CN109555317A - The template construction device and construction method of column visualization construction - Google Patents

The template construction device and construction method of column visualization construction Download PDF

Info

Publication number
CN109555317A
CN109555317A CN201910082524.2A CN201910082524A CN109555317A CN 109555317 A CN109555317 A CN 109555317A CN 201910082524 A CN201910082524 A CN 201910082524A CN 109555317 A CN109555317 A CN 109555317A
Authority
CN
China
Prior art keywords
template
support platform
construction
transparent
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910082524.2A
Other languages
Chinese (zh)
Other versions
CN109555317B (en
Inventor
雷明锋
张毫毫
李玉峰
钟文京
柳伟
张立
戴亚军
钟志全
谭芝文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
China Construction Tunnel Construction Co Ltd
Original Assignee
Central South University
China Construction Tunnel Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, China Construction Tunnel Construction Co Ltd filed Critical Central South University
Priority to CN201910082524.2A priority Critical patent/CN109555317B/en
Publication of CN109555317A publication Critical patent/CN109555317A/en
Application granted granted Critical
Publication of CN109555317B publication Critical patent/CN109555317B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to concrete construction technical field, the template construction device and construction method, device for being related to a kind of column visualization construction include rack platform, template system and conduit system;Rack platform includes first support platform and second support platform;First support platform and second support platform structure are identical;First support platform and second support platform are oppositely arranged is spliced to form dismountable overall structure jointly;Template system is to surround the hollow column structure formed by clear sheet;Template system is placed between first support platform and second support platform;Conduit system is connected with first support platform and second support platform respectively;Conduit system protrudes into inside template system.The present invention provides one kind can shorten preparation of construction time early period, guarantee key position concrete pouring quality and the sputtering of avoidable concrete visualizes the template construction device and construction method of construction to the column of the pollution of transparent template.

Description

The template construction device and construction method of column visualization construction
Technical field
The invention belongs to concrete construction technical field, it is related to a kind of template construction device and construction method, especially It is related to the template construction device and construction method of a kind of column visualization construction.
Background technique
Under conventional conditions, due to template black box effect and concrete pouring quality can not be real-time monitored, key position Concrete defect can not regulate and control in time, easily cause defects of concrete structure and generate ill effect;Traditional column mould builds work simultaneously Often there is the deficiencies of speed of application is slow, of poor quality, labour cost is high in sequence, therefore, a kind of new there is an urgent need to design and propose Constructing device and method reach easy to operate, construction efficiency is high, the guaranteed purpose of construction quality.
Summary of the invention
In order to solve the above technical problems in background technology, the present invention provides one kind can shorten construction early period standard The standby time guarantees that key position concrete pouring quality and the sputtering of avoidable concrete can to the column of the pollution of transparent template Template construction device and construction method depending on changing construction.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of template construction device of column visualization construction, the template construction device of the column visualization construction include Rack platform, template system and conduit system;The rack platform includes first support platform and second support platform;Institute It states first support platform and second support platform structure is identical;The first support platform and second support platform phase Dismountable overall structure is spliced to form jointly to setting;The template system is to surround the hollow column formed by clear sheet Shape structure;The template system is placed between first support platform and second support platform;The conduit system is respectively with One rack platform and second support platform are connected;The conduit system protrudes into inside template system.
Above-mentioned first support platform or second support platform include frame, rotation roller and telescopic rod;Described turn Dynamic idler wheel is placed in base of frame and is connected by telescopic rod with frame;The conduit system top with first support platform respectively Portion and the top of second support platform are connected and protrude into inside template system.
Above-mentioned rotation roller is the idler wheel that can be rotated in 360 ° of horizontal planes with self-locking function.
It is included at least in said frame and is placed in the upper leveling of frame roof and is placed in the lower leveling of base of frame;On described Pedestal is provided on leveling;The conduit system passes through the upper leveling of pedestal and first support platform respectively and second support is put down The upper leveling of platform is connected.
Above-mentioned template system includes transparent template, hinge and tie;The transparent template is at least 3, described transparent Template splicing is at columnar hollow frame structure;The inner surface of two neighboring transparent template is provided with hinge;Two neighboring transparent mould The outside of plate is connected by tie;The conduit system protrudes into the columnar hollow frame structure being spliced by transparent template.
Rubber strip is filled between two neighboring transparent template.
Above-mentioned transparent template includes the first transparent template, the second transparent template, third transparent template and the 4th transparent mould Plate;First transparent template, the second transparent template, third transparent template and the 4th transparent template surround frame hollow frame Structure.
Above-mentioned conduit system includes storage bin(hopper), telescopic catheter, Anti-splash retaining frame and fixed support plate;The storage bin(hopper) It is connected by telescopic catheter with Anti-splash retaining frame;Conduit through hole is provided on the fixed support plate;It is described telescopic to lead Pipe runs through fixed support plate;The fixed support plate is connected with first support platform and second support platform respectively;The storage One or more hooks are provided on hopper;The Anti-splash retaining frame is integrally in drops.
The template construction device of above-mentioned column visualization construction further includes that setting is connected on rack platform with conduit system For controlling the control system of conduit system stretching speed;The control system includes cabinet, be provided on cabinet input panel, Box house is provided with programmable logic controller (PLC);The input panel is connected with programmable logic controller (PLC);Programmable logic Controller, which is connected with telescopic catheter by outlet line and controls telescopic catheter, is spliced into columnar hollow frame in transparent template Stretching speed in frame structure.
A kind of construction method of the template construction device based on the visualization construction of foregoing column, it is characterised in that: The construction method the following steps are included:
1) equipment is in place: by rotation roller mobile device extremely to job position, and the self-locking function for passing through rotation roller Fixed equipment is adjusted the posture of rack platform by telescopic rod, rack platform is made to be in horizontality;
2) it adjusts template: the second transparent template, the 4th transparent template being unfolded by hinge, in intermediate leveling and lower flat Three groups of ties are respectively set on layer, transparent template assembly is integral, and the junction between transparent template is filled with rubber strip;
3) it places conduit: the both ends of fixed support plate is separately fixed at first support platform and second support platform On upper leveling pedestal, then by after storage bin(hopper), telescopic catheter, Anti-splash retaining frame assembly connection, fixed placement is supported fixed On the circular hole that plate is assembled into, Anti-splash retaining frame is sent to the columnar hollow being spliced by transparent template by the way that telescopic catheter is flexible The bottom of frame structure;
4) input control parameter: by input panel input the unit time can casting concrete amount and unit height it is to be poured Build concrete spatial volume;
5) starting pours: concrete pump pipe being installed on the hook with storage bin(hopper), power supply and gunite concrete preparation are opened Regulated and controled in time, through transparent template real time monitoring concrete pouring quality until pouring construction with corollary equipments such as conveyings It completes.
The present invention has following advantage:
The present invention provides a kind of template construction devices of column visualization construction and construction method, the constructing device to include Rack platform, template system and conduit system;Rack platform includes first support platform and second support platform;First Body panel and second support platform structure are identical;First support platform and second support platform are oppositely arranged common spelling It connects to form dismountable overall structure;Template system is to surround the hollow column structure formed by clear sheet;Template system It is placed between first support platform and second support platform;Conduit system is flat with first support platform and second support respectively Platform is connected;Conduit system protrudes into inside template system.Rack platform and template system group of the present invention is integral, has Traveling and formwork function convenient running fix and can simplify template erector in existing form concrete construction technology Sequence shortens the preparation of construction early period time;Meanwhile conventional wooden template is substituted using transparent template, it can effectively real-time monitoring mix Solidifying soil pouring quality is simultaneously regulated and controled, avoid the black box effect as template and caused by defects of concrete structure, ensure that Key position concrete pouring quality;Third, the telescoping catheter system of design connect coagulation using the hook designed in storage bin(hopper) Native pump line.Simultaneously utilize telescoping catheter and Anti-splash retaining frame, realize pour it is synchronous with promotion, work continuously, avoid coagulation Pollution of the soil sputtering to transparent template, it is ensured that transparent template can monitor in real time;The control system that the present invention designs is easy to operate, Thinking is clear.
Detailed description of the invention
Below in conjunction with the example diagram in the embodiment of the present invention, the technical solution of the embodiment of the present invention is carried out clear, complete Ground description, it should be apparent that, the accompanying drawings in the following description is only a part of the embodiments of the present invention, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art is obtained without making creative work All embodiments are obtained, shall fall within the protection scope of the present invention.
Fig. 1 is the overall structure diagram of the template construction device of column visualization construction provided by the present invention;
Fig. 2 is support platform structural schematic diagram of the present invention;
Fig. 3 is template system structural schematic diagram of the present invention;
Fig. 4 is that conduit system of the present invention is shown in the assembling structure of the template construction device of column visualization construction It is intended to;
Fig. 5 is the structural schematic diagram of conduit system of the present invention;
Fig. 6 is that control system of the present invention is shown in the assembling structure of the template construction device of column visualization construction It is intended to;
Fig. 7 is the circuit theory schematic diagram of control system of the present invention;
In figure:
1- rack platform;The upper leveling of 11-;111- pedestal;Leveling among 12-;Leveling under 13-;14- rotation roller;15- can Telescopic rod;2- template system;21- transparent template;The first transparent template of 211-;The second transparent template of 212-;213- third is transparent Template;The 4th transparent template of 214-;22- hinge;23- rubber strip;24- tie;3- conduit system;31- storage bin(hopper);311- is hung Hook;32- telescopic catheter;33- Anti-splash retaining frame;34- fixed support plate;4- control system;41- input panel;42- is programmable Logic controller;43- outlet line.
Specific embodiment
In the following, embodiments of the present invention are described in further detail with reference to the drawings and specific embodiments but not as this The restriction of invention.
In the description of the present invention, it should be noted that the side of the instructions such as term "left", "right", "upper", "lower", "bottom" Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, it is only for are retouched convenient for the description present invention and simplification It states, rather than refers in particular to or imply that signified element must have specific orientation, be constructed and operated in a specific orientation, therefore cannot It is interpreted as limitation of the present invention.
Referring to Fig. 1, the present invention provides a kind of template construction devices of column visualization construction, comprising: rack platform 1, Each base part, walking and position for loading device are fixed;Template system 2, for monitoring concreting state in real time simultaneously Regulated and controled, guarantees concrete pouring quality;Conduit system 3 for delivering concrete and prevents concrete from sputtering;Control system 4, for controlling the stretching speed of conduit system.Rack platform 1 includes first support platform and second support platform;First Body panel and second support platform structure are identical;First support platform and second support platform are oppositely arranged common spelling It connects to form dismountable overall structure;Template system 2 is to surround the hollow column structure formed by clear sheet;Template system 2 are placed between first support platform and second support platform;Conduit system 3 respectively with first support platform and second support Platform is connected;Conduit system 3 protrudes into inside template system 2.
Referring to Fig. 1 and Fig. 2, first support platform or second support platform include frame, rotation roller 14 and can Telescopic rod 15;Rotation roller 14 is placed in base of frame and is connected by telescopic rod 15 with frame;Conduit system 3 is respectively with first The top of rack platform and the top of second support platform are connected and protrude into inside template system 2.Rotation roller 14 is with certainly The idler wheel that can be rotated in 360 ° of horizontal planes of lock function.It is included at least on frame and is placed in the upper leveling 11 of frame roof and is placed in The lower leveling 13 of base of frame;Conduit system 3 passes through pedestal 111 and the upper leveling 11 of first support platform and second respectively The upper leveling 11 of body panel is connected.Preferably, first support platform or second support platform of the present invention are a ladders Shape space steel frame structure, divides upper, middle and lower-ranking, be upper leveling 11, intermediate leveling 12, lower leveling 13 is respectively operation layer, is used for Human assistance operation, inspection platform in work progress;There are two pedestals 111 for the upper setting of leveling 11, for installing fixed catheter system System 3;The relevant apparatus assembly of upper 11 installation control system of leveling 4;It is arranged at 1 bottom of rack platform, four socle with self-locking function 360 ° of horizontal plane rotation rollers 14, for the movement of fore-stock platform 1 of constructing and in place;On rotation roller 14 and rack platform 1 Portion's structure is fixedly connected using telescopic rod 15, for the rear horizontal attitude adjustment in place of rack platform 1.
Referring to Fig. 1 and Fig. 3, template system 2 of the present invention includes transparent template 21, hinge 22 and tie 24;Transparent template 21 is at least 3, and transparent template is spliced into columnar hollow frame structure;Two neighboring transparent template 21 it is interior Surface is provided with hinge 22;The outside of two neighboring transparent template 21 is connected by tie 24;Conduit system 3 is protruded by transparent mould In the columnar hollow frame structure that plate is spliced into;Rubber strip 23 is filled between two neighboring transparent template 21.Transparent template 21 Including the first transparent template 211, the second transparent template 212, third transparent template 213 and the 4th transparent template 214;First thoroughly Bright template 211, the second transparent template 212, third transparent template 213 and the 4th transparent template 214 surround frame hollow frame Structure.Preferably, transparent template 21 uses makrolon material, and the first transparent template 211 is fixedly mounted on the right side of rack platform; Pass through respectively between first transparent template 211 and the second transparent template 212, third transparent template 213 and the 4th transparent template 214 Six hinges 22 connect, and hinge is evenly arranged;Second transparent template 212 and third transparent template 213, the first transparent template 211 Entirety is formed using six groups of ties 24 with the 4th transparent template 214.Junction between transparent template 21 is filled out using rubber strip 23 It fills.
Referring to Fig. 1, Fig. 4 and Fig. 5, conduit system 3 of the present invention include storage bin(hopper) 31, telescopic catheter 32, Anti-splash retaining frame 33 and fixed support plate 34;Storage bin(hopper) 31 is connected by telescopic catheter 32 with Anti-splash retaining frame 33;It is fixed Conduit through hole is provided in support plate 34;Telescopic catheter 32 runs through fixed support plate 34;Fixed support plate 34 is respectively with One rack platform and second support platform are connected;One or more hooks 311 are provided on storage bin(hopper) 31;Anti-splash retaining frame 33 Whole is in drops.Conduit system 3 is for delivering concrete and prevents concrete from sputtering;Two pieces of special-shaped support plates 34 pass through screw It is fixedly mounted on the pedestal 111 of leveling 11 on rack platform 1;Storage bin(hopper) 31 is fixed on fixed support plate 34;It is telescopic to lead Pipe 32 is fixedly connected on 31 lower part of storage bin(hopper), and Anti-splash retaining frame 33 is fixedly connected on 32 lower part of telescopic catheter;In storage bin(hopper) 31 There are four hooks 311 for setting, for being connected and fixed concrete pump pipe.
Referring to Fig. 1, Fig. 6 and Fig. 7, the template construction device of column visualization construction provided by the present invention further includes setting Set the control system 4 being connected with conduit system 3 for controlling 3 stretching speed of conduit system on rack platform 1;Control system 4 Including cabinet, input panel 41 is provided on cabinet, box house is provided with programmable logic controller (PLC) 42;Input panel 41 with Programmable logic controller (PLC) 42 is connected;Programmable logic controller (PLC) 42 is connected and is controlled with telescopic catheter 32 by outlet line 43 Telescopic catheter 32 processed is spliced into the stretching speed in columnar hollow frame structure in transparent template.Input panel 41 is mainly used for The input unit time can casting concrete amount and unit height wait for casting concrete spatial volume;Programmable logic controller (PLC) 42 It is mainly used for the stretching speed according to input data calculation processing telescopic catheter 32;Outlet line 43 is used for basis and is calculated Stretching speed output control telescopic catheter 32 stretching speed.
In addition, the present invention also provides a kind of construction method carried out based on constructing device as previously described, the construction party Method the following steps are included:
1) equipment is in place: consolidating by 14 mobile device of rotation roller to job position, and by the self-locking function of idler wheel Locking equipment is further adjusted the posture of rack platform 1 by telescopic rod 15, rack platform 1 is made to be in horizontality;
2) it adjusts template: transparent template 212, transparent template 214 being unfolded by hinge 22, in intermediate leveling 12, lower flat Layer 13 is respectively set three groups of ties 24, and transparent template 21 is assembled integral, the junction rubber strip 23 between transparent template 21 Filling;
3) it places conduit: the both ends of fixed support plate 34 is separately fixed to the upper leveling base of left and right sides rack platform 1 On seat 111, then by after storage bin(hopper) 31, telescopic catheter 32, the assembled connection of Anti-splash retaining frame 33, fixed placement is supported fixed On the circular hole that plate 34 is assembled into, Anti-splash retaining frame 33 is sent to bottom by the way that telescopic catheter 32 is flexible.
4) input control parameter: by input panel 41 input the unit time can casting concrete amount and unit height wait for Casting concrete spatial volume;
5) starting pours: concrete pump pipe being installed on the hook 311 with storage bin(hopper) 31, power supply and gunite concrete are opened Preparation with conveying etc. corollary equipments, through transparent template 212, transparent template 214 monitor in real time concrete pouring quality, in time into Row regulation is shut down until pouring construction is completed.
The not detailed place of the present invention is routine techniques known in those skilled in the art.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and structure Think of is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of template construction device of column visualization construction, it is characterised in that: the template of the column visualization construction is applied Tooling is set including rack platform (1), template system (2) and conduit system (3);The rack platform (1) includes first support Platform and second support platform;The first support platform and second support platform structure are identical;Described first Body panel and second support platform are oppositely arranged is spliced to form dismountable overall structure jointly;The template system (2) is The hollow column structure formed is surrounded by clear sheet;The template system (2) is placed in first support platform and second Between body panel;The conduit system (3) is connected with first support platform and second support platform respectively;The conduit system (3) it is internal to protrude into template system (2).
2. the template construction device of column visualization construction according to claim 1, it is characterised in that: the first support Platform or second support platform include frame, rotation roller (14) and telescopic rod (15);The rotation roller (14) is set It is connected in base of frame and by telescopic rod (15) with frame;The conduit system (3) top with first support platform respectively Portion and the top of second support platform are connected and protrude into template system (2) inside.
3. the template construction device of column visualization construction according to claim 2, it is characterised in that: the rotation roller It (14) is the idler wheel that can be rotated in 360 ° of horizontal planes with self-locking function.
4. the template construction device of column according to claim 3 visualization construction, it is characterised in that: the frame up to Less including being placed in the upper leveling (11) of frame roof and being placed in the lower leveling (13) of base of frame;It is set on the upper leveling (11) It is equipped with pedestal (111);The conduit system (3) respectively by the upper leveling (11) of pedestal (111) and first support platform and The upper leveling (11) of second support platform is connected.
5. the template construction device of the visualization of column described in -4 any claims construction, feature exist according to claim 1 In: the template system (2) includes transparent template (21), hinge (22) and tie (24);The transparent template (21) is at least It is 3, the transparent template is spliced into columnar hollow frame structure;The inner surface setting of two neighboring transparent template (21) is hinged Chain (22);The outside of two neighboring transparent template (21) is connected by tie (24);The conduit system (3) is protruded by transparent mould In the columnar hollow frame structure that plate is spliced into.
6. the template construction device of column visualization construction according to claim 5, it is characterised in that: two neighboring transparent Rubber strip (23) are filled between template (21).
7. the template construction device of column visualization construction according to claim 6, it is characterised in that: the transparent template It (21) include the first transparent template (211), the second transparent template (212), third transparent template (213) and the 4th transparent template (214);First transparent template (211), the second transparent template (212), third transparent template (213) and the 4th transparent mould Plate (214) surrounds frame hollow frame structure.
8. the template construction device of column visualization construction according to claim 7, it is characterised in that: the conduit system It (3) include storage bin(hopper) (31), telescopic catheter (32), Anti-splash retaining frame (33) and fixed support plate (34);The storage bin(hopper) (31) it is connected by telescopic catheter (32) with Anti-splash retaining frame (33);Conduit is provided on the fixed support plate (34) to run through Hole;The telescopic catheter (32) runs through fixed support plate (34);The fixed support plate (34) respectively with first support platform And second support platform is connected;One or more hooks (311) are provided on the storage bin(hopper) (31);The Anti-splash retaining frame (33) whole is in drops.
9. the template construction device of column visualization construction according to claim 8, it is characterised in that: the column is visual The template construction device for changing construction further includes that setting is connected with conduit system (3) for controlling conduit system on rack platform (1) The control system (4) of system (3) stretching speed;The control system (4) includes cabinet, be provided on cabinet input panel (41), Box house is provided with programmable logic controller (PLC) (42);The input panel (41) and programmable logic controller (PLC) (42) phase Even;Programmable logic controller (PLC) (42) is connected with telescopic catheter (32) by outlet line (43) and controls telescopic catheter (32) stretching speed in columnar hollow frame structure is spliced into transparent template.
10. a kind of construction method of the template construction device based on column as claimed in claim 9 visualization construction, feature Be: the construction method the following steps are included:
1) equipment is in place: by rotation roller (14) mobile device extremely to job position, and passing through the self-locking of rotation roller (14) Function fixed equipment makes rack platform (1) be in horizontality by the posture of telescopic rod (15) adjustment rack platform (1);
2) it adjusts template: the second transparent template (212), the 4th transparent template (214) being unfolded by hinge (22), it is flat in centre Three groups of ties (24) are respectively set on layer (12) and lower leveling (13), by assembled integral, the transparent template of transparent template (21) (21) it is filled with rubber strip (23) junction between;
3) it places conduit: the both ends of fixed support plate (34) is separately fixed at first support platform and second support platform On upper leveling pedestal (111), after then storage bin(hopper) (31), telescopic catheter (32), Anti-splash retaining frame (33) assembly are connected, Gu Surely it is placed on the circular hole that fixed support plate (34) is assembled into, send Anti-splash retaining frame (33) by the way that telescopic catheter (32) are flexible To the bottom for the columnar hollow frame structure being spliced by transparent template (21);
4) input control parameter: by input panel (41) input unit time can casting concrete amount and unit height it is to be poured Build concrete spatial volume;
5) starting pours: concrete pump pipe being installed on the hook (311) of storage bin(hopper) (31), power supply and gunite concrete are opened The corollary equipments such as preparation and conveying monitor concrete pouring quality in real time through transparent template (21), are regulated and controled in time, until Pouring construction is completed.
CN201910082524.2A 2019-01-28 2019-01-28 Template construction device and construction method for visual construction of stand column Active CN109555317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910082524.2A CN109555317B (en) 2019-01-28 2019-01-28 Template construction device and construction method for visual construction of stand column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910082524.2A CN109555317B (en) 2019-01-28 2019-01-28 Template construction device and construction method for visual construction of stand column

Publications (2)

Publication Number Publication Date
CN109555317A true CN109555317A (en) 2019-04-02
CN109555317B CN109555317B (en) 2023-12-26

Family

ID=65873871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910082524.2A Active CN109555317B (en) 2019-01-28 2019-01-28 Template construction device and construction method for visual construction of stand column

Country Status (1)

Country Link
CN (1) CN109555317B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630018A (en) * 2019-09-11 2019-12-31 李素梅 Template construction device and construction method for visual construction of stand column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020145100A1 (en) * 1999-11-23 2002-10-10 Safway Formwork Systems, Llc Outside conversion corner for form work
CN102352628A (en) * 2011-10-13 2012-02-15 中土木(北京)技术检测有限公司 Cast-in-place pile concrete guide pipe mounting and dismounting device and construction method thereof
CN202596743U (en) * 2012-06-14 2012-12-12 中交四航局第一工程有限公司 Formwork trolley for underground tunnel pull-rod-free side wall construction
CN105350777A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Device and method for one-time pouring molding of ultra-high concrete column
CN206289619U (en) * 2016-10-27 2017-06-30 中国航天建设集团有限公司 Guide wall form board mounting structure and wall casting system
CN107327141A (en) * 2017-08-15 2017-11-07 上海建工二建集团有限公司 The construction formwork and method of the ultra-high performance concrete ruggedized construction of original rod structure
CN209556384U (en) * 2019-01-28 2019-10-29 中南大学 The template construction device of column visualization construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020145100A1 (en) * 1999-11-23 2002-10-10 Safway Formwork Systems, Llc Outside conversion corner for form work
CN102352628A (en) * 2011-10-13 2012-02-15 中土木(北京)技术检测有限公司 Cast-in-place pile concrete guide pipe mounting and dismounting device and construction method thereof
CN202596743U (en) * 2012-06-14 2012-12-12 中交四航局第一工程有限公司 Formwork trolley for underground tunnel pull-rod-free side wall construction
CN105350777A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Device and method for one-time pouring molding of ultra-high concrete column
CN206289619U (en) * 2016-10-27 2017-06-30 中国航天建设集团有限公司 Guide wall form board mounting structure and wall casting system
CN107327141A (en) * 2017-08-15 2017-11-07 上海建工二建集团有限公司 The construction formwork and method of the ultra-high performance concrete ruggedized construction of original rod structure
CN209556384U (en) * 2019-01-28 2019-10-29 中南大学 The template construction device of column visualization construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630018A (en) * 2019-09-11 2019-12-31 李素梅 Template construction device and construction method for visual construction of stand column
CN110630018B (en) * 2019-09-11 2021-04-02 李素梅 Template construction device and construction method for visual construction of stand column

Also Published As

Publication number Publication date
CN109555317B (en) 2023-12-26

Similar Documents

Publication Publication Date Title
CN107119715B (en) A kind of application method of pipe gallery entirety mould bases
CN106285051B (en) A kind of prefabricated toilet and its construction and installation method
CN110421687A (en) A kind of construction method of the hydraulic box culvert template of assembled and its prefabricated assembled box culvert
CN110130662B (en) The fine plumbing device of one pile for one column, system and method
CN206971268U (en) The working top plate mobile formwork body of underground pipe gallery
CN104343086A (en) Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon
CN204645727U (en) A kind of prefabricated toilet
CN109555317A (en) The template construction device and construction method of column visualization construction
CN209556384U (en) The template construction device of column visualization construction
CN108748626A (en) Precast wall body formwork erection pours device
CN105421781A (en) Synchronous pouring construction method and formwork system for concrete ridge platform and structural floor slab
CN211578073U (en) Portable electronic control programming training and learning platform
CN110578338A (en) System capable of moving aluminum alloy template integrally and operation method
CN206926070U (en) A kind of preform production line
CN205325942U (en) Piping lane box culvert pouring mold
CN205259603U (en) Centre form braced system
CN209240238U (en) Precast wall body formwork erection pours device
CN208135764U (en) A kind of pipeline hanging device without spin
CN116480152A (en) Concrete pouring device for house construction engineering and use method
CN207891915U (en) Piping lane wall rapid construction device
CN216740819U (en) Grouting device for joint repairing of high concrete surface
CN206030209U (en) Prefab production line
CN109296117A (en) Combined type hollow internal form light partition wall and construction method
CN205954910U (en) Beam column integration wallboard
CN210599012U (en) Automatic setting mechanism for secondary lining end mold of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant