CN109565995A - A kind of method for recovering vegetation of dry valley engineering body excavation slope - Google Patents

A kind of method for recovering vegetation of dry valley engineering body excavation slope Download PDF

Info

Publication number
CN109565995A
CN109565995A CN201910026089.1A CN201910026089A CN109565995A CN 109565995 A CN109565995 A CN 109565995A CN 201910026089 A CN201910026089 A CN 201910026089A CN 109565995 A CN109565995 A CN 109565995A
Authority
CN
China
Prior art keywords
excavation slope
engineering body
body excavation
plant
vegetation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910026089.1A
Other languages
Chinese (zh)
Inventor
苏正安
周涛
杨鸿琨
张信宝
王晓艺
何周窈
张建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Mountain Hazards and Environment IMHE of CAS
Original Assignee
Institute of Mountain Hazards and Environment IMHE of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Mountain Hazards and Environment IMHE of CAS filed Critical Institute of Mountain Hazards and Environment IMHE of CAS
Priority to CN201910026089.1A priority Critical patent/CN109565995A/en
Publication of CN109565995A publication Critical patent/CN109565995A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of method for recovering vegetation of dry valley engineering body excavation slope, the following steps are included: carrying out microrelief transformation to pretreated engineering body excavation slope, and the adaptable plant species of breeding in the region by microrelief transformation, according to the upgrowth situation of the plant species of different zones, corresponding other plant species are arranged in pairs or groups and augment, building is suitable for the vegetational type of dry valley engineering body excavation slope.Vegetation recovery procedure of the present invention in dry valley engineering body excavation slope, through the soil of the earth's surface in plant growth while digging, a certain proportion of gravel is added in soil surface and carries out ground mulching, increase soil porosity, reach and increases precipitation infiltration amount, evaporation capacity is reduced simultaneously, to guarantee plant growth water, improves plant survival rate.

Description

A kind of method for recovering vegetation of dry valley engineering body excavation slope
Technical field
The present invention relates to excavation slope Treatment process fields, and in particular to a kind of dry valley engineering body excavation slope Method for recovering vegetation.
Background technique
China is at present in infrastructure projects multidigits such as large-scale water power, railway and the highways built or will built in Gao Shanxia Canyon, often side slope is high steep in these areas, and Rock Mass Unloading weathering is serious, and often development has tomography, vein, off-load inside side slope The structural planes such as crack, the Geological Defects such as tomography are excavating slope surface exposure after slope excavating, form Dangerous Rock Body, seriously affect and excavate side The stability and security on slope.
Existing administering method not only cannot effectively administer excavation slope, but also be easy to cause soil erosion, it is also possible to deposit In the huge hidden danger of landslide.
Summary of the invention
The purpose of the present invention is to provide a kind of method for recovering vegetation of dry valley engineering body excavation slope, overcome existing The deficiency of various administering methods provides a kind of more efficient, beneficial method for recovering vegetation.
The present invention solves its technical problem and adopts the following technical solutions to realize.
The invention proposes a kind of method for recovering vegetation of dry valley engineering body excavation slope, comprising the following steps:
Microrelief transformation is carried out to pretreated excavation slope, and breeding is adapted in the region by microrelief transformation Plant species arrange in pairs or groups and augment corresponding other plant species according to the upgrowth situation of the plant species of different zones, construct It is suitable for the vegetational type of dry valley engineering body excavation slope.
The beneficial effects of the present invention are:
The present invention provides a kind of method for recovering vegetation of dry valley engineering body excavation slope, the present invention passes through in plant The soil of the earth's surface of growth is added a certain proportion of gravel in soil surface and carries out ground mulching, increase soil while digging Earth porosity reaches and increases precipitation infiltration amount, while reducing evaporation capacity, to guarantee plant growth water, improves plant survival Rate.
Specific embodiment
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention Technical solution be clearly and completely described.The person that is not specified actual conditions in embodiment, according to normal conditions or manufacturer builds The condition of view carries out.Reagents or instruments used without specified manufacturer is the conventional production that can be obtained by commercially available purchase Product.
Below to a kind of method for recovering vegetation progress of dry valley engineering body excavation slope provided in an embodiment of the present invention It illustrates.
The embodiment of the present invention provides a kind of method for recovering vegetation of dry valley engineering body excavation slope, including following step It is rapid:
Microrelief transformation, and the breeding in the region by microrelief transformation are carried out to pretreated engineering body excavation slope Corresponding other plant object is arranged in pairs or groups and augmented to adaptable plant species according to the upgrowth situation of the plant species of different zones Kind, building is suitable for the vegetational type of dry-hot valley coombe development area.
The embodiment of the present invention provides a kind of method for recovering vegetation of dry valley engineering body excavation slope, including following step It is rapid: firstly, microrelief transformation is carried out to pretreated engineering body excavation slope, since the engineering body in dry valley area excavates side Slope is soil-slope, and moisture penetration speed is slow, while evaporation capacity is big, causes planting plants to be not easy to survive, is transformed by microrelief Later, suitable topography and geomorphology is provided for plant growth, entering for moisturizing blends storage, moisture needed for providing plant growth And soil;Secondly, adaptable plant species are planted in the microrelief region by transformation, in the plant species process of breeding In based on local indigenous plant, indigenous plant not only well adapts to local natural environment, and input cost is low, and economy is received It is beneficial high, the new problem as caused by the invasion of alien species will not be had, and can mushroom out, prevent dry valley engineering Serious soil erosion occurs for body excavation slope;Again, according to the upgrowth situation of the plant species of different zones, collocation and supplement Corresponding other plant species, building are suitable for the vegetational type of dry valley engineering body excavation slope, promote dry valley work Whole vegetational type's function of journey body excavation slope.Side is excavated in entire dry valley engineering body by above-mentioned vegetation arrangement Thus domatic makes the entirety of dry valley engineering body excavation slope be improved and be administered at vegetative protection net, control arid river The degeneration of paddy engineering body excavation slope, and generate certain society and ecological benefits.
As it can be seen that carrying out clod cover processing by the surface soil to engineering body excavation slope in the embodiment of the present invention, make Moisture is easily infiltrated into and is saved, and provides moisture for plant growth, can effectively be formed in the slopes of engineering body excavation slope Vegetational type achievees the purpose that the vegetation of fast quick-recovery engineering body excavation slope, not only solves existing direct laying protection The problem that existing vegetation survival rate is low, survival is difficult is netted, and can all form green plant in the slope surface of engineering body excavation slope Coating cap rock, makes engineering body excavation slope integrally be improved and be administered, and provides a kind of efficient, beneficial dry valley engineering body The method for recovering vegetation of excavation slope.
In some embodiments, pretreatment includes: and gridiron, barricade is arranged in engineering body excavation slope and cuts to drain Ditch.
Engineering body excavation slope in the embodiment of the present invention is to pass through pretreated engineering body excavation slope, by locating in advance Reason is provided with the structures such as gridiron, barricade and drain dyke, due in engineering body excavation slope in engineering body excavation slope Form gridiron of uniform size in slope surface, and the regions such as the centre in slopes, surrounding and bottom be provided with it is adaptable Drain dyke, barricade is additionally provided in the bottom of slope of engineering body excavation slope, by above pretreated engineering body excavation slope It is being less prone to landslide after engineering measure transformation, further vegetation protection layer is being planted in engineering body excavation slope and reaches Reinforce the purpose of slope protection.
In some embodiments, microrelief is transformed are as follows: digs, and is turning in the slopes of engineering body excavation slope A certain proportion of gravel is added in soil surface while native and carries out ground mulching.
In some embodiments, the accounting of gravel in the soil is 10-30%, preferably 10-20%.
In some embodiments, the diameter of gravel is less than 7.5cm, it is preferred that the diameter of gravel is 2-5cm.
It repairs the roads in earth work, repair bridge, it is excavation slope (soil-slope) that digging or cutting, which form inclined inclined-plane, due to Natively precipitation is few for Dry Valleys, and evaporation capacity is big, and plant growth is difficult.Excavation slope is soil-slope, the macropore of the soil body Gap is few, and moisture penetration speed is slow, and evaporation capacity is big, and planting plants is caused to be not easy to survive.Therefore, engineering body in the area of Dry Valley excavates The key of revegetation in side slope is exactly to ensure that water supplies, and according to principle of water balance, the available water of plant is exactly to drop Rain-evaporation-production stream, that is, the water infiltrated, therefore, it is crucial for being added to and blending reduction evaporation.
It digs in the slopes of engineering body excavation slope in the embodiment of the present invention, adds while digging in soil surface Enter a certain proportion of gravel and carry out ground mulching, since the soil infiltration of engineering body excavation slope is poor, is added a certain proportion of Gravel can increase soil porosity instead, increase infiltration capacity, reduce evaporation, increase plant can water, it is raw for plant It is long that required moisture is provided.The accounting of the gravel that the embodiment of the present invention is added in the soil is 10-30%, preferably 10- 20%.Above-mentioned gravel ratio can make precipitation be easy to penetrate into and saved in the soil by the gap between gravel, be lower than or Moisture cannot be effectively stored higher than above-mentioned ratio or landslide or landslide are washed away by precipitation.Further, gravel is straight Diameter is less than 7.5cm, it is preferred that the diameter of gravel is 2-5cm.If gravel diameter is too big, it is unfavorable for plant growth, if gravel diameter It is too small, and the effect infiltrated is not had, therefore, the diameter of gravel is less than 7.5cm, it is preferred that the diameter of gravel is 2-5cm.
In some embodiments, the adaptable plant species of breeding are as follows: to being planted in pretreated engineering body excavation slope Plant adaptable plant species.
In some embodiments, plant species are based on indigenous plant, and plant species include shrub and draft, and In planting process: first planting shrub, then broadcast sowing grass-seed.
In some embodiments, shrub include Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony with And thorn is at least one of fluffy, draft includes in herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum It is at least one.
The plant species that plantation in the embodiment of the present invention is adapted are as follows: configured in the gridiron of engineering body excavation slope Plant species are based on draft and shrub, and since the length of grade of gridiron is smaller, and shrub first planted, due to the rhizome of shrub It is relatively strong, it is easy to take root in the soil, absorbs moisture, then broadcast sowing grass-seed, can further improve the survival rate of grass-seed, reinforce The coverage rate of herbaceous layer vegetation in gridiron makes to excavate to form the effective protection grid that shrub combines in each gridiron Side slope generally forms effective vegetative protection net.
In some embodiments, arrange in pairs or groups and augment corresponding other plant species are as follows: at the low position of vegetation coverage Organic collocation and plantation arbor, shrub and draft;In the high region of vegetation cover degree, the after-culture of shrub and draft is carried out.
The present invention is in vegetation recovery procedure, the adaptable plant species of breeding, based on Native species, takes into account promotion and plants By community function, since local indigenous plant has better physio-ecological adaptation, after plantation, it is easier to survive, it is not easy to Pest and disease damage occurs, input cost is low, and good in economic efficiency, it is easier to building adapt to local ecology whole phytobiocoenose and Ecological environment, the suitable ecological environment of long-range building.
In some embodiments, further include tending management, tending management are as follows: the vegetation just planted is carried out artificial It irrigates, and uses closing management, prevent that people and animals trample on, taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pays attention to pest and disease damage Prevention and treatment, is managed and protected 2 years.
Feature and performance of the invention are described in further detail with reference to embodiments.
Embodiment 1
A kind of method for recovering vegetation of dry valley engineering body excavation slope, comprising the following steps:
(1), microrelief is handled: excavating side to by the pretreated engineering body such as gridiron slope protection, barricade and drain dyke Slope carries out microrelief processing, microrelief transformation are as follows: dig in the slopes of engineering body excavation slope, in soil while digging Earth surface is added a certain proportion of gravel and carries out ground mulching.Shared gravel is 10%, and gravel diameter is that 2-5cm is best.
(2), the adaptable plant species of plantation are as follows: the plant species configured in the gridiron of engineering body excavation slope are with grass Originally and based on shrub, and in planting process: first planting shrub, then broadcast sowing grass-seed.The plant species of configuration are planted with native soil Based on object, shrub include Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony and thorn it is fluffy at least one Kind, draft includes at least one of herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum.
(3), arrange in pairs or groups and augment corresponding other plant species are as follows: organic collocation and plantation at the low position of vegetation coverage Shrub and draft;In the high region of vegetation cover degree, the after-culture of shrub and draft is carried out.
(4), tending management: man-made irrigation is carried out to the vegetation just planted, and uses closing management, prevents that people and animals trample It steps on, taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pays attention to the prevention and control of plant diseases, pest control, manages and protects 2 years.
Embodiment 2
A kind of method for recovering vegetation of dry valley engineering body excavation slope, comprising the following steps:
(1), microrelief is handled: excavating side to by the pretreated engineering body such as gridiron slope protection, barricade and drain dyke Slope carries out microrelief processing, microrelief transformation are as follows: dig in the slopes of engineering body excavation slope, in soil while digging Earth surface is added a certain proportion of gravel and carries out ground mulching.Optimal gravel proportion is 20%, and the diameter of gravel is 2-5cm Most preferably.
(2), the adaptable plant species of plantation are as follows: the plant species configured in the gridiron of engineering body excavation slope are with grass Originally and based on shrub, and in planting process: first planting shrub, then broadcast sowing grass-seed.The plant species of configuration are planted with native soil Based on object, shrub include Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony and thorn it is fluffy at least one Kind, draft includes at least one of herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum.
(3), arrange in pairs or groups and augment corresponding other plant species are as follows: organic collocation and plantation at the low position of vegetation coverage Shrub and draft;In the high region of vegetation cover degree, the after-culture of shrub and draft is carried out.
(4), tending management: man-made irrigation is carried out to the vegetation just planted, and uses closing management, prevents that people and animals trample It steps on, taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pays attention to the prevention and control of plant diseases, pest control, manages and protects 2 years.
Embodiment 3
A kind of method for recovering vegetation of dry valley engineering body excavation slope, comprising the following steps:
(1), microrelief is handled: excavating side to by the pretreated engineering body such as gridiron slope protection, barricade and drain dyke Slope carries out microrelief processing, microrelief transformation are as follows: dig in the slopes of engineering body excavation slope, in soil while digging Earth surface is added a certain proportion of gravel and carries out ground mulching.Optimal gravel proportion is 30%, and the diameter of gravel is in 2-5cm Most preferably.
(2), the adaptable plant species of plantation are as follows: the plant species configured in the gridiron of engineering body excavation slope are with grass Originally and based on shrub, and in planting process: first planting shrub, then broadcast sowing grass-seed.The plant species of configuration are planted with native soil Based on object, shrub include Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony and thorn it is fluffy at least one Kind, draft includes at least one of herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum.
(3), arrange in pairs or groups and augment corresponding other plant species are as follows: organic collocation and plantation at the low position of vegetation coverage Shrub and draft;In the high region of vegetation cover degree, the after-culture of shrub and draft is carried out.
(4), tending management: man-made irrigation is carried out to the vegetation just planted, and uses closing management, prevents that people and animals trample It steps on, taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pays attention to the prevention and control of plant diseases, pest control, manages and protects 2 years.
The gravel ratio being added when digging is stepped up in above embodiment 1-3, since the addition of gravel increases soil Earth porosity reaches and increases precipitation infiltration amount, while reducing evaporation capacity, to guarantee plant growth water, improves plant survival Rate has achieved the purpose that the revegetation to dry valley engineering body excavation slope, if further increasing the ratio of gravel, due to Gap in soil is excessive, and the surface layer soil layer not only bad for the growth of plant, and after digging excessively loosely will lead to out It is more unstable to dig side slope, it is easier to cause soil erosion or landslide to cave in by rain drop erosion.
Comparative example 1
A kind of method for recovering vegetation of dry valley engineering body excavation slope, comprising the following steps:
(1), the adaptable plant species of plantation are as follows: the plant species configured in the gridiron of engineering body excavation slope are with grass Originally and based on shrub, and in planting process: first planting shrub, then broadcast sowing grass-seed.The plant species of configuration are planted with native soil Based on object, shrub include Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony and thorn it is fluffy at least one Kind, draft includes at least one of herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum.
(2), arrange in pairs or groups and augment corresponding other plant species are as follows: organic collocation and plantation at the low position of vegetation coverage Shrub and draft;In the high region of vegetation cover degree, the after-culture of shrub and draft is carried out.
(3), tending management: man-made irrigation is carried out to the vegetation just planted, and uses closing management, prevents that people and animals trample It steps on, taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pays attention to the prevention and control of plant diseases, pest control, manages and protects 2 years.
Microrelief transformation is not carried out to engineering body excavation slope in above comparative example 1, directly in engineering body excavation slope Upper plantation vegetation, since engineering body excavation slope is soil-slope, moisture penetration speed is slow, engineering body excavation slope itself is tight The defect of weight water shortage fails to overcome, and causes the plant species survival rate of plantation very low, wastes a large amount of human and material resources and wealth Power not only cannot effectively play the role of slope protection, but also engineering body excavation slope is loose in the soil layer of the rear surface of excavation, Easily occur landslide collapsing etc. under rainwash, is easy to cause new problem.
Comparative example 2
Protective net is directly laid in engineering body excavation slope, protective net not can solve water loss and aesthetics etc. not only Problem cannot effectively restore vegetation, and since protective net is metal material, perishable, the service life is shorter, palliative.
To sum up, the embodiment of the present invention provides a kind of method for recovering vegetation of dry valley engineering body excavation slope, including with Lower step: microrelief transformation, and the breeding in the region by microrelief transformation are carried out to pretreated engineering body excavation slope Corresponding other plant object is arranged in pairs or groups and augmented to adaptable plant species according to the upgrowth situation of the plant species of different zones Kind, building is suitable for the vegetational type of dry valley engineering body excavation slope.
As it can be seen that the method for recovering vegetation of the dry valley engineering body excavation slope in the embodiment of the present invention, due on surface Soil property in joined a certain proportion of gravel so that the gap of soil increases, when so that there is precipitation, infiltration of the moisture to soil Increase, while evaporating reduction, the plant moisture of plantation is sufficient, and survival rate is higher.
Embodiments described above is a part of the embodiment of the present invention, instead of all the embodiments.Reality of the invention The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of selected implementation of the invention Example.Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts Every other embodiment, shall fall within the protection scope of the present invention.

Claims (10)

1. a kind of method for recovering vegetation of dry valley engineering body excavation slope, which comprises the following steps:
Microrelief transformation is carried out to the pretreated engineering body excavation slope, and in the region by microrelief transformation The adaptable plant species of breeding, according to the upgrowth situation of the plant species of different zones, collocation and other corresponding plants of supplement Object species, building are suitable for the vegetational type of dry valley engineering body excavation slope.
2. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 1, which is characterized in that described pre- Processing includes: that gridiron, barricade and drain dyke are arranged in the engineering body excavation slope.
3. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 1, which is characterized in that described micro- Landforms transformation are as follows: dig in the slopes of the engineering body excavation slope, and in soil surface while described dig A certain proportion of gravel is added and carries out ground mulching.
4. the method for recovering vegetation of dry valley engineering body excavation slope as claimed in claim 3, which is characterized in that the gravel Accounting of the stone in the soil is 10-30%, preferably 10-20%.
5. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 3 or 4, which is characterized in that institute The diameter for stating gravel is less than 7.5cm, it is preferred that the diameter of the gravel is 2-5cm.
6. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 1, which is characterized in that the choosing Educate adaptable plant species are as follows: plant adaptable plant species in the pretreated engineering body excavation slope.
7. the method for recovering vegetation of dry valley engineering body excavation slope as claimed in claim 6, which is characterized in that the plant Object species are based on indigenous plant, and the plant species include shrub and draft, and in planting process: first planting the filling Then wood broadcasts sowing grass-seed.
8. the method for recovering vegetation of dry valley engineering body excavation slope as claimed in claim 7, which is characterized in that the filling Wood includes Sophora viciifolia, father hugo's rose, small sparrow flower, Ajania, small saddle mountain ebony and pierces at least one of fluffy, the draft Including at least one of herba setariae viridis, splendid achnatherum, Chinese Incarvilla Herb, Elymus nutans, coreopsis and Onosma paniculatum.
9. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 1, which is characterized in that described to take Match and augment corresponding other plant species are as follows: organic collocation and plantation shrub and draft at the low position of vegetation coverage;? The high region of vegetation cover degree carries out the after-culture of shrub and draft.
10. the method for recovering vegetation of dry valley engineering body excavation slope as described in claim 1, which is characterized in that also wrap Include tending management, the tending management are as follows: man-made irrigation is carried out to the vegetation just planted, and uses closing management, is prevented People and animals trample on, and taboo is herded taboo and cut down, and second year carries out after-culture to dead plant, pay attention to the prevention and control of plant diseases, pest control, manage and protect 2 years.
CN201910026089.1A 2019-01-11 2019-01-11 A kind of method for recovering vegetation of dry valley engineering body excavation slope Pending CN109565995A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910026089.1A CN109565995A (en) 2019-01-11 2019-01-11 A kind of method for recovering vegetation of dry valley engineering body excavation slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910026089.1A CN109565995A (en) 2019-01-11 2019-01-11 A kind of method for recovering vegetation of dry valley engineering body excavation slope

Publications (1)

Publication Number Publication Date
CN109565995A true CN109565995A (en) 2019-04-05

Family

ID=65916682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910026089.1A Pending CN109565995A (en) 2019-01-11 2019-01-11 A kind of method for recovering vegetation of dry valley engineering body excavation slope

Country Status (1)

Country Link
CN (1) CN109565995A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111492875A (en) * 2020-03-19 2020-08-07 深圳市仙湖植物园管理处(深圳市园林研究中心) Road slope plant recovery method
CN111887107A (en) * 2020-07-16 2020-11-06 中国科学院成都生物研究所 Arid region embedded plant community configuration model and slope protection vegetation planting method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813236B1 (en) * 2007-03-12 2008-03-13 이평우 The structure for a slope reinforcement and eco slope reinforcement method
CN201915413U (en) * 2010-12-30 2011-08-03 长安大学 Flexible grid for steep slope protection
CN102926391A (en) * 2012-11-09 2013-02-13 北京北林绿源生态技术研究院有限责任公司 Loess slope ecological protection method
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
CN106900195A (en) * 2017-02-21 2017-06-30 河海大学 One kind fetches earth an ecological restoring method
CN108782046A (en) * 2018-06-01 2018-11-13 中国电建集团贵阳勘测设计研究院有限公司 Method for building artificial grassland in dry and warm valley slag field in alpine region
CN108834462A (en) * 2018-06-29 2018-11-20 中国科学院、水利部成都山地灾害与环境研究所 A kind of vegetation arrangement method preventing and treating the development area soil erosion of dry-hot valley coombe

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100813236B1 (en) * 2007-03-12 2008-03-13 이평우 The structure for a slope reinforcement and eco slope reinforcement method
CN201915413U (en) * 2010-12-30 2011-08-03 长安大学 Flexible grid for steep slope protection
CN102926391A (en) * 2012-11-09 2013-02-13 北京北林绿源生态技术研究院有限责任公司 Loess slope ecological protection method
CN105484275A (en) * 2016-01-12 2016-04-13 中国电建集团贵阳勘测设计研究院有限公司 Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area
CN106900195A (en) * 2017-02-21 2017-06-30 河海大学 One kind fetches earth an ecological restoring method
CN108782046A (en) * 2018-06-01 2018-11-13 中国电建集团贵阳勘测设计研究院有限公司 Method for building artificial grassland in dry and warm valley slag field in alpine region
CN108834462A (en) * 2018-06-29 2018-11-20 中国科学院、水利部成都山地灾害与环境研究所 A kind of vegetation arrangement method preventing and treating the development area soil erosion of dry-hot valley coombe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111492875A (en) * 2020-03-19 2020-08-07 深圳市仙湖植物园管理处(深圳市园林研究中心) Road slope plant recovery method
CN111492875B (en) * 2020-03-19 2022-05-20 深圳市仙湖植物园管理处(深圳市园林研究中心) Road slope plant recovery method
CN111887107A (en) * 2020-07-16 2020-11-06 中国科学院成都生物研究所 Arid region embedded plant community configuration model and slope protection vegetation planting method
CN111887107B (en) * 2020-07-16 2022-02-18 中国科学院成都生物研究所 Arid region embedded plant community configuration model and slope protection vegetation planting method

Similar Documents

Publication Publication Date Title
CN105103843B (en) Prevent and treat the vegetation arrangement method of dry-hot valley Mine production soil erosion
CN101112157B (en) Method for greening high precipitous rock slope
Phillips et al. Observations of root growth of young poplar and willow planting types
CN104131572A (en) Method for governing red soil strongly-eroded slope
CN109673195A (en) A method of for muddy coast saline land greening and restoration of the ecosystem
CN102392455A (en) Technique for safe improvement as well as ecological repair and reconstruction of mine soil discharge yard
Grip et al. 22 Soil and water impacts during forest conversion and stabilisation to new land use
CN101507406B (en) Sand-heaping forestation technique on gobi sandstorm area at extreme drought environment
CN100350106C (en) Soil and water conservation and ecological restoring technology for landfill
CN103362135B (en) Fang Beng hilllock, protect water and soil net grass bank protection
CN105453984B (en) A kind of high altitude sand cypress introduction and cultivation method
CN104396691B (en) A kind of arid serrir area sacsaoul unirrigated vegetation method of forestation
CN110915348A (en) Ecological restoration method for stony desertification mountains
CN110800414B (en) Terrain renovation method for natural recovery of Siberian larch in gold mining damaged area
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN109005722A (en) A kind of iron ore waste-rock yard land reclamation comprehensive improvement method
CN104452729A (en) Water and soil conservation method of electric power transmission line engineering construction
CN101292619A (en) Rain cultivation method of forestation on dry-hot valley dryland hillside fields
CN109565995A (en) A kind of method for recovering vegetation of dry valley engineering body excavation slope
CN106605469A (en) Coastal reclamation land ecological restoration and greening method
Kraebel Erosion control on mountain roads
CN104762946A (en) Filler and method for ecologically repairing damaged mountain
CN105103696B (en) Method for desertification control through salix bangongensis cuttage in high-altitude gobi wind-blown sand region
CN102027849A (en) Vegetation protection and recovery technology for plateau high-cold steppe area
CN109565994A (en) A kind of method for recovering vegetation of dry valley Dumping Sites side slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination