CN109544097A - Monthly closing entry information processing method, electronic device and readable storage medium storing program for executing based on new product development - Google Patents

Monthly closing entry information processing method, electronic device and readable storage medium storing program for executing based on new product development Download PDF

Info

Publication number
CN109544097A
CN109544097A CN201811221270.XA CN201811221270A CN109544097A CN 109544097 A CN109544097 A CN 109544097A CN 201811221270 A CN201811221270 A CN 201811221270A CN 109544097 A CN109544097 A CN 109544097A
Authority
CN
China
Prior art keywords
project
item nodes
new product
development
requirement documents
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811221270.XA
Other languages
Chinese (zh)
Other versions
CN109544097B (en
Inventor
王海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Life Insurance Company of China Ltd
Original Assignee
Ping An Life Insurance Company of China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Life Insurance Company of China Ltd filed Critical Ping An Life Insurance Company of China Ltd
Priority to CN201811221270.XA priority Critical patent/CN109544097B/en
Publication of CN109544097A publication Critical patent/CN109544097A/en
Application granted granted Critical
Publication of CN109544097B publication Critical patent/CN109544097B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to exploitations, provide a kind of monthly closing entry information processing method, electronic device and readable storage medium storing program for executing based on new product development, this method comprises: obtaining the project development requirement documents of new product to be developed;It is identified project node triggering event and item nodes triggered time according to the project development requirement documents;When reaching in the item nodes triggered time, determine whether the new product to be developed currently reaches the item nodes trigger event;When determining that the new product to be developed reaches the item nodes trigger event, the monthly closing entry factor is exported, the monthly closing entry factor includes the current exploitation data of the new product to be developed.The present invention so as to provide the monthly closing entry factor in time for downstream tester, and then will not influence the testing progress of downstream tester, improve new product development efficiency without manually generating the monthly closing entry factor.

Description

Monthly closing entry information processing method, electronic device and readable storage based on new product development Medium
Technical field
The present invention relates to field of computer technology more particularly to a kind of monthly closing entry information processing sides based on new product development Method, electronic device and readable storage medium storing program for executing.
Background technique
Currently, generally requiring in New Product Development Process and exporting the monthly closing entry factor in the specific time.At present be typically all by Programmer manually generates the monthly closing entry factor, and manually exports the monthly closing entry factor, is given to downstream tester, and by downstream tester It is tested.Drawback of the prior art is that causing many times due to human factor and business shortage of manpower The monthly closing entry factor cannot be provided for downstream tester in time, and then influence the testing progress of downstream tester, new product development Efficiency is lower.
Summary of the invention
The monthly closing entry information processing method that the purpose of the present invention is to provide a kind of based on new product development, electronic device and can Read storage medium, it is intended to the monthly closing entry factor can be provided in time for downstream tester, improve new product development efficiency.
To achieve the above object, the present invention provides a kind of electronic device, the electronic device include memory, processor and The monthly closing entry information processing system based on new product development that is stored on the memory and can run on the processor, institute It states when the monthly closing entry information processing system based on new product development is executed by the processor and realizes following steps:
Obtain the project development requirement documents of new product to be developed;
It is identified project node triggering event and item nodes triggered time according to the project development requirement documents;
When reaching in the item nodes triggered time, determine whether the new product to be developed currently reaches the project Node triggering event;
When determining that the new product to be developed reaches the item nodes trigger event, the monthly closing entry factor, the moon are exported The knot factor includes the current exploitation data of the new product to be developed.
Preferably, the monthly closing entry information processing system based on new product development executed by the processor realize it is described When determining that the new product to be developed reaches the item nodes trigger event, export the monthly closing entry factor the step of after, also realize Following steps:
According to the monthly closing entry factor, the current exploitation data of the new product to be developed are tested.
Preferably, the monthly closing entry information processing system based on new product development is executed by the processor and realizes described According to the project development requirement documents identify project node triggering event and the step in item nodes triggered time when, comprising:
Determine the attribute information of the project development requirement documents;
The attribute for having with the project development requirement documents is searched whether in the Product Development Model database prestored The product model attribute information of information matches includes preset product model attribute information in the Product Development Model database And corresponding item nodes trigger event model parameter and item nodes triggered time model parameter;
There is the category with the project development requirement documents in finding the Product Development Model database prestored When the product model attribute information of property information matches, according to the attribute information of the project development requirement documents and described prestore Product Development Model database determine corresponding item nodes trigger event and item nodes triggered time.
Preferably, the monthly closing entry information processing system based on new product development is executed by the processor and realizes described According to the project development requirement documents identify project node triggering event and the step in item nodes triggered time when, comprising:
Exist and the project development requirement documents in not finding the Product Development Model database prestored When the matched product model attribute information of attribute information, generated pair according to the analysis of the attribute information of the project development requirement documents The item nodes trigger event answered and item nodes triggered time;
By the attribute information of the project development requirement documents, and the corresponding item nodes trigger event and item that generate The mesh node triggered time is updated in the Product Development Model database prestored.
In addition, to achieve the above object, the present invention also provides a kind of monthly closing entry information processing method based on new product development, The described method includes:
Obtain the project development requirement documents of new product to be developed;
It is identified project node triggering event and item nodes triggered time according to the project development requirement documents;
When reaching in the item nodes triggered time, determine whether the new product to be developed currently reaches the project Node triggering event;
When determining that the new product to be developed reaches the item nodes trigger event, the monthly closing entry factor, the moon are exported The knot factor includes the current exploitation data of the new product to be developed.
Preferably, described when determining that the new product to be developed reaches the item nodes trigger event, export monthly closing entry After the step of factor, further includes:
According to the monthly closing entry factor, the current exploitation data of the new product to be developed are tested.
Preferably, described to be triggered according to identify project node triggering event and item nodes of the project development requirement documents The step of time includes:
Determine the attribute information of the project development requirement documents;
The attribute for having with the project development requirement documents is searched whether in the Product Development Model database prestored The product model attribute information of information matches includes preset product model attribute information in the Product Development Model database And corresponding item nodes trigger event model parameter and item nodes triggered time model parameter;
There is the category with the project development requirement documents in finding the Product Development Model database prestored When the product model attribute information of property information matches, according to the attribute information of the project development requirement documents and described prestore Product Development Model database determine corresponding item nodes trigger event and item nodes triggered time.
Preferably, described to be triggered according to identify project node triggering event and item nodes of the project development requirement documents The step of time further include:
Exist and the project development requirement documents in not finding the Product Development Model database prestored When the matched product model attribute information of attribute information, generated pair according to the analysis of the attribute information of the project development requirement documents The item nodes trigger event answered and item nodes triggered time;
The method also includes:
By the attribute information of the project development requirement documents, and the corresponding item nodes trigger event and item that generate The mesh node triggered time is updated in the Product Development Model database prestored.
Preferably, described to be triggered according to identify project node triggering event and item nodes of the project development requirement documents The step of time further include:
Exist and the project development requirement documents in not finding the Product Development Model database prestored When the matched product model attribute information of attribute information, project is sent to preset external server and triggers information acquisition request, The project triggering information acquisition request includes the attribute information of the project development requirement documents;
Receive the corresponding with the attribute information of the project development requirement documents of the preset external server transmission Item nodes trigger event and item nodes triggered time.
Further, to achieve the above object, the present invention also provides a kind of computer readable storage medium, the computers Readable storage medium storing program for executing is stored with the monthly closing entry information processing system based on new product development, the monthly closing entry letter based on new product development Breath processing system can be executed by least one processor, so that at least one described processor is executed as above-mentioned based on new product The step of monthly closing entry information processing method of exploitation.
Monthly closing entry information processing method, electronic device and readable storage medium storing program for executing proposed by the present invention based on new product development, It is identified project node triggering event and item nodes triggered time by the project development requirement documents of new product to be developed, in institute When stating the arrival of item nodes triggered time, determine whether the new product to be developed currently reaches the item nodes triggering thing Part, when the new product to be developed reaches the item nodes trigger event, output includes working as the new product to be developed The monthly closing entry factor of preceding exploitation data.Due to that can reach the item nodes triggered time and reach corresponding item nodes trigger event When, it is automatic to export the monthly closing entry factor, without manually generating the monthly closing entry factor, so as to provide the moon in time for downstream tester The factor is tied, and then will not influence the testing progress of downstream tester, improves new product development efficiency.
Detailed description of the invention
Fig. 1 is that the present invention is based on the signals of the running environment of the monthly closing entry information processing system preferred embodiment of new product development Figure;
Fig. 2 is that the present invention is based on the flow diagrams of one embodiment of monthly closing entry information processing method of new product development.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work Every other embodiment obtained is put, shall fall within the protection scope of the present invention.
It should be noted that the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot It is interpreted as its relative importance of indication or suggestion or implicitly indicates the quantity of indicated technical characteristic.Define as a result, " the One ", the feature of " second " can explicitly or implicitly include at least one of the features.In addition, the skill between each embodiment Art scheme can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when technical solution Will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not the present invention claims Protection scope within.
The present invention provides a kind of monthly closing entry information processing system based on new product development.Referring to Fig. 1, be the present invention is based on The running environment schematic diagram of 10 preferred embodiment of monthly closing entry information processing system of new product development.
In the present embodiment, the monthly closing entry information processing system 10 based on new product development is installed and runs on electronics In device 1.The electronic device 1 may include, but be not limited only to, memory 11, processor 12 and display 13.Fig. 1 is illustrated only Electronic device 1 with component 11-13 can substitute it should be understood that being not required for implementing all components shown Implement more or less component.
The memory 11 is the readable computer storage medium of at least one type, and the memory 11 is in some implementations It can be the internal storage unit of the electronic device 1, such as the hard disk or memory of the electronic device 1 in example.The memory 11 are also possible to the External memory equipment of the electronic device 1 in further embodiments, such as are equipped on the electronic device 1 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, Flash card (Flash Card) etc..Further, the memory 11 can also both include the storage inside of the electronic device 1 Unit also includes External memory equipment.The memory 11 for store the application software for being installed on the electronic device 1 and respectively Class data, such as the program code etc. of the monthly closing entry information processing system 10 based on new product development.The memory 11 is also It can be used for temporarily storing the data that has exported or will export.
The processor 12 can be in some embodiments a central processing unit (Central Processing Unit, CPU), microprocessor or other data processing chips, for running the program code stored in the memory 11 or processing number According to, such as execute the monthly closing entry information processing system 10 etc. based on new product development.
The display 13 can be light-emitting diode display, liquid crystal display, touch-control liquid crystal display in some embodiments And OLED (Organic Light-Emitting Diode, Organic Light Emitting Diode) touches device etc..The display 13 is used In being shown in the information handled in the electronic device 1 and for showing visual user interface, such as new production to be developed Project development requirement documents, corresponding node triggering event and the item nodes triggered time of product, the monthly closing entry factor of generation etc..Institute The component 11-13 for stating electronic device 1 is in communication with each other by system bus.
Monthly closing entry information processing system 10 based on new product development includes that at least one is stored in the memory 11 Computer-readable instruction, at least one computer-readable instruction can be executed by the processor 12, to realize each reality of the application Apply example.
Wherein, it is realized such as when the above-mentioned monthly closing entry information processing system 10 based on new product development is executed by the processor 12 Lower step:
Step S1 obtains the project development requirement documents of new product to be developed.
In the present embodiment, the project development requirement documents of new product to be developed may include item types, project development Required business function, business function algorithm information, business function parameter information, project development timing node etc..Item types, Business function needed for project development, business function algorithm information, business function parameter information, project development timing node all may be used To be considered the attribute information of project development requirement documents.
Step S2, according to the project development requirement documents identify project node triggering event and item nodes trigger when Between.
Specifically, being identified project node triggered time and item nodes touching according to the attribute information of project development requirement documents Hair event.A project development requirement documents can have multiple item nodes trigger events and item nodes triggered time, In, there is one-to-one relationship between item nodes trigger event and item nodes triggered time.
Step S3 determines whether the new product to be developed currently reaches when reaching in the item nodes triggered time The item nodes trigger event.
In the present embodiment, in the development process of new product to be developed, when reaching in the item nodes triggered time, if The new product to be developed is currently also up to the item nodes trigger event, thens follow the steps S4.
If the new product to be developed is currently not up to the item nodes when reaching in the item nodes triggered time Trigger event then exports monthly closing entry prompt information, to prompt current developer to need the output monthly closing entry factor manually in time.
Step S4 exports the monthly closing entry factor when determining that the new product to be developed reaches the item nodes trigger event, The monthly closing entry factor includes the current exploitation data of the new product to be developed.
Further, the current exploitation data of the new product to be developed can also be surveyed according to the monthly closing entry factor Examination.
In the present embodiment, by the project development requirement documents of new product to be developed identify project node triggering event and The item nodes triggered time determines whether the new product to be developed currently reaches when reaching in the item nodes triggered time To the item nodes trigger event, when the new product to be developed reaches the item nodes trigger event, output includes The monthly closing entry factor of the current exploitation data of the new product to be developed.Due to that can reach the item nodes triggered time and reach pair It is automatic to export the monthly closing entry factor when item nodes trigger event answered, without manually generating the monthly closing entry factor, so as to timely The monthly closing entry factor is provided for downstream tester, and then will not influence the testing progress of downstream tester, improves new product development Efficiency.
Further, in an optional embodiment, on the basis of the above embodiments, the step S2 includes:
Determine the attribute information of the project development requirement documents.
The attribute for having with the project development requirement documents is searched whether in the Product Development Model database prestored The product model attribute information of information matches includes preset product model attribute information in the Product Development Model database And corresponding item nodes trigger event model parameter and item nodes triggered time model parameter.
In the present embodiment, the Product Development Model prestored, which can be, to be obtained from external server or external network.Or Person is also possible in local server according to the attribute information of history development and the corresponding item nodes trigger event generated And the item nodes triggered time automatically saves generation.
Exist in finding the Product Development Model database prestored and believes with the attribute of the project development requirement documents When ceasing matched product model attribute information, according to the attribute information of the project development requirement documents and the production prestored Product development model database determines corresponding item nodes trigger event and item nodes triggered time.
In the present embodiment, by the category in the Product Development Model database prestored, with project development requirement documents Property information matches product model attribute information corresponding to item nodes trigger event model parameter as item nodes trigger Event and item nodes triggered time model parameter are as the item nodes triggered time.
Without every time by manually analysis and arrangement goes out item from the project development requirement documents of new product to be developed Mesh node triggering event and item nodes triggered time, complete according to item nodes trigger event and item nodes triggered time The artificial output monthly closing entry factor is relied at degree.It is available in the Product Development Model database prestored in the present embodiment When item nodes trigger event that current new product to be developed uses and item nodes triggered time, then directly prestored from described The acquisition of Product Development Model database lookup can export the monthly closing entry factor automatically, effectively raise the efficiency of new product development.
Further, in an optional embodiment, the step S2 further include:
There is no the attribute information phases with the project development requirement documents in the Product Development Model database prestored When matched product model attribute information, corresponding project is generated according to the analysis of the attribute information of the project development requirement documents Node triggering event and item nodes triggered time;And by the attribute information of the project development requirement documents, and generate Corresponding item nodes trigger event and item nodes triggered time are updated in the Product Development Model database prestored.
To generate corresponding item according to the attribute information of the project development requirement documents of new product to be developed every time When mesh node triggering event and item nodes triggered time, all by the attribute information of the project development requirement documents, and generate The item nodes trigger event and the item nodes triggered time be updated in the Product Development Model database prestored. So that not needing generating item again when the subsequent project development demand obtained again and above-mentioned project development requirement documents match Mesh node triggering event and item nodes triggered time do not need to obtain item nodes touching to external server or external network yet Hair event and item nodes triggered time can directly get from the Product Development Model database prestored corresponding Item nodes trigger event and item nodes triggered time, further improve the efficiency of new product development.
Further, in an optional embodiment, the step S2 further include:
There is no the attribute information phases with the project development requirement documents in the Product Development Model database prestored When matched product model attribute information, project triggering acquisition of information is sent to preset external server or external network and is asked It asks, the project triggering information acquisition request includes the attribute information of the project development requirement documents.
In the present embodiment, if external server or external network prestore the corresponding item of project triggering information acquisition request Mesh develops attribute information, item nodes trigger event and the corresponding relationship between the item nodes triggered time of requirement documents, then Receive the project corresponding with the attribute information of the project development requirement documents that the external server or external network are sent Node triggering event and item nodes triggered time.
Further, in the category with the project development requirement documents for receiving external server or external network transmission The property corresponding item nodes trigger event of information and after the item nodes triggered time, can also be by the project development requirement documents Attribute information and received item nodes trigger event and the corresponding relationship between the item nodes triggered time be updated to and prestore Product Development Model database in.
If external server or external network do not prestore the corresponding project development demand of project triggering information acquisition request Attribute information, item nodes trigger event and the corresponding relationship between the item nodes triggered time of document then feed back refusal letter Breath.After the refusal information for receiving external server or external network feedback, then according to the project development requirement documents Attribute information analyzes generation project node triggering event and item nodes triggered time, and by the attribute of project development requirement documents Information, item nodes trigger event and item nodes triggered time are updated in the Product Development Model database prestored.
As shown in Fig. 2, Fig. 2 is that the present invention is based on the processes of one embodiment of monthly closing entry information processing method of new product development to show It is intended to, method includes the following steps:
Step S10 obtains the project development requirement documents of new product to be developed.
In the present embodiment, the project development requirement documents of new product to be developed may include item types, project development Required business function, business function algorithm information, business function parameter information, project development timing node etc..Item types, Business function needed for project development, business function algorithm information, business function parameter information, project development timing node all may be used To be considered the attribute information of project development requirement documents.
Step S20, according to the project development requirement documents identify project node triggering event and item nodes trigger when Between.
Specifically, being identified project node triggered time and item nodes touching according to the attribute information of project development requirement documents Hair event.A project development requirement documents can have multiple item nodes trigger events and item nodes triggered time, In, there is one-to-one relationship between item nodes trigger event and item nodes triggered time.
Step S30 determines whether the new product to be developed currently reaches when reaching in the item nodes triggered time The item nodes trigger event.
In the present embodiment, in the development process of new product to be developed, when reaching in the item nodes triggered time, if The new product to be developed is currently also up to the item nodes trigger event, thens follow the steps S40.
If the new product to be developed is currently not up to the item nodes when reaching in the item nodes triggered time Trigger event then exports monthly closing entry prompt information, to prompt current developer to need the output monthly closing entry factor manually in time.
Step S40, when determining that the new product to be developed reaches the item nodes trigger event, output monthly closing entry because Son, the monthly closing entry factor include the current exploitation data of the new product to be developed.
Further, the current exploitation data of the new product to be developed can also be surveyed according to the monthly closing entry factor Examination.
In the present embodiment, by the project development requirement documents of new product to be developed identify project node triggering event and The item nodes triggered time determines whether the new product to be developed currently reaches when reaching in the item nodes triggered time To the item nodes trigger event, when the new product to be developed reaches the item nodes trigger event, output includes The monthly closing entry factor of the current exploitation data of the new product to be developed.Due to that can reach the item nodes triggered time and reach pair It is automatic to export the monthly closing entry factor when item nodes trigger event answered, without manually generating the monthly closing entry factor, so as to timely The monthly closing entry factor is provided for downstream tester, and then will not influence the testing progress of downstream tester, improves new product development Efficiency.
Further, in an optional embodiment, on the basis of the above embodiments, the step S20 includes:
Determine the attribute information of the project development requirement documents.
The attribute for having with the project development requirement documents is searched whether in the Product Development Model database prestored The product model attribute information of information matches includes preset product model attribute information in the Product Development Model database And corresponding item nodes trigger event model parameter and item nodes triggered time model parameter.
In the present embodiment, the Product Development Model prestored, which can be, to be obtained from external server or external network.Or Person is also possible in local server according to the attribute information of history development and the corresponding item nodes trigger event generated And the item nodes triggered time automatically saves generation.
Exist in finding the Product Development Model database prestored and believes with the attribute of the project development requirement documents When ceasing matched product model attribute information, according to the attribute information of the project development requirement documents and the production prestored Product development model database determines corresponding item nodes trigger event and item nodes triggered time.
In the present embodiment, by the category in the Product Development Model database prestored, with project development requirement documents Property information matches product model attribute information corresponding to item nodes trigger event model parameter as item nodes trigger Event and item nodes triggered time model parameter are as the item nodes triggered time.
Without every time by manually analysis and arrangement goes out item from the project development requirement documents of new product to be developed Mesh node triggering event and item nodes triggered time, complete according to item nodes trigger event and item nodes triggered time The artificial output monthly closing entry factor is relied at degree.It is available in the Product Development Model database prestored in the present embodiment When item nodes trigger event that current new product to be developed uses and item nodes triggered time, then directly prestored from described The acquisition of Product Development Model database lookup can export the monthly closing entry factor automatically, effectively raise the efficiency of new product development.
Further, in an optional embodiment, the step S20 further include:
There is no the attribute information phases with the project development requirement documents in the Product Development Model database prestored When matched product model attribute information, corresponding project is generated according to the analysis of the attribute information of the project development requirement documents Node triggering event and item nodes triggered time;And by the attribute information of the project development requirement documents, and generate Corresponding item nodes trigger event and item nodes triggered time are updated in the Product Development Model database prestored.
To generate corresponding item according to the attribute information of the project development requirement documents of new product to be developed every time When mesh node triggering event and item nodes triggered time, all by the attribute information of the project development requirement documents, and generate The item nodes trigger event and the item nodes triggered time be updated in the Product Development Model database prestored. So that not needing generating item again when the subsequent project development demand obtained again and above-mentioned project development requirement documents match Mesh node triggering event and item nodes triggered time do not need to obtain item nodes touching to external server or external network yet Hair event and item nodes triggered time can directly get from the Product Development Model database prestored corresponding Item nodes trigger event and item nodes triggered time, further improve the efficiency of new product development.
Further, in an optional embodiment, the step S20 further include:
There is no the attribute information phases with the project development requirement documents in the Product Development Model database prestored When matched product model attribute information, project triggering acquisition of information is sent to preset external server or external network and is asked It asks, the project triggering information acquisition request includes the attribute information of the project development requirement documents.
In the present embodiment, if external server or external network prestore the corresponding item of project triggering information acquisition request Mesh develops attribute information, item nodes trigger event and the corresponding relationship between the item nodes triggered time of requirement documents, then Receive the project corresponding with the attribute information of the project development requirement documents that the external server or external network are sent Node triggering event and item nodes triggered time.
Further, in the category with the project development requirement documents for receiving external server or external network transmission The property corresponding item nodes trigger event of information and after the item nodes triggered time, can also be by the project development requirement documents Attribute information and received item nodes trigger event and the corresponding relationship between the item nodes triggered time be updated to and prestore Product Development Model database in.
If external server or external network do not prestore the corresponding project development demand of project triggering information acquisition request Attribute information, item nodes trigger event and the corresponding relationship between the item nodes triggered time of document then feed back refusal letter Breath.After the refusal information for receiving external server or external network feedback, then according to the project development requirement documents Attribute information analyzes generation project node triggering event and item nodes triggered time, and by the attribute of project development requirement documents Information, item nodes trigger event and item nodes triggered time are updated in the Product Development Model database prestored.
In addition, the computer-readable recording medium storage has the present invention also provides a kind of computer readable storage medium Monthly closing entry information processing system based on new product development, the monthly closing entry information processing system based on new product development can be by least One processor executes, so that at least one described processor is executed such as the monthly closing entry based on new product development in above-described embodiment The step of information processing method, it is specific to be somebody's turn to do step S10, S20, S30 of monthly closing entry information processing method based on new product development etc. Implementation process is as described above, and details are not described herein.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to be realized by hardware, but very much In the case of the former be more preferably embodiment.Based on this understanding, technical solution of the present invention is substantially in other words to existing The part that technology contributes can be embodied in the form of software products, which is stored in a storage In medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can be mobile phone, calculate Machine, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
Preferred embodiments of the present invention have been described above with reference to the accompanying drawings, not thereby limiting the scope of the invention.On It is for illustration only to state serial number of the embodiment of the present invention, does not represent the advantages or disadvantages of the embodiments.It is patrolled in addition, though showing in flow charts Sequence is collected, but in some cases, it can be with the steps shown or described are performed in an order that is different from the one herein.
Without departing from the scope and spirit of the invention, there are many variations to implement the present invention by those skilled in the art, It can be used for another embodiment for example as the feature of one embodiment and obtain another embodiment.It is all to use technology of the invention Made any modifications, equivalent replacements, and improvements within design, should all be within interest field of the invention.

Claims (10)

1. a kind of electronic device, which is characterized in that the electronic device includes memory, processor and is stored in the memory The monthly closing entry information processing system based on new product development that is upper and can running on the processor, it is described to be based on new product development Monthly closing entry information processing system realize following steps when being executed by the processor:
Obtain the project development requirement documents of new product to be developed;
It is identified project node triggering event and item nodes triggered time according to the project development requirement documents;
When reaching in the item nodes triggered time, determine whether the new product to be developed currently reaches the item nodes Trigger event;
When determining that the new product to be developed reaches the item nodes trigger event, export the monthly closing entry factor, the monthly closing entry because Attached bag includes the current exploitation data of the new product to be developed.
2. electronic device as described in claim 1, which is characterized in that the monthly closing entry information processing system based on new product development System is executed described in realization when determining that the new product to be developed reaches the item nodes trigger event by the processor, defeated Out after the step of monthly closing entry factor, following steps are also realized:
According to the monthly closing entry factor, the current exploitation data of the new product to be developed are tested.
3. electronic device as claimed in claim 1 or 2, which is characterized in that at the monthly closing entry information based on new product development Reason system by the processor execute realize it is described according to the project development requirement documents identify project node triggering event and When the step in item nodes triggered time, comprising:
Determine the attribute information of the project development requirement documents;
The attribute information for having with the project development requirement documents is searched whether in the Product Development Model database prestored Matched product model attribute information includes preset product model attribute information in the Product Development Model database and right The item nodes trigger event model parameter and item nodes triggered time model parameter answered;
Exist in finding the Product Development Model database prestored and believes with the attribute of the project development requirement documents When ceasing matched product model attribute information, according to the attribute information of the project development requirement documents and the production prestored Product development model database determines corresponding item nodes trigger event and item nodes triggered time.
4. electronic device as claimed in claim 3, which is characterized in that the monthly closing entry information processing system based on new product development System is executed by the processor to be realized and described is identified project node triggering event and project according to the project development requirement documents When the step in node triggered time, comprising:
There is the attribute with the project development requirement documents in not finding the Product Development Model database prestored When the product model attribute information of information matches, generated according to the analysis of the attribute information of the project development requirement documents corresponding Item nodes trigger event and item nodes triggered time;
By the attribute information of the project development requirement documents, and the corresponding item nodes trigger event and project section that generate The point triggered time is updated in the Product Development Model database prestored.
5. a kind of monthly closing entry information processing method based on new product development, which is characterized in that the described method includes:
Obtain the project development requirement documents of new product to be developed;
It is identified project node triggering event and item nodes triggered time according to the project development requirement documents;
When reaching in the item nodes triggered time, determine whether the new product to be developed currently reaches the item nodes Trigger event;
When determining that the new product to be developed reaches the item nodes trigger event, export the monthly closing entry factor, the monthly closing entry because Attached bag includes the current exploitation data of the new product to be developed.
6. the monthly closing entry information processing method based on new product development as claimed in claim 5, which is characterized in that described in determination When the new product to be developed reaches the item nodes trigger event, export the monthly closing entry factor the step of after, further includes:
According to the monthly closing entry factor, the current exploitation data of the new product to be developed are tested.
7. such as the monthly closing entry information processing method described in claim 5 or 6 based on new product development, which is characterized in that described According to the project development requirement documents identify project node triggering event and item nodes triggered time the step of include:
Determine the attribute information of the project development requirement documents;
The attribute information for having with the project development requirement documents is searched whether in the Product Development Model database prestored Matched product model attribute information includes preset product model attribute information in the Product Development Model database and right The item nodes trigger event model parameter and item nodes triggered time model parameter answered;
Exist in finding the Product Development Model database prestored and believes with the attribute of the project development requirement documents When ceasing matched product model attribute information, according to the attribute information of the project development requirement documents and the production prestored Product development model database determines corresponding item nodes trigger event and item nodes triggered time.
8. the monthly closing entry information processing method based on new product development as claimed in claim 7, which is characterized in that described according to institute State project development requirement documents identify project node triggering event and item nodes triggered time the step of further include:
There is the attribute with the project development requirement documents in not finding the Product Development Model database prestored When the product model attribute information of information matches, generated according to the analysis of the attribute information of the project development requirement documents corresponding Item nodes trigger event and item nodes triggered time;
The method also includes:
By the attribute information of the project development requirement documents, and the corresponding item nodes trigger event and project section that generate The point triggered time is updated in the Product Development Model database prestored.
9. the monthly closing entry information processing method based on new product development as claimed in claim 7, which is characterized in that described according to institute State project development requirement documents identify project node triggering event and item nodes triggered time the step of further include:
There is the attribute with the project development requirement documents in not finding the Product Development Model database prestored When the product model attribute information of information matches, project is sent to preset external server and triggers information acquisition request, it is described Project triggering information acquisition request includes the attribute information of the project development requirement documents;
Receive the project corresponding with the attribute information of the project development requirement documents that the preset external server is sent Node triggering event and item nodes triggered time.
10. a kind of computer readable storage medium, which is characterized in that be stored on the computer readable storage medium based on new The monthly closing entry information processing system of product development, when the monthly closing entry information processing system based on new product development is executed by processor The step of realizing the monthly closing entry information processing method based on new product development as described in any one of claim 6 to 9.
CN201811221270.XA 2018-10-19 2018-10-19 Moon knot information processing method based on new product development, electronic device and readable storage medium Active CN109544097B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811221270.XA CN109544097B (en) 2018-10-19 2018-10-19 Moon knot information processing method based on new product development, electronic device and readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811221270.XA CN109544097B (en) 2018-10-19 2018-10-19 Moon knot information processing method based on new product development, electronic device and readable storage medium

Publications (2)

Publication Number Publication Date
CN109544097A true CN109544097A (en) 2019-03-29
CN109544097B CN109544097B (en) 2024-04-05

Family

ID=65844019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811221270.XA Active CN109544097B (en) 2018-10-19 2018-10-19 Moon knot information processing method based on new product development, electronic device and readable storage medium

Country Status (1)

Country Link
CN (1) CN109544097B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007015227A1 (en) * 2005-08-04 2007-02-08 Prolify Ltd. Apparatus and methods for process and project management and control
JP2011159202A (en) * 2010-02-03 2011-08-18 Nippon Telegr & Teleph Corp <Ntt> Test item generating method, device, and program
CN105677620A (en) * 2014-11-21 2016-06-15 高德软件有限公司 Generation method and device for project management documents
CN106682877A (en) * 2016-12-29 2017-05-17 江西博瑞彤芸科技有限公司 Method of project management
CN108255653A (en) * 2018-01-02 2018-07-06 深圳壹账通智能科技有限公司 The test method and its terminal of a kind of product

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007015227A1 (en) * 2005-08-04 2007-02-08 Prolify Ltd. Apparatus and methods for process and project management and control
JP2011159202A (en) * 2010-02-03 2011-08-18 Nippon Telegr & Teleph Corp <Ntt> Test item generating method, device, and program
CN105677620A (en) * 2014-11-21 2016-06-15 高德软件有限公司 Generation method and device for project management documents
CN106682877A (en) * 2016-12-29 2017-05-17 江西博瑞彤芸科技有限公司 Method of project management
CN108255653A (en) * 2018-01-02 2018-07-06 深圳壹账通智能科技有限公司 The test method and its terminal of a kind of product

Also Published As

Publication number Publication date
CN109544097B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN106598574B (en) Page rendering method and device
US10372597B2 (en) Software testing and verification
CN107506291B (en) Analysis method and device based on data acquisition
CN107133174A (en) Test case code automatically generating device and method
CN108492005B (en) Project data processing method and device, computer equipment and storage medium
US20120159446A1 (en) Verification framework for business objects
US9411833B2 (en) Generation of service specification of a service oriented architecture (SOA) solution
CN110275826A (en) Automated testing method, device and computer readable storage medium
CN109783351A (en) Interface detection method, apparatus and computer readable storage medium
CN110019080A (en) Data access method and device
CN108959067A (en) Test method, device and the computer readable storage medium of search engine
CN110784377A (en) Method for uniformly managing cloud monitoring data in multi-cloud environment
Hamza et al. Web and mobile applications' testing using black and white box approaches
CN115168166A (en) Method, device and equipment for recording business data change and storage medium
CN113434542B (en) Data relationship identification method and device, electronic equipment and storage medium
CN114185776A (en) Big data point burying method, device, equipment and medium for application program
CN109544097A (en) Monthly closing entry information processing method, electronic device and readable storage medium storing program for executing based on new product development
CN107437174A (en) virtual card management method and device
CN114727100A (en) Joint debugging method and device for monitoring equipment
CN112817782B (en) Data acquisition reporting method and device, electronic equipment and storage medium
CN113935847A (en) Online process risk processing method, device, server and medium
CN114387021A (en) Service state generation method, device, equipment and storage medium
CN114546793A (en) Log generation method and device and computer readable storage medium
CN110134406B (en) Deployment method and system of intelligent cloud network product
CN115827423A (en) Test case generation method, device, equipment and medium based on multi-scene clustering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant