CN109555147A - A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method - Google Patents

A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method Download PDF

Info

Publication number
CN109555147A
CN109555147A CN201811174272.8A CN201811174272A CN109555147A CN 109555147 A CN109555147 A CN 109555147A CN 201811174272 A CN201811174272 A CN 201811174272A CN 109555147 A CN109555147 A CN 109555147A
Authority
CN
China
Prior art keywords
cushion cap
pile foundation
cast
original
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811174272.8A
Other languages
Chinese (zh)
Inventor
鄢余文
阮杰
胡欣
屠梦麟
洪惠卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201811174272.8A priority Critical patent/CN109555147A/en
Publication of CN109555147A publication Critical patent/CN109555147A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

The present invention relates to a kind of existing Bridge Group pile foundation reinforcement reconstruction structures, including existing pile foundation, original cushion cap, it is characterized in that setting supplement pile foundation on the outside of existing cushion cap, cast-in-place cushion cap is arranged in supplement pile foundation and original cushion cap, cast-in-place cushion cap is formed to the package of original cushion cap, cast-in-place cushion cap protrudes on the downside of original cushion cap at supplement pile foundation, forms supporting role to original cushion cap.The invention makes full use of existing structure, effectively improves multi-column pier foundation bearing capacity, saves cost, is good for the environment;It supplements pile foundation and uses cast-in-situ bored pile, flexibly, cast-in-place cushion cap can adjust shape and size according to piling position, and strengthening reconstruction structure exploitativeness is strong for stake diameter, the long selection of stake.

Description

A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method
Technical field
The present invention relates to a kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling methods, are particularly suitable for existing Multi-column pier foundation supplements the strengthening reconstruction of original cushion cap after pile foundation in bridge reconstruction.
Background technique
During existing bridge reconstruction, route transformation, grade improve etc. due to influence, lead to existing Bridge Group Pile Bearing Capacity is insufficient, and existing pile foundation and cushion cap technology status are even intact, and existing multi-column pier foundation Demolition Construction is difficult, and It is uneconomical, not environmentally.To meet existing bridge upgrade requirement, while original multi-column pier foundation is made full use of, saving construction cost, advantageous ring It protects, a kind of existing Bridge Group pile foundation reinforcement reconstruction structure is suggested.
Summary of the invention
The purpose of the present invention is to provide a kind of existing Bridge Group pile foundation reinforcement reconstruction structures, change suitable for existing bridge The situation of Bridge Group Pile Bearing Capacity deficiency, can make full use of existing structure caused by building, and effectively improve multi-column pier foundation carrying Power.
To achieve the goals above, technical scheme is as follows: a kind of existing Bridge Group pile foundation reinforcement transformation knot Structure, including existing pile foundation, original cushion cap, it is characterised in that supplement pile foundation is set on the outside of existing cushion cap, in supplement pile foundation and original Have and arrange cast-in-place cushion cap on cushion cap, form cast-in-place cushion cap to the package of original cushion cap, supplement cast-in-place cushion cap at pile foundation protrude into it is original On the downside of cushion cap, supporting role is formed to original cushion cap.
Further, planting rebar at original cushion cap and cast-in-place cushion cap faying face, lay in cast-in-place cushion cap support stirrup and Steel tie, it is ensured that pouring rear the old and new's cushion cap can effectively connect.
Further, the rough surface for being not less than 6mm at male and fomale(M&F) is dug at original cushion cap and cast-in-place cushion cap faying face, to increase Cast-in-place cushion cap is connect with the concrete of original cushion cap.
Further, the supplement pile foundation is cast-in-situ bored pile.
Another object of the present invention is to provide a kind of existing Bridge Group pile foundation reinforcement remodeling methods, are suitable for existing bridge The situation of Bridge Group Pile Bearing Capacity deficiency, can make full use of existing structure, effectively improve multi-column pier foundation caused by beam is reconstructed Bearing capacity.
To achieve the goals above, technical scheme is as follows: a kind of existing Bridge Group pile foundation reinforcement transformation side Method, it is characterised in that the described method includes:
Supplement pile foundation is set on the outside of existing cushion cap;
By existing cushion cap lateral surface dabbing, the rough surface that male and fomale(M&F) is not less than 6mm, while the kind at existing cushion cap lateral surface are formed Plant reinforcing bar;
Cast-in-place cushion cap is arranged in supplement pile foundation and original cushion cap, is formed cast-in-place cushion cap to the package of original cushion cap, is supplemented pile foundation Locate cast-in-place cushion cap to protrude on the downside of original cushion cap, supporting role is formed to original cushion cap.
Further, support stirrup and steel tie are laid in the cast-in-place cushion cap.
Further, the supplement pile foundation is cast-in-situ bored pile.
Technical solution of the present invention can achieve the following beneficial effects:
1. the multi-column pier foundation of existing bridge is made full use of to be transformed, avoids the difficulty of original multi-column pier foundation dismounting, reduces Discarded influence of the structure to environment.
2. the multi-column pier foundation of existing bridge is made full use of to be transformed, the effect of original structure has been played, has been reduced newly-built The cost of engineering, good economy performance.
3. supplementing pile foundation uses cast-in-situ bored pile, stake position, stake diameter, stake it is long can flexible choice as needed, and construction site Limit it is small, on existing structure influence it is small, technical solution exploitativeness is strong.
4. the shape and size of cast-in-place cushion cap can be according to flexible cloth of actual conditions such as stake position, the requirement for bearing capacity for supplementing pile foundation It sets, it is easy for construction.
Detailed description of the invention
Fig. 1 is existing Bridge Group pile foundation reinforcement reconstruction structure floor plan of the present invention.
Fig. 2 is existing Bridge Group pile foundation reinforcement reconstruction structure facade layout drawing of the present invention.
Fig. 3 is existing Bridge Group pile foundation reinforcement reconstruction structure section reinforcement drawing of the present invention.
It include: 1- existing pile foundation in figure, 2- supplements pile foundation, the original cushion cap of 3-, and 4- supplements cushion cap, the original column of 5-, 6- kind Plant reinforcing bar, 7- support stirrup, 8- steel tie.
Specific embodiment
Below according to Figure of description and specific embodiments of the present invention, the present invention will be further elaborated.
Existing Bridge Group pile foundation reinforcement reconstruction structure mainly includes existing pile foundation, supplement pile foundation, original cushion cap, cast-in-place The parts such as cushion cap, connection reinforcing bar.
The stake diameter and quantity that require supplementation with pile foundation are determined firstly, calculating according to design, the piling drilling on the outside of existing cushion cap Bored concrete pile forms supplement pile foundation.
Cast-in-place cushion cap is arranged in the top of original cushion cap and supplement pile foundation later, so that the cast-in-place cushion cap connection supplement stake Base, while original cushion cap side and top are also connected with cast-in-place cushion cap, realize that cast-in-place cushion cap to " package " of original cushion cap, is such as schemed Shown in 1 ~ 2.Cast-in-place cushion cap protrudes into certain distance on the downside of original cushion cap at supplement pile foundation, forms supporting role to original cushion cap, such as Shown in Fig. 2.
Supplement pile foundation is set on the outside of existing cushion cap, which is formed effectively by cast-in-place cushion cap and existing multi-column pier foundation Connection, to improve the bearing capacity of multi-column pier foundation.
Dabbing is not less than the rough surface of 6mm at male and fomale(M&F) at original cushion cap and cast-in-place cushion cap faying face, to increase cast-in-place hold Platform is connect with the concrete of original cushion cap.Planting rebar at original cushion cap and cast-in-place cushion cap faying face, interior lay of cast-in-place cushion cap are held Stirrup is held in the palm, sets steel tie between the cast-in-place cushion cap of original cushion cap two sides and the cast-in-place cushion cap above original cushion cap, it is ensured that pour Afterwards the old and new's cushion cap can effectively connect, common stress, as shown in Figure 3.
Supplement that the stake position of cast-in-situ bored pile, stake diameter, stake is long to be adjusted as needed, shape, the size of cast-in-place cushion cap It can be adjusted according to actual conditions such as stake position, the requirement for bearing capacity for supplementing pile foundation, legend pattern is only for reference.
Although the contents of the present invention are discussed in detail through the foregoing embodiment, but it should be appreciated that the description above It is not considered as limitation of the present invention.After those skilled in the art have read above content, for of the invention a variety of Modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (7)

1. a kind of existing Bridge Group pile foundation reinforcement reconstruction structure, including existing pile foundation, original cushion cap, it is characterised in that existing Supplement pile foundation is set on the outside of cushion cap, cast-in-place cushion cap is arranged in supplement pile foundation and original cushion cap, forms cast-in-place cushion cap and held to original The package of platform supplements cast-in-place cushion cap at pile foundation and protrudes on the downside of original cushion cap, forms supporting role to original cushion cap.
2. a kind of existing Bridge Group pile foundation reinforcement reconstruction structure as described in claim 1, which is characterized in that original cushion cap with Planting rebar at cast-in-place cushion cap faying face, cast-in-place cushion cap is interior to lay support stirrup and steel tie, it is ensured that pours rear the old and new's cushion cap It can effectively connect.
3. a kind of existing Bridge Group pile foundation reinforcement reconstruction structure as described in claim 1, which is characterized in that original cushion cap with The rough surface for being not less than 6mm at male and fomale(M&F) is dug at cast-in-place cushion cap faying face, to increase the concrete of cast-in-place cushion cap Yu original cushion cap Connection.
4. a kind of existing Bridge Group pile foundation reinforcement reconstruction structure as described in claim 1, which is characterized in that the supplement stake Base is cast-in-situ bored pile.
5. a kind of existing Bridge Group pile foundation reinforcement remodeling method, it is characterised in that the described method includes:
Supplement pile foundation is set on the outside of existing cushion cap;
By existing cushion cap lateral surface dabbing, the rough surface that male and fomale(M&F) is not less than 6mm, while the kind at existing cushion cap lateral surface are formed Plant reinforcing bar;
Cast-in-place cushion cap is arranged in supplement pile foundation and original cushion cap, is formed cast-in-place cushion cap to the package of original cushion cap, is supplemented pile foundation Locate cast-in-place cushion cap to protrude on the downside of original cushion cap, supporting role is formed to original cushion cap.
6. a kind of existing Bridge Group pile foundation reinforcement remodeling method as claimed in claim 5, which is characterized in that described cast-in-place to hold Support stirrup and steel tie are laid in platform.
7. a kind of existing Bridge Group pile foundation reinforcement remodeling method as claimed in claim 5, which is characterized in that the supplement stake Base is cast-in-situ bored pile.
CN201811174272.8A 2018-10-09 2018-10-09 A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method Pending CN109555147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811174272.8A CN109555147A (en) 2018-10-09 2018-10-09 A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811174272.8A CN109555147A (en) 2018-10-09 2018-10-09 A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method

Publications (1)

Publication Number Publication Date
CN109555147A true CN109555147A (en) 2019-04-02

Family

ID=65864746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811174272.8A Pending CN109555147A (en) 2018-10-09 2018-10-09 A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method

Country Status (1)

Country Link
CN (1) CN109555147A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055906A (en) * 2019-04-22 2019-07-26 同济大学 The Reinforcement of existing bridge when high-speed rail bridge is worn under shield
CN110552364A (en) * 2019-08-19 2019-12-10 中建铁投轨道交通建设有限公司 inverted wedge-shaped expansion construction method for building pile foundation bearing platform
CN110820819A (en) * 2019-10-31 2020-02-21 山西省交通建设工程质量检测中心(有限公司) Method for adding pile on existing bridge pile foundation
CN114892697A (en) * 2022-05-24 2022-08-12 中建二局第三建筑工程有限公司 Foundation reinforcing structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202530486U (en) * 2011-12-27 2012-11-14 北京中建建筑设计院有限公司 Pile foundation reinforcing apparatus for current building
KR20160087964A (en) * 2015-01-14 2016-07-25 (주)골든엔지니어링 Construction method for addition pile
CN107165058A (en) * 2017-05-08 2017-09-15 中铁上海设计院集团有限公司 One kind is used for existing operation Bridge pier reinforcement means
CN108457204A (en) * 2018-02-10 2018-08-28 北京工业大学 One kind carrying out bracing means for old Bridge Foundation Lack of support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202530486U (en) * 2011-12-27 2012-11-14 北京中建建筑设计院有限公司 Pile foundation reinforcing apparatus for current building
KR20160087964A (en) * 2015-01-14 2016-07-25 (주)골든엔지니어링 Construction method for addition pile
CN107165058A (en) * 2017-05-08 2017-09-15 中铁上海设计院集团有限公司 One kind is used for existing operation Bridge pier reinforcement means
CN108457204A (en) * 2018-02-10 2018-08-28 北京工业大学 One kind carrying out bracing means for old Bridge Foundation Lack of support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢开仲等: "《桥梁加固与改造》", 31 May 2017, 电子科技大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055906A (en) * 2019-04-22 2019-07-26 同济大学 The Reinforcement of existing bridge when high-speed rail bridge is worn under shield
CN110552364A (en) * 2019-08-19 2019-12-10 中建铁投轨道交通建设有限公司 inverted wedge-shaped expansion construction method for building pile foundation bearing platform
CN110820819A (en) * 2019-10-31 2020-02-21 山西省交通建设工程质量检测中心(有限公司) Method for adding pile on existing bridge pile foundation
CN114892697A (en) * 2022-05-24 2022-08-12 中建二局第三建筑工程有限公司 Foundation reinforcing structure and construction method thereof
CN114892697B (en) * 2022-05-24 2023-02-03 中建二局第三建筑工程有限公司 Foundation reinforcing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN109555147A (en) A kind of existing Bridge Group pile foundation reinforcement reconstruction structure and its remodeling method
CN102155025B (en) Late poured band type assembled pipe jacking working open caisson
CN103882854B (en) The construction method of the continuous undercrossing tunnel of shield and viaduct
CN105239594A (en) Prestressed pipe pile upright
CN111396095A (en) Tunnel simply-supported arch open cut tunnel structure penetrating through giant karst cave and construction method thereof
CN202031108U (en) Post-poured band type fabricated pipe-jacking working well
CN104727227A (en) Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN102493472B (en) Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
CN102296600A (en) Method for positioning middle pile of spread built subway station
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN208251156U (en) It is a kind of to reduce the grand heavy device of underground structure using building enclosure
CN216156610U (en) Municipal bridge cushion cap structure for protecting existing subway tunnel
CN206157484U (en) Moderate -low speed magnetic levitation traffic engineering single line location supporting beam of pile foundation formula support rail girder construction of filling
CN207073046U (en) A kind of newly-built peg board formula roadbed of the chainless drives formula structural system with bent cap
CN206157483U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail girder construction of filling
CN205116206U (en) Stress tube stake stand in advance
CN212003218U (en) Tunnel simple-support arch open cut tunnel structure passing through giant karst cave
CN107940102A (en) Underground raw water pipe protection construction method
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN207714364U (en) System is underpined in the passive supplement in existing building basis and hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190402