CN109577341A - The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post - Google Patents

The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post Download PDF

Info

Publication number
CN109577341A
CN109577341A CN201811322043.6A CN201811322043A CN109577341A CN 109577341 A CN109577341 A CN 109577341A CN 201811322043 A CN201811322043 A CN 201811322043A CN 109577341 A CN109577341 A CN 109577341A
Authority
CN
China
Prior art keywords
soil body
erratic boulder
construction
pile
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811322043.6A
Other languages
Chinese (zh)
Inventor
程跃辉
何承海
张世奎
徐波
许超
杨志勇
陈冬
刘杰
刘海勇
胡乘恺
蒋道东
江鸿
李德杰
王强
熊凯
程煌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu City Construction Engineering Co Ltd Of China Exchange Two
CCCC Second Harbor Engineering Co
Original Assignee
Chengdu City Construction Engineering Co Ltd Of China Exchange Two
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu City Construction Engineering Co Ltd Of China Exchange Two, CCCC Second Harbor Engineering Co filed Critical Chengdu City Construction Engineering Co Ltd Of China Exchange Two
Priority to CN201811322043.6A priority Critical patent/CN109577341A/en
Publication of CN109577341A publication Critical patent/CN109577341A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses the anti-collapse construction methods of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post, the method construction impact drill drilling pile of " bore one and jump one " or " bore one and jump two " is used first, by the percussion of impact drill by inter-pile soil body dense extrusion, churning driven drilling pile of then constructing between impact drill drilling pile.Effect of the invention is: 1., in rich water ovum erratic boulder soil body burning into sand stratum construction major diameter fender post, can greatly reduce and go along with sb. to guard him pile driving construction collapse hole risk;2. relative to all using impact drill drilling construction, construction efficiency is substantially increased.

Description

The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post
Technical field
The present invention relates to subway foundation pit major diameter fender post construction fields.It is more particularly related to a kind of rich water Ovum erratic boulder soil body burning into sand strata metro foundation pit major diameter goes along with sb. to guard him pile construction method.
Background technique
It is many that sand-pebble layer major diameter goes along with sb. to guard him pile construction method, and wherein cast-in-situ bored pile is using relatively broad.Drilling fills Note stake is broadly divided into spiral-digging pore bored concrete pile, cast-in-situ bored pile and manual pore-forming according to the difference of pore-forming technique and is perfused Stake, this few class forming hole method is gone along with sb. to guard him in pile driving construction in sand-pebble layer using more at present.Rich water boulser bde is loosely organized, Soil body partial size is big, ovum erratic boulder intensity is high, infiltration coefficient is big, and fender post drilling difficulty easily occurs in pore forming process, hole wall collapses Etc. risks, seriously affect construction quality and progress;Meanwhile being mingled with Extra-fine sand or medium-sand seam in sand-pebble layer, it drills It is easier to collapse hole in the process;It constructs in rich water boulser bde, ground disturbance is larger, and drilling is easily influenced by Adjacent Pile body construction, If pile body is closer, hole quality is more difficult to ensure.Currently, it is mostly single that rich water boulser bde, which goes along with sb. to guard him pile construction method, One rotary digging drilling hole construction technology takes the method for " bore one and jump one " or " bore one and jump two " to reduce the shadow to neighbouring pore-forming to the greatest extent It rings, and rotary digging drilling hole construction technology single in practice of construction is still difficult to ensure hole quality.
Summary of the invention
The present invention is able to solve the problem of ovum erratic boulder soil body folder thin silt major diameter fender post pore-forming difficulty, floats for ovum The anti-collapse hole construction of stone soil body folder thin silt major diameter fender post provides a kind of method.
The purpose of the present invention is achieved through the following technical solutions:
The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post, first using " bore one and jump one " Or the method construction impact drill drilling pile of " bore one and jump two ", by the percussion of impact drill by inter-pile soil body dense extrusion, so The construction churning driven drilling pile between impact drill drilling pile afterwards.
It is preferred that the ovum erratic boulder soil body is extruded closely knit between stake under impact drill percussion.
It is preferred that being suitable for ovum erratic boulder soil body burning into sand stratum, the soil of ovum erratic boulder soil body burning into sand stratum from top to down Layer is miscellaneous fill, silty clay, Extra-fine sand, land pebble, middle sand and land pebble.
The beneficial effects of the present invention are: 1. rich water ovum erratic boulder soil body burning into sand stratum construct major diameter fender post, can be significantly Pile driving construction collapse hole risk is gone along with sb. to guard him in reduction;2. relative to all using impact drill drilling construction, construction efficiency is substantially increased.
Detailed description of the invention
Fig. 1 is that the particularly suitable ovum erratic boulder soil body of the present invention contains Flooding in Borehole;
Fig. 2 is drilled pile construction sequence.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing, but protection scope of the present invention is not limited to It is as described below.
Ovum erratic boulder soil body burning into sand distribution of strata situation as shown in Figure 1, including<1-2>miscellaneous fill,<2-3>silty clay,< 3-4-1>Extra-fine sand,<3-8-1>land pebble,<3-8-2>land pebble,<3-8-3>land pebble, sand in<3-5-2>.The ovum erratic boulder soil body Loosely, when constructing using churning driven, stake position pore-forming can preferably be completed by mud off, but that there are powder in land pebble is thin When the interlayers such as sand, middle sand, mud off effect is poor, churning driven easy collapse hole when constructing to interlayers such as Extra-fine sand, middle sand, and uses punching Collapse hole risk can preferably be controlled by hitting brill construction.As shown in Figure 2 for the improved bored pile construction in this stratum sequence, 1,2, 3 construct for percussive drilling, and 4,5,6,7 construct for rotary digging drilling hole.Rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post Anti-collapse construction method is constructed using the method for " brill one jumps one " (such as Fig. 2 (a)) or " bore one and jump two " (such as Fig. 2 (b)) impact first Drilled as holes stake, by the percussion of impact drill by inter-pile soil body dense extrusion, rotary digging of then constructing between impact drill drilling pile Drilled as holes stake.
The present invention is to go along with sb. to guard him pile construction method based on existing sand-pebble layer major diameter to carry out certain improvement.Existing ovum Erratic boulder stratum major diameter goes along with sb. to guard him pile driving construction using rotary digging drilled as holes, and " bore one and jump one " or " bore one and jump two " method is constructed, ovum Loosely, easy collapse hole in work progress is easier to collapse hole if having Extra-fine sand, medium coarse sand interlayer in stratum, and collapse hole is tight on erratic boulder stratum It is firm to will affect the ground soil body when weight, causes personnel equipment to damage so that pore-forming equipment topples;It can guarantee using impact drilled as holes Hole quality, but the impact drilled as holes time is longer, and for the stake holes of more than 20 meters of depths, impact drill needs two days or so time, rotation Digging to bore only needs several hours can be completed, and is greatly increased using the impact drill construction period.The present invention is on the basis of rotary digging drilled as holes On combine impact drilled as holes, impact drill intersects with churning driven constructs, first using " jumping one every one " or " brill one jump two " Method carry out impact drill construction, under impact drill percussion, the ovum erratic boulder soil body is extruded closely knit between stake, then among stake into The construction of row churning driven, can greatly reduce churning driven collapse hole risk.
In a preferred embodiment, under impact drill percussion, the ovum erratic boulder soil body is extruded closely knit between stake.
In a preferred embodiment, be suitable for ovum erratic boulder soil body burning into sand stratum, ovum erratic boulder soil body burning into sand stratum from upper and Under soil layer be miscellaneous fill, silty clay, Extra-fine sand, land pebble, middle sand and land pebble.
Present invention improves over ovum erratic boulder soil burning into sand strata metro foundation pit major diameters to go along with sb. to guard him pile construction method, is drilled to using impact The two kinds of construction technology intersections in hole and rotary digging drilled as holes are constructed, and are solved ovum erratic boulder soil burning into sand strata metro foundation pit major diameter and are enclosed Fender pile is constructed the problem of easy collapse hole, and construction efficiency is improved.Specific mechanism are as follows: using " bore one and jump one " or " bore one to jump Then two " method construction impact drill drilling pile is applied by the percussion of impact drill by inter-pile soil body dense extrusion between stake Work churning driven drilling pile can be mentioned since rotary digging drilled as holes is fast compared with impact drill speed of fulfiling hole with this while guaranteeing hole quality High construction efficiency.
Present invention can ensure that the quality of ovum erratic boulder soil burning into sand stratum large diameter bored pile construction, avoids pore forming process Middle collapse hole, while the pore-forming time can be greatlyd save using rotary digging drilled as holes, churning driven is utilized in conjunction with guarantee with impact drill and is applied The construction time can be saved while working medium amount, improves construction efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, it is noted that all Made any modifications, equivalent replacements, and improvements etc. within the spirit and principles in the present invention should be included in guarantor of the invention Within the scope of shield.

Claims (3)

1. the anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post, it is characterised in that: use first The method construction impact drill drilling pile of " bore one and jump one " or " bore one and jump two ", is squeezed inter-pile soil body by the percussion of impact drill Densification is real, churning driven drilling pile of then constructing between impact drill drilling pile.
2. the anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post according to claim 1, It is characterized by: the ovum erratic boulder soil body is extruded closely knit between stake under impact drill percussion.
3. the anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post according to claim 1, It is characterized by: be suitable for ovum erratic boulder soil body burning into sand stratum, the soil layer of ovum erratic boulder soil body burning into sand stratum from top to down be miscellaneous fill, Silty clay, Extra-fine sand, land pebble, middle sand and land pebble.
CN201811322043.6A 2018-11-08 2018-11-08 The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post Pending CN109577341A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811322043.6A CN109577341A (en) 2018-11-08 2018-11-08 The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811322043.6A CN109577341A (en) 2018-11-08 2018-11-08 The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post

Publications (1)

Publication Number Publication Date
CN109577341A true CN109577341A (en) 2019-04-05

Family

ID=65921766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811322043.6A Pending CN109577341A (en) 2018-11-08 2018-11-08 The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post

Country Status (1)

Country Link
CN (1) CN109577341A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818713A (en) * 2015-02-26 2015-08-05 武汉中力岩土工程有限公司 Profile steel cement soil pile construction method adaptive to various stratums
CN105275381A (en) * 2014-05-28 2016-01-27 宏润建设集团股份有限公司 Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN106087997A (en) * 2016-07-26 2016-11-09 中铁建大桥工程局集团第五工程有限公司 A kind of high latitude, high and cold Permafrost Area drilled pile construction engineering method
CN107237323A (en) * 2017-05-23 2017-10-10 中铁建大桥工程局集团第工程有限公司 Major diameter super thick boulder bed forming hole method
CN107842313A (en) * 2017-11-28 2018-03-27 重庆华硕建设有限公司 A kind of rotary drilling rig compact making hole construction technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275381A (en) * 2014-05-28 2016-01-27 宏润建设集团股份有限公司 Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN105275381B (en) * 2014-05-28 2018-05-04 宏润建设集团股份有限公司 Impact drill drilling construction method in rich water pebble layer
CN104818713A (en) * 2015-02-26 2015-08-05 武汉中力岩土工程有限公司 Profile steel cement soil pile construction method adaptive to various stratums
CN106087997A (en) * 2016-07-26 2016-11-09 中铁建大桥工程局集团第五工程有限公司 A kind of high latitude, high and cold Permafrost Area drilled pile construction engineering method
CN107237323A (en) * 2017-05-23 2017-10-10 中铁建大桥工程局集团第工程有限公司 Major diameter super thick boulder bed forming hole method
CN107842313A (en) * 2017-11-28 2018-03-27 重庆华硕建设有限公司 A kind of rotary drilling rig compact making hole construction technology

Similar Documents

Publication Publication Date Title
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN104947690B (en) Grooving construction method for embedding underground continuous wall into rock
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN102409972B (en) Multi-bit convolution punching/tamping engineering groover
CN102182399B (en) Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag
CN105970918A (en) Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN108505935A (en) Rectangle pile foundation drilling construction equipment and construction method
CN1265062C (en) Construction for making piles and tools
CN110424430A (en) Deep basal pit powder land floor Deep Pumped Wells construction method and its application
CN203584301U (en) Hole guide equipment
CN103015408A (en) Cast-in-place pile synchronous casing hole-forming constructing method
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN109653196A (en) A kind of depth mound backfill reaming casing method
CN102425179B (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN202611632U (en) Cast-in-place drilled/punched pile construction plant with mud pit and mud separating device
CN102817349B (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
RU2114957C1 (en) Method and device for stabilization of earth structure
CN208396651U (en) Rectangle pile foundation drilling construction equipment
CN109944251A (en) The drawing hole construction method that soft rock stratum steel sheet pile is squeezed into
CN109577341A (en) The anti-collapse construction method of rich water ovum erratic boulder soil body burning into sand stratum foundation pit major diameter fender post
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN108894213A (en) A kind of artificial digging pile passes through the construction method of rich water drifting sand layer
CN205100226U (en) Underground continuous wall goes into rock grooving construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405