CN109579650A - A kind of static blasting method of no free boundary rock mass - Google Patents

A kind of static blasting method of no free boundary rock mass Download PDF

Info

Publication number
CN109579650A
CN109579650A CN201910081342.3A CN201910081342A CN109579650A CN 109579650 A CN109579650 A CN 109579650A CN 201910081342 A CN201910081342 A CN 201910081342A CN 109579650 A CN109579650 A CN 109579650A
Authority
CN
China
Prior art keywords
rock mass
hole
static
boundary
static blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910081342.3A
Other languages
Chinese (zh)
Inventor
马剑华
杨顺清
肖汝诚
庄冬利
王伟立
杨乐
温欣岚
喻江武
雷瑜
孟晓鹏
刘子军
邬林宏
罗占业
张兵
谭鹏
潘博博
赵小虎
李广明
计俊涛
李志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tongji Bridge Technology Co Ltd
CCCC Second Highway Engineering Co Ltd
Original Assignee
Shanghai Tongji Bridge Technology Co Ltd
CCCC Second Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tongji Bridge Technology Co Ltd, CCCC Second Highway Engineering Co Ltd filed Critical Shanghai Tongji Bridge Technology Co Ltd
Priority to CN201910081342.3A priority Critical patent/CN109579650A/en
Publication of CN109579650A publication Critical patent/CN109579650A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Abstract

The present invention relates to a kind of static blasting methods of no free boundary rock mass, comprising the following steps: 1) determines burst region and explosion boundary;2) emptying aperture is laid on explosion boundary, and charging hole and compensation hole are laid inside burst region;3) static crushing substance is added to charging hole, carries out static blasting.Compared with prior art, the present invention in the rock mass of no free boundary by constructing artificial free boundary, and added inside burst region with charging hole be in quincunx laying compensation hole, to reduce the constraint of rock mass to be blasted, high stress areas is set sufficiently to cover region to be blasted, achieve the purpose that effectively broken, suitable for the static blasting to no free boundary or few free boundary rock mass, it can reduce because rock mass constraint is excessive caused by lacking free boundary, the bad situation of demolition effect, ensure the static blasting effect under harsh constraint condition, realize the disposable region-wide interior noiseless static blasting for carrying out rock mass.

Description

A kind of static blasting method of no free boundary rock mass
Technical field
The invention belongs to rock mass Static Blasting Technique fields, are related to a kind of static blasting method of no free boundary rock mass.
Background technique
The static blasting of rock mass is referred in engineering constructions such as road, bridge, mine, tunnel, water conservancy, foundation pit and hole stakes In, it replaces explosive to carry out explosion to rock mass using static breaking agent, meets hydrate expansion technique using noiseless static breaking agent, Reach a kind of construction method for excavating purpose.The static blasting method used in the prior art compares the presence for relying on free boundary (in free boundary, rock mass expansion direction is not constrained, can be with free wxpansion), when needs excavate on huge rockmass When, due to not having free boundary, expansion space of the rock mass under static breaking agent effect is limited, thus is difficult to realize area to be blasted The rock crushing in domain is unable to reach effectively broken purpose.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of no free boundary rocks The static blasting method of body.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of static blasting method of no free boundary rock mass, method includes the following steps:
1) burst region and explosion boundary are determined;
2) emptying aperture is laid on explosion boundary, and charging hole and compensation hole are laid inside burst region;
3) static crushing substance is added to charging hole, carries out static blasting.
Further, in step 1), the burst region is polygon or round.Polygon includes square, rectangular Shape, triangle, parallelogram, diamond shape or trapezoidal etc., circle include positive round, ellipse or multifocal null circle etc..
Further, in step 2), before laying emptying aperture on explosion boundary, the operation above burst region is first cleared up Face.
Further, in step 2), uniformly distributed multiple emptying apertures on the explosion boundary.Multiple emptying apertures are enclosed quick-fried Broken region.
Further, the aperture of the emptying aperture is 40-60mm, and the distance between adjacent two emptying aperture is 200-250mm.
Further, in step 2), multiple charging hole rows and multiple benefits are successively alternately laid inside the burst region Repay hole row.
Further, charging hole row includes multiple charging holes being disposed in parallel in inside burst region, described The aperture of charging hole is 38-42mm, and the distance between adjacent two charging hole is 200-300mm;The compensation hole row includes more A compensation hole being disposed in parallel in inside burst region, the aperture of the compensation hole are 38-42mm, between adjacent two compensation hole Distance be 200-300mm.Charging hole and compensation hole are in a row laid, for loading the static crushing of explosion in charging hole Agent, release rock mass stress forms crack when compensation hole is used for explosion.
Further, the charging hole arranges the distance between compensation hole row as 200-300mm, and the powder charge Hole and the interlaced setting of compensation hole, in quincunx.
Further, distance between the minimum range between the charging hole and explosion boundary≤adjacent two charging hole Half.Minimum range between charging hole and explosion boundary is minimum burden.
Further, in step 3), the static crushing substance is the mixture of static breaking agent and water.
In the present invention, emptying aperture, charging hole and compensation hole are vertical hole.The depth of emptying aperture, charging hole and compensation hole is 1.05H, wherein H is depth to be blasted, and is no more than 1.5m;When depth to be blasted is more than 1.5m, it is layered explosion.
The present invention closely lays multiple emptying apertures in the explosion boundary of rock mass, constitutes artificial free boundary, and in charging hole Compensation hole in a row is laid between row to discharge the bulbs of pressure, finally weakens confining pressure suffered by rock mass to be blasted.Pass through The pressure of artificial free boundary and compensation hole that emptying aperture is constituted discharges so that rock mass obtains bigger expansion space, induces simultaneously The uneven distribution of rock mass internal stress lures that crack generates and development into so that stress concentration phenomenon is more prone to produce.Pass through benefit The quincunx distribution for repaying hole and charging hole, the pressure for generating static breaking agent expansion sufficiently cover region to be blasted, promote to split Seam generates development.
Compared with prior art, the invention has the characteristics that:
1) by constructing artificial free boundary (laying emptying aperture on explosion boundary) in the rock mass of no free boundary, To surround burst region, and add inside burst region be in charging hole quincunx laying compensation hole, it is to be blasted to reduce The constraint of rock mass makes high stress areas sufficiently cover region to be blasted, achievees the purpose that effectively to be crushed, be suitable for no free margins The static blasting of boundary or few free boundary rock mass can be reduced because rock mass constrains excessive, explosion caused by lacking free boundary Ineffective situation, it is ensured that the static blasting effect under harsh constraint condition realizes disposable region-wide interior progress rock The noiseless static blasting of body;
2) the advantages of remaining low noise, self raising flour dirt, low vibration and the low pollution of static blasting method, easy to operate, solution Traditional static of having determined blasting method relies on free boundary, the problem ineffective to no free boundary rock blasting, improves quick-fried Broken efficiency.
Detailed description of the invention
Fig. 1 is static blasting construction process schematic diagram in embodiment 1;
Fig. 2 is the top view of 1 central holing structure of embodiment, wherein it is burst region inside rectangle ABDC, line segment AB, BD, DC, CA are the artificial free boundary that emptying aperture is constituted, i.e. explosion boundary;
Description of symbols in figure:
1-emptying aperture, 2-charging holes, 3-compensation holes.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to Following embodiments.
Embodiment 1:
As shown in Figure 1 and Figure 2, a kind of key step of the static blasting method of no free boundary rock mass is as follows:
Step 1: determining burst region, explosion boundary is set centered on burst region;
Specifically, by needed for engineering excavation spatial dimension extend outwardly 1m region in be determined as burst region.Foundation Requirement of engineering, static blasting region can be rectangle, be also possible to other shapes.Using burst region edge as explosion boundary.
Step 2: work surface above cleaning burst region guarantees that it works suitable for subsequent static blasting;
Specifically, the process of work surface includes: above cleaning burst region
Vegetation, barrier, ponding and the soil layer etc. above burst region are cleared up, work surface no-sundries are kept;By work surface It is covered with clad can Protective film, keeps lower rock temperature.Equipment quantity needed for constructing and equipment working performance are examined, medicine is examined Agent reliability (Packing Intact, heat release without exception).
Step 3: laying emptying aperture 1 on explosion boundary, constitute artificial free boundary;
Specifically, according to the scheme arrangement figure provided, by bore position setting-out needed for whole in burst region.With hand-held gas Leg churn drills according to setting-out position, and boring direction is perpendicular to horizontal plane.Emptying aperture aperture DIt is emptyIt is taken as 40-60mm, emptying aperture pitch-row a It is taken as 200-250mm, is arranged in rows.It gets the small value when rock mass quality to be broken is hard, can use the larger value when soft.Emptying aperture 1 Depth is 1.05H, and wherein H is depth to be blasted.
Step 4: charging hole 2 and compensation hole 3 are laid in burst region;
Specifically, according to the scheme arrangement figure provided, by bore position setting-out needed for whole in burst region.With hand-held gas Leg churn drills according to setting-out position, and boring direction is perpendicular to horizontal plane.Charging hole aperture DMedicineIt is taken as 38-42mm, charging hole Pitch-row b is taken as 200-300mm, is arranged in rows.It gets the small value when rock mass quality to be broken is hard, can use the larger value when soft. 2 depth of charging hole is 1.05H, and wherein H is depth to be blasted.Compensation hole aperture DIt mendsIt is taken as 38-42mm, compensation hole pitch-row c is taken as 200-300mm is arranged in rows.
Specifically, charging hole row is alternately arranged with compensation hole row, standoff distance 200-300mm;Charging hole 2 and compensation hole 3 interlock, and present quincunx.
Specifically, remaining water and ash slag application high-pressure blast purging are clean in each drilling, should be completely without native rock ballast by aperture. Work surface clad can Protective film should be covered after drilling, before powder charge.
Step 5: by static breaking agent and water mix;
Specifically, the quality of every hole powder charge can be by relational expression Q=ρ π r2H is calculated, wherein ρ is quiet after mix State cracking agent density, r are powder charge pore radius (DMedicine/ 2), H is depth to be blasted;It can also be estimated according to estimation formula is simplified Q=2.2H weighs the intact static breaking agent of performance (2.2H) kg, the clean water (0.66H) that temperature is 30 DEG C or so every time Static breaking agent, is first placed in mix basin, then clean water is poured into, is stirred with poking bar by kg (the 30% of static breaking agent quality) It mixes uniformly, the face for making wet and loose is cotton-shaped or clay shape.
Step 6: loading static breaking agent into charging hole 2, and block charging hole 2;
Clad can Protective film is opened, the static breaking agent mixed powder charge spoon and big funnel are packed into charging hole 2, while not It is disconnected with rod tamping is disclosed, avoid in hole that there are bubbles for static breaking agent.
When powder charge, from centre to two sides successively powder charge, the charging hole 2 in same row fills different charging holes row in a direction Medicine, until all 2 powder charges of charging hole are completed.Be already equipped with above the charging hole 2 of static breaking agent forbid stand with visually.
Staff need to wear safety goggles and rubber gloves in entire powder charge process, institute clothing should cover skin as far as possible Skin.Static breaking agent mix is completed to powder charge, and the time should shorten as far as possible, is controlled within 5 minutes, is prevented mentioning for static breaking agent Preceding reaction.The static breaking agent for having bubbled and having scalded one's hand is forbidden in load hole.
Blocking charging hole is rolled up with cotton.
Step 7: broken removing being carried out to rock mass after waiting static breaking agent fully reacting.
Specifically, after 6 hours of powder charge, the crack progressing situation around a hour observation charging hole is chosen and is represented Three, crack of property, carries out width measurement with vernier caliper and records.When continuously changing value is small three times for the fracture width numerical value of record Crack is regarded as in the 0.1mm moment and reaches maximum width, can be stopped recording.Whole process should wear protective ocular, and clothing should cover Lid skin is forbidden to spy upon into charging hole.
After fracture width stops developing, the rock mass of cracking is further crushed with pneumatic pick and is peeled off, detritus should transport out of in time Scene.
It is other basic in the technology other than the key step and set-up mode enumerated in the present embodiment Refer to the prior art for technology contents, and this embodiment is not repeated.
Embodiment 2:
A kind of static blasting method of no free boundary rock mass, comprising the following steps:
1) polygon burst region and explosion boundary are determined;
2) work surface above burst region is cleared up, later uniformly distributed multiple emptying apertures 1 on explosion boundary, emptying aperture 1 Aperture is 40mm, and the distance between adjacent two emptying aperture 1 is 200mm;
3) multiple charging hole rows and multiple compensation holes row, charging hole row and compensation are successively alternately laid inside burst region The distance between hole row is 200mm;Charging hole row includes multiple charging holes 2 being disposed in parallel in inside burst region, charging hole 2 Aperture be 38mm, the distance between adjacent two charging hole 2 be 200mm;Compensation hole row is disposed in parallel in blast area including multiple Compensation hole 3 inside domain, the aperture of compensation hole 3 are 38mm, and the distance between adjacent two compensation hole 3 is 200mm;Multiple charging holes 2 with the interlaced setting of multiple compensation holes 3, between minimum range=adjacent two charging hole 2 between charging hole 2 and explosion boundary The half of distance;
3) mixture of static breaking agent and water is added to charging hole 2, carries out static blasting.
Embodiment 3:
A kind of static blasting method of no free boundary rock mass, comprising the following steps:
1) round burst region and explosion boundary are determined;
2) work surface above burst region is cleared up, later uniformly distributed multiple emptying apertures 1 on explosion boundary, emptying aperture 1 Aperture is 60mm, and the distance between adjacent two emptying aperture 1 is 250mm;
3) multiple charging hole rows and multiple compensation holes row, charging hole row and compensation are successively alternately laid inside burst region The distance between hole row is 300mm;Charging hole row includes multiple charging holes 2 being disposed in parallel in inside burst region, charging hole 2 Aperture be 42mm, the distance between adjacent two charging hole 2 be 300mm;Compensation hole row is disposed in parallel in blast area including multiple Compensation hole 3 inside domain, the aperture of compensation hole 3 are 42mm, and the distance between adjacent two compensation hole 3 is 300mm;Multiple charging holes 2 with the interlaced setting of multiple compensation holes 3, between minimum range < adjacent two charging hole 2 between charging hole 2 and explosion boundary The half of distance;
3) mixture of static breaking agent and water is added to charging hole 2, carries out static blasting.
Embodiment 4:
A kind of static blasting method of no free boundary rock mass, comprising the following steps:
1) burst region and explosion boundary are determined;
2) work surface above burst region is cleared up, later uniformly distributed multiple emptying apertures 1 on explosion boundary, emptying aperture 1 Aperture is 50mm, and the distance between adjacent two emptying aperture 1 is 220mm;
3) multiple charging hole rows and multiple compensation holes row, charging hole row and compensation are successively alternately laid inside burst region The distance between hole row is 220mm;Charging hole row includes multiple charging holes 2 being disposed in parallel in inside burst region, charging hole 2 Aperture be 40mm, the distance between adjacent two charging hole 2 be 220mm;Compensation hole row is disposed in parallel in blast area including multiple Compensation hole 3 inside domain, the aperture of compensation hole 3 are 40mm, and the distance between adjacent two compensation hole 3 is 220mm;Multiple charging holes 2 with the interlaced setting of multiple compensation holes 3, between minimum range≤adjacent two charging hole 2 between charging hole 2 and explosion boundary The half of distance;
3) mixture of static breaking agent and water is added to charging hole 2, carries out static blasting.
The above description of the embodiments is intended to facilitate ordinary skill in the art to understand and use the invention. Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein general Principle is applied in other embodiments without having to go through creative labor.Therefore, the present invention is not limited to the above embodiments, ability Field technique personnel announcement according to the present invention, improvement and modification made without departing from the scope of the present invention all should be of the invention Within protection scope.

Claims (10)

1. a kind of static blasting method of no free boundary rock mass, which is characterized in that method includes the following steps:
1) burst region and explosion boundary are determined;
2) emptying aperture (1) is laid on explosion boundary, and lays charging hole (2) and compensation hole (3) inside burst region;
3) static crushing substance is added to charging hole (2), carries out static blasting.
2. a kind of static blasting method of no free boundary rock mass according to claim 1, which is characterized in that step 1) In, the burst region is polygon or round.
3. a kind of static blasting method of no free boundary rock mass according to claim 1, which is characterized in that step 2) In, before laying emptying aperture (1) on explosion boundary, first clear up the work surface above burst region.
4. a kind of static blasting method of no free boundary rock mass according to claim 1, which is characterized in that step 2) In, uniformly distributed multiple emptying apertures (1) on the explosion boundary.
5. a kind of static blasting method of no free boundary rock mass according to claim 4, which is characterized in that the sky The aperture in hole (1) is 40-60mm, and the distance between adjacent two emptying aperture (1) is 200-250mm.
6. a kind of static blasting method of no free boundary rock mass according to claim 1, which is characterized in that step 2) In, multiple charging hole rows and multiple compensation holes row are successively alternately laid inside the burst region.
7. a kind of static blasting method of no free boundary rock mass according to claim 6, which is characterized in that the dress Medicine hole row includes multiple charging holes (2) being disposed in parallel in inside burst region, and the aperture of the charging hole (2) is 38- 42mm, the distance between adjacent two charging hole (2) are 200-300mm;The described compensation hole row include it is multiple be disposed in parallel in it is quick-fried Compensation hole (3) inside broken region, the aperture of the compensation hole (3) are 38-42mm, between adjacent two compensation hole (3) away from From for 200-300mm.
8. a kind of static blasting method of no free boundary rock mass according to claim 7, which is characterized in that the dress The distance between medicine hole row and compensation hole row are 200-300mm, and the charging hole (2) and compensation hole (3) is interlaced Setting.
9. a kind of static blasting method of no free boundary rock mass according to claim 7, which is characterized in that the dress The half of distance between minimum range≤adjacent two charging hole (2) between medicine hole (2) and explosion boundary.
10. a kind of static blasting method of no free boundary rock mass according to claim 1, which is characterized in that step 3) In, the static crushing substance is the mixture of static breaking agent and water.
CN201910081342.3A 2019-01-28 2019-01-28 A kind of static blasting method of no free boundary rock mass Pending CN109579650A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910081342.3A CN109579650A (en) 2019-01-28 2019-01-28 A kind of static blasting method of no free boundary rock mass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910081342.3A CN109579650A (en) 2019-01-28 2019-01-28 A kind of static blasting method of no free boundary rock mass

Publications (1)

Publication Number Publication Date
CN109579650A true CN109579650A (en) 2019-04-05

Family

ID=65917804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910081342.3A Pending CN109579650A (en) 2019-01-28 2019-01-28 A kind of static blasting method of no free boundary rock mass

Country Status (1)

Country Link
CN (1) CN109579650A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905505A (en) * 2019-11-28 2020-03-24 辽宁工程技术大学 Coal mining method based on carbon dioxide blasting
CN112683119A (en) * 2020-12-23 2021-04-20 莱芜莱新铁矿有限责任公司 Electronic detonator underground blasting construction method
CN112709243A (en) * 2020-12-28 2021-04-27 中铁广州工程局集团有限公司 Construction method of lock catch steel pipe pile cofferdam bearing platform

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6375271B1 (en) * 1999-04-30 2002-04-23 Young, Iii Chapman Controlled foam injection method and means for fragmentation of hard compact rock and concrete
CN101191415A (en) * 2006-11-27 2008-06-04 杨仁树 Method for crushing rock formation of coal mine
CN102392650A (en) * 2011-11-02 2012-03-28 中铁隧道集团有限公司 Non-explosive tunnel excavation construction method
CN102865787A (en) * 2012-08-17 2013-01-09 重庆市爆破工程建设有限责任公司 Static blasting method
CN104314574A (en) * 2014-10-13 2015-01-28 福州市规划设计研究院 Hard rock tunnel non-blasting digging blocking method and construction method
CN104457466A (en) * 2014-12-08 2015-03-25 上海市政工程设计研究总院(集团)有限公司 Explosion method of open-cut tunnel segment
CN104990467A (en) * 2015-05-22 2015-10-21 深圳市工勘岩土集团有限公司 Digging pile hard rock section combined construction method
CN105423832A (en) * 2015-12-02 2016-03-23 广东中人集团建设有限公司 Blast construction method of orientation window of thick-wall brick chimney
CN105651132A (en) * 2016-01-28 2016-06-08 湖南航天建筑工程有限公司 Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN106351212A (en) * 2016-08-17 2017-01-25 中铁建大桥工程局集团第三工程有限公司 Pile foundation construction method with water drilling and static explosive expansion under rock geological condition
CN109026019A (en) * 2018-08-03 2018-12-18 中水电第十工程局(郑州)有限公司 The method that water mill bores non-blasting rock move hole excavation construction

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6375271B1 (en) * 1999-04-30 2002-04-23 Young, Iii Chapman Controlled foam injection method and means for fragmentation of hard compact rock and concrete
CN101191415A (en) * 2006-11-27 2008-06-04 杨仁树 Method for crushing rock formation of coal mine
CN102392650A (en) * 2011-11-02 2012-03-28 中铁隧道集团有限公司 Non-explosive tunnel excavation construction method
CN102865787A (en) * 2012-08-17 2013-01-09 重庆市爆破工程建设有限责任公司 Static blasting method
CN104314574A (en) * 2014-10-13 2015-01-28 福州市规划设计研究院 Hard rock tunnel non-blasting digging blocking method and construction method
CN104457466A (en) * 2014-12-08 2015-03-25 上海市政工程设计研究总院(集团)有限公司 Explosion method of open-cut tunnel segment
CN104990467A (en) * 2015-05-22 2015-10-21 深圳市工勘岩土集团有限公司 Digging pile hard rock section combined construction method
CN105423832A (en) * 2015-12-02 2016-03-23 广东中人集团建设有限公司 Blast construction method of orientation window of thick-wall brick chimney
CN105651132A (en) * 2016-01-28 2016-06-08 湖南航天建筑工程有限公司 Directional static blasting construction method for foundation pit stratum and combined guiding device for directional static blasting construction method
CN106351212A (en) * 2016-08-17 2017-01-25 中铁建大桥工程局集团第三工程有限公司 Pile foundation construction method with water drilling and static explosive expansion under rock geological condition
CN109026019A (en) * 2018-08-03 2018-12-18 中水电第十工程局(郑州)有限公司 The method that water mill bores non-blasting rock move hole excavation construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程丙权 等: "静态破碎剂破碎技术在津巴布韦卡南扩机工程中的应用", 《中国高新科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905505A (en) * 2019-11-28 2020-03-24 辽宁工程技术大学 Coal mining method based on carbon dioxide blasting
CN112683119A (en) * 2020-12-23 2021-04-20 莱芜莱新铁矿有限责任公司 Electronic detonator underground blasting construction method
CN112709243A (en) * 2020-12-28 2021-04-27 中铁广州工程局集团有限公司 Construction method of lock catch steel pipe pile cofferdam bearing platform

Similar Documents

Publication Publication Date Title
CN106284314B (en) Karst landform spiral-digging pore cast-in-place pile construction method
CN109579650A (en) A kind of static blasting method of no free boundary rock mass
CN106761790B (en) A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
CN101864960B (en) Carst region double-arch road tunnel construction method
CN106988758A (en) One kind is used to pass through large-scale vertical solution cavity group method for tunnel construction
CN107201908B (en) Construction method for deep-buried central ditch of tunnel in severe cold region
CN110132084A (en) A kind of Tunnel Overbreak &amp; Underbreak control method
CN106194195A (en) Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method
CN107165160A (en) Electric drill bores construction filling pile construction engineering method with rotary digging relay
CN109372517A (en) One kind is suitable for wearing water supplying pipe construction method under upper soft lower hard compound stratum tunnel
CN101196117A (en) Non-blasting digging method for tunnel and underground project
CN103437351B (en) Treatment method of deviation and fracture remediation of pile body of filling pile
CN112832802B (en) Large-bottom plate supporting structure and method for asymmetric pressure
CN109778869A (en) Foundation ditch construction method
CN110847197A (en) Comprehensive treatment method for loess tunnel entrance section crossing landslide body
CN110778328A (en) Loess tunnel entrance section construction method for passing through landslide body
CN108867692A (en) The protection of city big cross section open trench tunnel Nearby Structure and tunnel foundation pit method for digging
CN110863832A (en) Large-section tunnel stability control construction method for penetrating through earth-rock boundary stratum
CN108625368A (en) A kind of Deep Thick Soft Ground Area Rigid Long-Short-Pile Composite Foundation construction method
CN109826201A (en) A kind of weak soil foundation pit step method for protecting support
CN110821512A (en) Loess tunnel entrance opening section pre-reinforcing and excavating construction method passing through landslide body
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN108457659B (en) Railway single method for tunnel construction of the extremely frigid zones with center Deeply buried ditch
CN110438857A (en) A kind of Freeway of Mountain Range steel reinforcement cage stalagmite stake and its construction technology
CN110397091A (en) Ancient building shock insulation barrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405

RJ01 Rejection of invention patent application after publication