CN109544097B - Moon knot information processing method based on new product development, electronic device and readable storage medium - Google Patents
Moon knot information processing method based on new product development, electronic device and readable storage medium Download PDFInfo
- Publication number
- CN109544097B CN109544097B CN201811221270.XA CN201811221270A CN109544097B CN 109544097 B CN109544097 B CN 109544097B CN 201811221270 A CN201811221270 A CN 201811221270A CN 109544097 B CN109544097 B CN 109544097B
- Authority
- CN
- China
- Prior art keywords
- project
- development
- attribute information
- new product
- project node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012356 Product development Methods 0.000 title claims abstract description 99
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 title claims abstract description 72
- 230000010365 information processing Effects 0.000 title claims abstract description 32
- 238000003672 processing method Methods 0.000 title claims abstract description 15
- 238000011161 development Methods 0.000 claims abstract description 140
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000012360 testing method Methods 0.000 claims abstract description 10
- 238000004458 analytical method Methods 0.000 claims description 6
- 230000006870 function Effects 0.000 description 12
- 230000008569 process Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008094 contradictory effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
Abstract
The invention relates to development, and provides a moon knot information processing method, an electronic device and a readable storage medium based on new product development, wherein the method comprises the following steps: acquiring a project development requirement document of a new product to be developed; determining project node triggering events and project node triggering time according to the project development requirement document; when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event; outputting a moon factor when the new product to be developed reaches the project node trigger event, wherein the moon factor comprises current development data of the new product to be developed. The invention does not need to manually generate the moon knot factor, thereby being capable of providing the moon knot factor for downstream testers in time, further not influencing the test progress of the downstream testers and improving the development efficiency of new products.
Description
Technical Field
The present invention relates to the field of computer technologies, and in particular, to a lunar junction information processing method, an electronic device, and a readable storage medium based on new product development.
Background
Currently, in the development of new products, it is generally necessary to output the moon factor at a specific time. At present, a programmer generally manually generates a moon knot factor, manually derives the moon knot factor, and gives the moon knot factor to a downstream tester for testing. The defects of the prior art are that due to human factors and insufficient business manpower, moon knot factors can not be provided for downstream testers in time in many times, so that the testing progress of the downstream testers is affected, and the new product development efficiency is low.
Disclosure of Invention
The invention aims to provide a moon knot information processing method, an electronic device and a readable storage medium based on new product development, which aims to provide moon knot factors for downstream testers in time and improve the new product development efficiency.
To achieve the above object, the present invention provides an electronic device including a memory, a processor, and a new product development-based moon cake information processing system stored on the memory and operable on the processor, the new product development-based moon cake information processing system implementing the following steps when executed by the processor:
acquiring a project development requirement document of a new product to be developed;
determining project node triggering events and project node triggering time according to the project development requirement document;
when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event;
outputting a moon factor when the new product to be developed reaches the project node trigger event, wherein the moon factor comprises current development data of the new product to be developed.
Preferably, after the step of outputting the moon node factor when determining that the new product to be developed reaches the project node triggering event is performed by the processor, the method further comprises the steps of:
and testing the current development data of the new product to be developed according to the moon junction factor.
Preferably, when the lunar junction information processing system based on new product development is executed by the processor, the step of determining a project node trigger event and a project node trigger time according to the project development requirement document comprises:
determining attribute information of the project development requirement document;
searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters;
when the pre-stored product development model database is found to have product model attribute information matched with the attribute information of the project development demand document, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database.
Preferably, when the lunar junction information processing system based on new product development is executed by the processor, the step of determining a project node trigger event and a project node trigger time according to the project development requirement document comprises:
when product model attribute information matched with the attribute information of the project development demand document does not exist in the pre-stored product development model database, generating a corresponding project node trigger event and project node trigger time according to the attribute information analysis of the project development demand document;
and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the generated corresponding project node trigger time into the pre-stored product development model database.
In addition, in order to achieve the above object, the present invention also provides a lunar junction information processing method based on new product development, the method comprising:
acquiring a project development requirement document of a new product to be developed;
determining project node triggering events and project node triggering time according to the project development requirement document;
when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event;
outputting a moon factor when the new product to be developed reaches the project node trigger event, wherein the moon factor comprises current development data of the new product to be developed.
Preferably, after the step of outputting a moon node factor when determining that the new product to be developed reaches the project node trigger event, the method further comprises:
and testing the current development data of the new product to be developed according to the moon junction factor.
Preferably, the step of determining the project node trigger event and the project node trigger time according to the project development requirement document includes:
determining attribute information of the project development requirement document;
searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters;
when the pre-stored product development model database is found to have product model attribute information matched with the attribute information of the project development demand document, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database.
Preferably, the step of determining the project node trigger event and the project node trigger time according to the project development requirement document further comprises:
when product model attribute information matched with the attribute information of the project development demand document does not exist in the pre-stored product development model database, generating a corresponding project node trigger event and project node trigger time according to the attribute information analysis of the project development demand document;
the method further comprises the steps of:
and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the generated corresponding project node trigger time into the pre-stored product development model database.
Preferably, the step of determining the project node trigger event and the project node trigger time according to the project development requirement document further comprises:
when product model attribute information matched with the attribute information of the project development requirement document does not exist in the pre-stored product development model database, sending a project trigger information acquisition request to a preset external server, wherein the project trigger information acquisition request comprises the attribute information of the project development requirement document;
and receiving a project node triggering event and project node triggering time which are sent by the preset external server and correspond to the attribute information of the project development requirement document.
Further, to achieve the above object, the present invention also provides a computer-readable storage medium storing a new product development-based moon cake information processing system executable by at least one processor to cause the at least one processor to perform the steps of the new product development-based moon cake information processing method as described above.
The invention provides a new product development-based moon knot information processing method, an electronic device and a readable storage medium. The moon node factor can be automatically output when the project node triggering time is reached and the corresponding project node triggering event is reached, and manual generation of the moon node factor is not needed, so that the moon node factor can be provided for downstream testers in time, the testing progress of the downstream testers is not influenced, and the new product development efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of a preferred embodiment of a lunar junction information handling system based on new product development in accordance with the present invention;
FIG. 2 is a flow chart of a method for processing lunar junction information based on new product development according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that the description of "first", "second", etc. in this disclosure is for descriptive purposes only and is not to be construed as indicating or implying a relative importance or implying an indication of the number of technical features being indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In addition, the technical solutions of the embodiments may be combined with each other, but it is necessary to base that the technical solutions can be realized by those skilled in the art, and when the technical solutions are contradictory or cannot be realized, the combination of the technical solutions should be considered to be absent and not within the scope of protection claimed in the present invention.
The invention provides a lunar junction information processing system based on new product development. Referring now to FIG. 1, therein is shown a schematic diagram of an operating environment for a preferred embodiment of a lunar junction information handling system 10 based on new product development in accordance with the present invention.
In the present embodiment, the lunar junction information processing system 10 based on new product development is installed and operated in the electronic device 1. The electronic device 1 may include, but is not limited to, a memory 11, a processor 12, and a display 13. Fig. 1 shows only an electronic device 1 with components 11-13, but it is understood that not all shown components are required to be implemented, and that more or fewer components may alternatively be implemented.
The memory 11 is at least one type of readable computer storage medium, and the memory 11 may in some embodiments be an internal storage unit of the electronic device 1, such as a hard disk or a memory of the electronic device 1. The memory 11 may in other embodiments also be an external storage device of the electronic apparatus 1, such as a plug-in hard disk, a Smart Media Card (SMC), a Secure Digital (SD) Card, a Flash memory Card (Flash Card) or the like, which are provided on the electronic apparatus 1. Further, the memory 11 may also include both an internal storage unit and an external storage device of the electronic apparatus 1. The memory 11 is used for storing application software and various data installed in the electronic device 1, such as program codes of the lunar junction information processing system 10 based on new product development. The memory 11 may also be used for temporarily storing data that has been output or is to be output.
The processor 12 may in some embodiments be a central processing unit (Central Processing Unit, CPU), microprocessor or other data processing chip for executing program code or processing data stored in the memory 11, such as executing the new product development-based moon-tie information processing system 10, etc.
The display 13 may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, an OLED (Organic Light-Emitting Diode) touch device, or the like in some embodiments. The display 13 is used for displaying information processed in the electronic device 1 and for displaying visual user interfaces, such as project development requirement documents of new products to be developed, corresponding node trigger events and project node trigger times, generated moon cake factors, etc. The components 11-13 of the electronic device 1 communicate with each other via a system bus.
The new product development based month node information processing system 10 includes at least one computer readable instruction stored in the memory 11, which is executable by the processor 12 to implement embodiments of the present application.
Wherein the lunar junction information processing system 10 based on new product development, when executed by the processor 12, performs the following steps:
step S1, acquiring a project development requirement document of a new product to be developed.
In this embodiment, the project development requirement document of the new product to be developed may include a project type, a service function required for project development, service function algorithm information, service function parameter information, a project development time node, and the like. The project type, the business function required by the project development, the business function algorithm information, the business function parameter information and the project development time node can be regarded as attribute information of the project development requirement document.
And step S2, determining project node triggering events and project node triggering time according to the project development requirement document.
Specifically, the project node triggering time and the project node triggering event are determined according to the attribute information of the project development requirement document. A project development requirement document can be provided with a plurality of project node trigger events and project node trigger times, wherein the project node trigger events and the project node trigger times have a one-to-one correspondence.
And step S3, when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event.
In this embodiment, in the development process of a new product to be developed, when the project node trigger time arrives, if the new product to be developed also has reached the project node trigger event currently, step S4 is executed.
And if the new product to be developed does not reach the project node triggering event currently when the project node triggering time arrives, outputting moon knot prompting information and timely prompting the current developer that the moon knot factor needs to be manually output.
And step S4, outputting a moon knot factor when the new product to be developed reaches the project node triggering event, wherein the moon knot factor comprises the current development data of the new product to be developed.
Further, the current development data of the new product to be developed can also be tested according to the moon factor.
In this embodiment, a project node trigger event and a project node trigger time are determined according to a project development requirement document of a new product to be developed, when the project node trigger time arrives, whether the new product to be developed currently reaches the project node trigger event is determined, and when the new product to be developed reaches the project node trigger event, a moon node factor including current development data of the new product to be developed is output. The moon node factor can be automatically output when the project node triggering time is reached and the corresponding project node triggering event is reached, and manual generation of the moon node factor is not needed, so that the moon node factor can be provided for downstream testers in time, the testing progress of the downstream testers is not influenced, and the new product development efficiency is improved.
Further, in an alternative embodiment, based on the foregoing embodiment, the step S2 includes:
and determining attribute information of the project development requirement document.
Searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters.
In this embodiment, the pre-stored product development model may be acquired from an external server or an external network. Or, the method can be automatically stored and generated in a local server according to the attribute information of the historical development products, the corresponding generated project node trigger events and the project node trigger time.
When the product model attribute information matched with the attribute information of the project development demand document exists in a pre-stored product development model database, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database.
In this embodiment, the item node trigger event model parameter corresponding to the product model attribute information matched with the attribute information of the item development requirement document in the pre-stored product development model database is used as the item node trigger event, and the item node trigger time model parameter is used as the item node trigger time.
Therefore, the project node trigger event and the project node trigger time are not required to be manually analyzed and tidied from the project development requirement document of the new product to be developed every time, and the moon junction factor is manually output according to the completion degree of the project node trigger event and the project node trigger time. In the embodiment, when the project node trigger event and the project node trigger time which can be used by the new product to be developed currently exist in the pre-stored product development model database, the moon node factor can be automatically output by directly searching and acquiring from the pre-stored product development model database, so that the efficiency of new product development is effectively improved.
Further, in an alternative embodiment, the step S2 further includes:
when the pre-stored product development model database does not contain product model attribute information matched with the attribute information of the project development demand document, corresponding project node trigger events and project node trigger time are generated according to the attribute information analysis of the project development demand document; and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the project node trigger time into the pre-stored product development model database.
Therefore, when corresponding project node trigger events and project node trigger times are generated according to the attribute information of the project development demand document of the new product to be developed, the attribute information of the project development demand document, and the generated project node trigger events and project node trigger times are updated to the pre-stored product development model database. When the project development requirements matched with the project development requirement documents are obtained again later, the project node trigger event and the project node trigger time do not need to be generated again, the project node trigger event and the project node trigger time do not need to be obtained from an external server or an external network, the corresponding project node trigger event and the project node trigger time can be obtained directly from the pre-stored product development model database, and the efficiency of new product development is further improved.
Further, in an alternative embodiment, the step S2 further includes:
and when the pre-stored product development model database does not contain the product model attribute information matched with the attribute information of the project development requirement document, sending a project trigger information acquisition request to a preset external server or external network, wherein the project trigger information acquisition request comprises the attribute information of the project development requirement document.
In this embodiment, if the external server or the external network pre-stores the corresponding relationship between the attribute information of the project development requirement document corresponding to the project trigger information acquisition request, the project node trigger event and the project node trigger time corresponding to the attribute information of the project development requirement document sent by the external server or the external network are received.
Further, after receiving the project node trigger event and the project node trigger time corresponding to the attribute information of the project development requirement document sent by the external server or the external network, the attribute information of the project development requirement document and the corresponding relationship between the received project node trigger event and the project node trigger time can be updated to a pre-stored product development model database.
If the external server or the external network does not store the attribute information of the project development requirement document corresponding to the project trigger information acquisition request, and the corresponding relation between the project node trigger event and the project node trigger time in advance, the reject information is fed back. After receiving rejection information fed back by an external server or an external network, analyzing and generating a project node trigger event and project node trigger time according to the attribute information of the project development demand document, and updating the attribute information, the project node trigger event and the project node trigger time of the project development demand document into a pre-stored product development model database.
As shown in fig. 2, fig. 2 is a flow chart of an embodiment of a lunar junction information processing method based on new product development according to the present invention, the method includes the following steps:
step S10, acquiring a project development requirement document of a new product to be developed.
In this embodiment, the project development requirement document of the new product to be developed may include a project type, a service function required for project development, service function algorithm information, service function parameter information, a project development time node, and the like. The project type, the business function required by the project development, the business function algorithm information, the business function parameter information and the project development time node can be regarded as attribute information of the project development requirement document.
And step S20, determining project node triggering events and project node triggering time according to the project development requirement document.
Specifically, the project node triggering time and the project node triggering event are determined according to the attribute information of the project development requirement document. A project development requirement document can be provided with a plurality of project node trigger events and project node trigger times, wherein the project node trigger events and the project node trigger times have a one-to-one correspondence.
And step S30, when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event.
In this embodiment, in the process of developing a new product to be developed, when the project node trigger time arrives, if the new product to be developed also has reached the project node trigger event, step S40 is executed.
And if the new product to be developed does not reach the project node triggering event currently when the project node triggering time arrives, outputting moon knot prompting information and timely prompting the current developer that the moon knot factor needs to be manually output.
Step S40, outputting a moon knot factor when determining that the new product to be developed reaches the project node triggering event, wherein the moon knot factor comprises current development data of the new product to be developed.
Further, the current development data of the new product to be developed can also be tested according to the moon factor.
In this embodiment, a project node trigger event and a project node trigger time are determined according to a project development requirement document of a new product to be developed, when the project node trigger time arrives, whether the new product to be developed currently reaches the project node trigger event is determined, and when the new product to be developed reaches the project node trigger event, a moon node factor including current development data of the new product to be developed is output. The moon node factor can be automatically output when the project node triggering time is reached and the corresponding project node triggering event is reached, and manual generation of the moon node factor is not needed, so that the moon node factor can be provided for downstream testers in time, the testing progress of the downstream testers is not influenced, and the new product development efficiency is improved.
Further, in an alternative embodiment, based on the foregoing embodiment, the step S20 includes:
and determining attribute information of the project development requirement document.
Searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters.
In this embodiment, the pre-stored product development model may be acquired from an external server or an external network. Or, the method can be automatically stored and generated in a local server according to the attribute information of the historical development products, the corresponding generated project node trigger events and the project node trigger time.
When the product model attribute information matched with the attribute information of the project development demand document exists in a pre-stored product development model database, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database.
In this embodiment, the item node trigger event model parameter corresponding to the product model attribute information matched with the attribute information of the item development requirement document in the pre-stored product development model database is used as the item node trigger event, and the item node trigger time model parameter is used as the item node trigger time.
Therefore, the project node trigger event and the project node trigger time are not required to be manually analyzed and tidied from the project development requirement document of the new product to be developed every time, and the moon junction factor is manually output according to the completion degree of the project node trigger event and the project node trigger time. In the embodiment, when the project node trigger event and the project node trigger time which can be used by the new product to be developed currently exist in the pre-stored product development model database, the moon node factor can be automatically output by directly searching and acquiring from the pre-stored product development model database, so that the efficiency of new product development is effectively improved.
Further, in an alternative embodiment, the step S20 further includes:
when the pre-stored product development model database does not contain product model attribute information matched with the attribute information of the project development demand document, corresponding project node trigger events and project node trigger time are generated according to the attribute information analysis of the project development demand document; and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the project node trigger time into the pre-stored product development model database.
Therefore, when corresponding project node trigger events and project node trigger times are generated according to the attribute information of the project development demand document of the new product to be developed, the attribute information of the project development demand document, and the generated project node trigger events and project node trigger times are updated to the pre-stored product development model database. When the project development requirements matched with the project development requirement documents are obtained again later, the project node trigger event and the project node trigger time do not need to be generated again, the project node trigger event and the project node trigger time do not need to be obtained from an external server or an external network, the corresponding project node trigger event and the project node trigger time can be obtained directly from the pre-stored product development model database, and the efficiency of new product development is further improved.
Further, in an alternative embodiment, the step S20 further includes:
and when the pre-stored product development model database does not contain the product model attribute information matched with the attribute information of the project development requirement document, sending a project trigger information acquisition request to a preset external server or external network, wherein the project trigger information acquisition request comprises the attribute information of the project development requirement document.
In this embodiment, if the external server or the external network pre-stores the corresponding relationship between the attribute information of the project development requirement document corresponding to the project trigger information acquisition request, the project node trigger event and the project node trigger time corresponding to the attribute information of the project development requirement document sent by the external server or the external network are received.
Further, after receiving the project node trigger event and the project node trigger time corresponding to the attribute information of the project development requirement document sent by the external server or the external network, the attribute information of the project development requirement document and the corresponding relationship between the received project node trigger event and the project node trigger time can be updated to a pre-stored product development model database.
If the external server or the external network does not store the attribute information of the project development requirement document corresponding to the project trigger information acquisition request, and the corresponding relation between the project node trigger event and the project node trigger time in advance, the reject information is fed back. After receiving rejection information fed back by an external server or an external network, analyzing and generating a project node trigger event and project node trigger time according to the attribute information of the project development demand document, and updating the attribute information, the project node trigger event and the project node trigger time of the project development demand document into a pre-stored product development model database.
In addition, the present invention also provides a computer-readable storage medium storing a new product development-based moon cake information processing system executable by at least one processor to cause the at least one processor to perform the steps of the new product development-based moon cake information processing method as in the above embodiments, and specific implementation procedures of the new product development-based moon cake information processing method steps S10, S20, S30, etc. are described above and will not be repeated here.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
From the above description of the embodiments, it will be clear to those skilled in the art that the above-described embodiment method may be implemented by means of software plus a necessary general hardware platform, but of course may also be implemented by means of hardware, although in many cases the former is a preferred embodiment. Based on such understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art in the form of a software product stored in a storage medium (e.g. ROM/RAM, magnetic disk, optical disk) comprising instructions for causing a terminal device (which may be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to perform the method according to the embodiments of the present invention.
The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, and thus do not limit the scope of the claims of the present invention. The foregoing embodiment numbers of the present invention are merely for the purpose of description, and do not represent the advantages or disadvantages of the embodiments. In addition, while a logical order is illustrated in the flowchart, in some cases, the steps illustrated or described may be performed in a different order than is shown.
Those skilled in the art will appreciate that many modifications are possible in which the invention is practiced without departing from its scope or spirit, e.g., features of one embodiment can be used with another embodiment to yield yet a further embodiment. Any modification, equivalent replacement and improvement made within the technical idea of the present invention should be within the scope of the claims of the present invention.
Claims (7)
1. An electronic device comprising a memory, a processor, and a new product development based moon cake information processing system stored on the memory and operable on the processor, the new product development based moon cake information processing system when executed by the processor performing the steps of:
acquiring a project development requirement document of a new product to be developed;
determining project node triggering events and project node triggering time according to the project development requirement document;
when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event;
outputting a moon knot factor when the new product to be developed reaches the project node triggering event, wherein the moon knot factor comprises current development data of the new product to be developed;
the determining the project node triggering event and the project node triggering time according to the project development requirement document comprises the following steps:
determining attribute information of the project development requirement document;
searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters;
when the product model attribute information matched with the attribute information of the project development demand document exists in the pre-stored product development model database, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database;
when product model attribute information matched with the attribute information of the project development requirement document does not exist in the pre-stored product development model database, generating a corresponding project node trigger event and project node trigger time according to the attribute information analysis of the project development requirement document, or sending a project trigger information acquisition request to a preset external server, and receiving the project node trigger event and project node trigger time corresponding to the attribute information of the project development requirement document sent by the preset external server, wherein the project trigger information acquisition request comprises the attribute information of the project development requirement document.
2. The electronic device of claim 1, wherein the new product development-based moon cake information processing system is implemented after the step of outputting a moon cake factor upon determining that the new product to be developed reaches the project node trigger event is performed by the processor, further implementing the steps of:
and testing the current development data of the new product to be developed according to the moon junction factor.
3. The electronic device of claim 1, wherein the new product development based lunar junction information processing system when executed by the processor further performs the steps of:
and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the generated corresponding project node trigger time into the pre-stored product development model database.
4. A new product development-based moon knot information processing method, the method comprising:
acquiring a project development requirement document of a new product to be developed;
determining project node triggering events and project node triggering time according to the project development requirement document;
when the project node triggering time arrives, determining whether the new product to be developed currently reaches the project node triggering event;
outputting a moon knot factor when the new product to be developed reaches the project node triggering event, wherein the moon knot factor comprises current development data of the new product to be developed;
the determining the project node triggering event and the project node triggering time according to the project development requirement document comprises the following steps:
determining attribute information of the project development requirement document;
searching whether product model attribute information matched with the attribute information of the project development requirement document exists in a pre-stored product development model database, wherein the product development model database comprises preset product model attribute information, corresponding project node trigger event model parameters and project node trigger time model parameters;
when the product model attribute information matched with the attribute information of the project development demand document exists in the pre-stored product development model database, determining a corresponding project node trigger event and project node trigger time according to the attribute information of the project development demand document and the pre-stored product development model database;
when product model attribute information matched with the attribute information of the project development requirement document does not exist in the pre-stored product development model database, generating a corresponding project node trigger event and project node trigger time according to the attribute information analysis of the project development requirement document, or sending a project trigger information acquisition request to a preset external server, and receiving the project node trigger event and project node trigger time corresponding to the attribute information of the project development requirement document sent by the preset external server, wherein the project trigger information acquisition request comprises the attribute information of the project development requirement document.
5. The new product development-based moon cake information processing method according to claim 4, wherein after the step of outputting a moon cake factor upon determining that the new product to be developed reaches the project node trigger event, further comprising:
and testing the current development data of the new product to be developed according to the moon junction factor.
6. The new product development-based moon cake information processing method according to claim 4, wherein the method further comprises:
and updating the attribute information of the project development requirement document, the generated corresponding project node trigger event and the generated corresponding project node trigger time into the pre-stored product development model database.
7. A computer-readable storage medium, wherein a new product development-based moon cake information processing system implementing the new product development-based moon cake information processing method according to any one of claims 4 to 6 when executed by a processor is stored thereon.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811221270.XA CN109544097B (en) | 2018-10-19 | 2018-10-19 | Moon knot information processing method based on new product development, electronic device and readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811221270.XA CN109544097B (en) | 2018-10-19 | 2018-10-19 | Moon knot information processing method based on new product development, electronic device and readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109544097A CN109544097A (en) | 2019-03-29 |
CN109544097B true CN109544097B (en) | 2024-04-05 |
Family
ID=65844019
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811221270.XA Active CN109544097B (en) | 2018-10-19 | 2018-10-19 | Moon knot information processing method based on new product development, electronic device and readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109544097B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007015227A1 (en) * | 2005-08-04 | 2007-02-08 | Prolify Ltd. | Apparatus and methods for process and project management and control |
JP2011159202A (en) * | 2010-02-03 | 2011-08-18 | Nippon Telegr & Teleph Corp <Ntt> | Test item generating method, device, and program |
CN105677620A (en) * | 2014-11-21 | 2016-06-15 | 高德软件有限公司 | Generation method and device for project management documents |
CN106682877A (en) * | 2016-12-29 | 2017-05-17 | 江西博瑞彤芸科技有限公司 | Method of project management |
CN108255653A (en) * | 2018-01-02 | 2018-07-06 | 深圳壹账通智能科技有限公司 | The test method and its terminal of a kind of product |
-
2018
- 2018-10-19 CN CN201811221270.XA patent/CN109544097B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007015227A1 (en) * | 2005-08-04 | 2007-02-08 | Prolify Ltd. | Apparatus and methods for process and project management and control |
JP2011159202A (en) * | 2010-02-03 | 2011-08-18 | Nippon Telegr & Teleph Corp <Ntt> | Test item generating method, device, and program |
CN105677620A (en) * | 2014-11-21 | 2016-06-15 | 高德软件有限公司 | Generation method and device for project management documents |
CN106682877A (en) * | 2016-12-29 | 2017-05-17 | 江西博瑞彤芸科技有限公司 | Method of project management |
CN108255653A (en) * | 2018-01-02 | 2018-07-06 | 深圳壹账通智能科技有限公司 | The test method and its terminal of a kind of product |
Also Published As
Publication number | Publication date |
---|---|
CN109544097A (en) | 2019-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109165856B (en) | Dynamic configuration method, device and storage medium of approval chain | |
CN110019486B (en) | Data acquisition method, device, equipment and storage medium | |
US9465724B2 (en) | Method, program, and system for generating test cases | |
CN107545181B (en) | Program operating method, terminal, and computer-readable storage medium | |
CN109446837B (en) | Text auditing method and device based on sensitive information and readable storage medium | |
CN108920370B (en) | Compatibility problem detection method, device and equipment | |
CN108874464B (en) | Automatic scanning assembly method and device for middleware and storage medium | |
CN111181805B (en) | Micro-service test baffle generation method and system based on test case | |
CN113448862B (en) | Software version testing method and device and computer equipment | |
CN108959067A (en) | Test method, device and the computer readable storage medium of search engine | |
CN115576828A (en) | Test case generation method, device, equipment and storage medium | |
CN113126955A (en) | Random data generation method and device, intelligent terminal and storage medium | |
CN111090589A (en) | Software testing method, software testing device and readable storage medium | |
CN113342692A (en) | Test case automatic generation method and device, electronic equipment and storage medium | |
CN109544097B (en) | Moon knot information processing method based on new product development, electronic device and readable storage medium | |
CN111061637B (en) | Interface testing method, interface testing device and storage medium | |
CN111061733B (en) | Data processing method, device, electronic equipment and computer readable storage medium | |
CN112905451A (en) | Automatic testing method and device for application program | |
CN111159028A (en) | Webpage testing method and device | |
CN109063846B (en) | Machine learning operation method, device, equipment and storage medium | |
CN113672497B (en) | Method, device and equipment for generating non-buried point event and storage medium | |
CN110457021B (en) | Index data processing method, device and computer readable storage medium | |
CN109522014B (en) | Algorithm processing method based on new product development, electronic device and readable storage medium | |
CN112162816A (en) | Method and device for checking container cluster resource object and storage medium | |
CN111045720A (en) | Code management method, code management system, server, and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |