CN209011157U CN201821577036.6U CN201821577036U CN209011157U CN 209011157 U CN209011157 U CN 209011157U CN 201821577036 U CN201821577036 U CN 201821577036U CN 209011157 U CN209011157 U CN 209011157U
Authority
CN
China
Prior art keywords
overlapping
bottom plate
layer
side fascia
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821577036.6U
Other languages
Chinese (zh)
Inventor
孙伟丰
肖铁威
孙辉
范庆军
王琇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Original Assignee
DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd filed Critical DALIAN SANCHUAN CONSTRUCTION GROUP Co Ltd
Priority to CN201821577036.6U priority Critical patent/CN209011157U/en
Application granted granted Critical
Publication of CN209011157U publication Critical patent/CN209011157U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to precast concrete municipal administration technical field of structures, it proposes a kind of superposed type and exempts from demoulding assembled integral pipe gallery, including overlapping top plate, overlapping bottom plate or cast-in-place bottom plate and overlapping Side fascia, overlapping top plate includes top plate preformed layer and top plate last layer, overlapping bottom plate includes bottom plate preformed layer and bottom plate last layer, and the overlapping Side fascia includes Side fascia preformed layer, fiber cement board pressure and Side fascia last layer;Side fascia preformed layer is made of single layer outer wall precast slab and girder rib, and the lower edge of the girder rib is embedded in the vertical reinforcement in outer wall precast slab and replacing corresponding site in advance, and fiber cement board pressure in-site installation winds up in girder rib.The utility model can give full play to the advantages of cast-in-site and prefabrication, and fiber cement board pressure greatly shortens the duration as the free removal of template later period, guarantee construction quality, structural integrity is equivalent cast-in-place, and waterproof performance is good, and the construction for domestic pipe gallery provides reliable technical support.

Description

A kind of superposed type exempts from demoulding assembled integral pipe gallery
Technical field
The utility model relates to precast concrete municipal administration technical field of structures, and in particular to a kind of superposed type exempts from demoulding assembly Monoblock type pipe gallery.
Background technique
There are mainly two types of methods for the construction of country's pipe gallery at present: one is pipe galleries made of cast-in-site, separately One is the prefabricated pipe galleries of total cross-section outside.Whole work of cast-in-site pipe gallery are all completed at the scene, and wet construction is more, Environmental pollution is serious, and the construction period is long, difficulty of vibrating is big, quality control on construction is difficult, artificial demand is big, template is at high cost; The prefabricated pipe gallery of total cross-section is by plant produced, on-site consolidation, and prefabricated components sectional dimension is big, component weight, lead to not using Production line production, plant produced low efficiency, by transport, lifting condition is influenced, lead to that precast section is short, prefabricated components piece is more, Edge joint position water-proofing treatment is difficult.The patent of the shortcomings that overcome two methods, Patent No. 201710068376.X disclose one The excellent of cast-in-site and prefabrication is utilized using the prefabricated and cast-in-place structure combined in kind of assembled integral pipe gallery Point, but what is used due to it is the double-deck prefabricated board, that there are construction costs is higher, later period free removal is time-consuming and be unfavorable for from The deficiencies of dynamic metaplasia producing line production.
Utility model content
In order to solve deficiency present in both the above pipe gallery method of construction, the utility model proposes a kind of superposed types The advantages of exempting from demoulding assembled integral pipe gallery, capable of giving full play to cast-in-site and prefabrication reduces situ wet work Industry shortens the construction period, and under the premise of guaranteeing comprehensive pipe gallery structure globality and safety, using single layer prefabricated board and exempts to tear plate open, It advantageously reduces construction cost, save working hour.
The utility model solves technical solution used by above-mentioned technical problem: it is whole that a kind of superposed type exempts from demoulding assembly Formula pipe gallery, including overlapping top plate, overlapping bottom plate or cast-in-place bottom plate and overlapping Side fascia, overlapping top plate includes top plate preformed layer And top plate last layer, overlapping bottom plate includes bottom plate preformed layer and bottom plate last layer, and the overlapping Side fascia includes that Side fascia is prefabricated Layer, fiber cement board pressure and Side fascia last layer;
The Side fascia preformed layer is made of single layer outer wall precast slab and girder rib, and the lower edge of the girder rib is embedded in outer in advance Wall prefabricated board is interior and replaces the vertical reinforcement of corresponding site, from the vertical reinforcement that outer wall precast slab lower end is stretched out into folded Side fascia Portion's bending, and be mutually lapped with the vertical reinforcement of outer wall precast slab opposite side setting into hollow muscle, and the inside setting of hollow muscle There is longitudinal reinforcement, the hollow muscle is anchored in bottom plate last layer or in cast-in-place bottom plate, is stretched out by outer wall precast slab upper end perpendicular To reinforcing bar to pipe gallery internal bend, and bending part is anchored in top plate last layer, the fiber cement board pressure scene It is installed on winding up for girder rib.
The girder rib of the Side fascia preformed layer, which winds up, is welded with band slotted hole steel plate, and the fiber cement board pressure scene is adopted It is installed on band slotted hole steel plate with screw.
It further includes setting between overlapping top plate and overlapping bottom plate that a kind of superposed type, which exempts from demoulding assembled integral pipe gallery, One or more layers overlapping lining, the overlapping lining includes that lining preformed layer and lining in-situ layer, lining are pre- Preparative layer is made of single layer interior wall prefabricated board and girder rib, and the lower edge of the girder rib is embedded in advance in interior wall prefabricated board, by described interior Vertical reinforcement is stretched out to lining internal bend in wall prefabricated board top and bottom, and the vertical steel with the setting of interior wall prefabricated board opposite side Muscle is mutually lapped into hollow muscle, and hollow muscle is internally provided with longitudinal reinforcement, and the hollow muscle upper and lower end is anchored in respectively In top plate last layer and bottom plate last layer, fiber cement board pressure in-site installation the winding up in girder rib.
The girder rib of the lining preformed layer, which winds up, is welded with band slotted hole steel plate, and the fiber cement board pressure scene is adopted It is installed on band slotted hole steel plate with screw.
The top plate preformed layer includes top plate prefabricated board, girder rib, and girder rib lower edge is embedded in top plate prefabricated board in advance and generation For the steel bar stress of corresponding site, overlapping Side fascia upper end is extended to by the reinforcing bar stretched out in top plate prefabricated board outside and is anchored in exterior wall In plate last layer.
The bottom plate preformed layer includes bottom plate prefabricated board, girder rib, and girder rib lower edge is embedded in bottom plate prefabricated board in advance and generation For the steel bar stress of corresponding site, the reinforcing bar stretched out in bottom plate prefabricated board extends to overlapping Side fascia lower end outside and is folded upward at anchoring In in Side fascia last layer.
The overlapping Side fascia and overlapping Side fascia, overlapping lining and overlapping lining, overlapping top plate and overlapping top plate And bridging is provided with additional bar in overlapping bottom plate and the last layer of overlapping bottom plate stitching portion, and fills out in preformed layer stitching portion Spillage when being plugged with foam rods to prevent casting concrete.
Compared with the method for construction of current domestic pipe gallery, advantage protrusion, distinct characteristics embody the utility model :
1. whole work of cast-in-site pipe gallery are all completed at the scene, wet construction is more, and environmental pollution is serious;This Utility model uses prefabricated board, fiber cement board pressure and cast-in-place concrete coordinative construction, and situ wet operation is few, to environment It pollutes small;
2. whole work of cast-in-site pipe gallery or draining Great Gulch canal are all completed at the scene, the artificial demand in scene Greatly, template consumption is more, at high cost, and template needs to remove after the completion of construction, and the construction period is long, and technique is cumbersome;The utility model is adopted With prefabricated board, fiber cement board pressure and cast-in-place concrete coordinative construction, guarantee construction quality, reduces scene manually, it is fine It ties up cement pressure plate and is used as the free removal of template later period, can effectively shorten the construction period, reduction construction cost.
3. the prefabricated pipe gallery of total cross-section is by plant produced, on-site consolidation, prefabricated components sectional dimension is big, component weight, leads Cause is not available automatic production line production, plant produced low efficiency, and the utility model uses prefabricated board, fiber cement board pressure With cast-in-place concrete coordinative construction, wherein pre-erection is single layer superimposed sheet, and automatic production line production, work can be used Factory's high production efficiency, for wallboard stitching portion fiber cement board pressure by in-site installation, the installation of rest part factory is easy for construction.
4. the prefabricated pipe gallery of total cross-section is by plant produced, on-site consolidation, prefabricated components sectional dimension is big, component weight, by Transport, lifting condition influence big, lead to that precast section is short, prefabricated components piece is more, edge joint position water-proofing treatment is difficult, and the utility model is pre- Member section processed is small, and component is light, by transport, lifting condition is influenced small, precast section can be lengthened suitably, while be scene inside wallboard It is poured concrete, structural integrity is equivalent cast-in-place, further increases the safety and waterproofness of structure.
The utility model can give full play to the advantages of cast-in-site and prefabrication, reduce situ wet operation, fiber Cement pressure plate greatly shortens the duration as the free removal of template later period, guarantees construction quality, and structural integrity is equivalent cast-in-place, prevents It is aqueous can be good, improve plant produced efficiency, by transport, lifting condition is influenced small, cost is reduced, for the construction of domestic pipe gallery Provide reliable technical support.
Detailed description of the invention
Fig. 1 is formula assembled integral pipe gallery, drainage ditch or Great Gulch canal structure section schematic diagram;
Fig. 2 is overlapping lining pre-erection structural schematic diagram;
Fig. 3 is overlapping Side fascia pre-erection structural schematic diagram;
Fig. 4 is band slotted hole steel plate schematic diagram;
Fig. 5 is overlapping top plate pre-erection schematic diagram;
Fig. 6 is overlapping bottom plate pre-erection schematic diagram;
Fig. 7 is overlapping Side fascia and overlapping top plate connecting node organigram;
Fig. 8 is overlapping Side fascia and overlapping bottom plate connecting node organigram;
Fig. 9 is overlapping lining and overlapping top plate connecting node organigram;
Figure 10 is overlapping lining and overlapping bottom plate connecting node organigram;
Figure 11 is overlapping lining, overlapping exterior wall splicing joint structure schematic diagram;
Figure 12 is that overlapping top plate or overlapping bottom plate splice joint structure schematic diagram.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing.
A kind of superposed type as shown in Figure 1 exempts from demoulding assembled integral pipe gallery, including overlapping top plate 3, overlapping bottom plate 4 Or cast-in-place bottom plate, overlapping Side fascia 1 and overlapping lining 2, overlapping top plate 3 include top plate preformed layer and top plate last layer, overlapping Bottom plate 4 includes bottom plate preformed layer and bottom plate last layer, and cast-in-place bottom plate includes bottom plate last layer, and overlapping Side fascia 1 includes Side fascia Preformed layer, fiber cement board pressure and Side fascia last layer;Overlapping lining 2 includes lining preformed layer, fibre cement pressure Plate and lining last layer;It overlaps bottom plate 4 or cast-in-place bottom plate is arranged on blinding layer or waterproof layer (or waterproof protective layer), The pre-erection configuration reinforcement of all superposed members (overlapping bottom plate, overlapping top plate, overlapping lining and overlapping Side fascia), overlapping Side fascia and the girder rib for overlapping lining, which wind up, is welded with band slotted hole steel plate, after each component on-site assembly, completes structure institute There is the binding of steel bar stress, adds necessary splicing structure reinforcing bar, and scene pacifies fiber cement board pressure 19 using screw Exempt from demoulding assembled integral pipe gallery loaded on concrete formation superposed type on band slotted hole steel plate 7, is finally poured.
As shown in Fig. 3,7,8,11, Side fascia preformed layer is overlapped by outer wall precast slab 5, girder rib 6 and with slotted hole steel plate 7 Composition, the lower edge of girder rib 6 is embedded in outer wall precast slab 5 in advance and the vertical reinforcement of replacement corresponding site, in outer wall precast slab 5 Vertical reinforcement is stretched out from 5 lower end of outer wall precast slab and to Side fascia internal bend, with Side fascia preformed layer opposite side vertical reinforcement It being mutually lapped into hollow muscle, and hollow muscle is internally provided with longitudinal reinforcement 18, hollow muscle is anchored in bottom plate last layer, by The vertical reinforcement that 5 upper end of outer wall precast slab is stretched out is to pipe gallery internal bend, and bending part is anchored in top plate last layer, The binding of exterior wall preformed layer opposite side reinforcing bar scene, the girder rib of Side fascia preformed layer, which winds up, is welded with band slotted hole steel plate 7, fibre cement 19 scene of pressure plare is installed on band slotted hole steel plate 7 using screw.
As shown in Fig. 2,9,10,11, lining preformed layer is overlapped by prefabricated board 8, girder rib 9 and with 7 groups of slotted hole steel plate At the lower edge of girder rib 9 is embedded in the vertical reinforcement in layer prefabricated board 8 and replacing corresponding site, the vertical reinforcement in prefabricated board 8 in advance From 8 upper end of prefabricated board, lower end stretch out and to lining internal bend, be mutually lapped with lining preformed layer opposite side vertical reinforcement Into hollow muscle, and hollow muscle is internally provided with longitudinal reinforcement 18, and hollow muscle is anchored in top plate and bottom plate last layer, wallboard The binding of preformed layer opposite side reinforcing bar scene, the girder rib of lining preformed layer, which winds up, is welded with band slotted hole steel plate 7, fibre cement pressure 19 scene of plate is installed on band slotted hole steel plate 7 using screw.
Shown in Fig. 5,7,9,12, overlapping top plate preformed layer includes top plate prefabricated board 10, girder rib 11, and 11 lower edge of girder rib is pre- It is embedded in top plate prefabricated board 10 and is replaced the steel bar stress of corresponding site, extends to exterior wall outside the reinforcing bar stretched out in top plate prefabricated board 10 Plate upper end is simultaneously anchored in Side fascia last layer, the binding of top plate epithelium reinforcing bar scene.
As shown in Fig. 6,8,10,12, overlapping bottom plate preformed layer includes bottom plate prefabricated board 12, girder rib 13, under girder rib 13 String is embedded in the steel bar stress in bottom plate prefabricated board 12 and replacing corresponding site in advance, extends to outside the reinforcing bar stretched out in bottom plate prefabricated board outer Wallboard lower end and being folded upward at is anchored in Side fascia last layer, the binding of bottom plate epithelium reinforcing bar scene.
As shown in figure 11, lining stitching position and overlapping exterior wall stitching position setting additional bar 14 and additional steel are overlapped Then muscle 15 pours concrete and forms entirety.
As shown in figure 12, top plate stitching position and overlapping bottom plate stitching position setting additional bar 16 and additional steel are overlapped Then muscle 17 pours concrete and forms entirety.

Claims (7)

1. a kind of superposed type exempts from demoulding assembled integral pipe gallery, including overlaps top plate, overlapping bottom plate or cast-in-place bottom plate and fold Side fascia is closed, overlapping top plate includes top plate preformed layer and top plate last layer, and overlapping bottom plate includes pouring after bottom plate preformed layer and bottom plate Layer, it is characterised in that: the overlapping Side fascia includes Side fascia preformed layer, fiber cement board pressure and Side fascia last layer;
The Side fascia preformed layer is made of single layer outer wall precast slab and girder rib, and it is pre- that the lower edge of the girder rib is embedded in exterior wall in advance Making sheet is interior and replaces the vertical reinforcement of corresponding site, curved from the vertical reinforcement that outer wall precast slab lower end is stretched out to folded Side fascia inside Folding, and being mutually lapped with the vertical reinforcement of outer wall precast slab opposite side setting into hollow muscle, and hollow muscle be internally provided with it is vertical To reinforcing bar, the hollow muscle is anchored in the vertical steel stretched out in bottom plate last layer or in cast-in-place bottom plate by outer wall precast slab upper end Muscle is to pipe gallery internal bend, and bending part is anchored in top plate last layer, the fiber cement board pressure in-site installation In winding up for girder rib.
2. a kind of superposed type according to claim 1 exempts from demoulding assembled integral pipe gallery, it is characterised in that: described outer The girder rib of wallboard preformed layer, which winds up, is welded with band slotted hole steel plate, and the fiber cement board pressure scene is installed on using screw On band slotted hole steel plate.
3. a kind of superposed type according to claim 1 exempts from demoulding assembled integral pipe gallery, it is characterised in that: further include Overlapping top plate is set and overlaps one or more layers overlapping lining between bottom plate, the overlapping lining includes that lining is pre- Preparative layer and lining in-situ layer, lining preformed layer are made of single layer interior wall prefabricated board and girder rib, the lower edge of the girder rib It is embedded in interior wall prefabricated board in advance, stretches out vertical reinforcement to lining internal bend from interior wall prefabricated board top and bottom, and It is mutually lapped into hollow muscle with the vertical reinforcement of interior wall prefabricated board opposite side setting, and hollow muscle is internally provided with longitudinal steel Muscle, the hollow muscle upper and lower end are anchored in respectively in top plate last layer and bottom plate last layer, the fiber cement board pressure scene It is installed on winding up for girder rib.
4. a kind of superposed type according to claim 3 exempts from demoulding assembled integral pipe gallery, it is characterised in that: in described The girder rib of wallboard preformed layer, which winds up, is welded with band slotted hole steel plate, and the fiber cement board pressure scene is installed on using screw On band slotted hole steel plate.
5. a kind of superposed type according to claim 1 to 4 exempts from demoulding assembled integral pipe gallery, it is characterised in that: The top plate preformed layer includes top plate prefabricated board, girder rib, and girder rib lower edge is embedded in top plate prefabricated board in advance and replaces corresponding portion The steel bar stress of position extends to overlapping Side fascia upper end by the reinforcing bar stretched out in top plate prefabricated board outside and is anchored in Side fascia last layer It is interior.
6. a kind of superposed type according to claim 1 to 4 exempts from demoulding assembled integral pipe gallery, it is characterised in that: The bottom plate preformed layer includes bottom plate prefabricated board, girder rib, and girder rib lower edge is embedded in bottom plate prefabricated board in advance and replaces corresponding portion The steel bar stress of position, the interior reinforcing bar stretched out of bottom plate prefabricated board, which extends to overlapping Side fascia lower end outside and is folded upward at, is anchored in Side fascia In last layer.
7. a kind of superposed type according to claim 1 to 4 exempts from demoulding assembled integral pipe gallery, it is characterised in that: The overlapping Side fascia and overlapping Side fascia, overlapping lining and overlapping lining, overlapping top plate and overlapping top plate and overlapping Bridging is provided with additional bar in bottom plate and the last layer of overlapping bottom plate stitching portion, and is packed with foam in preformed layer stitching portion Spillage when stick is to prevent casting concrete.
CN201821577036.6U 2018-09-27 2018-09-27 A kind of superposed type exempts from demoulding assembled integral pipe gallery Expired - Fee Related CN209011157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821577036.6U CN209011157U (en) 2018-09-27 2018-09-27 A kind of superposed type exempts from demoulding assembled integral pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821577036.6U CN209011157U (en) 2018-09-27 2018-09-27 A kind of superposed type exempts from demoulding assembled integral pipe gallery

Publications (1)

Publication Number Publication Date
CN209011157U true CN209011157U (en) 2019-06-21

Family

ID=66834378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821577036.6U Expired - Fee Related CN209011157U (en) 2018-09-27 2018-09-27 A kind of superposed type exempts from demoulding assembled integral pipe gallery

Country Status (1)

Country Link
CN (1) CN209011157U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173035A (en) * 2020-02-28 2020-05-19 无锡地铁集团有限公司 Fabricated underground station single-side prefabricated wall plate and vertical rotation installation method
CN111691459A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method of prefabricated superposed underground comprehensive pipe gallery

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173035A (en) * 2020-02-28 2020-05-19 无锡地铁集团有限公司 Fabricated underground station single-side prefabricated wall plate and vertical rotation installation method
CN111173035B (en) * 2020-02-28 2024-06-28 无锡地铁集团有限公司 Assembled single-side prefabricated wall plate for underground station and vertical rotation installation method
CN111691459A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method of prefabricated superposed underground comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN105839667B (en) The construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery
CN106638671A (en) High and low bin assembling integrated utility tunnel or draining canal
CN106836280A (en) A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN208473116U (en) A kind of partial precast assembly steel reinforced concrete holes in soffit beam
CN209011157U (en) A kind of superposed type exempts from demoulding assembled integral pipe gallery
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN201891133U (en) Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall
CN206635804U (en) A kind of height cabin assembled integral pipe gallery or escape canal
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN112796198A (en) Hollow arch bridge system connected by UHPC wet joints and construction method
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN114108672B (en) Tower crane foundation and bottom plate superposed integrated structure and construction method thereof
CN100999931B (en) Hollow form unit for concrete filling
CN101016763B (en) Hollow pipe used for concrete
CN1995598B (en) Cavity shuttering component for filling concrete
CN100537929C (en) A kind of cavity form component for concrete filling
CN101004057A (en) A hollow shuttering component in use for filling in concrete
CN100999932A (en) Hollow form unit for concrete filling
CN101004059A (en) A hollow shuttering component in use for filling in concrete
CN1995602A (en) Cavity shuttering component for filling concrete
CN1995610A (en) Cavity shuttering component for filling concrete
CN1995601A (en) Cavity shuttering component for filling concrete
CN1995596A (en) Cavity shuttering component for filling concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190621