CN109594571A - A kind of staged green edge slope structure - Google Patents

A kind of staged green edge slope structure Download PDF

Info

Publication number
CN109594571A
CN109594571A CN201811552513.8A CN201811552513A CN109594571A CN 109594571 A CN109594571 A CN 109594571A CN 201811552513 A CN201811552513 A CN 201811552513A CN 109594571 A CN109594571 A CN 109594571A
Authority
CN
China
Prior art keywords
cladding
plate
slope
staged
edge slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811552513.8A
Other languages
Chinese (zh)
Other versions
CN109594571B (en
Inventor
祝云华
周丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Hejiang Enterprise Management Consulting Co ltd
Original Assignee
Neijiang Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Neijiang Normal University filed Critical Neijiang Normal University
Priority to CN201811552513.8A priority Critical patent/CN109594571B/en
Publication of CN109594571A publication Critical patent/CN109594571A/en
Application granted granted Critical
Publication of CN109594571B publication Critical patent/CN109594571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of staged green edge slope structures, No.1 cladding plate and No. two cladding plates including being located at side slope surface, the No.1 cladding plate and No. two cladding plates include the level board being close to slope surface horizontal plane and the inclined plate be close to slope surface inclined surface, buffer gear is equipped between the No.1 cladding plate and No. two cladding plates, the present invention is improved for the shortcomings that existing apparatus, in actual use, the setting of this buffer gear is so that have certain cushion performance between No.1 cladding plate and No. two cladding plates, the stress of deforming of the slope generation can be absorbed, and staff can judge the size of side slope internal stress according to the compressed situation of buffer spring, so that staff is safeguarded in time, in addition the later period use when can in soil horizon planting plants, plant can grow, then pass through ventilative grid, and then it covers It covers on entire edge slope structure surface, so that side slope structure is protected, helps to improve the service life of edge slope structure.

Description

A kind of staged green edge slope structure
Technical field
The present invention relates to side slope apparatus field, specifically a kind of staged green edge slope structure.
Background technique
Modern social development is rapid, and green plants is caused to be seriously damaged, and the reduction of plant can allow soil straight on hillside Sudden and violent leakage is connect outside, since the extraneous factors influence such as rainy will lead to mud-stone flow disaster.Mud-rock flow occurs in order to prevent hillside, often Slope retaining wall can be installed in hillside bottom, to withstand the soil under sliding from mountain, protect the people and property at mountain bottom.However Existing slope retaining wall design comparison tradition, mud-rock flow and braced wall are mostly rigid collision when colliding, without buffer function, Braced wall is caused to be easy impaired, the service life of existing slope retaining wall is not grown, and existing edge slope structure is improving peace Environment is also destroyed while full property.
In view of the above-mentioned problems, there is presently provided a kind of staged green edge slope structure.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of staged green edge slope structure Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of staged green edge slope structure, No.1 cladding plate and No. two cladding plates including being located at side slope surface are described No.1 cladding plate and No. two cladding plates include the level board being close to slope surface horizontal plane and the inclined plate be close to slope surface inclined surface, institute It states and is integrally formed between level board and inclined plate, the level board lower end surface is equipped with the No.1 spud pile for being inserted into slope surface, described Inclined plate lower surface is equipped with No. two spud piles for being inserted into slope surface, and buffering is equipped between the No.1 cladding plate and No. two cladding plates Mechanism;
The No.1 cladding plate and No. two cladding plate upper ends are designed with greening structure.
As a further solution of the present invention: being equipped with barb structure on the outside of the No.1 spud pile and No. two spud piles.
As a further solution of the present invention: the buffer gear includes the fixture block positioned at No.1 cladding plate lower end, fixture block Quantity be four or more, equipped with sliding shoe, the sliding shoe upper end is set the sliding of No. two cladding plate surfaces where the fixture block There is the card slot matched with fixture block, the quantity of the card slot and the quantity of fixture block are corresponding, No. two packets on the right side of the sliding shoe Cladding plate surface is vertically equipped with fixed plate, and the fixed plate left side is equipped with guide sleeve, is sliding combined with guiding in the guide sleeve Buffer spring is equipped on the outside of bar, the guide sleeve and guide rod, in actual use, the setting of this buffer gear is so that No.1 There is certain cushion performance between cladding plate and No. two cladding plates, the stress of deforming of the slope generation can be absorbed, and work Personnel can judge the size of side slope internal stress according to the compressed situation of buffer spring, so that staff carries out in time Maintenance.
As a further solution of the present invention: the greening structure includes the plantation chamber on level board, the plantation Intracavitary bottom is equipped with soil horizon, and moisturizing layer is equipped on the downside of the soil horizon, is detachably equipped at the plantation chamber upper port Gas grid, later period planting plants, plant can grow when using in soil horizon, then pass through ventilative grid, and then cover On entire edge slope structure surface, so that side slope structure is protected, the service life of edge slope structure is helped to improve, in addition So that edge slope structure thawing cylinders, reduce the destruction to environment, the drainage hole of discharge rainwater, row are equipped on the right side of the plantation chamber The setting in water hole avoids rainwater from being drowned plant.
As a further solution of the present invention: the moisturizing layer is made of water suction cotton material.
As a further solution of the present invention: the inclined plate surface of the No.1 cladding plate and No. two cladding plates is equipped with several Implantation hole.
As a further solution of the present invention: the implantation hole is the circular hole for connecting slope surface, so that seed is sent into side slope Inside is planted, and is connected between the implantation hole by communicating pipe.
Compared with prior art, the beneficial effects of the present invention are: the present invention improves the shortcomings that being directed to existing apparatus, In actual use, the setting of this buffer gear is so that have certain resiliency between No.1 cladding plate and No. two cladding plates Can, the stress of deforming of the slope generation can be absorbed, and staff can judge according to the compressed situation of buffer spring In addition the size of side slope internal stress can plant so that staff is safeguarded in time when later period use in soil horizon Plant, plant can grow, and then pass through ventilative grid, and then be covered on entire edge slope structure surface, thus side slope structure into Row protection, helps to improve the service life of edge slope structure, in addition but also edge slope structure thawing cylinders, reduce to environment It destroys, it is practical.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of buffer gear in the present invention.
Wherein: 1, No. two cladding plate 2 of No.1 cladding plate, level board 101, inclined plate 102, ventilative grid 3, plantation chamber 4, soil Layer 5, No.1 spud pile 6, moisturizing layer 7, slope surface 8, guide rod 9, reset spring 10, guide sleeve 11, implantation hole 12, fixed plate 13, Sliding shoe 14, card slot 15, fixture block 16, No. two spud piles 17, drainage holes 18.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~2, in the embodiment of the present invention, a kind of staged green edge slope structure, including it is located at 8 surface of side slope No.1 cladding plate 1 and No. two cladding plates 2, the No.1 cladding plate 1 and No. two cladding plates 2 include being close to 8 horizontal plane of slope surface Level board 101 and the inclined plate 102 be close to 8 inclined surface of slope surface, be integrally formed between the level board 101 and inclined plate 102, institute 101 lower end surface of level board is stated equipped with the No.1 spud pile 6 for being inserted into slope surface 8,102 lower surface of inclined plate is equipped with for being inserted into No. two spud piles 17 of slope surface are equipped with barb structure, the No.1 cladding on the outside of the No.1 spud pile 6 and No. two spud piles 17 Buffer gear is equipped between plate 1 and No. two cladding plates 2, the buffer gear includes the fixture block 16 positioned at 1 lower end of No.1 cladding plate, The quantity of fixture block 16 is four or more, and No. two 2 surfaces of the cladding plate sliding where the fixture block 16 is equipped with sliding shoe 14, the cunning 14 upper end of motion block is equipped with the card slot 15 matched with fixture block 16, and the quantity of the card slot 15 is corresponding with the quantity of fixture block 16, institute No. two 2 surfaces of cladding plate for stating 14 right side of sliding shoe are vertically equipped with fixed plate 13, and 13 left side of fixed plate is equipped with guide sleeve 11, it is sliding combined with guide rod 9 in the guide sleeve 11, is equipped with buffer spring 10 on the outside of the guide sleeve 11 and guide rod 9, In actual use, the setting of this buffer gear is so that have certain resiliency between No.1 cladding plate 1 and No. two cladding plates 2 Can, the stress of deforming of the slope generation can be absorbed, and staff can sentence according to the compressed situation of buffer spring 10 The size of cut edge slope internal stress, so that staff is safeguarded in time.
The No.1 cladding plate 1 and No. two 2 upper ends of cladding plate are designed with greening structure, and greening structure includes being located at level board Plantation chamber 4 on 101, bottom is equipped with soil horizon 5 in the plantation chamber 4, is equipped with moisturizing layer 7 on the downside of the soil horizon 5, and described kind It plants and ventilative grid 3 is detachably installed at 4 upper port of chamber, the later period planting plants, plant can give birth to when using in soil horizon 5 It is long, ventilative grid 3 is then passed through, and then be covered on entire edge slope structure surface to facilitate so that side slope structure is protected The service life for improving edge slope structure, in addition but also edge slope structure thawing cylinders, reduce the destruction to environment, the plantation The drainage hole 18 of discharge rainwater is equipped on the right side of chamber 4, the setting of drainage hole 18 avoids rainwater from being drowned plant, and the moisturizing layer 7 is to inhale Water cotton material is made.
102 surface of inclined plate of the No.1 cladding plate 1 and No. two cladding plates 2 is equipped with several implantation holes 12, implantation hole 12 It for the circular hole for connecting slope surface 8, is planted so that seed to be sent into inside side slope, passes through communicating pipe phase between the implantation hole 12 Connection.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (8)

1. a kind of staged green edge slope structure, No.1 cladding plate (1) and No. two cladding plates including being located at side slope (8) surface (2), the No.1 cladding plate (1) and No. two cladding plates (2) include the level board (101) being close to slope surface (8) horizontal plane and with The inclined plate (102) that slope surface (8) inclined surface is close to, is integrally formed, the level between the level board (101) and inclined plate (102) Plate (101) lower end surface is equipped with the No.1 spud pile (6) for being inserted into slope surface (8), and inclined plate (102) lower surface is equipped with for inserting Enter No. two spud piles (17) of slope surface;
It is characterized in that, being equipped between the No.1 cladding plate (1) and No. two cladding plates (2) for absorbing side slope internal stress Buffer gear;
The No.1 cladding plate (1) and No. two cladding plate (2) upper ends are designed with greening structure.
2. staged green edge slope structure according to claim 1, which is characterized in that the No.1 spud pile (6) and two Barb structure is equipped on the outside of number spud pile (17).
3. staged green edge slope structure according to claim 1, which is characterized in that the buffer gear includes being located at one The fixture block (16) of number cladding plate (1) lower end, No. two cladding plate (2) the surfaces sliding where the fixture block (16) are equipped with sliding shoe (14), sliding shoe (14) upper end is equipped with the card slot (15) that matches with fixture block (16), and two on the right side of the sliding shoe (14) Number cladding plate (2) surface is vertically equipped with fixed plate (13), and fixed plate (13) left side is equipped with guide sleeve (11), the guiding It is sliding combined with guide rod (9) in set (11), is equipped with buffer spring (10) on the outside of the guide sleeve (11) and guide rod (9).
4. staged green edge slope structure according to claim 3, which is characterized in that the quantity of the fixture block (16) is four More than a, the quantity of the card slot (15) is corresponding with the quantity of fixture block (16).
5. staged green edge slope structure according to claim 1, which is characterized in that the greening structure includes being located at water Plantation chamber (4) on plate (101), the interior bottom of the plantation chamber (4) are equipped with soil horizon (5), are equipped on the downside of the soil horizon (5) Moisturizing layer (7) is detachably equipped with ventilative grid (3) at plantation chamber (4) upper port.
6. staged green edge slope structure according to claim 5, which is characterized in that the moisturizing layer (7) is absorbent wool Material is made.
7. -6 any staged green edge slope structure according to claim 1, which is characterized in that the No.1 cladding plate (1) and inclined plate (102) surface of No. two cladding plates (2) is equipped with several implantation holes (12).
8. staged green edge slope structure according to claim 7, which is characterized in that the implantation hole (12) is connection slope The circular hole in face (8) is planted so that seed to be sent into inside side slope, is connected between the implantation hole (12) by communicating pipe It is logical.
CN201811552513.8A 2018-12-19 2018-12-19 Cascaded green side slope structure Active CN109594571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811552513.8A CN109594571B (en) 2018-12-19 2018-12-19 Cascaded green side slope structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811552513.8A CN109594571B (en) 2018-12-19 2018-12-19 Cascaded green side slope structure

Publications (2)

Publication Number Publication Date
CN109594571A true CN109594571A (en) 2019-04-09
CN109594571B CN109594571B (en) 2020-11-06

Family

ID=65963944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811552513.8A Active CN109594571B (en) 2018-12-19 2018-12-19 Cascaded green side slope structure

Country Status (1)

Country Link
CN (1) CN109594571B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356141A (en) * 2021-06-28 2021-09-07 张英雄 Hydraulic engineering is with bank protection making devices that prevents collapsing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604071A (en) * 2016-02-29 2016-05-25 西安科技大学 Loess slope vegetation planting guarantee PVC board structure system and construction method thereof
CN205530290U (en) * 2016-02-18 2016-08-31 宏大国源(芜湖)资源环境治理有限公司 Side slope greening device
CN106149734A (en) * 2016-06-21 2016-11-23 西安科技大学 A kind of ground protective slope structure and construction method thereof
CN107460883A (en) * 2017-08-24 2017-12-12 蔡振让 The supplementary structure that highway is come down with anti-mountain top
CN207160029U (en) * 2017-07-20 2018-03-30 王昶磊 A kind of protector for Hydraulic and Hydro-Power Engineering side slope
CN207846446U (en) * 2018-02-05 2018-09-11 安徽新华学院 A kind of water and soil conservation ecological revetment
CN207987934U (en) * 2017-12-27 2018-10-19 中国地质大学(武汉) A kind of robust structure for ecological treatment of slope
CN208136926U (en) * 2018-03-17 2018-11-23 陈建林 A kind of soft rock tunnel Tunnel slope ruggedized construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205530290U (en) * 2016-02-18 2016-08-31 宏大国源(芜湖)资源环境治理有限公司 Side slope greening device
CN105604071A (en) * 2016-02-29 2016-05-25 西安科技大学 Loess slope vegetation planting guarantee PVC board structure system and construction method thereof
CN106149734A (en) * 2016-06-21 2016-11-23 西安科技大学 A kind of ground protective slope structure and construction method thereof
CN207160029U (en) * 2017-07-20 2018-03-30 王昶磊 A kind of protector for Hydraulic and Hydro-Power Engineering side slope
CN107460883A (en) * 2017-08-24 2017-12-12 蔡振让 The supplementary structure that highway is come down with anti-mountain top
CN207987934U (en) * 2017-12-27 2018-10-19 中国地质大学(武汉) A kind of robust structure for ecological treatment of slope
CN207846446U (en) * 2018-02-05 2018-09-11 安徽新华学院 A kind of water and soil conservation ecological revetment
CN208136926U (en) * 2018-03-17 2018-11-23 陈建林 A kind of soft rock tunnel Tunnel slope ruggedized construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356141A (en) * 2021-06-28 2021-09-07 张英雄 Hydraulic engineering is with bank protection making devices that prevents collapsing

Also Published As

Publication number Publication date
CN109594571B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
CN208733652U (en) Slope protecting device
CN105724226B (en) A kind of water-saving building facade greening building method
CN109594571A (en) A kind of staged green edge slope structure
CN107327705A (en) A kind of gas pipeline drainer with anti-blocking and gas cutting function
CN205475095U (en) Side slope soil and water conservation device
CN104064236A (en) Terrace flatly-buried type underground nuclear power station
CN203966581U (en) The flat type underground nuclear power station that buries of slope formula
CN210039050U (en) Geological disaster monitoring and early warning device
CN219450691U (en) Wind-proof sand-fixing device for desert control
CN104094833B (en) Hidden planting unit
RU2008135289A (en) PROTECTIVE SCREEN FROM FOREIGN PARTICLES ON THE TOP RESISTANT PLATE FOR THE THERMAL DEPARTMENT ASSEMBLY OF THE NUCLEAR REACTOR AND METHOD FOR PROTECTING THE ASSEMBLY FROM FOREIGN PARTICLES
CN204598769U (en) A kind of combination irrigation retaining plant growing box
CN209353359U (en) A kind of side slope protection rapid construction template
CN110761382A (en) Ecological slope protection drainage ditch structure
CN207505542U (en) A kind of environmental science windblown sand movement protecting and greening equipment
CN209339161U (en) Ecological breast boards structure
CN208009390U (en) A kind of sand-fixing greening net
CN109594582A (en) A kind of Multi-layer compressive buffer-type retaining wall
CN208501730U (en) A kind of segmented retaining Wall
CN207099963U (en) The vertical greening system of compartment on pole abrupt slope
CN202559365U (en) Latticed steep slope ecological greening structure
CN206227221U (en) A kind of low altitude area Tea planting cloud and mist system
CN206602902U (en) One kind is used for abrupt slope vegetation growth device
CN221030810U (en) Landscape building composite wall
CN209144959U (en) A kind of Ecological hedgerow slot based on high slope riding track gutter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240121

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Country or region after: China

Address before: No. 705, Dong Tung Road, Neijiang, Sichuan

Patentee before: NEIJIANG NORMAL University

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241018

Address after: 450000 Room 405, 4th Floor, Building 1, No. 300 Wenhua North Road, Huiji District, Zhengzhou City, Henan Province

Patentee after: Henan Hejiang Enterprise Management Consulting Co.,Ltd.

Country or region after: China

Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Dragon totem Technology (Hefei) Co.,Ltd.

Country or region before: China