CN109580779A - The full-automatic real-time system for monitoring and pre-warning of inverted arch structure and method - Google Patents

The full-automatic real-time system for monitoring and pre-warning of inverted arch structure and method Download PDF

Info

Publication number
CN109580779A
CN109580779A CN201811520584.XA CN201811520584A CN109580779A CN 109580779 A CN109580779 A CN 109580779A CN 201811520584 A CN201811520584 A CN 201811520584A CN 109580779 A CN109580779 A CN 109580779A
Authority
CN
China
Prior art keywords
inverted arch
warning
tunnel
information
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811520584.XA
Other languages
Chinese (zh)
Other versions
CN109580779B (en
Inventor
薛翊国
陈清
候守江
张学亮
潘建平
李广坤
宁泽旭
柏成浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
China Railway 18th Bureau Group Co Ltd
Original Assignee
Shandong University
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University, China Railway 18th Bureau Group Co Ltd filed Critical Shandong University
Priority to CN201811520584.XA priority Critical patent/CN109580779B/en
Publication of CN109580779A publication Critical patent/CN109580779A/en
Application granted granted Critical
Publication of CN109580779B publication Critical patent/CN109580779B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/04Analysing solids
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B17/00Measuring arrangements characterised by the use of infrasonic, sonic or ultrasonic vibrations
    • G01B17/04Measuring arrangements characterised by the use of infrasonic, sonic or ultrasonic vibrations for measuring the deformation in a solid, e.g. by vibrating string
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B17/00Measuring arrangements characterised by the use of infrasonic, sonic or ultrasonic vibrations
    • G01B17/06Measuring arrangements characterised by the use of infrasonic, sonic or ultrasonic vibrations for measuring contours or curvatures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/02Indexing codes associated with the analysed material
    • G01N2291/023Solids
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/02Indexing codes associated with the analysed material
    • G01N2291/028Material parameters
    • G01N2291/0289Internal structure, e.g. defects, grain size, texture
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/26Scanned objects
    • G01N2291/269Various geometry objects

Abstract

The present disclosure discloses a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure and methods, including detection system, including reflectoscope and pressure gauge, are configured as detection inverted arch internal structure, check for the pressure from surrounding rock for damaging and measuring inverted arch lower part;Wireless signal transmission system is configured as the collected information of detection system being transmitted to middle control platform;Middle control platform, it is configured as analyzing the variation of inverted arch lower part pressure from surrounding rock based on the operation phase tunnel inverted arch information received, establishing inverted arch lower part pressure from surrounding rock consecutive variations model, judge that current pressure from surrounding rock provides corresponding early warning for the influence degree of inverted arch safety, and according to influence degree;Power-supply system, is configured as detection system and wireless signal transmission system provides electric power, can provide valuable scientific information for research operation phase tunnel surrounding stress, deformation Variation Features and tunnel perimeter hydrogeology state of development.

Description

The full-automatic real-time system for monitoring and pre-warning of inverted arch structure and method
Technical field
This disclosure relates to a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure and method.
Background technique
Only there is provided background technical informations relevant to the disclosure for the statement of this part, it is not necessary to so constitute first skill Art.
Major part tunnel all occurs that different degrees of infiltration, surrouding rock deformation is excessive, tunnel inverted arch within the operation phase at present The problems such as floating, seriously threatens tunnel structure stabilization and traffic safety.Wherein, one as tunnel structure of tunnel inverted arch Point, great function is played in terms of inhibiting surrouding rock deformation, guaranteeing tunnel overall structure stabilization, and inverted arch floating in tunnel leads to road The problem of Keelung is risen seriously threatens engineering safety, and especially prominent in weak surrounding rock environment, and repair process is spent human and material resources, Cause huge Socie-economic loss.
The main reason for causing inverted arch to float includes: 1, inverted arch unreasonable structural design, causes inverted arch beyond bearing capacity Range, structure are destroyed, and foundation soil takes inverted arch floating;2, subgrade soils compacting not enough, within the operation phase by various external actions by It is gradually detached from, can not continue to undertake the effect for inhibiting surrouding rock deformation;3, in the enrichment of inverted arch bottom, (especially continuity drops by force underground water After rain), cause regional area buoyancy to be greater than inverted arch structural anti-buoyancy power, inverted arch floats.
Monitoring measurement is played an important role in constructing tunnel and all in the operation phase, is monitored within the tunnel operation phase It measures, can be analysis surrouding rock deformation rule, verify surrouding rock deformation convergence, security risk offer that may be present section in tunnel is provided Foundation, prevents trouble before it happens.But it is domestic at present for operation phase tunnel monitoring measurement rely primarily on manpower add level, The mode of the device measurings such as total station is realized, is influenced by extraneous factor, low efficiency, can not grasp the deformation feelings of country rock in real time Condition;In addition, merely carrying out deformation monitoring has hysteresis quality, the process and shape of the destruction of tunnel inverted arch structure can not be further disclosed Formula accomplishes the omen early warning and real-time perception destroyed to inverted arch structure floating.Therefore, operation phase tunnel inverted arch structure how is realized Full-automatic real time monitoring-early warning be a technical problem urgently to be resolved at present.
Summary of the invention
The disclosure to solve the above-mentioned problems, proposes a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure and side Method, the disclosure obtain the status information of inverted arch structure in tunnel by detection system, and it is flat to be then wirelessly transmitted to middle control Platform is analyzed, and identifies the abnormal deformation of inverted arch structure, is carried out early warning to the safety problem that inverted arch is likely to occur, is realized the operation phase The full-automatic real-time monitoring of tunnel inverted arch and early warning.
To achieve the goals above, the disclosure adopts the following technical scheme that
A kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure, comprising:
Detection system, including reflectoscope and pressure gauge are configured as detection inverted arch internal structure, check for damaging And the pressure from surrounding rock of measurement inverted arch lower part;
Wireless signal transmission system is configured as the collected information of detection system being transmitted to middle control platform;
Middle control platform is configured as analyzing inverted arch lower part pressure from surrounding rock based on the operation phase tunnel inverted arch information received Variation, establish inverted arch lower part pressure from surrounding rock consecutive variations model, judge influence of the current pressure from surrounding rock for inverted arch safety Degree, and corresponding early warning is provided according to influence degree;
Power-supply system, is configured as detection system and wireless signal transmission system provides electric power.
It is limited as further, the middle control platform includes signal receiving module, message output module, information analysis mould Block and warning module, in which:
The signal receiving module, is configured as being mutually matched with wireless signal transmission system and connect;
The information analysis module is configured as judging inverted arch three-dimensional structure, identify tensile crack therein, Pressure-break and/or shear crack find out dangerous crack therein according to certain rule, provide operation phase tunnel inverted arch edge stress The region of distribution;
The warning module is configured as providing dangerous crack and crack output in significant change state each The crack form in crack and issuable corresponding harm;
The message output module, the information for being configured as to receive shows on a terminal screen, including in each inverted arch Portion's structure three-dimensional perspective view and each inverted arch bottom pressure from surrounding rock time history plot.
It is limited as further, the inverted arch that the information analysis module is received by inverted arch three-dimensional structure and before is three-dimensional Structure is compared, and finds out the crack in expansion state and the crack in compressive state.
It is limited as further, the pressure from surrounding rock variation that the warning module is configured as would tend to precarious position is bent Line chart is output to terminal screen, reminds clerk of works personnel to check actual tunnel corresponding site, accomplishes to prevent trouble before it happens.
It is limited as further, the power-supply system includes power transformer and the electric wire that is attached thereto.
It is limited as further, the detection system, power-supply system and power-supply system are all set in shell, and described Shell is column concrete casing, with prevent internal portion's electronic equipment electromagnetic interference and external underground water infiltration to electronics The damage of equipment.
It is limited as further, the detection system is laid in the contact surface of inverted arch bottom and country rock in constructing tunnel On, and the automatic progress data acquisition of timing.
Limited as further, the wireless signal transmission system can real-time reception come from reflectoscope and pressure The data-signal of power meter, and information is passed through into the middle control platform of electromagnetic transmission to the Tunnel Engineering immediately.
It is limited as further, the power-supply system is laid in constructing tunnel, connect with electrical system in tunnel.
Working method based on above system, comprising the following steps:
When tunnel excavation, concrete casing and detection system, wireless signal are laid every a distance in inverted arch lower part Transmission system and power transformer;
After tunnel comes into operation, detection system starts to acquire data, is faced upward at regular intervals by reflectoscope detection Encircle internal structure and pressure gauge detects inverted arch lower part pressure from surrounding rock;
After detection system has acquired data each time, collected data are sent to wireless signal transmission system;
After wireless signal transmission system receives information, middle control platform is transferred information to;
Middle control bracket signal receives the information from wireless signal transmission system and will be in inverted arch by information display module Portion's structure and inverted arch lower part pressure from surrounding rock change curve are shown in terminal screen, analyze the information received, and The security risk occurred in tunnel is shown by warning module, completes primary information collection analysis early warning work.
Compared with prior art, the disclosure has the beneficial effect that
The disclosure uses full-automatic real-time detection system, which can carry out information to operation phase tunnel inverted arch structure Change, automation, fining detection, overcomes the shortcomings that traditional monitoring means are influenced by weather, yielded poor results.The system energy simultaneously Inverted arch internal structure change is enough disclosed, inverted arch lower part pressure from surrounding rock is established and changes over time model, for monitoring operation phase tunnel Inverted arch safety makes timely early warning to existing security risk and is of great significance.Meanwhile the system can be research fortune Battalion's phase tunnel surrounding stress, the Variation Features of deformation and tunnel perimeter hydrogeology state of development provide valuable science money Material.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is the general illustration of the present embodiment;
Fig. 2 is the layout diagram of the present embodiment;
Fig. 3 is the detection system top view of the present embodiment;
Fig. 4 is the middle control platform schematic diagram of the present embodiment;
Wherein, the 1. full-automatic real-time monitoring-early warning system of tunnel inverted arch structure, 2. detection systems, 3. wireless signal transmission System, controls platform in 4., 5. power-supply systems, 6. reflectoscopes, 7. pressure gauges, 8. shells, 9. power transformers, 10. electric wires, 11. country rock, 12. tunnel cross-sections, 13. inverted arch, 14. signal receiving modules, 15. information analysis modules, 16. message output modules, 17. warning module;
Specific embodiment:
The disclosure is described further with embodiment with reference to the accompanying drawing.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
In the disclosure, term for example "upper", "lower", "left", "right", "front", "rear", "vertical", "horizontal", " side ", The orientation or positional relationship of the instructions such as "bottom" is to be based on the orientation or positional relationship shown in the drawings, only to facilitate describing this public affairs The relative for opening each component or component structure relationship and determination, not refers in particular to either component or element in the disclosure, cannot understand For the limitation to the disclosure.
In the disclosure, term such as " affixed ", " connected ", " connection " be shall be understood in a broad sense, and indicate may be a fixed connection, It is also possible to be integrally connected or is detachably connected;It can be directly connected, it can also be indirectly connected through an intermediary.For The related scientific research of this field or technical staff can determine the concrete meaning of above-mentioned term in the disclosure as the case may be, It should not be understood as the limitation to the disclosure.
Embodiment 1:
As shown in Figure 1, a kind of full-automatic real-time monitoring-early warning system (1) of inverted arch structure suitable for runing phase tunnel, by Detection system (2), wireless signal transmission system (3), middle control platform (4), (5) four part of power-supply system are constituted.Detection system (1) It is made of reflectoscope (6), pressure gauge (7), shell (8).
As shown in Fig. 2, tunnel cross-section (12) is wrapped in country rock (11), a kind of inverted arch structure suitable for runing phase tunnel Full-automatic real-time monitoring-early warning system (1) is laid under inverted arch (13).
As shown in figure 3, placing reflectoscope (6), wireless signal transmission system (3), power transformer in shell (8) (9), pressure gauge (7) is placed in except shell (8), and electric wire (10) is connected with electrical system.
As shown in figure 4, middle control platform (4) includes signal receiving module (14), information analysis module (15), information output mould Block (16), warning module (17), data information are transmitted to signal receiving module (14) by wireless signal transmission system (3), are passed through After crossing analysis (15), analysis result is shown by message output module (16), and carry out early warning (17).
Reflectoscope can carry out supersonic sounding, and the information that detection is obtained to concrete in inverted arch and bar construction Pass to radio transmitting device.
Reflectoscope in detection system, from and power-supply system in power transformer be placed in high-strength shell It is interior, prevent it to be extruded destruction.
Pressure gauge is installed on high-strength shell exterior to play a role.
High-strength shell use column concrete casing, with prevent internal portion's electronic equipment electromagnetic interference and externally under Damage of the infiltration of water to electronic equipment.
High-strength shell and the reflectoscope of its positioned inside, wireless signal transmission system, power transformer, in tunnel It is laid in when construction on the contact surface of inverted arch bottom and country rock.
High-strength shell and pressure gauge influenced by external elements variation it is small, being capable of round-the-clock acquisition information.
Reflectoscope can carry out nondestructive inspection, will not cause structural damage to top inverted arch.
The detection range of reflectoscope can achieve ten meters, meet engineering sounding demand.
Pressure gauge can measure pressure from surrounding rock at this, and obtained information is passed to radio transmitting device.
Detection system can carry out a data acquisition automatically at regular intervals, and information is summarized in time to wireless communication Number Transmission system.
The first three years of detection system after tunnel is built up, data collection interval can be taken as 12 hours, when hereafter acquiring Between be spaced and can be taken as 24 or 48 hours.
Wireless signal transmission system can data-signal of the real-time reception from reflectoscope and pressure gauge, and immediately Information is passed through into the middle control platform of electromagnetic transmission to the Tunnel Engineering.
Under inverted arch internal structural information and inverted arch that the wireless signal transmission system that signal receiving module can receive transmits Portion's pressure from surrounding rock information.
Message output module can show the information received on a terminal screen, including each inverted arch internal structure is three-dimensional Perspective view and each inverted arch bottom pressure from surrounding rock time history plot, the clerk of works personnel for middle control platform provide directly The tunnel inverted arch information of sight.
Information analysis module can judge inverted arch three-dimensional structure, identify tensile crack therein, pressure-break, cut Crack finds out dangerous crack therein according to certain rule, provides the substantially area of operation phase tunnel inverted arch edge stress distribution Domain.
Inverted arch three-dimensional structure can be compared with the inverted arch received before three-dimensional structure for information analysis module, find out Crack in expansion state and the crack in compressive state.
Information analysis module can analyze the variation of inverted arch lower part pressure from surrounding rock, establish inverted arch lower part pressure from surrounding rock and continuously become Change model, judges current pressure from surrounding rock for the influence degree of inverted arch safety.
Dangerous crack and crack in significant change state can be output on terminal screen by warning module, be provided The crack form in each crack and issuable corresponding harm remind clerk of works personnel to carry out actual tunnel corresponding site Investigation, accomplishes to prevent trouble before it happens.
The pressure from surrounding rock change curve that warning module can would tend to precarious position is output to terminal screen, reminds work Journey supervisor checks actual tunnel corresponding site, accomplishes to prevent trouble before it happens.
Power-supply system is laid in constructing tunnel, is connect with electrical system in tunnel, for other equipment power supply.
A kind of working method of the full-automatic real-time monitoring-early warning system of inverted arch structure suitable for runing phase tunnel, including Following steps:
Step 1: when tunnel excavation, laying concrete casing (8) and detection system (2), wireless in inverted arch (13) lower part Signal transmission system (3), power transformer (9);
Step 2: after tunnel comes into operation, detection system (2) starts to acquire data, passes through ultrasonic inspection at regular intervals Instrument (6) detects inverted arch (13) internal structure and pressure gauge (7) detects inverted arch (13) lower part pressure from surrounding rock;
Step 3: after detection system has acquired data each time, collected data being sent to wireless signal transmission system (3);
Step 4: after wireless signal transmission system (3) receives information, transferring information to middle control platform (4);
Step 5: middle control bracket signal receiving module (14) receives the information from wireless signal transmission system (3) and passes through Inverted arch (13) internal structure and inverted arch (13) lower part pressure from surrounding rock change curve are shown in end by information display module (16) Hold screen;
Step 6: middle control platform information analysis module (15) analyzes the information received, and passes through warning module (17) it shows the security risk occurred in tunnel, clerk of works personnel is reminded to carry out live investigation, complete primary information acquisition Analysis and early warning work;
Step 7: repeating step 2 to step 6.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to the disclosure, model not is protected to the disclosure The limitation enclosed, those skilled in the art should understand that, on the basis of the technical solution of the disclosure, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within the protection scope of the disclosure.

Claims (10)

1. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure, it is characterized in that: including:
Detection system, including reflectoscope and pressure gauge, be configured as detection inverted arch internal structure, check for damage and Measure the pressure from surrounding rock of inverted arch lower part;
Wireless signal transmission system is configured as the collected information of detection system being transmitted to middle control platform;
Middle control platform is configured as analyzing the change of inverted arch lower part pressure from surrounding rock based on the operation phase tunnel inverted arch information received Change, establish inverted arch lower part pressure from surrounding rock consecutive variations model, judge current pressure from surrounding rock for the influence degree of inverted arch safety, And corresponding early warning is provided according to influence degree;
Power-supply system, is configured as detection system and wireless signal transmission system provides electric power.
2. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the middle control is flat Platform includes signal receiving module, message output module, information analysis module and warning module, in which:
The signal receiving module, is configured as being mutually matched with wireless signal transmission system and connect;
The information analysis module is configured as judging inverted arch three-dimensional structure, identifies tensile crack therein, pressure break Seam and/or shear crack find out dangerous crack therein according to certain rule, provide the distribution of operation phase tunnel inverted arch edge stress Region;
The warning module, be configured as by dangerous crack and in significant change state crack output, provide each crack Crack form and issuable corresponding harm;
The message output module, the information for being configured as to receive are shown on a terminal screen, including each inverted arch internal junction Structure 3 dimensional drawing and each inverted arch bottom pressure from surrounding rock time history plot.
3. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as claimed in claim 2, it is characterized in that: the information point Inverted arch three-dimensional structure is compared analysis module with the inverted arch three-dimensional structure received before, finds out the crack in expansion state And the crack in compressive state.
4. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as claimed in claim 2, it is characterized in that: the early warning mould The pressure from surrounding rock change curve that block is configured as would tend to precarious position is output to terminal screen, reminds clerk of works personnel Actual tunnel corresponding site is checked, accomplishes to prevent trouble before it happens.
5. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the power supply system System includes power transformer and the electric wire being attached thereto.
6. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the detection is System, power-supply system and power-supply system are all set in shell, and the shell is column concrete casing, to prevent internal portion's electricity Damage of the infiltration of the electromagnetic interference of sub- equipment and external underground water to electronic equipment.
7. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the detection is System is laid on the contact surface of inverted arch bottom and country rock in constructing tunnel, and the automatic progress data acquisition of timing.
8. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the wireless communication Number Transmission system can data-signal of the real-time reception from reflectoscope and pressure gauge, and information is passed through into electromagnetism immediately Wave is transferred to the middle control platform of the Tunnel Engineering.
9. a kind of full-automatic real-time system for monitoring and pre-warning of inverted arch structure as described in claim 1, it is characterized in that: the power supply system System is laid in constructing tunnel, is connect with electrical system in tunnel.
10. based on the working method of system described in any one of claim 1-9, it is characterized in that: the following steps are included:
When tunnel excavation, concrete casing and detection system, wireless signal transmission are laid every a distance in inverted arch lower part System and power transformer;
After tunnel comes into operation, detection system starts to acquire data, is detected in inverted arch by reflectoscope at regular intervals Portion's structure and pressure gauge detect inverted arch lower part pressure from surrounding rock;
After detection system has acquired data each time, collected data are sent to wireless signal transmission system;
After wireless signal transmission system receives information, middle control platform is transferred information to;
Middle control bracket signal receives the information from wireless signal transmission system and passes through information display module for inverted arch internal junction Structure and inverted arch lower part pressure from surrounding rock change curve are shown in terminal screen, analyze the information received, and pass through Warning module shows the security risk occurred in tunnel, completes primary information collection analysis early warning work.
CN201811520584.XA 2018-12-12 2018-12-12 Full-automatic real-time monitoring and early warning system and method for inverted arch structure Active CN109580779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811520584.XA CN109580779B (en) 2018-12-12 2018-12-12 Full-automatic real-time monitoring and early warning system and method for inverted arch structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811520584.XA CN109580779B (en) 2018-12-12 2018-12-12 Full-automatic real-time monitoring and early warning system and method for inverted arch structure

Publications (2)

Publication Number Publication Date
CN109580779A true CN109580779A (en) 2019-04-05
CN109580779B CN109580779B (en) 2021-04-16

Family

ID=65929198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811520584.XA Active CN109580779B (en) 2018-12-12 2018-12-12 Full-automatic real-time monitoring and early warning system and method for inverted arch structure

Country Status (1)

Country Link
CN (1) CN109580779B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414338A (en) * 2020-10-16 2021-02-26 山东大学 Shield surrounding rock deformation monitoring system and method carried by TBM

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001174242A (en) * 1999-12-22 2001-06-29 Toyo Commun Equip Co Ltd In-tunnel monitoring system
CN103075195A (en) * 2012-12-28 2013-05-01 西北大学 Measurement system and method for stress of surrounding rock of hipparion red soil tunnel under influence of crack water
CN205157496U (en) * 2015-11-30 2016-04-13 中国神华能源股份有限公司 Tunnel basement detecting system
CN205593565U (en) * 2016-05-05 2016-09-21 智性纤维复合加固南通有限公司 Tunnel engineering life -cycle monitoring devices
CN106053234A (en) * 2016-07-25 2016-10-26 昆明理工大学 Railway tunnel bottom structure dynamic force model testing device and method
CN107067690A (en) * 2017-01-17 2017-08-18 中山大学 A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN107830890A (en) * 2017-10-17 2018-03-23 上海潮旅信息科技股份有限公司 A kind of tunnel safety monitoring system based on fibre optical sensor
CN108037184A (en) * 2017-11-03 2018-05-15 武汉市工程科学技术研究院 Tunnel inverted arch detection of construction quality method
CN207675227U (en) * 2017-12-25 2018-07-31 江西通慧科技股份有限公司 A kind of self-powered type wireless tunnel health monitoring device based on vibrating power-generation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001174242A (en) * 1999-12-22 2001-06-29 Toyo Commun Equip Co Ltd In-tunnel monitoring system
CN103075195A (en) * 2012-12-28 2013-05-01 西北大学 Measurement system and method for stress of surrounding rock of hipparion red soil tunnel under influence of crack water
CN205157496U (en) * 2015-11-30 2016-04-13 中国神华能源股份有限公司 Tunnel basement detecting system
CN205593565U (en) * 2016-05-05 2016-09-21 智性纤维复合加固南通有限公司 Tunnel engineering life -cycle monitoring devices
CN106053234A (en) * 2016-07-25 2016-10-26 昆明理工大学 Railway tunnel bottom structure dynamic force model testing device and method
CN107067690A (en) * 2017-01-17 2017-08-18 中山大学 A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN107830890A (en) * 2017-10-17 2018-03-23 上海潮旅信息科技股份有限公司 A kind of tunnel safety monitoring system based on fibre optical sensor
CN108037184A (en) * 2017-11-03 2018-05-15 武汉市工程科学技术研究院 Tunnel inverted arch detection of construction quality method
CN207675227U (en) * 2017-12-25 2018-07-31 江西通慧科技股份有限公司 A kind of self-powered type wireless tunnel health monitoring device based on vibrating power-generation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414338A (en) * 2020-10-16 2021-02-26 山东大学 Shield surrounding rock deformation monitoring system and method carried by TBM

Also Published As

Publication number Publication date
CN109580779B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
CN208225263U (en) A kind of safety monitoring slope acquisition system based on Internet of Things big data
KR102042616B1 (en) IoT Based Safety Management System of Urban Construction Site
CN103727911B (en) Assembly type deep soils equipment and system based on MEMS array
CN202688979U (en) Integral monitoring system of foundation pit under construction
CN105952495A (en) Wireless positioning portable tunnel construction safety warning system and wireless positioning portable tunnel construction safety warning method
CN106546219A (en) Electrical substation monitoring device, method and system
CN111485949B (en) System and method for monitoring internal force of tunnel pre-supporting shell and pressure of soil behind tunnel pre-supporting shell in real time
CN110017171A (en) One kind being used for tunnel structure health Life cycle real-time monitoring system
CN112330927B (en) Multi-parameter integrated karst collapse monitoring and early warning device and working method thereof
CN206833669U (en) A kind of slope geological monitoring and warning system
CN107478909A (en) A kind of smart grounding resistance on-line computing model and its system
CN110595342A (en) Automatic measuring device for side slope crack displacement
CN113898372A (en) Full life cycle health monitoring system of deep tunnel of sewage
CN209639759U (en) A kind of downstream Tailings Dam dam inside ess-strain comprehensive monitor system
CN111622807A (en) Mine in-situ filling body mechanical evaluation system and method
CN203024763U (en) Construction beam posture monitoring system
CN201387325Y (en) Verticality and parallelism measuring device for metallurgical equipment by acoustic control method
CN108716906B (en) Fixed intelligent inclinometer, system and implementation method
CN109580779A (en) The full-automatic real-time system for monitoring and pre-warning of inverted arch structure and method
CN211604275U (en) Wireless transmission type landslide disaster monitoring device
CN106297238A (en) A kind of transacter
CN208505293U (en) A kind of fixed intelligent inclinometer and system
CN102721406B (en) Construction beam gesture monitoring system
CN206684904U (en) A kind of Mine production monitoring device
CN205027414U (en) Dam body hydrostatic level normal position automatic monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Xue Yiguo

Inventor after: Chen Qing

Inventor after: Hou Shoujiang

Inventor after: Zhang Xueliang

Inventor after: Pan Jianping

Inventor after: Li Guangkun

Inventor after: Ning Zexu

Inventor after: Bai Chenghao

Inventor before: Xue Yiguo

Inventor before: Chen Qing

Inventor before: Hou Shoujiang

Inventor before: Zhang Xueliang

Inventor before: Pan Jianping

Inventor before: Li Guangkun

Inventor before: Ning Zexu

Inventor before: Bai Chenghao

CB03 Change of inventor or designer information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant