
CN205036928U (zh) * | 2015-09-28 | 2016-02-17 | 三峡大学 | 一种能够自动卸压的恒压阀门 |
CN106368720A (zh) * | 2016-10-10 | 2017-02-01 | 三峡大学 | 胎式衬砌与泡沫混凝土联合使用的支护结构及施工方法 |
CN106437757A (zh) * | 2016-10-10 | 2017-02-22 | 三峡大学 | 用于隧道与盾构衬砌管片之间的胎式衬砌结构及方法 |
CN206111201U (zh) * | 2016-10-27 | 2017-04-19 | 三峡大学 | 结构改良的胎式衬砌结构 |
CN108955967A (zh) * | 2018-06-06 | 2018-12-07 | 三峡大学 | 一种模拟环形隧洞流质充填衬砌支护结构受力的装置及方法 |
-
2019
- 2019-01-24 CN CN201910069628.XA patent/CN109595003B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2097566C1 (ru) * | 1996-04-16 | 1997-11-27 | Институт горного дела СО РАН | Способ крепления горных выработок в условиях напряженного состояния массива |
CN101644160A (zh) * | 2009-06-05 | 2010-02-10 | 中国科学院武汉岩土力学研究所 | 高地应力软岩卸压施工方法 |
CN204691784U (zh) * | 2015-06-25 | 2015-10-07 | 甘肃省建设投资(控股)集团总公司 | 一种地铁车站抗震隔墙 |
CN205036928U (zh) * | 2015-09-28 | 2016-02-17 | 三峡大学 | 一种能够自动卸压的恒压阀门 |
CN106368720A (zh) * | 2016-10-10 | 2017-02-01 | 三峡大学 | 胎式衬砌与泡沫混凝土联合使用的支护结构及施工方法 |
CN106437757A (zh) * | 2016-10-10 | 2017-02-22 | 三峡大学 | 用于隧道与盾构衬砌管片之间的胎式衬砌结构及方法 |
CN206111201U (zh) * | 2016-10-27 | 2017-04-19 | 三峡大学 | 结构改良的胎式衬砌结构 |
CN108955967A (zh) * | 2018-06-06 | 2018-12-07 | 三峡大学 | 一种模拟环形隧洞流质充填衬砌支护结构受力的装置及方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110094215A (zh) * | 2019-05-30 | 2019-08-06 | 三峡大学 | 非牛顿流体衬砌支护结构及施工方法 |
CN110318773A (zh) * | 2019-06-21 | 2019-10-11 | 三峡大学 | 可调磁力的门式流质衬砌围岩卸压装置及施工方法 |
CN110836120A (zh) * | 2019-11-07 | 2020-02-25 | 山东大学 | 适用于穿越活断层的自监测调节的隧道衬砌结构及施工方法 |
CN111594223A (zh) * | 2020-06-12 | 2020-08-28 | 河海大学 | 一种可吸收锚固体时效变形的让压结构及其支护方法 |
CN112177632A (zh) * | 2020-09-27 | 2021-01-05 | 三峡大学 | 一种用于隧道直接施加二次衬砌支护的装置及方法 |
CN112177632B (zh) * | 2020-09-27 | 2022-06-21 | 三峡大学 | 一种用于隧道直接施加二次衬砌支护的装置及方法 |
CN112963169A (zh) * | 2021-02-25 | 2021-06-15 | 西华大学 | 一种隧道开挖大变形强支护装置 |
CN113738394A (zh) * | 2021-09-11 | 2021-12-03 | 中建铁路投资建设集团有限公司 | 开挖支护加固结构和开挖支护加固装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109595003B (zh) | 2020-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109595003A (zh) | 一种隧洞大截面超挖衬砌支护及自主卸压装置及施工方法 | |
CN108843332B (zh) | 穿越断层破碎带大断面隧道开挖及支护方法 | |
CN103758134B (zh) | 一种组合双排桩支护体系的施工方法 | |
CN106703814B (zh) | 暗挖地铁车站洞桩施工方法 | |
CN107605489A (zh) | 三线大跨隧道斜井进正洞施工方法 | |
CN206319886U (zh) | 隧洞衬砌结构 | |
CN206752482U (zh) | 控制偏压变形的组合支挡结构 | |
CN108915728B (zh) | 基于门架式支撑的隧道拱墙初期支护侵限换拱施工方法 | |
CN203729308U (zh) | 钢筋混凝土桩组合型钢水泥土搅拌桩墙的双排桩支护体系 | |
CN107143358A (zh) | 控制隧道偏压变形的对拉锚索结构及其施工方法 | |
CN109578027A (zh) | 上软下硬地层隧道开挖支护结构及隧道开挖施工方法 | |
CN108868834A (zh) | 隧道拱墙初期支护侵限换拱施工临时支护体系 | |
JPH0953396A (ja) | 地下空洞の覆工構造およびその覆工方法 | |
CN109235702A (zh) | 一种带肋的装配式双钢板组合剪力墙结构及其施工方法 | |
CN105386779B (zh) | 浅埋岩层中修建大型地下结构物的拱柱法 | |
CN109837910A (zh) | 逆作法和钢支撑相结合的基坑施工方法 | |
CN107034905A (zh) | 控制偏压变形的组合支挡结构及其施工方法 | |
KR101884663B1 (ko) | 캡 슬래브를 이용한 흙막이 구조물의 그 시공방법 | |
CN208456616U (zh) | 穿越断层破碎带隧道初期支护及中隔壁加强支护体系 | |
CN206845196U (zh) | 控制隧道偏压变形的钢花管桩支挡结构 | |
JPH03202599A (ja) | 双設トンネル | |
CN110145315A (zh) | 一种减弱城区浅埋隧道爆破震动的掘进方法 | |
JPS6140914A (ja) | 砂防堤およびその構築方法 | |
CN208456633U (zh) | 隧道拱墙初期支护侵限换拱施工临时支护体系 | |
CN210315650U (zh) | 一种锚杆加筋复合挡土墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20190409 Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd. Assignor: CHINA THREE GORGES University Contract record no.: X2023980043461 Denomination of invention: A Large Section Overexcavation Lining Support and Autonomous Pressure Relief Device and Construction Method for Tunnels Granted publication date: 20200901 License type: Exclusive License Record date: 20231019 |
|
EC01 | Cancellation of recordation of patent licensing contract | ||
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd. Assignor: CHINA THREE GORGES University Contract record no.: X2023980043461 Date of cancellation: 20240402 |