CN109537459A
CN109537459A CN201811446478.1A CN201811446478A CN109537459A CN 109537459 A CN109537459 A CN 109537459A CN 201811446478 A CN201811446478 A CN 201811446478A CN 109537459 A CN109537459 A CN 109537459A
Authority
CN
China
Prior art keywords
web plate
skew web
plate support
cast
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811446478.1A
Other languages
Chinese (zh)
Inventor
陈建军
梁桥
裴培
郭恒
赵清源
袁鹏
逯锦伟
苏柯
李晓柯
胡新阳
刘宁
孙启富
谢小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Second Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201811446478.1A priority Critical patent/CN109537459A/en
Publication of CN109537459A publication Critical patent/CN109537459A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of cast-in-situ box girder skew web plate mould bases integral construction methods, the installation that cast-in-situ box girder disk buckles bracket and bottom plate transverse direction I-steel is carried out first, then multiple skew web plate support frames are respectively arranged on corresponding bottom plate transverse direction I-steel, the length that skew web plate support frame adjustable supports beam is adjusted after being installed ensures that the angle of skew web plate and bottom plate meets the installation drawing requirement of skew web plate, finally carries out the installation of skew web plate mould bases and examination.The present invention is supported positioning to skew web plate mould bases using multiple skew web plate support frames, ensure that the installation of skew web plate meets drawing requirement, the fixed supporting beam of skew web plate support frame is used to support skew web plate template and chamfering circular arc template, to ensure that support stiffness and intensity, the construction method of cast-in-situ box girder skew web plate mould bases of the present invention is simple, installation is quick, and working procedure and construction cost is greatly saved.

Description

A kind of cast-in-situ box girder skew web plate mould bases integral construction method
Technical field
The present invention relates to construction of cast-in-situ box-beam field, specifically a kind of cast-in-situ box girder skew web plate mould bases integrated construction side Method.
Background technique
With the emergence of urban traffic blocking, urban viaduct increasingly receives the favor of people, passes through decades Development, overpass construction of cast-in-situ box-beam technique reaches its maturity.How efficiently, the completion construction of cast-in-situ box-beam of safety, and And obtain that owner, management, industry specialists are widely recognized as, it is all the long-cherished wish of science of bridge building teacher all the time.Cast-in-situ box girder bottom plate Cross-sectional form with side plate, side plate and wing plate is usually rounded corner or direct chamfering.Traditional wing plate at side plate more adopt It is ridden on holder jacking with steel pipe pre-bending and does temporary support, template uses bamboo slab rubber at chamfering.Conventional steel supports process numerous Mostly and takes time and effort and also bring many puzzlements to construction party.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of cast-in-situ box girder skew web plate mould bases integral construction methods, can be fast Speed realizes the installation of cast-in-situ box girder skew web plate template, and template mounting structure is stablized, quick detachable.
The technical solution of the present invention is as follows:
A kind of cast-in-situ box girder skew web plate mould bases integral construction method, has specifically included following steps:
(1), cast-in-situ box girder disk is set up first and buckle bracket, then adjust bottom plate transverse direction I-steel absolute altitude, then carry out box beam bottom plate side Line setting-out finally determines installation site of the skew web plate support frame on bottom plate transverse direction I-steel, and crosses;
(2), multiple skew web plate support frames are fixed on bottom plate transverse direction I-steel and skew web plate side template is supported, each The installation steps of skew web plate support frame are as follows: two hold-down supports of each skew web plate support frame bottom end are fixed on bottom plate transverse direction I-shaped Then the bottom end of the fixation supporting beam of skew web plate support frame and adjustable supports beam is hingedly connected to corresponding by the scribing position of steel On hold-down support is solid, finally the top of the fixation supporting beam of side form plate bracing frame and adjustable supports beam is hinged;
(3), multiple skew web plate support frames carry out height and Slope angle adjustment, specific steps are as follows: install skew web plate support frame solid After setting, the length of adjustable supports beam is adjusted to which the whole height and gradient to skew web plate support frame is adjusted, is adjusted After the whole absolute altitude required to design drawing and gradient require, the joint steel pipe on the adjustable supports beam of each skew web plate support frame Right-angle coupler, and the steel pipe right angle fastener on multiple skew web plate support frame Adjustable bracing bars is subjected to horizontal coupled with connecting tube, To increase the stability of multiple skew web plate support frame integrated support;
(4), the more parallel lumps of wood are required to be fixed in the fixation supporting beam of multiple skew web plate support frames according to drawing scheme And the fixation supporting beam of the more lumps of wood and multiple skew web plate support frames is to be mutually perpendicular to structure, then installs side template and circular arc falls Angle formwork, circular arc chamfering template is bolted on the lumps of wood in order to which circular arc chamfering template and side template are spliced, after splicing is good It polishes circular arc chamfering template, it is ensured that seam flatness;
(5), after cast-in-situ box girder skew web plate template and flange plate template are installed, whole examination is carried out.
Each skew web plate support frame includes that there are two the fixed pedestals of U-shaped structure, fixed supporting beam and adjustable Supporting beam, the adjustable supports beam are made of threaded sleeve, upper screw rod and lower screw rod, and the bottom end of the upper screw rod screws togather It is connected on the top of threaded sleeve, the top of the lower screw rod is screwed together on the bottom of threaded sleeve, and upper screw rod Oppositely oriented with lower screw flight, the bottom of screw rod is respectively protruding into two under the fixation supporting beam and adjustable supports beam In fixed pedestal and hinged with corresponding fixed pedestal, on the top of the fixation supporting beam and adjustable supports beam the top of screw rod End is hinged.
The steel pipe right angle fastener fixing is connected on the threaded sleeve of Adjustable bracing bar, and Adjustable bracing bar thread bush Swing handle is fixedly installed on outer wall in the middle part of pipe.
The side template selects bamboo slab rubber, and the circular arc chamfering template selects steel form.
Advantages of the present invention:
The present invention is supported positioning to skew web plate mould bases using multiple skew web plate support frames, and by adjusting multiple skew web plate branch The length adjustment skew web plate of support adjustable supports beam and the angle of bottom plate, it is ensured that the installation of skew web plate meets drawing requirement, fixed Supporting beam is used to support skew web plate template and chamfering circular arc template, thus ensure that support stiffness and intensity, the cast-in-place case of the present invention The construction method of beam skew web plate mould bases is simple, installation is quick, and working procedure and construction cost is greatly saved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of skew web plate support frame support skew web plate mould bases of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of cast-in-situ box girder skew web plate mould bases integral construction method, has specifically included following steps:
(1), cast-in-situ box girder disk is set up first and buckle bracket, then adjust bottom plate transverse direction I-steel absolute altitude, then carry out box beam bottom plate side Line setting-out finally determines installation site of the skew web plate support frame on bottom plate transverse direction I-steel, and crosses;
(2), multiple skew web plate support frames are fixed on bottom plate transverse direction I-steel 1 and skew web plate side template 2 is supported, often A skew web plate support frame includes that there are two the fixed pedestal 4 of U-shaped structure, fixed supporting beam 5 and adjustable supports beam, adjustable supports Beam is made of threaded sleeve 6, upper screw rod 7 and lower screw rod 8, and the bottom end of upper screw rod 7 is screwed together in the top of threaded sleeve 6 On, the top of lower screw rod 8 is screwed together on the bottom of threaded sleeve 6, and the thread rotary orientation of upper screw rod 7 and lower screw rod 8 on the contrary, Swing handle 9 is fixedly installed on the outer wall at 6 middle part of threaded sleeve, the bottom of screw rod 8 under fixed supporting beam 5 and adjustable supports beam It is respectively protruding into two fixed pedestals 4 and hinged with corresponding fixed pedestal 4, the top of fixed supporting beam 5 and adjustable supports The top of screw rod 7 is hinged on beam;
The installation steps of each skew web plate support frame are as follows: two hold-down supports 4 of each skew web plate support frame bottom end are fixed on bottom The scribing position of plate transverse direction I-steel 1, then by screw rod 8 under the fixation supporting beam 5 of skew web plate support frame and adjustable supports beam Bottom end is hingedly connected on corresponding hold-down support solid 4, finally by the fixation supporting beam 5 of side form plate bracing frame and adjustable supports beam The top of upper screw rod 7 is hinged;
(3), multiple skew web plate support frames carry out height and Slope angle adjustment, specific steps are as follows: install skew web plate support frame solid After setting, holds swing handle 9 and rotate the length of the adjusting adjustable supports beam of threaded sleeve 6 to the entirety to skew web plate support frame Height and gradient be adjusted, be adjusted to design drawing requirement absolute altitude and gradient require after, in each skew web plate branch Joint steel pipe right-angle coupler 10 on the threaded sleeve 6 of support adjustable supports beam, and with connecting tube 11 by multiple skew web plate support frames Steel pipe right angle fastener 10 on Adjustable bracing bar carries out horizontal coupled, to increase the stabilization of multiple skew web plate support frame integrated support Property;
(4), the more parallel lumps of wood 12 are required to the fixation supporting beam 5 for being fixed on multiple skew web plate support frames according to drawing scheme The upper and fixation supporting beam 5 of the more lumps of wood 12 and multiple skew web plate support frames is to be mutually perpendicular to structure, then installs side template 2 (bamboo slab rubber) and circular arc chamfering template 3(steel form), circular arc chamfering template 3 is bolted on the lumps of wood 12 in order to which circular arc falls Angle formwork 3 and side template 2 splice, and polish after splicing is good circular arc chamfering template 3, it is ensured that seam flatness;
(5), after cast-in-situ box girder skew web plate template and flange plate template are installed, whole examination is carried out.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of cast-in-situ box girder skew web plate mould bases integral construction method, it is characterised in that: specifically include following steps:
(1), cast-in-situ box girder disk is set up first and buckle bracket, then adjust bottom plate transverse direction I-steel absolute altitude, then carry out box beam bottom plate side Line setting-out finally determines installation site of the skew web plate support frame on bottom plate transverse direction I-steel, and crosses;
(2), multiple skew web plate support frames are fixed on bottom plate transverse direction I-steel and skew web plate side template is supported, each The installation steps of skew web plate support frame are as follows: two hold-down supports of each skew web plate support frame bottom end are fixed on bottom plate transverse direction I-shaped Then the bottom end of the fixation supporting beam of skew web plate support frame and adjustable supports beam is hingedly connected to corresponding by the scribing position of steel On hold-down support is solid, finally the top of the fixation supporting beam of side form plate bracing frame and adjustable supports beam is hinged;
(3), multiple skew web plate support frames carry out height and Slope angle adjustment, specific steps are as follows: install skew web plate support frame solid After setting, the length of adjustable supports beam is adjusted to which the whole height and gradient to skew web plate support frame is adjusted, is adjusted After the whole absolute altitude required to design drawing and gradient require, the joint steel pipe on the adjustable supports beam of each skew web plate support frame Right-angle coupler, and the steel pipe right angle fastener on multiple skew web plate support frame Adjustable bracing bars is subjected to horizontal coupled with connecting tube, To increase the stability of multiple skew web plate support frame integrated support;
(4), the more parallel lumps of wood are required to be fixed in the fixation supporting beam of multiple skew web plate support frames according to drawing scheme And the fixation supporting beam of the more lumps of wood and multiple skew web plate support frames is to be mutually perpendicular to structure, then installs side template and circular arc falls Angle formwork, circular arc chamfering template is bolted on the lumps of wood in order to which circular arc chamfering template and side template are spliced, after splicing is good It polishes circular arc chamfering template, it is ensured that seam flatness;
(5), after cast-in-situ box girder skew web plate template and flange plate template are installed, whole examination is carried out.
2. a kind of cast-in-situ box girder skew web plate mould bases integral construction method according to claim 1, it is characterised in that: it is described Each skew web plate support frame include there are two the fixed pedestal of U-shaped structure, fixed supporting beam and adjustable supports beam, it is described Adjustable supports beam is made of threaded sleeve, upper screw rod and lower screw rod, and the bottom end of the upper screw rod is screwed together in thread bush On the top of pipe, the top of the lower screw rod is screwed together on the bottom of threaded sleeve, and the spiral shell of upper screw rod and lower screw rod Line is oppositely oriented, under the fixation supporting beam and adjustable supports beam the bottom of screw rod be respectively protruding into two fixed pedestals and Hinged with corresponding fixed pedestal, the top of screw rod is hinged on the top of the fixation supporting beam and adjustable supports beam.
3. a kind of cast-in-situ box girder skew web plate mould bases integral construction method according to claim 2, it is characterised in that: it is described Steel pipe right angle fastener fixing be connected on the threaded sleeve of Adjustable bracing bar, and the outer wall in the middle part of Adjustable bracing bar threaded sleeve On be fixedly installed swing handle.
4. a kind of cast-in-situ box girder skew web plate mould bases integral construction method according to claim 1, it is characterised in that: it is described Side template select bamboo slab rubber, the circular arc chamfering template selects steel form.
CN201811446478.1A 2018-11-29 2018-11-29 A kind of cast-in-situ box girder skew web plate mould bases integral construction method Pending CN109537459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811446478.1A CN109537459A (en) 2018-11-29 2018-11-29 A kind of cast-in-situ box girder skew web plate mould bases integral construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811446478.1A CN109537459A (en) 2018-11-29 2018-11-29 A kind of cast-in-situ box girder skew web plate mould bases integral construction method

Publications (1)

Publication Number Publication Date
CN109537459A true CN109537459A (en) 2019-03-29

Family

ID=65851554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811446478.1A Pending CN109537459A (en) 2018-11-29 2018-11-29 A kind of cast-in-situ box girder skew web plate mould bases integral construction method

Country Status (1)

Country Link
CN (1) CN109537459A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565529A (en) * 2019-08-27 2019-12-13 苏州中车建设工程有限公司 Sound barrier basis and case roof beam integration template of pouring
CN112342929A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Continuous beam inclined web circular arc section construction method adopting steel-wood mixed template
CN113373812A (en) * 2021-06-04 2021-09-10 中国建筑一局(集团)有限公司 Supporting device capable of adjusting elevation of bent cap end chamfer template and construction process
CN113512940A (en) * 2021-03-18 2021-10-19 中铁十一局集团第一工程有限公司 Low tower cable-stayed bridge cable beam anchoring block construction process based on adjustable brackets
CN113774802A (en) * 2021-09-17 2021-12-10 黑龙江省龙建路桥第五工程有限公司 Cast-in-place box girder edge protection structure and construction method
CN114525736A (en) * 2022-02-25 2022-05-24 山东淄博环宇桥梁模板有限公司 Preparation process of small-batch special-shaped modular bridge steel template

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3678831B2 (en) * 1996-02-20 2005-08-03 川鉄橋梁鉄構株式会社 Steel-concrete composite floor slab bridge and its construction method
CN104963290A (en) * 2015-07-08 2015-10-07 杭州江润科技有限公司 Mold supporting structure for variable cross-section cast-in-place box girder at section combining horizontal and longitudinal curves, and construction method of the mold supporting structure
CN204691247U (en) * 2015-05-27 2015-10-07 中电建建筑集团有限公司 Novel universal beam form strutting system
CN105178596A (en) * 2015-10-10 2015-12-23 安徽卓良新材料有限公司 Cast-in-place box girder formwork diagonal bracing device
CN105887696A (en) * 2016-05-25 2016-08-24 中交第航务工程局有限公司 Variable-cross-section adjustable integral form board of mobile formwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3678831B2 (en) * 1996-02-20 2005-08-03 川鉄橋梁鉄構株式会社 Steel-concrete composite floor slab bridge and its construction method
CN204691247U (en) * 2015-05-27 2015-10-07 中电建建筑集团有限公司 Novel universal beam form strutting system
CN104963290A (en) * 2015-07-08 2015-10-07 杭州江润科技有限公司 Mold supporting structure for variable cross-section cast-in-place box girder at section combining horizontal and longitudinal curves, and construction method of the mold supporting structure
CN105178596A (en) * 2015-10-10 2015-12-23 安徽卓良新材料有限公司 Cast-in-place box girder formwork diagonal bracing device
CN105887696A (en) * 2016-05-25 2016-08-24 中交第航务工程局有限公司 Variable-cross-section adjustable integral form board of mobile formwork

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565529A (en) * 2019-08-27 2019-12-13 苏州中车建设工程有限公司 Sound barrier basis and case roof beam integration template of pouring
CN112342929A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Continuous beam inclined web circular arc section construction method adopting steel-wood mixed template
CN113512940A (en) * 2021-03-18 2021-10-19 中铁十一局集团第一工程有限公司 Low tower cable-stayed bridge cable beam anchoring block construction process based on adjustable brackets
CN113512940B (en) * 2021-03-18 2022-07-08 中铁十一局集团第一工程有限公司 Low tower cable-stayed bridge cable beam anchoring block construction process based on adjustable brackets
CN113373812A (en) * 2021-06-04 2021-09-10 中国建筑一局(集团)有限公司 Supporting device capable of adjusting elevation of bent cap end chamfer template and construction process
CN113774802A (en) * 2021-09-17 2021-12-10 黑龙江省龙建路桥第五工程有限公司 Cast-in-place box girder edge protection structure and construction method
CN114525736A (en) * 2022-02-25 2022-05-24 山东淄博环宇桥梁模板有限公司 Preparation process of small-batch special-shaped modular bridge steel template

Similar Documents

Publication Publication Date Title
CN109537459A (en) A kind of cast-in-situ box girder skew web plate mould bases integral construction method
CN107558730B (en) The formwork support method and support system of Super High girder with rolled steel section en cased in concrete
CN209260572U (en) A kind of supporting tool of cast-in-situ box girder skew web plate mould bases
CN108979130A (en) A kind of the side wall unilateral side vertical mold device and construction method of adjustable formwork height
CN206337819U (en) A kind of bracing means of concrete structure templates for expansion joints
CN111622482A (en) Simple support frame for steel structure overhanging plate edge and mounting method thereof
CN209958206U (en) Cast-in-situ box girder template
CN202430994U (en) Template limiting clamp
CN111851317B (en) Method for installing arch ring of arch bridge
CN209585630U (en) Building construction formwork adjustable support frame
CN211499816U (en) Device for pouring construction of cantilever support of steel-concrete composite beam
CN208586899U (en) A kind of support frame with oblique jacking
CN109812005B (en) Supporting device for cantilever plate on section steel and construction method thereof
CN207847086U (en) A kind of tall and big beam form support frame
CN116460957A (en) Box girder prefabricated component production construction mould
CN213538700U (en) Supporting structure for concrete construction of cantilever end of steel-concrete composite beam bridge
CN207633366U (en) A kind of inspection shaft reinforcing bearing adjustable support
CN209381058U (en) It is a kind of for dismantling the work-saving device of precast-concrete form
CN208604922U (en) A kind of building template
CN202625670U (en) Adjustable wall-attached support device of tower crane of building
CN205444881U (en) A braced frame for concrete plastic formwork
CN205822778U (en) A kind of huge post of stiffness is without screw aluminum alloy formwork system
CN217026732U (en) Novel steel case roof beam pushes away nose girder for construction
CN115012656B (en) Combined fixture for reserved hole of filler stone and construction method thereof
CN216109673U (en) Large-scale assembled fair-faced concrete composite formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329