CN109583142A - A kind of NALC assembled wall BIM database design method - Google Patents

A kind of NALC assembled wall BIM database design method Download PDF

Info

Publication number
CN109583142A
CN109583142A CN201811648952.9A CN201811648952A CN109583142A CN 109583142 A CN109583142 A CN 109583142A CN 201811648952 A CN201811648952 A CN 201811648952A CN 109583142 A CN109583142 A CN 109583142A
Authority
CN
China
Prior art keywords
nalc
wall
plate
bim
race
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811648952.9A
Other languages
Chinese (zh)
Inventor
孙小曦
和东月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING ASHAI NEW BUILDING MATERIALS CO Ltd
Original Assignee
NANJING ASHAI NEW BUILDING MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING ASHAI NEW BUILDING MATERIALS CO Ltd filed Critical NANJING ASHAI NEW BUILDING MATERIALS CO Ltd
Priority to CN201811648952.9A priority Critical patent/CN109583142A/en
Publication of CN109583142A publication Critical patent/CN109583142A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of NALC assembled wall BIM database design methods, it the described method comprises the following steps: the wall race in NALC assembled wall BIM database (1) is provided for design side, (2) after the BIM model related work collection for obtaining design side, create the secondary in-depth working set of NALC plate, (3) NALC plate race directly arranges, (4) curtain wall NALC wall curtain wall inlaid-plate type composing method, (5) the NALC wall board key message data sheet of whole project is exported, (6) after data obtain BIM platform authorization message, it is output to factory and is standardized flow line production;(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, carries out precision construction and installation.

Description

A kind of NALC assembled wall BIM database design method
Technical field
The present invention relates to a kind of methods, and in particular to a kind of NALC assembled wall BIM database design method belongs to number According to library design field.
Background technique
Building Information Model (Building Information Modeling, abbreviation BIM) is from proposing to gradually complete It is kind, then the generally receiving of engineering construction industry is arrived, it experienced the course of decades.The practice of BIM is initially mainly by several comparisons Small pioneer country dominates, such as Finland, Norway and Singapore, followed by some early stage practitioners in the U.S..Through too long Phase ferments, and BIM is increasingly becoming mainstream in the U.S., and generates shadow to the BIM of the other countries including China practice It rings, BIM technology has quite been popularized external, and BIM technology is that whole building industrial chain brings huge change.Currently, state The national standard of entitled " the Building Information Model construction application standard " by firmly building portion's official approval, BIM technology are inside also put into effect Development at home is imperative.The application and popularization for coping with whole building industry BIM platform in the following industrialization of the country 2.0 be It make a good technical reserve and corresponding data-interface;The foundation of NALC assembled wall BIM database be really by NALC plate from Traditional building material, which upgrades to, adapts to industrialized building Modular building component component, but generally existing following skill in the prior art Art problem;Production efficiency is low, and design, production, construction disconnect, and therefore, a kind of new scheme of urgent need solves above-mentioned technology Problem.
Summary of the invention
The present invention exactly for the technical problems in the prior art, provides a kind of NALC assembled wall BIM data Library design method integrates data and is used while this method can reach raising production efficiency, liberate the productive forces, with It realizes from design phase to production phase, the seamless connection of construction stage, guarantees efficiently accurate construction, and to data information It recorded, stored and is timely updated in database and cloud.
To achieve the goals above, technical scheme is as follows: a kind of NALC assembled wall BIM database design Method, which is characterized in that the described method comprises the following steps:
(1) provide the wall race in NALC assembled wall BIM database for design side, included in information, such as design The parameter informations such as bulk density, heat storage coefficient select wall parameter by design side.
(2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created,
The secondary in-depth typesetting work of NALC plate race, is to create the secondary depth of NALC plate by the professional technician of plate supplier Change working set, carries out plate-laying operation using NALC assembled wall BIM database, the parameters such as wall size, thickness are adjusted It is whole, select following NALC plate-laying mode to carry out wall board arrangement work according to project reality.
(3) NALC plate race directly arranges, by using plan view as major interfaces to wallboard, floor, roof boarding plate Material is directly arranged, and carries out auxiliary modification using facade and 3-D view.It is completed by the method for modifying parameter to plate ruler Very little, position, mounting height are precisely controlled, and to needing the plate for carrying out on-site cutting to modify, mark its size, position It sets, guarantees the installation accuracy of plate.
(4) curtain wall NALC wall curtain wall inlaid-plate type composing method is edited by way of monolithic curtain wall is isolated, first to wall Body carries out grid dividing, NALC plate panel race is placed in therewith, finally to the NALC plate of specific position (such as window side plate, door side plate) Material panel race modifies editor, completes the quick plate-laying to whole face wall;After completing above-mentioned plate-laying operation, collision detection is used System carries out collision detection to door, window, beam, column, the shear wall that may clash contact with plate, it is ensured that NALC ash wall body plate The accuracy of material arrangement.And export collision detection result.
(5) the NALC wall board key message data sheet for exporting whole project, such as slot type, quantity, size letter Breath etc., is uploaded to BIM platform;
(6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production;And pass through The needs of NALC wall board installation extract respective plates race region, location information from BIM platform, carry out stock control and fortune It is defeated.(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, is carried out precision and is applied Work installation.And the data generated in work progress, such as installation progress, consumption of materials parameter feedback are to NALC assembled wall Body BIM database.Program NALC assembled wall BIM database is to be based on BIM system for fabricated building wall component A set of database being made of parameterized model that column software is developed.The database has design industrialization, multidimensional visual The properties such as change, model data are provided simultaneously with design, production and construction seamless interfacing, and model can quantify to scheme out, data circulation is double The characteristics of tropism.It plays an important role in the design process and optimization process of NALC assembled wall inclination;
NALC assembled wall BIM database root is divided into following components using function and creation method according to it: NALC assembly Formula wall race, general NALC plate race, the NALC plate race based on wall, the NALC plate race based on curtain wall panel, linear battle array Arrange NALC plate race etc..
The present invention has the advantages that and 1) carries out from design source to NALC wall compared with traditional design production model Optimization,
Substantially increase design production efficiency;2) present invention uses collision detection system in design acceptance phase, to can with plate Energy
Door, window, beam, column, the shear wall for clashing contact carry out collision detection, it is ensured that NALC wall board is arranged accurate
Property, it effectively reduces due to manual operation and bring error amount;3) present invention to the installation of actual items plate into Row
Simulation, solves the problems, such as that site operation exists in a model in advance, carries out secondary in-depth to the plate region to go wrong and sets Meter,
And the processing of particular/special requirement plate is completed in factory lines in advance, greatly reduce the work of construction site secondary operation Amount,
And the essence for effectively increasing construction is but spent;4) present invention with service life continuous rising, by continuous expanding data library 's
Capacity, including continual global optimization is carried out to database, it will so that the function of database is become stronger day by day.
Detailed description of the invention
Fig. 1 is race's library classification chart of the technical program;
Fig. 2 is the implementation flow chart of the technical program.
Specific embodiment
In order to deepen to awareness and understanding of the invention, further it is situated between with embodiment to of the invention with reference to the accompanying drawing It continues.
Embodiment 1: referring to Fig. 1, Fig. 2, a kind of NALC assembled wall BIM database design method, the method includes Following steps:
(1) provide the wall race in NALC assembled wall BIM database for design side, included in information, such as design The parameter informations such as bulk density, heat storage coefficient select wall parameter by design side.
(2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created,
The secondary in-depth typesetting work of NALC plate race, is to create the secondary depth of NALC plate by the professional technician of plate supplier Change working set, carries out plate-laying operation using NALC assembled wall BIM database, the parameters such as wall size, thickness are adjusted It is whole, select following NALC plate-laying mode to carry out wall board arrangement work according to project reality.
(3) NALC plate race directly arranges, by using plan view as major interfaces to wallboard, floor, roof boarding plate Material is directly arranged, and carries out auxiliary modification using facade and 3-D view.It is completed by the method for modifying parameter to plate ruler Very little, position, mounting height are precisely controlled, and to needing the plate for carrying out on-site cutting to modify, mark its size, position It sets, guarantees the installation accuracy of plate.
(4) curtain wall NALC wall curtain wall inlaid-plate type composing method is edited by way of monolithic curtain wall is isolated, first to wall Body carries out grid dividing, NALC plate panel race is placed in therewith, finally to the NALC plate of specific position (such as window side plate, door side plate) Material panel race modifies editor, completes the quick plate-laying to whole face wall;After completing above-mentioned plate-laying operation, collision detection is used System carries out collision detection to door, window, beam, column, the shear wall that may clash contact with plate, it is ensured that NALC ash wall body plate The accuracy of material arrangement.And export collision detection result.
(5) the NALC wall board key message data sheet for exporting whole project, such as slot type, quantity, size letter Breath etc., is uploaded to BIM platform;
(6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production;And pass through The needs of NALC wall board installation extract respective plates race region, location information from BIM platform, carry out stock control and fortune It is defeated.(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, is carried out precision and is applied Work installation.And the data generated in work progress, such as installation progress, consumption of materials parameter feedback are to NALC assembled wall Body BIM database.
Design concept and concrete operation method:
NALC assembled wall BIM database provides wall race for design side, provides comprehensively in the design phase for building designers NALC wall parameter information, by designer to wall parameters, such as decorative pattern, color, material and thickness, store design bulk density The parameters such as hot coefficient are selected, and carry out mapping operation using the wall race.
NALC assembled wall BIM database is to bring change in the NALC assembled wall Deepen Design stage, will be traditional Drafting in CAD in NALC wall inclination, artificial statistics, artificial nucleus to the traditional mode of, Excel Output of for ms docking production, Upgrade to the new mould that plate arrangement is carried out using the plate race in NALC assembled wall BIM database and directly docks production Formula.
NALC wall database continues to use traditional component component construction modulus, to adapt to manufacturer's standard mature at present Change flow line production mode.Each of NALC wall database subitem all has the function of parameterisable control, to plate Size, notch, mounting height, floor, quantity, special marking can realize that precise information is output and input.
The arrangement of NALC wall board mainly uses two methods according to different item types and drawing depth: plate race is straight Run in cloth, the insertion of curtain wall panel.
Application Example 1:
Transition business use building in Longshan during Longgang District of Shenzhen City (the 4th the People's Hospital) former address reconstruction and expansion:
(1) the wall race provided in NALC assembled wall BIM database such as sets to designing institute by design side to wall parameter The parameter informations such as meter bulk density, heat storage coefficient are selected.And Computer Aided Design side carries out the creation of Preliminary design model.
(2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created.It uses NALC assembled wall BIM database carries out plate-laying operation.The parameters such as wall size, thickness are adjusted, NALC plate is used The mode that material race directly arranges carries out wall board arrangement work;
(3) the direct arrangement that plate is carried out using NALC plate race, by being major interfaces to needed for project using plan view The plate progress BIM plate-laying operation of wallboard, floor, roof boarding, carries out auxiliary modification using facade and 3-D view.Pass through modification The method completion of parameter is precisely controlled board dimension, position, mounting height, and to need to carry out the plate of on-site cutting into Row modification, marks its size, position.Guarantee the installation accuracy of plate;
(4) collision detection system is used, door, window, beam, column, shear wall that contact may be clashed with plate are collided It checks, it is ensured that the accuracy of NALC wall board arrangement.And export collision detection result;
(5) by the information data report output of the NALC wall board of project, and it is uploaded to BIM platform;
(6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production.And pass through The needs of NALC wall board installation extract respective plates race region, location information from BIM platform, carry out stock control and fortune It is defeated.
(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, carries out essence Trueization construction and installation.And the data that will be generated in work progress, such as installation progress, consumption of materials parameter feedback are filled to NALC With formula wall BIM database.
Application Example 2:
Technical equipment research and development centre, CBMI Sinoma International Engineering Co., Ltd. and its firing, environmental protection equipment Industrialization Projects:
(1) the wall race provided in NALC assembled wall BIM database such as sets to designing institute by design side to wall parameter The parameter informations such as meter bulk density, heat storage coefficient are selected.And Computer Aided Design side carries out the creation of Preliminary design model;
(2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created;Use NALC Assembled wall BIM database carries out plate-laying operation.The parameters such as wall size, thickness are adjusted, NALC plate race is used The mode directly arranged carries out wall board arrangement work;
(3) the direct arrangement that plate is carried out using NALC plate race, by being major interfaces to needed for project using plan view The plate progress BIM plate-laying operation of wallboard, floor, roof boarding, carries out auxiliary modification using facade and 3-D view.Pass through modification The method completion of parameter is precisely controlled board dimension, position, mounting height, and to need to carry out the plate of on-site cutting into Row modification, marks its size, position.Guarantee the installation accuracy of plate;
(4) collision detection system is used, door, window, beam, column, shear wall that contact may be clashed with plate are collided It checks, it is ensured that the accuracy of NALC wall board arrangement.And export collision detection result;
(5) by the information data report output of the NALC wall board of project, and it is uploaded to BIM platform;
(6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production.And pass through The needs of NALC wall board installation extract respective plates race region, location information from BIM platform, carry out stock control and fortune It is defeated.
(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, carries out essence Trueization construction and installation.And the data that will be generated in work progress, such as installation progress, consumption of materials parameter feedback are filled to NALC With formula wall BIM database.
It should be noted that above-described embodiment, is not intended to limit the scope of protection of the present invention, in above-mentioned technical proposal On the basis of made equivalents or substitution each fall within the range that the claims in the present invention are protected.

Claims (8)

1. a kind of NALC assembled wall BIM database design method, which is characterized in that the described method comprises the following steps:
(1) the wall race in NALC assembled wall BIM database is provided for design side,
(2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created,
(3) NALC plate race directly arranges,
(4) curtain wall NALC wall curtain wall inlaid-plate type composing method,
(5) the NALC wall board key message data sheet of whole project is exported,
(6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production;
(7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, is refined Construction and installation.
2. NALC assembled wall BIM database design method according to claim 1, which is characterized in that the step (1) specific as follows, provide the wall race in NALC assembled wall BIM database for design side, included in information, if The parameter informations such as bulk density, heat storage coefficient are counted, wall parameter is selected by design side.
3. NALC assembled wall BIM database design method according to claim 2, which is characterized in that the step (2) after the BIM model related work collection for obtaining design side, the secondary in-depth working set of NALC plate is created, it is specific as follows,
The secondary in-depth typesetting work of NALC plate race, is to create the secondary depth of NALC plate by the professional technician of plate supplier Change working set, carries out plate-laying operation using NALC assembled wall BIM database, the parameters such as wall size, thickness are adjusted It is whole, select following NALC plate-laying mode to carry out wall board arrangement work according to project reality.
4. NALC assembled wall BIM database design method according to claim 2 or 3, which is characterized in that the step Suddenly (3) NALC plate race directly arranges, specific as follows, by being major interfaces to wallboard, floor, roof boarding using plan view Plate is directly arranged, and carries out auxiliary modification using facade and 3-D view;It is completed by the method for modifying parameter to plate Size, position, mounting height are precisely controlled, and to needing the plate for carrying out on-site cutting to modify, mark its size, position It sets, guarantees the installation accuracy of plate.
5. NALC assembled wall BIM database design method according to claim 4, which is characterized in that the step (4) curtain wall NALC wall curtain wall inlaid-plate type composing method, it is specific as follows, it is edited by way of monolithic curtain wall is isolated, it is first right Wall carries out grid dividing, is placed in NALC plate panel race therewith, finally repairs to the NALC plate panel race of specific position The quick plate-laying to whole face wall is completed in reorganization volume;After completing the operation of above-mentioned plate-laying, using collision detection system, to plate Door, window, beam, column, the shear wall that contact may be clashed carry out collision detection, it is ensured that NALC wall board is arranged accurate Property, and export collision detection result.
6. NALC assembled wall BIM database design method according to claim 5, which is characterized in that the step (5) the NALC wall board key message data sheet of whole project, including slot type, quantity, dimension information are exported, is uploaded To BIM platform.
7. NALC assembled wall BIM database design method according to claim 6, which is characterized in that the step (6) it after data obtain BIM platform authorization message, is output to factory and is standardized flow line production;And pass through NALC wall The needs of body plate installation extract respective plates race region, location information from BIM platform, carry out stock control and transport.
8. NALC assembled wall BIM database design method according to claim 7, which is characterized in that the step (7) in building-site construction, the NALC wall board race information of corresponding region is extracted from BIM platform, carries out precision construction Installation, and the data generated in work progress, such as installation progress, consumption of materials parameter feedback are to NALC assembled wall BIM database.
CN201811648952.9A 2018-12-30 2018-12-30 A kind of NALC assembled wall BIM database design method Pending CN109583142A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811648952.9A CN109583142A (en) 2018-12-30 2018-12-30 A kind of NALC assembled wall BIM database design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811648952.9A CN109583142A (en) 2018-12-30 2018-12-30 A kind of NALC assembled wall BIM database design method

Publications (1)

Publication Number Publication Date
CN109583142A true CN109583142A (en) 2019-04-05

Family

ID=65914900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811648952.9A Pending CN109583142A (en) 2018-12-30 2018-12-30 A kind of NALC assembled wall BIM database design method

Country Status (1)

Country Link
CN (1) CN109583142A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321620A (en) * 2019-06-26 2019-10-11 浙江杭加泽通建筑节能新材料有限公司 A kind of design and construction method of prefabricated buildings building
CN110414181A (en) * 2019-08-08 2019-11-05 苏州宜特加建筑工程有限公司 A kind of design method of the heat insulating decorative board exterior wall based on BIM
CN113374269A (en) * 2021-06-28 2021-09-10 中国建筑第七工程局有限公司 Autoclaved lightweight concrete wallboard standard layer construction optimization method based on 3D lofting
CN118013629A (en) * 2024-02-20 2024-05-10 广东天赐湾实验室装备制造有限公司 Design method and system for self-contained wallboard

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110054652A1 (en) * 2009-08-27 2011-03-03 Heil Duane A Building Construction Software and System
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
US20160160515A1 (en) * 2006-08-26 2016-06-09 Global Building Modules, Inc. System for modular building construction
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN107145695A (en) * 2017-06-27 2017-09-08 中建局集团建设发展有限公司 A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel
CN107663947A (en) * 2017-10-31 2018-02-06 中国冶集团有限公司 Autoclaved aerated concrete slab construction method in assembled architecture based on BIM
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN108108510A (en) * 2017-10-27 2018-06-01 广东星层建筑科技股份有限公司 A kind of assembled architecture design method and equipment based on BIM
CN108532953A (en) * 2018-05-18 2018-09-14 宝业湖北建工集团有限公司 Overhanging board construction method based on BIM and construction techniques
CN108647404A (en) * 2018-04-23 2018-10-12 中建三局第建设工程有限责任公司 Masonry Intelligentized design method based on BIM and its device
CN108920769A (en) * 2018-06-08 2018-11-30 上海大学 A method of the buildings model standardization processing based on Revit platform

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160160515A1 (en) * 2006-08-26 2016-06-09 Global Building Modules, Inc. System for modular building construction
US20110054652A1 (en) * 2009-08-27 2011-03-03 Heil Duane A Building Construction Software and System
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN107016625A (en) * 2017-03-13 2017-08-04 同济大学 A kind of total bag enterprise B IM authorizing standard methods of architectural engineering
CN107145695A (en) * 2017-06-27 2017-09-08 中建局集团建设发展有限公司 A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel
CN108108510A (en) * 2017-10-27 2018-06-01 广东星层建筑科技股份有限公司 A kind of assembled architecture design method and equipment based on BIM
CN107663947A (en) * 2017-10-31 2018-02-06 中国冶集团有限公司 Autoclaved aerated concrete slab construction method in assembled architecture based on BIM
CN108647404A (en) * 2018-04-23 2018-10-12 中建三局第建设工程有限责任公司 Masonry Intelligentized design method based on BIM and its device
CN108532953A (en) * 2018-05-18 2018-09-14 宝业湖北建工集团有限公司 Overhanging board construction method based on BIM and construction techniques
CN108920769A (en) * 2018-06-08 2018-11-30 上海大学 A method of the buildings model standardization processing based on Revit platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321620A (en) * 2019-06-26 2019-10-11 浙江杭加泽通建筑节能新材料有限公司 A kind of design and construction method of prefabricated buildings building
CN110321620B (en) * 2019-06-26 2023-07-21 浙江杭加泽通建筑节能新材料有限公司 Design construction method of assembled house building
CN110414181A (en) * 2019-08-08 2019-11-05 苏州宜特加建筑工程有限公司 A kind of design method of the heat insulating decorative board exterior wall based on BIM
CN113374269A (en) * 2021-06-28 2021-09-10 中国建筑第七工程局有限公司 Autoclaved lightweight concrete wallboard standard layer construction optimization method based on 3D lofting
CN118013629A (en) * 2024-02-20 2024-05-10 广东天赐湾实验室装备制造有限公司 Design method and system for self-contained wallboard
CN118013629B (en) * 2024-02-20 2024-08-02 广东天赐湾实验室装备制造有限公司 Design method and system for self-contained wallboard

Similar Documents

Publication Publication Date Title
CN109583142A (en) A kind of NALC assembled wall BIM database design method
CN104281729B (en) A kind of BIM methods manufactured applied to steel building Digital manufacturing
CN110929328A (en) Concrete assembly type building construction method based on BIM
CN111400812A (en) BIM-based method for designing machining drawing of assembled structure shear wall
CN113094784B (en) Adjacent complex underground engineering parametric modeling method based on building information model
CN106709660A (en) BIM-based architectural design method
CN111460560A (en) Foundation pit excavation construction method based on BIM
CN111191996A (en) BIM-based dynamic cost management method for whole process of power transmission and transformation project
CN111967073A (en) BIM-based secondary structure construction method
CN106971046A (en) A kind of high-order receipts water cooling tower Central Shaft design method
CN106446448A (en) Formwork system parametrization design method based on BIM technology
CN103324806A (en) Sketchup workshop auto-modeling method on the basis of language Ruby
KR101394022B1 (en) Method for the bim-based automation of building envelope form generation and building energy simulation
CN107066644B (en) Automatic modeling method for special-shaped suspended ceiling
CN112288384A (en) Application of P-BIAS-based fabricated building full-life-cycle management
CN112765711A (en) BIM modeling method for green building simulation calculation
Miller The Hangzhou tennis center: a case study in integrated parametric design
CN114372301A (en) BIM technology-based unit type curtain wall parametric modeling method
CN116861542A (en) Peripheral wall panel design method and system based on BIM
WO2021042585A1 (en) Cdm establishment method for building component
Afzal et al. Systematic investigation of interoperability issues between BIM and BEM
CN113496054A (en) BIM technology-based construction design method for waste incineration power plant
CN113139222A (en) ObjectARX-based urban open cut tunnel cross section drawing method
He Research on the Application of BIM Technology in Prefabricated Building Construction
Li et al. The application value of BIM technology in prefabricated building based on EPC general contracting management model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405

RJ01 Rejection of invention patent application after publication