CN109555156A - Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall - Google Patents

Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall Download PDF

Info

Publication number
CN109555156A
CN109555156A CN201811589182.5A CN201811589182A CN109555156A CN 109555156 A CN109555156 A CN 109555156A CN 201811589182 A CN201811589182 A CN 201811589182A CN 109555156 A CN109555156 A CN 109555156A
Authority
CN
China
Prior art keywords
bottom plate
sandwich wall
cabin
prefabricated panel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811589182.5A
Other languages
Chinese (zh)
Inventor
万磊
涂齐亮
赵帅
周敏
宁京
马宁
王金鹏
张亚南
郑鑫
廖熊
唐伟超
韩昌涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
China Railway 17th Bureau Group Co Ltd
Shanghai Rail Transit Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
China Railway 17th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group, China Railway 17th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Shanghai Rail Transit Engineering Co Ltd Of Middle Tie Shiqiju Group
Priority to CN201811589182.5A priority Critical patent/CN109555156A/en
Publication of CN109555156A publication Critical patent/CN109555156A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The invention belongs to technical field of civil engineering, and in particular between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall;Including the first prefabricated panel embedded bar and the second prefabricated panel embedded bar being separately fixed on the bottom plate of two adjacent steel pipe corridors cabin, two adjacent ends of two bottom plate embedded bars, which mutually overlap, forms cyclic structure, it overlaps and is also banded with being vertically arranged at formed cyclic structure and protrudes into the steel hoop between two adjacent steel pipe corridors cabin at sandwich wall, several foundation plate longitudinal reinforcements are banded at the intersecting lower of cyclic structure and steel hoop, above-mentioned reinforcing bar is connected as one by cast-in-place concrete between bottom plate;The top of steel hoop is banded with several sandwich wall longitudinal reinforcements, and bottom plate is connected as one with steel hoop, sandwich wall longitudinal reinforcement and sandwich wall cast-in-place concrete;Using between floor of the invention and the connection structure of sandwich wall, piping lane cabin integral anti-shearing and bending strength are improved, the compatible deformation ability between piping lane segment is enhanced.

Description

Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall
Technical field
The invention belongs to technical field of civil engineering, and in particular to one kind is used between the bottom plate of assembled steel piping lane cabin and sandwich wall Connection structure.
Background technique
China assembled architecture market is in Rapid development stage, increasingly mature with assembled architecture technology, respectively The extensive research and application of class new material, new technology, new process, also open for the construction of China's underground pipe gallery completely new Path, assembled corrugated steel piping lane are one of which.Assembled corrugated steel piping lane is in starting stage, single cabin corrugated steel at present Piping lane base plate size is small, and transport and lifting are convenient, and double cabins and the above cabin piping lane bottom plate volume are bigger than normal, and transport and lifting are deposited In difficulty, scheme is difficult to carry out.
Summary of the invention
The present invention is to solve the technical problem of more cabin assembled corrugated steel piping lane transports and lifting difficulty, provides one kind and is used for Between the bottom plate of assembled steel piping lane cabin and the connection structure of sandwich wall;It easily transports and lifts to construction site in single steel pipe corridor Afterwards, it is attached with connection structure of the invention, improves the integral anti-shearing and bending strength in piping lane cabin.
In order to solve the above technical problems, the technical scheme adopted by the invention is as follows: one kind being used for assembled steel piping lane cabin Between bottom plate and the connection structure of sandwich wall, including the first prefabricated panel being separately fixed on the bottom plate of two adjacent steel pipe corridors cabin Embedded bar and the second prefabricated panel embedded bar, the first prefabricated panel embedded bar and the second prefabricated panel embedded bar Two ends it is U-shaped, the first prefabricated panel embedded bar and the adjacent two end phases of the second prefabricated panel embedded bar Mutually overlap joint forms cyclic structure, overlaps and is also banded with being vertically arranged at formed cyclic structure and protrudes into two adjacent steel pipes Steel hoop between corridor cabin at sandwich wall, if being banded at the intersecting lower of the formed cyclic structure of the overlap joint and steel hoop The dry root horizontally disposed bottom plate longitudinal reinforcement all vertical with the two, the first prefabricated panel embedded bar, the second prefabricated panel are pre- Reinforcing bar, the steel hoop at bottom plate and bottom plate longitudinal reinforcement is buried to be connected as one by cast-in-place concrete between bottom plate;It is described The top for stretching to the steel hoop between two adjacent steel pipe corridors cabin at sandwich wall is also banded with several horizontally disposed folders Wall longitudinal reinforcement, bottom plate and sandwich wall are by extending into the steel hoop, sandwich wall longitudinal reinforcement and sandwich wall cast-in-place concrete of sandwich wall It is connected as one.
Connection structure of the present invention includes two nodes, and first node includes the first prefabricated panel embedded bar, second prefabricated Cast-in-place concrete between bottom plate embedded bar, steel hoop, bottom plate longitudinal reinforcement and bottom plate;Second node includes to stretch in first node Enter the steel hoop to sandwich wall, sandwich wall longitudinal reinforcement and sandwich wall cast-in-place concrete.Two sides bottom plate by first node it is cast-in-place after the completion of After being connected as one, then an entirety is connected as by second node and the cast-in-place concrete of piping lane sandwich wall.
First node is attached by steel hoop and sandwich wall cast-in-place concrete and is improved between piping lane cabin between bottom plate The shearing resistance and bending resistance of tie point.
It is connected by increasing bottom plate longitudinal reinforcement with sandwich wall longitudinal reinforcement with adjacent segment piping lane, enhances the whole association of piping lane Adjust deformability.
Compared with prior art the invention has the following advantages:
It mostly uses integral prefabricated more cabin assembled corrugated steel piping lanes greatly with the prior art, is difficult to transport and on-site hoisting is asked More cabin piping lane bottom plates are divided into several single Ceilings, bottom plate assembly are carried out after transport to construction site, is solved by topic, the present invention More cabin assembled corrugated steel piping lanes transports and the difficult problem of lifting, using between floor of the invention and the connection knot of sandwich wall Structure, while piping lane cabin integral anti-shearing and bending strength are improved, enhance the compatible deformation ability between piping lane segment.
Detailed description of the invention
Fig. 1 is between assembled steel piping lane bottom plate and the connection structure diagrammatic cross-section of sandwich wall.
Fig. 2 is the enlarged drawing in Fig. 1 at A.
Fig. 3 is the structural schematic diagram of the first prefabricated panel embedded bar, the second prefabricated panel embedded bar and steel hoop.
It is marked in figure as follows:
1- the first prefabricated panel embedded bar, 2- the second prefabricated panel embedded bar, 3- steel hoop, 4- bottom plate longitudinal reinforcement, Cast-in-place concrete between 5- bottom plate, 6- sandwich wall cast-in-place concrete, 7- sandwich wall longitudinal reinforcement.
Specific embodiment
Below in conjunction with specific embodiment, the invention will be further described.
Kind is used between the bottom plate of assembled steel piping lane cabin and the connection structure of sandwich wall, including is separately fixed at two adjacent The first prefabricated panel embedded bar 1 and the second prefabricated panel embedded bar 2 on the bottom plate of steel pipe corridor cabin, the first prefabricated bottom Two ends of plate embedded bar 1 and the second prefabricated panel embedded bar 2 are U-shaped, as shown in Figure 3;First prefabricated panel is pre- It buries reinforcing bar 1 and adjacent two ends of the second prefabricated panel embedded bar 2 mutually overlaps and form cyclic structure, overlap formed ring It is also banded with being vertically arranged at shape structure and protrudes into the steel hoop 3 between two adjacent steel pipe corridors cabin at sandwich wall, it is described It overlaps and is banded with several and all vertical horizontally disposed of the two at formed cyclic structure and the intersecting lower of steel hoop 3 Bottom plate longitudinal reinforcement 4, the first prefabricated panel embedded bar 1, the second prefabricated panel embedded bar 2, the ring steel at bottom plate Muscle 3 and bottom plate longitudinal reinforcement 4 are connected as one by cast-in-place concrete 5 between bottom plate;It is described to stretch to two adjacent steel pipe corridors The top of steel hoop 3 between cabin at sandwich wall is also banded with several horizontally disposed sandwich wall longitudinal reinforcements 7, bottom plate and sandwich wall Steel hoop 3, sandwich wall longitudinal reinforcement 7 and sandwich wall cast-in-place concrete 6 by extending into sandwich wall are connected as one.
Further as illustrated in fig. 1 and 2, the bottom plate longitudinal reinforcement 4 is provided with four, and sandwich wall longitudinal reinforcement 7 is provided with Two.
It is connected by increasing bottom plate longitudinal reinforcement 4 with sandwich wall longitudinal reinforcement 7 with adjacent segment piping lane, enhances the entirety of piping lane Compatible deformation ability.
Further, as illustrated in fig. 1 and 2, the steel hoop 3 is rectangle.First node passes through steel hoop 3 between bottom plate The shearing resistance and bending resistance for improving tie point between piping lane cabin are attached with sandwich wall cast-in-place concrete.
It is connected by bottom plate longitudinal reinforcement 4 with sandwich wall longitudinal reinforcement 7 between adjacent piping lane segment.
Connection structure of the invention obtain Specific construction process the following steps are included:
Step 1: hoisting prefabricated corrugated steel piping lane bottom plate is to design position;
Step 2: the first prefabricated panel embedded bar 1 of binding and the second prefabricated panel embedded bar 2;
Step 3: installation binding extend into the steel hoop 3 of sandwich wall;
Step 4: installation binding bottom plate longitudinal reinforcement 4 and sandwich wall longitudinal reinforcement 7;
Step 5: installation piping lane corrugated steel mid-board;
Step 6: pouring cast-in-place concrete 5 and sandwich wall cast-in-place concrete 6 between bottom plate.

Claims (3)

1. between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall, which is characterized in that including fixing respectively The first prefabricated panel embedded bar (1) and the second prefabricated panel embedded bar on the bottom plate of two adjacent steel pipe corridors cabin (2), two ends of the first prefabricated panel embedded bar (1) and the second prefabricated panel embedded bar (2) are U-shaped, the It is cyclic annular that one prefabricated panel embedded bar (1) and adjacent two ends of the second prefabricated panel embedded bar (2) mutually overlap formation Structure overlaps and is also banded with being vertically arranged at formed cyclic structure and protrudes between two adjacent steel pipe corridors cabin at sandwich wall Steel hoop (3), be banded with several and two at the intersecting lower of the formed cyclic structure of the overlap joint and steel hoop (3) The all vertical horizontally disposed bottom plate longitudinal reinforcement (4) of person, the first prefabricated panel embedded bar (1), the second prefabricated panel are pre-buried Cast-in-place concrete (5) is connected as between reinforcing bar (2), the steel hoop (3) at bottom plate and bottom plate longitudinal reinforcement (4) pass through bottom plate One;The top for stretching to the steel hoop (3) between two adjacent steel pipe corridors cabin at sandwich wall is also banded with several Horizontally disposed sandwich wall longitudinal reinforcement (7), bottom plate and sandwich wall are by extending into steel hoop (3), the sandwich wall longitudinal reinforcement of sandwich wall (7) and sandwich wall cast-in-place concrete (6) is connected as one.
2. special between a kind of bottom plate for assembled steel piping lane cabin according to claim 1 and the connection structure of sandwich wall Sign is that the bottom plate longitudinal reinforcement (4) is provided with four, and sandwich wall longitudinal reinforcement (7) is provided with two.
3. between a kind of bottom plate for assembled steel piping lane cabin according to claim 1 or 2 and the connection structure of sandwich wall, It is characterized in that the steel hoop (3) are rectangle.
CN201811589182.5A 2018-12-25 2018-12-25 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall Pending CN109555156A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811589182.5A CN109555156A (en) 2018-12-25 2018-12-25 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811589182.5A CN109555156A (en) 2018-12-25 2018-12-25 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall

Publications (1)

Publication Number Publication Date
CN109555156A true CN109555156A (en) 2019-04-02

Family

ID=65871084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811589182.5A Pending CN109555156A (en) 2018-12-25 2018-12-25 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall

Country Status (1)

Country Link
CN (1) CN109555156A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351754A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery bottom T-shaped joint and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019475A (en) * 2015-08-06 2015-11-04 黑龙江宇辉新型建筑材料有限公司 Prefabricated integral concrete comprehensive pipe rack and construction method
CN106836280A (en) * 2017-02-08 2017-06-13 大连三川建筑科技有限公司 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN108277826A (en) * 2018-02-09 2018-07-13 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling flat underground pipe gallery in the more cabins of cabin formula
CN108951869A (en) * 2018-07-26 2018-12-07 陕西建筑产业投资集团有限公司 A kind of full assembly concrete shear wall structure system of low layer
CN209669925U (en) * 2018-12-25 2019-11-22 中铁十七局集团有限公司 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019475A (en) * 2015-08-06 2015-11-04 黑龙江宇辉新型建筑材料有限公司 Prefabricated integral concrete comprehensive pipe rack and construction method
CN106836280A (en) * 2017-02-08 2017-06-13 大连三川建筑科技有限公司 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN108277826A (en) * 2018-02-09 2018-07-13 南京联众建设工程技术有限公司 Single cabin piping lane and the spelling flat underground pipe gallery in the more cabins of cabin formula
CN108951869A (en) * 2018-07-26 2018-12-07 陕西建筑产业投资集团有限公司 A kind of full assembly concrete shear wall structure system of low layer
CN209669925U (en) * 2018-12-25 2019-11-22 中铁十七局集团有限公司 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351754A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery bottom T-shaped joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN106869315B (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN106088327B (en) The production method of assembling frame column based on 3D printing
CN107893477A (en) Overlap wall and horizontal member connecting node and its construction method
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN208363404U (en) A kind of prefabricated panel and its connection structure
CN105507470B (en) A kind of periphery overlapping overall assembled floor and its construction method
CN109680841A (en) Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method
CN108360678A (en) A kind of assembled beam-column node tenon connection structure
CN208363271U (en) A kind of basement steel pipe congruent band of column girder connection using reverse construction
CN108179806A (en) A kind of complete assembled steel reinforced concrete frame structure system
CN209669925U (en) Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall
CN108775085A (en) The assembled integral concrete frame structure and its construction method of beam-ends connection
CN106436975A (en) Built-in girder shear wall
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN207032601U (en) A kind of two-way close spelling laminated floor slab connecting joint structure
CN109555156A (en) Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall
CN102392417B (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN107893478A (en) Overlap wall and horizontal member connecting node and its construction method
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN204804129U (en) Prefabricated concrete floor entirely for building
CN206693470U (en) A kind of cast-in-place secondary beam T-shaped floor
CN206655359U (en) A kind of precast concrete overlapped shear wall
CN107142830B (en) Steel pipe web prestress steel-concrete combined girder structure and construction method
CN110359488A (en) A kind of fender member of assembled underground structure and its connecting structure with arch sheet
CN206267358U (en) A kind of built-in girder steel shear wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination