CN106836280A - A kind of assembled integral pipe gallery, escape canal or Great Gulch canal - Google Patents

A kind of assembled integral pipe gallery, escape canal or Great Gulch canal Download PDF

Info

Publication number
CN106836280A
CN106836280A CN201710068376.XA CN201710068376A CN106836280A CN 106836280 A CN106836280 A CN 106836280A CN 201710068376 A CN201710068376 A CN 201710068376A CN 106836280 A CN106836280 A CN 106836280A
Authority
CN
China
Prior art keywords
overlapping
layer
base plate
canal
side fascia
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710068376.XA
Other languages
Chinese (zh)
Inventor
孙伟丰
肖铁威
梁伟
孙辉
高义民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Sanchuan Building Technology Co Ltd
Original Assignee
Dalian Sanchuan Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Sanchuan Building Technology Co Ltd filed Critical Dalian Sanchuan Building Technology Co Ltd
Priority to CN201710068376.XA priority Critical patent/CN106836280A/en
Publication of CN106836280A publication Critical patent/CN106836280A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to precast concrete municipal administration technical field of structures.Propose assembled integral pipe gallery, escape canal or Great Gulch canal, including overlapping top board, overlapping base plate or cast-in-place base plate and overlapping Side fascia, overlapping top board includes top board preformed layer and top board in-situ layer, overlapping base plate includes base plate preformed layer and base plate in-situ layer, cast-in-place base plate includes base plate in-situ layer, and overlapping Side fascia includes Side fascia preformed layer and Side fascia in-situ layer;Overlapping base plate or cast-in-place base plate are arranged on blinding layer or waterproof layer(Or fish tail and waterproof layer)On, in the pre-erection configuration reinforcement of all superposed members, after pre-erection Assembling, necessary stress and distributing bar are set up, cast concrete turns into assembled integral pipe gallery, escape canal or Great Gulch canal.The present invention can give full play to the advantage of cast-in-site and prefabrication, reduce situ wet operation, shorten the duration, improve construction quality, it is ensured that the globality of pipe gallery, escape canal or Great Gulch canal, water resistance is good.

Description

A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
Technical field
The present invention relates to precast concrete municipal administration technical field of structures, and in particular to a kind of assembled integral pipe gallery, Escape canal or Great Gulch canal.
Background technology
The construction of country's pipe gallery, escape canal or Great Gulch canal at present mainly has two methods:One kind is cast-in-site Pipe gallery, escape canal or Great Gulch canal, another is the prefabricated pipe gallery of total cross-section, escape canal or Great Gulch Canal.Whole work of cast-in-site pipe gallery, escape canal or Great Gulch canal are all completed at the scene, and wet trade is more, dirty to environment Dye is serious, and the construction period is long, difficulty of vibrating is big, quality control on construction is difficult, artificial demand big, template high cost;Total cross-section is pre- Pipe gallery processed, escape canal or Great Gulch canal by plant produced, on-site consolidation, prefabricated components sectional dimension is big, component weight, causes Cannot be produced using production line, plant produced efficiency is low, by transporting, lifting condition is influenceed greatly, to cause prefabricated section of short, prefabricated components Piece is more, and edge joint position water-proofing treatment is difficult.
The content of the invention
In order to solve the deficiency existing for both the above pipe gallery, escape canal or Great Gulch canal method of construction, the present invention A kind of assembled integral pipe gallery, escape canal or Great Gulch canal are proposed, cast-in-site and prefabrication can be given full play to Advantage, reduces situ wet operation, shortens the duration, improves construction quality, it is ensured that pipe gallery, escape canal or Great Gulch canal Globality, water resistance is good, improves plant produced efficiency, and by transporting, lifting condition is influenceed small, reduces construction cost.
The present invention solves the technical scheme that is used of above-mentioned technical problem:Propose a kind of assembled integral integrated pipe Corridor, escape canal or Great Gulch canal, including overlapping top board, overlapping base plate or cast-in-place base plate and overlapping Side fascia, overlapping top board include Top board preformed layer and top board in-situ layer, overlapping base plate include base plate preformed layer and base plate in-situ layer, and cast-in-place base plate is existing including base plate Layer is poured, overlapping Side fascia includes Side fascia preformed layer and Side fascia in-situ layer;
The Side fascia preformed layer is made up of inside and outside two-layer prefabricated board and girder rib, and the upper and lower string of girder rib is embedded in two in advance respectively Layer prefabricated board is interior and replaces the vertical reinforcement of corresponding site, and the bottom of inside and outside two-layer prefabricated board flushes, in inside and outside two-layer prefabricated board Vertical reinforcement stretched out by prefabricated board lower end and bend and be mutually lapped into hollow muscle, and hollow muscle is internally provided with longitudinal steel Muscle, hollow muscle is anchored in base plate in-situ layer, and outer preform plate upper end level is less than internal layer prefabricated board upper end level, inside and outside layer Vertical reinforcement in prefabricated board is stretched out and bends inwards by prefabricated board upper end, and bending part is anchored in top board in-situ layer;
The top board preformed layer includes top board prefabricated board, girder rib, and girder rib lower edge is embedded in top board prefabricated board in advance, and top board is prefabricated The outer preform plate upper end of Side fascia is extended outside the reinforcing bar stretched out in plate and is anchored in Side fascia in-situ layer, top board epithelium reinforcing bar Live colligation, is bent to downwards the outer preform plate upper end of Side fascia and is anchored in Side fascia in-situ layer;
The base plate preformed layer includes base plate prefabricated board, girder rib, and girder rib lower edge is embedded in base plate prefabricated board in advance, and base plate is prefabricated The reinforcing bar stretched out in plate is folded upward to the outer preform plate lower end of Side fascia and is anchored in Side fascia in-situ layer, base plate epithelium Reinforcing bar scene colligation, extends the outer preform plate lower end of Side fascia and is anchored in Side fascia in-situ layer.
Described assembled integral pipe gallery, escape canal or Great Gulch canal, also including being arranged on overlapping top board with overlapping One or more layers overlapping lining between base plate, the overlapping lining includes lining preformed layer and lining in-situ layer, Lining preformed layer is made up of inside and outside two-layer prefabricated board and girder rib, and the upper and lower string of girder rib is embedded in two-layer prefabricated board in advance respectively Vertical reinforcement that is interior and replacing corresponding site, the vertical reinforcement stretched out from inside and outside two-layer prefabricated board lower end bends and is mutually lapped Hollow muscle be anchored in base plate in-situ layer, the vertical reinforcement bending stretched out from inside and outside two-layer prefabricated board upper end and mutually The hollow muscle of overlap joint is anchored in top board in-situ layer, and longitudinal reinforcement is provided with inside hollow muscle.
Bridging is provided with reinforcing bar in the lining in-situ layer of the stitching portion between the overlapping lining and overlapping lining Cage.
Bridging is provided with reinforcing bar in the Side fascia in-situ layer of the stitching portion between the overlapping Side fascia and overlapping Side fascia Cage.
The overlapping top board is provided with additional bar, additional bar with bridging in the top board in-situ layer of overlapping top board stitching portion Positioned at top board prefabricated board top, the elongated setting of epithelium reinforcing bar of two overlapping top boards;Overlapping base plate and the bottom for overlapping base plate stitching portion Bridging is provided with additional bar in plate in-situ layer, and additional bar is located at base plate prefabricated board top, the epithelium reinforcing bar of two overlapping base plates Elongated setting.
Multiple tracks expansion joint is arranged at intervals with along the pipe gallery, escape canal or Great Gulch canal length direction, in expansion joint Waterstop is provided with, expansion joint both sides overlap Side fascia, overlapping base plate or overlapping top board and go out muscle using side, the reinforcing bar for stretching out In the cast-in-place region inner bending anchoring in expansion joint, the framework of steel reinforcement that steel bar stress or distributing bar are formed fixes waterstop, and pours The solidifying soil of note forms overall.
Multiple tracks expansion joint is arranged at intervals with along the pipe gallery, escape canal or Great Gulch canal length direction, in expansion joint Waterstop is provided with, expansion joint both sides are overlapped Side fascia, overlapping lining, overlapping base plate or overlapping top board and gone out using side Muscle, the reinforcing bar for stretching out is fixed in the cast-in-place region inner bending anchoring in expansion joint, the framework of steel reinforcement that steel bar stress or distributing bar are formed Firmly waterstop, and pour into a mould concrete and form entirety.
It is of the invention compared with the method for construction of current domestic pipe gallery, escape canal or Great Gulch canal, advantage protrude, feature Distinctness, is embodied in:
1. whole work of cast-in-site pipe gallery, escape canal or Great Gulch canal are all completed at the scene, and wet trade is more, to environment It is seriously polluted;, using prefabricated board and cast-in-place concrete coordinative construction, situ wet operation is few, and environmental pollution is small for the present invention;
2. whole work of cast-in-site pipe gallery or draining Great Gulch canal are all completed at the scene, and the construction period is long, difficulty of vibrating Greatly, quality control on construction is difficult, the artificial demand in scene is big, template consumption is more, high cost;The present invention is poured using prefabricated board with scene Note concrete match ratio construction, can effectively shorten the construction period, and pre-erection vibrates conveniently in plant produced, it is possible to increase construction Quality, reduces scene manually and template consumption, reduces construction cost.
3. the prefabricated pipe gallery of total cross-section, escape canal or Great Gulch canal are by plant produced, on-site consolidation, prefabricated components section Size is big, component weight, leads to not be produced using production line, and plant produced efficiency is low, and the present invention is poured using prefabricated board with scene Note concrete match ratio construction, wherein pre-erection are all plate class member, and section is small, it is possible to use production line is produced, plant produced Efficiency high.
4. the prefabricated pipe gallery of total cross-section, escape canal or Great Gulch canal are by plant produced, on-site consolidation, prefabricated components section Size is big, component weight, by transporting, lifting condition influenceed greatly, cause prefabricated section short, prefabricated components piece it is many, at edge joint position waterproof Reason is difficult, and prefabricated components section of the present invention is small, and component is light, and by transporting, lifting condition is influenceed small, and prefabricated section can suitably lengthen, and reduce Prefabricated components piece, and then reduce edge joint position water-proofing treatment difficulty.
The present invention can give full play to the advantage of cast-in-site and prefabrication, reduce situ wet operation, shorten the duration, Improve construction quality, it is ensured that the globality of pipe gallery, escape canal or Great Gulch canal, water resistance is good, improve plant produced Efficiency, by transporting, lifting condition is influenceed small, reduces cost, for the construction of domestic pipe gallery, escape canal or Great Gulch canal is provided Reliable technical support.
Brief description of the drawings
Fig. 1 is single cabin formula assembled integral pipe gallery, escape canal or Great Gulch canal structure section schematic diagram;
Fig. 2 is double-cabin type assembled integral pipe gallery, escape canal or Great Gulch canal structure section schematic diagram;
Fig. 3 is three cabin formula assembled integral pipe galleries, escape canal or Great Gulch canal structure section schematic diagram;
Fig. 4 is overlapping Side fascia pre-erection schematic diagram;
Fig. 5 is overlapping lining pre-erection schematic diagram;
Fig. 6 is overlapping top board pre-erection schematic diagram;
Fig. 7 is overlapping base plate pre-erection schematic diagram;
Fig. 8 is overlapping Side fascia and overlapping top board connecting node organigram;
Fig. 9 is overlapping Side fascia and overlapping base plate or cast-in-place base plate connecting node organigram;
Figure 10 is overlapping lining and overlapping top board connecting node organigram;
Figure 11 is overlapping lining and overlapping base plate or cast-in-place base plate connecting node organigram;
Figure 12 is overlapping lining or overlapping Side fascia piece joint structure schematic diagram;
Figure 13 is overlapping top board or overlapping base plate piece joint structure schematic diagram;
Figure 14 is overlapping lining or overlapping Side fascia expansion joint joint structure schematic diagram;
Figure 15 is overlapping top board or overlapping base plate expansion joint joint structure schematic diagram.
Specific embodiment
The present invention is described in detail below in conjunction with the accompanying drawings.
Embodiment 1:
Single cabin formula assembled integral pipe gallery as shown in Figure 1, escape canal or Great Gulch canal, including overlapping Side fascia 1, overlapping Top board 3, overlapping base plate 4 or cast-in-place base plate, overlapping top board 3 include top board preformed layer and top board in-situ layer, and overlapping base plate 4 includes bottom Plate preformed layer and base plate in-situ layer, cast-in-place base plate include base plate in-situ layer, and overlapping Side fascia 1 includes Side fascia preformed layer and exterior wall Plate in-situ layer.Overlapping base plate 4 or cast-in-place base plate are arranged on blinding layer or waterproof layer(Or fish tail and waterproof layer)On, in all overlappings Component(Overlapping base plate, overlapping top board and overlapping Side fascia)Pre-erection configuration reinforcement, after pre-erection Assembling, set up Necessary stress and distributing bar, cast concrete turn into assembled integral pipe gallery, escape canal or Great Gulch canal.
As shown in Fig. 4,8,9, Side fascia preformed layer is made up of internal layer prefabricated board 6, outer preform plate 5 and girder rib 7, truss The upper and lower string of muscle 7 is embedded in two-layer prefabricated board and replaces the vertical reinforcement of corresponding site, the bottom of inside and outside two-layer prefabricated board in advance respectively End flushes, and the vertical reinforcement in inside and outside two-layer prefabricated board stretches out to bend and be mutually lapped by prefabricated board lower end and forms hollow muscle, And hollow muscle is internally provided with longitudinal reinforcement 14, hollow muscle is anchored in base plate in-situ layer, outer preform plate upper end level is short In internal layer prefabricated board upper end level, the short bending anchorage length that overlapping top board epithelium reinforcing bar should be met in part, inside and outside layer is prefabricated Vertical reinforcement in plate is stretched out and bends inwards by prefabricated board upper end, and bending part is anchored in top board in-situ layer;
Top board preformed layer as shown in Figure 6 includes top board prefabricated board 11, girder rib 7, and the lower edge of girder rib 7 is embedded in top board prefabricated board in advance It is interior.As shown in figure 8, extending the upper end of outer preform plate 5 of Side fascia outside the reinforcing bar stretched out in top board prefabricated board and being anchored in exterior wall In plate in-situ layer, the scene colligation of top board epithelium reinforcing bar is bent to downwards the upper end of outer preform plate 5 of Side fascia and is anchored in exterior wall In plate in-situ layer;
As shown in fig. 7, base plate preformed layer includes base plate prefabricated board 13, girder rib 7, the lower edge of girder rib 7 is embedded in base plate prefabricated board in advance In 13.As shown in figure 9, the reinforcing bar stretched out in base plate prefabricated board 13 is folded upward to the lower end of outer preform plate 5 of Side fascia and anchor It is fixed in Side fascia in-situ layer, the scene colligation of base plate epithelium reinforcing bar, extends the lower end of outer preform plate 5 of Side fascia and be anchored in outer In wallboard in-situ layer.
As shown in figure 12, overlapping Side fascia connecting method places steel using at the pre-erection scene of adjacent overlapping Side fascia Muscle cage 15, then pours concrete and forms entirety.
As shown in figure 13, overlapping top board connecting method sets additional bar using the pre-erection in adjacent overlapping top board 16, additional bar 16 is located at top board prefabricated board top, meanwhile, the epithelium reinforcing bar of two overlapping top boards is interconnected, and is then poured into a mould mixed Solidifying soil forms overall;Overlapping base plate connecting method uses similar approach.
As shown in Figure 14,15, set at a certain distance together along pipe gallery, escape canal or Great Gulch canal length direction Expansion joint, expansion joint both sides overlap Side fascia, overlapping base plate or overlapping top board and go out muscle using side, and in the cast-in-place area in expansion joint Domain inner bending anchoring, necessary steel bar stress is placed at scene or distributing bar forms it into framework of steel reinforcement and fixes waterstop 17, Then pour into a mould solidifying soil and form overall.Waterstop is around assembled integral pipe gallery, escape canal or Great Gulch canal width shape Into closed-loop, sealing effect is played.
Embodiment 2:
The present embodiment is double-cabin type or three cabin formula assembled integral pipe galleries, escape canal or Great Gulch canal, Fig. 2,3 is seen, with reality It is that increased overlapping lining 2 to apply the structure difference of example 1, and as shown in Fig. 5,10,11, overlapping lining 2 includes lining Preformed layer and lining in-situ layer, lining preformed layer is by lining outer preform plate 8, interior wall inner cord prefabricated board 9 and truss Muscle 7 is constituted, and the upper and lower string of girder rib 7 is embedded in two-layer prefabricated board and instead of the vertical reinforcement of corresponding site in advance respectively, from it is interior, The hollow muscle that the vertical reinforcement that outer two-layer prefabricated board lower end is stretched out bends and is mutually lapped is anchored in base plate in-situ layer, from The anchoring of hollow muscle and top board in-situ layer that the vertical reinforcement that inside and outside two-layer prefabricated board upper end is stretched out bends and is mutually lapped It is interior, it is respectively provided with by longitudinal reinforcement inside hollow muscle.
As shown in Figure 14,15, set at a certain distance together along pipe gallery, escape canal or Great Gulch canal length direction Expansion joint, expansion joint both sides overlappings Side fascia, overlapping lining, overlapping base plate or overlapping top board go out muscle using side, and The cast-in-place region inner bending anchoring in expansion joint, necessary steel bar stress is placed at scene or distributing bar forms it into framework of steel reinforcement and fixes Firmly waterstop 17, then pour into a mould concrete and form entirety.Waterstop is around assembled integral pipe gallery, escape canal or Great Gulch Canal width forms closed-loop, plays sealing effect.

Claims (7)

1. a kind of assembled integral pipe gallery, escape canal or Great Gulch canal, it is characterised in that:Including overlapping top board, overlapping bottom Plate or cast-in-place base plate and overlapping Side fascia, overlapping top board include top board preformed layer and top board in-situ layer, and overlapping base plate includes base plate Preformed layer and base plate in-situ layer, cast-in-place base plate include base plate in-situ layer, and overlapping Side fascia includes Side fascia preformed layer and Side fascia In-situ layer;
The Side fascia preformed layer is made up of inside and outside two-layer prefabricated board and girder rib, and the upper and lower string of girder rib is embedded in two in advance respectively Layer prefabricated board is interior and replaces the vertical reinforcement of corresponding site, and the bottom of inside and outside two-layer prefabricated board flushes, in inside and outside two-layer prefabricated board Vertical reinforcement stretched out by prefabricated board lower end and bend and be mutually lapped into hollow muscle, and hollow muscle is internally provided with longitudinal steel Muscle, hollow muscle is anchored in base plate in-situ layer, and outer preform plate upper end level is less than internal layer prefabricated board upper end level, inside and outside layer Vertical reinforcement in prefabricated board is stretched out and bends inwards by prefabricated board upper end, and bending part is anchored in top board in-situ layer;
The top board preformed layer includes top board prefabricated board, girder rib, and girder rib lower edge is embedded in top board prefabricated board in advance, and top board is prefabricated The outer preform plate upper end of Side fascia is extended outside the reinforcing bar stretched out in plate and is anchored in Side fascia in-situ layer, top board epithelium reinforcing bar Live colligation, is bent to downwards the outer preform plate upper end of Side fascia and is anchored in Side fascia in-situ layer;
The base plate preformed layer includes base plate prefabricated board, girder rib, and girder rib lower edge is embedded in base plate prefabricated board in advance, and base plate is prefabricated The reinforcing bar stretched out in plate is folded upward to the outer preform plate lower end of Side fascia and is anchored in Side fascia in-situ layer, base plate epithelium Reinforcing bar scene colligation, extends the outer preform plate lower end of Side fascia and is anchored in Side fascia in-situ layer.
2. assembled integral pipe gallery according to claim 1, escape canal or Great Gulch canal, it is characterised in that:Also wrap One or more layers overlapping lining being arranged between overlapping top board and overlapping base plate is included, the overlapping lining includes lining Preformed layer and lining in-situ layer, lining preformed layer are made up of inside and outside two-layer prefabricated board and girder rib, girder rib it is upper and lower String is embedded in two-layer prefabricated board and replaces the vertical reinforcement of corresponding site in advance respectively, is stretched out from inside and outside two-layer prefabricated board lower end The hollow muscle that vertical reinforcement bends and is mutually lapped is anchored in base plate in-situ layer, is stretched from inside and outside two-layer prefabricated board upper end The hollow muscle that the vertical reinforcement for going out bends and is mutually lapped is anchored in top board in-situ layer, is provided with inside hollow muscle vertical To reinforcing bar.
3. assembled integral pipe gallery according to claim 2, escape canal or Great Gulch canal, it is characterised in that:It is described Bridging is provided with steel reinforcement cage in the lining in-situ layer of the stitching portion between overlapping lining and overlapping lining.
4., according to any described assembled integral pipe galleries of claim 1-3, escape canal or Great Gulch canal, its feature exists In:Bridging is provided with steel reinforcement cage in the Side fascia in-situ layer of the stitching portion between the overlapping Side fascia and overlapping Side fascia.
5., according to any described assembled integral pipe galleries of claim 1-3, escape canal or Great Gulch canal, its feature exists In:The overlapping top board is provided with additional bar with bridging in the top board in-situ layer of overlapping top board stitching portion, and additional bar is located at Top board prefabricated board top, the elongated setting of epithelium reinforcing bar of two overlapping top boards;Overlapping base plate shows with the base plate of overlapping base plate stitching portion Pour bridging in layer and be provided with additional bar, additional bar is located at base plate prefabricated board top, and the epithelium reinforcing bar of two overlapping base plates is elongated Set.
6. assembled integral pipe gallery according to claim 1, escape canal or Great Gulch canal, it is characterised in that:Along institute State pipe gallery, escape canal or Great Gulch canal length direction and be arranged at intervals with multiple tracks expansion joint, waterstop is provided with expansion joint, Expansion joint both sides overlap Side fascia, overlapping base plate or overlapping top board and go out muscle using side, and the reinforcing bar for stretching out is cast-in-place at expansion joint Region inner bending anchoring, the framework of steel reinforcement that steel bar stress or distributing bar are formed fixes waterstop, and the solidifying soil of cast forms whole Body.
7. assembled integral pipe gallery according to Claims 2 or 3, escape canal or Great Gulch canal, it is characterised in that:Edge The pipe gallery, escape canal or Great Gulch canal length direction are arranged at intervals with multiple tracks expansion joint, and sealing is provided with expansion joint Band, expansion joint both sides overlap Side fascia, overlapping lining, overlapping base plate or overlapping top board and go out muscle using side, the steel for stretching out Muscle fixes waterstop in the cast-in-place region inner bending anchoring in expansion joint, the framework of steel reinforcement that steel bar stress or distributing bar are formed, and Cast concrete forms entirety.
CN201710068376.XA 2017-02-08 2017-02-08 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal Pending CN106836280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710068376.XA CN106836280A (en) 2017-02-08 2017-02-08 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710068376.XA CN106836280A (en) 2017-02-08 2017-02-08 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal

Publications (1)

Publication Number Publication Date
CN106836280A true CN106836280A (en) 2017-06-13

Family

ID=59122292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710068376.XA Pending CN106836280A (en) 2017-02-08 2017-02-08 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal

Country Status (1)

Country Link
CN (1) CN106836280A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761762A (en) * 2017-10-13 2018-03-06 中冶天工集团天津有限公司 A kind of buried movement joint of cast-in-place pipe gallery and its casting method
CN108049318A (en) * 2018-02-02 2018-05-18 湖北宇辉中工建筑产业化有限公司 Composite entity assembling overlapping box culvert and construction method
CN108547335A (en) * 2018-06-27 2018-09-18 吉林建筑大学 A kind of assembly superposed type pipe gallery test model and preparation method thereof
CN108625399A (en) * 2018-07-26 2018-10-09 河南城建学院 A kind of city integrated piping lane roof steel bar truss construction method
CN108625398A (en) * 2018-07-26 2018-10-09 河南城建学院 A kind of city integrated piping lane top plate overlapping construction method
CN108797638A (en) * 2018-06-01 2018-11-13 中国建筑股份有限公司 Integrated assembled piping lane based on composite bottom board and its construction method
CN109555156A (en) * 2018-12-25 2019-04-02 中铁十七局集团有限公司 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall
CN111733884A (en) * 2020-07-24 2020-10-02 张延年 Large-span overlapping assembly integral comprehensive pipe gallery
CN111794341A (en) * 2020-08-06 2020-10-20 国投信开水环境投资有限公司 Channel for sewage treatment plant and construction method
CN115182385A (en) * 2022-08-03 2022-10-14 上海市城市建设设计研究总院(集团)有限公司 Prefabricated assembly structure of integral open-cut tunnel and assembly construction method thereof
CN115262434A (en) * 2022-09-27 2022-11-01 山西建投建筑产业有限公司 Assembled integral four-cabin flood discharge box culvert haunching structure and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265484A (en) * 1999-03-19 2000-09-26 Penta Ocean Constr Co Ltd CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN105937269A (en) * 2016-06-03 2016-09-14 长沙远大住宅工业集团股份有限公司 Novel prefabricated building connecting joint
CN105937280A (en) * 2016-06-03 2016-09-14 长沙远大住宅工业集团股份有限公司 Novel prefabricated building connecting joint
CN106245675A (en) * 2016-09-22 2016-12-21 中铁四局集团建筑工程有限公司 A kind of novel assembled piping lane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265484A (en) * 1999-03-19 2000-09-26 Penta Ocean Constr Co Ltd CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN105937269A (en) * 2016-06-03 2016-09-14 长沙远大住宅工业集团股份有限公司 Novel prefabricated building connecting joint
CN105937280A (en) * 2016-06-03 2016-09-14 长沙远大住宅工业集团股份有限公司 Novel prefabricated building connecting joint
CN106245675A (en) * 2016-09-22 2016-12-21 中铁四局集团建筑工程有限公司 A kind of novel assembled piping lane

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107761762A (en) * 2017-10-13 2018-03-06 中冶天工集团天津有限公司 A kind of buried movement joint of cast-in-place pipe gallery and its casting method
CN108049318A (en) * 2018-02-02 2018-05-18 湖北宇辉中工建筑产业化有限公司 Composite entity assembling overlapping box culvert and construction method
CN108797638A (en) * 2018-06-01 2018-11-13 中国建筑股份有限公司 Integrated assembled piping lane based on composite bottom board and its construction method
CN108547335A (en) * 2018-06-27 2018-09-18 吉林建筑大学 A kind of assembly superposed type pipe gallery test model and preparation method thereof
CN108625399A (en) * 2018-07-26 2018-10-09 河南城建学院 A kind of city integrated piping lane roof steel bar truss construction method
CN108625398A (en) * 2018-07-26 2018-10-09 河南城建学院 A kind of city integrated piping lane top plate overlapping construction method
CN109555156A (en) * 2018-12-25 2019-04-02 中铁十七局集团有限公司 Between a kind of bottom plate for assembled steel piping lane cabin and the connection structure of sandwich wall
CN111733884A (en) * 2020-07-24 2020-10-02 张延年 Large-span overlapping assembly integral comprehensive pipe gallery
CN111794341A (en) * 2020-08-06 2020-10-20 国投信开水环境投资有限公司 Channel for sewage treatment plant and construction method
CN115182385A (en) * 2022-08-03 2022-10-14 上海市城市建设设计研究总院(集团)有限公司 Prefabricated assembly structure of integral open-cut tunnel and assembly construction method thereof
CN115262434A (en) * 2022-09-27 2022-11-01 山西建投建筑产业有限公司 Assembled integral four-cabin flood discharge box culvert haunching structure and construction method

Similar Documents

Publication Publication Date Title
CN106836280A (en) A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN106638671A (en) High and low bin assembling integrated utility tunnel or draining canal
CN103114669B (en) Ribbed steel bar truss concrete superimposed sheet and construction method thereof
CN206070562U (en) Subassembly formula underground structure
CN104594523A (en) Prestress splicing method for fabricated shear wall
CN106223183B (en) Assembled concrete-filled rectangular steel tube combines truss bridge and construction method
CN108678279A (en) Based on the built-in assembled architecture and its construction method for leading to high bellows prefabricated panel
CN204311614U (en) The fabricated shear wall of prestressing force splicing
CN106245817A (en) A kind of fabricated shear wall vertical connection structure and installation method thereof
AU2019101278A4 (en) Prefabricated high-strength concrete combined pier structure and construction method thereof
CN206090275U (en) Assembled rectangular concrete -filled steel tube makes up truss bridge
CN110512727A (en) A kind of pre-buried insulation board post stretching anchorage node construction of assembled architecture lotus rhizome beam and its construction method
CN107152104A (en) Assembled cavity shear wall horizontal joint teeth groove rotating vane type attachment structure
CN107859059A (en) Prefabricated sandwich side wall and prefabricated overlapping bottom plate connecting joint structure and its construction method
CN206635804U (en) A kind of height cabin assembled integral pipe gallery or escape canal
CN108240045A (en) A kind of compound late poured band structure of outer wall precast slab and its construction method
CN206844149U (en) A kind of connecting node of prefabricated assembled pipe gallery
CN106639101A (en) Assembled type cavity composite floor slab construction method
CN209011157U (en) A kind of superposed type exempts from demoulding assembled integral pipe gallery
CN100516404C (en) Reinforcing-bar concrete building roof with tree-dimensional bearing structure
CN101230659A (en) Force-bearing type underplate component
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN110130934A (en) The construction method of city tunnel bifurcation mouth with box top board structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613