- CN110565529A CN110565529A CN201910793725.3A CN201910793725A CN110565529A CN 110565529 A CN110565529 A CN 110565529A CN 201910793725 A CN201910793725 A CN 201910793725A CN 110565529 A CN110565529 A CN 110565529A
- Authority
- CN
- China
- Prior art keywords
- sound barrier
- template
- foundation
- angle steel
- barrier foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
- E01F8/0023—Details, e.g. foundations
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Abstract
the invention discloses a sound barrier foundation and box girder integrated pouring template, wherein an outer side template of the sound barrier foundation is formed by integrally extending and heightening an outer side template of a box girder upwards, an inner side template of the sound barrier foundation adopts rectangular steel plates with the same length as the outer side template of the sound barrier foundation, the outer side template of the sound barrier foundation and the inner side template of the sound barrier foundation are connected by a plurality of П -shaped connecting members arranged at equal intervals along the length direction, the П -shaped connecting members are formed by overlapping two oppositely-arranged bar-shaped angle steels through top surfaces and then splicing the bar-shaped angle steels by combining bolts, the vertical surface of one bar-shaped angle steel is welded with the outer vertical surface of the outer side template of the sound barrier foundation, the vertical surface of the other bar-shaped angle steel is welded with the outer vertical surface of the inner side template of the sound barrier foundation, the outer side polishing process of the sound barrier foundation is omitted, high-altitude edge-facing operation is reduced.
Description
Technical Field
The invention belongs to the technical field of bridge construction, and particularly relates to an integrated pouring template for a sound barrier foundation and a box girder.
Background
The sound barrier is widely used in municipal traffic facilities such as urban rail transit, highway and the like, can absorb sound and reduce noise, and reduces the influence of traffic noise on urban areas.
Taking a bridge as an example, the technology widely adopted at present is to bond reinforcing steel bars on the flange of a box girder after the box girder is poured and is condensed and hardened to reach a certain strength, install a sound barrier foundation template and pour a sound barrier foundation. The method has two main defects, namely, cement paste blocks are easily formed on the outer vertical face at the joint of the sound barrier foundation and the box girder due to template slurry leakage, and the safety risk of high-altitude edge-facing operation exists when the cement paste blocks on the outer vertical face are polished at the later stage; and secondly, the construction of the sound barrier foundation needs to be carried out after the construction of the box girder is finished, so that the construction procedures and the construction period are increased, the investment of time and labor is increased, and the engineering cost is increased.
Disclosure of Invention
The invention aims to save the outer side polishing process of the sound barrier foundation, reduce overhead edge-facing operation and reduce safety risks, and can reduce the times of template installation and concrete pouring, save construction time, reduce labor input and improve the operation efficiency and engineering benefits.
according to the technical scheme, the sound barrier foundation and box girder integrated pouring template comprises a sound barrier foundation outer side template and a sound barrier foundation inner side template, wherein the sound barrier foundation outer side template is formed by integrally extending and heightening the box girder outer side template upwards, the sound barrier foundation inner side template is made of rectangular steel plates with the same length as the sound barrier foundation outer side template, the sound barrier foundation inner side template and the sound barrier foundation outer side template are arranged in parallel, the sound barrier foundation outer side template and the sound barrier foundation inner side template are connected through a plurality of П -shaped connecting members arranged at equal intervals in the length direction, the П -shaped connecting members are formed by splicing two oppositely arranged strip-shaped angle steels after being overlapped through top surfaces and then combining bolts, the strip-shaped vertical surface of one strip-shaped angle steel is welded with the outer vertical surface of the sound barrier foundation outer side template, and the strip-shaped angle steel vertical surface of the other strip-shaped angle steel is welded with the outer vertical surface of the.
Preferably, the stiffening member is welded on the inner side formwork of the sound barrier foundation, the stiffening member is an angle steel plate which is equal to the inner side formwork of the sound barrier foundation, the vertical surface of the angle steel plate is welded with the outer vertical surface of the inner side formwork of the sound barrier foundation, and the top of the angle steel plate is welded with the bottom surface of the strip-shaped angle steel on the corresponding side. The stiffening member plays the effect of reinforcing sound barrier foundation inboard template rigidity, welds with the inboard template of sound barrier foundation, the bar angle steel of corresponding side simultaneously, and the installation is firm reliable.
further preferably, the top surface of bar angle steel is provided with at least three bolt via holes that set up along inside and outside direction equidistance interval, and every П type connecting elements is formed by at least two bolt concatenations to realize the adjustable installation of sound barrier basis outside template and sound barrier basis inboard template interval.
The invention has the beneficial effects that:
(1) The method has the advantages that the sound barrier foundation and the box girder can be integrally poured, and the steel bars are bound to install the sound barrier foundation template after the pouring of the box girder reaches a certain strength, so that the construction operation steps are simplified, the operation efficiency is improved, the construction operation period is shortened, and the economic benefit of the engineering is improved;
(2) The outer side template of the sound barrier foundation is formed by integrally extending and heightening the outer side template of the box girder upwards, so that the quality defect of the joint between the sound barrier foundation template and the box girder caused by slurry leakage of the template can be reduced and even avoided, and the attractiveness of the outer vertical surface of the bridge and the durability of the structure are improved;
(3) The traditional process for installing the sound barrier foundation formwork, particularly installing the outer side formwork of the sound barrier foundation and polishing the cement paste block of the outer vertical surface has the safety risk of high-altitude edge-facing operation, and the operation safety is high.
(4) the pouring height of the sound barrier foundation is usually about 30cm, the weight of the corresponding inner side template is small, the stress of П -shaped connecting members is not large, П -shaped connecting members are formed by overlapping two oppositely-arranged strip-shaped angle steels through top surfaces and then splicing the two strip-shaped angle steels through bolts, the sound barrier foundation is poured between the adjacent II-shaped connecting members, П -shaped connecting members are used for connecting the inner side template and the outer side template of the sound barrier foundation, the inner side template of the sound barrier foundation can be quickly installed and detached, the quick formwork erection and demolding can be further realized, meanwhile, the self weight of the inner side template and the lateral extrusion force of concrete on the inner side template of the sound barrier foundation can be transmitted to the outer side template of the sound barrier foundation, and the.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a left side view of fig. 1.
Fig. 3 is a top view of fig. 1.
Detailed Description
The invention will be further illustrated by the following examples in conjunction with the accompanying drawings:
referring to fig. 1 to 3, the sound barrier foundation and box girder integrated pouring template mainly comprises a sound barrier foundation outer side template 1, a sound barrier foundation inner side template 2 and an П type connecting member 3.
the sound barrier foundation outer side formwork 1 is formed by integrally extending and heightening a box girder outer side formwork upwards, the sound barrier foundation inner side formwork 2 is made of rectangular steel plates which are as long as the sound barrier foundation outer side formwork 1, the sound barrier foundation inner side formwork 2 is arranged in parallel with the sound barrier foundation outer side formwork 1, and the sound barrier foundation outer side formwork 1 and the sound barrier foundation inner side formwork 2 are connected through a plurality of П -shaped connecting members 3 which are arranged at equal intervals in the length direction.
the П -shaped connecting members 3 are formed by splicing two oppositely arranged bar-shaped angle steels 3a through top surface superposition and then combining bolts 3b, wherein the vertical surface of one bar-shaped angle steel 3a is welded with the outer vertical surface of the outer side template 1 of the sound barrier foundation, and the vertical surface of the other bar-shaped angle steel 3a is welded with the outer vertical surface of the inner side template 2 of the sound barrier foundation.
Preferably, the stiffening member 4 is welded on the inner side formwork 2 of the sound barrier foundation, the stiffening member 4 is a gusset plate with the same length as the inner side formwork 2 of the sound barrier foundation, the vertical face of the gusset plate is welded with the outer vertical face of the inner side formwork 2 of the sound barrier foundation, and the top of the gusset plate is welded with the bottom face of the strip-shaped angle steel 3a on the corresponding side.
in addition, the top surface of the strip-shaped angle steel 3a is provided with at least three bolt through holes 3c which are arranged along the inner direction and the outer direction at equal intervals, the number of the bolt through holes is not limited to three, preferably three to four, each П -shaped connecting member 3 is formed by splicing at least two bolts 3b, and therefore the adjustable installation of the distance between the outer side template 1 of the sound barrier foundation and the inner side template 2 of the sound barrier foundation is achieved.
preferably, the П -shaped connecting members 3 are arranged one at an interval along the length direction 1 m-2 m, i.e. the П -shaped connecting members 3 are arranged one at a distance of 1 m-2 m along the bridge direction.
Claims (4)
1. the utility model provides a template is pour with box girder integration to sound barrier basis, its characterized in that includes sound barrier basis outside template (1) and sound barrier basis inboard template (2), sound barrier basis outside template (1) is heightened by the whole upwards extension of box girder outside template, and sound barrier basis inboard template (2) adopt the rectangle steel sheet isometric with sound barrier basis outside template (1), and sound barrier basis inboard template (2) and sound barrier basis outside template (1) parallel arrangement, sound barrier basis outside template (1) and sound barrier basis inboard template (2) link to each other by a plurality of length direction equidistance interval arrangement's П type connecting elements (3), П type facade connecting elements (3) are formed by two bar elevation angle steel (3a) that set up relatively through the top surface coincide after combining bolt (3b) concatenation again, wherein the outer welding of bar angle steel (3a) and sound barrier basis outside template (1), the outer welding of the inboard template (2) of bar angle steel (3a) and sound barrier in addition.
2. The sound barrier foundation and box girder integrated pouring template according to claim 1, characterized in that: the welding has stiffening member (4) on the inboard template of sound barrier basis (2), stiffening member (4) adopt the angle steel board isometric with the inboard template of sound barrier basis (2), and the facade of this angle steel board welds with the outer facade of the inboard template of sound barrier basis (2), and the top of this angle steel board welds with the bottom surface of the bar angle steel (3a) of corresponding side simultaneously.
3. the sound barrier foundation and box girder integrated pouring template according to claim 1 is characterized in that the top surface of the strip-shaped angle steel (3a) is provided with at least three bolt through holes (3c) which are equidistantly arranged along the inner and outer directions at intervals, and each П -shaped connecting member (3) is formed by splicing at least two bolts (3b), so that the distance between the outer side template (1) of the sound barrier foundation and the inner side template (2) of the sound barrier foundation can be adjusted and installed.
4. the sound barrier foundation and box girder integrated pouring template according to any one of claims 1-3, wherein one II-shaped connecting member (3) is arranged at intervals of 1-2 m along the length direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910793725.3A CN110565529B (en) | 2019-08-27 | 2019-08-27 | Sound barrier basis and case roof beam integration template of pouring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910793725.3A CN110565529B (en) | 2019-08-27 | 2019-08-27 | Sound barrier basis and case roof beam integration template of pouring |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110565529A true CN110565529A (en) | 2019-12-13 |
CN110565529B CN110565529B (en) | 2021-05-14 |
Family
ID=68776209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910793725.3A Active CN110565529B (en) | 2019-08-27 | 2019-08-27 | Sound barrier basis and case roof beam integration template of pouring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110565529B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113373808A (en) * | 2021-06-10 | 2021-09-10 | 中铁隧道局集团建设有限公司 | Steel guardrail base and bridge deck integrated prefabricated slab, prefabricated formwork and construction method |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5119731A (en) * | 1989-10-24 | 1992-06-09 | Jean Muller International | Station on a railway or other line, situated on a viaduct |
WO1999058765A1 (en) * | 1998-05-12 | 1999-11-18 | Wolfgang Brunbauer | Soundproofing device |
KR200361190Y1 (en) * | 2004-06-23 | 2004-09-07 | 김길평 | Soundproofing wall for bridge |
CN2773156Y (en) * | 2005-04-13 | 2006-04-19 | 路俊生 | Integrated template of cast-in-situs concrete barrier for bridge |
CN201065644Y (en) * | 2007-07-10 | 2008-05-28 | 宏润建设集团股份有限公司 | Anti-collision wall formwork without supporting bracket |
CN201176570Y (en) * | 2008-03-21 | 2009-01-07 | 东南大学 | Acoustical barrier for elevated bridge |
CN102286915A (en) * | 2011-08-30 | 2011-12-21 | 北京城建设计研究总院有限责任公司 | Urban railway traffic continuous basin type beam |
DE102011051342A1 (en) * | 2011-04-11 | 2012-10-11 | Ed. Züblin Ag | Sound insulation wall installed at e.g. road, has post cap comprising molded tabs that are engaged at upper edge of the soundproofing elements |
US20150376848A1 (en) * | 2014-06-27 | 2015-12-31 | M.H. Corbin, Inc. | Sound Arresting Barrier Having A Spacer Bracket |
CN105755958A (en) * | 2016-03-03 | 2016-07-13 | 中铁二十局集团第四工程有限公司 | Special bracket for construction of whole bilateral post-poured flange plate and application method thereof |
CN206591420U (en) * | 2016-12-07 | 2017-10-27 | 中铁第四勘察设计院集团有限公司 | Driving totally enclosed type box beam in railway box |
CN206635662U (en) * | 2017-04-07 | 2017-11-14 | 天津九为实业有限公司 | A kind of cast-in-place concrete bridge flange plate mould plate supporting device |
CN206987120U (en) * | 2017-08-01 | 2018-02-09 | 汪风珍 | A kind of integral wall form |
CN108005376A (en) * | 2017-11-28 | 2018-05-08 | 天津市鑫福盛新型建筑模板有限公司 | Special fastening connector is used in a kind of New Type Architecture Mode support |
CN207988406U (en) * | 2018-01-20 | 2018-10-19 | 金粤幕墙装饰工程有限公司 | A kind of Side fascia connector |
CN108894133A (en) * | 2018-07-13 | 2018-11-27 | 曾福英 | A kind of municipal administration bridge sound insulation board mounting structure |
KR20180127838A (en) * | 2017-05-22 | 2018-11-30 | 민정미 | Negative reaction control and displacement absorb device for noise barrier of bridges, girder using the same and construction method thereof |
CN109537459A (en) * | 2018-11-29 | 2019-03-29 | 中铁四局集团第二工程有限公司 | A kind of cast-in-situ box girder skew web plate mould bases integral construction method |
CN109736211A (en) * | 2019-03-08 | 2019-05-10 | 中铁十九局集团第三工程有限公司 | The one-piece casting template and erection method of T-type beam side walk slab and sound barrier pedestal |
CN110158479A (en) * | 2019-05-31 | 2019-08-23 | 陕西路桥集团有限公司 | A kind of arc bracket gang form and its erection method for cast-in-situ box girder |
CN110164409A (en) * | 2019-06-14 | 2019-08-23 | 苏州中车建设工程有限公司 | Easy-to-detach protective sleeve of silencing module, array type silencer and mounting and dismounting method |
-
2019
- 2019-08-27 CN CN201910793725.3A patent/CN110565529B/en active Active
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5119731A (en) * | 1989-10-24 | 1992-06-09 | Jean Muller International | Station on a railway or other line, situated on a viaduct |
WO1999058765A1 (en) * | 1998-05-12 | 1999-11-18 | Wolfgang Brunbauer | Soundproofing device |
KR200361190Y1 (en) * | 2004-06-23 | 2004-09-07 | 김길평 | Soundproofing wall for bridge |
CN2773156Y (en) * | 2005-04-13 | 2006-04-19 | 路俊生 | Integrated template of cast-in-situs concrete barrier for bridge |
CN201065644Y (en) * | 2007-07-10 | 2008-05-28 | 宏润建设集团股份有限公司 | Anti-collision wall formwork without supporting bracket |
CN201176570Y (en) * | 2008-03-21 | 2009-01-07 | 东南大学 | Acoustical barrier for elevated bridge |
DE102011051342A1 (en) * | 2011-04-11 | 2012-10-11 | Ed. Züblin Ag | Sound insulation wall installed at e.g. road, has post cap comprising molded tabs that are engaged at upper edge of the soundproofing elements |
CN102286915A (en) * | 2011-08-30 | 2011-12-21 | 北京城建设计研究总院有限责任公司 | Urban railway traffic continuous basin type beam |
US20150376848A1 (en) * | 2014-06-27 | 2015-12-31 | M.H. Corbin, Inc. | Sound Arresting Barrier Having A Spacer Bracket |
CN105755958A (en) * | 2016-03-03 | 2016-07-13 | 中铁二十局集团第四工程有限公司 | Special bracket for construction of whole bilateral post-poured flange plate and application method thereof |
CN206591420U (en) * | 2016-12-07 | 2017-10-27 | 中铁第四勘察设计院集团有限公司 | Driving totally enclosed type box beam in railway box |
CN206635662U (en) * | 2017-04-07 | 2017-11-14 | 天津九为实业有限公司 | A kind of cast-in-place concrete bridge flange plate mould plate supporting device |
KR20180127838A (en) * | 2017-05-22 | 2018-11-30 | 민정미 | Negative reaction control and displacement absorb device for noise barrier of bridges, girder using the same and construction method thereof |
CN206987120U (en) * | 2017-08-01 | 2018-02-09 | 汪风珍 | A kind of integral wall form |
CN108005376A (en) * | 2017-11-28 | 2018-05-08 | 天津市鑫福盛新型建筑模板有限公司 | Special fastening connector is used in a kind of New Type Architecture Mode support |
CN207988406U (en) * | 2018-01-20 | 2018-10-19 | 金粤幕墙装饰工程有限公司 | A kind of Side fascia connector |
CN108894133A (en) * | 2018-07-13 | 2018-11-27 | 曾福英 | A kind of municipal administration bridge sound insulation board mounting structure |
CN109537459A (en) * | 2018-11-29 | 2019-03-29 | 中铁四局集团第二工程有限公司 | A kind of cast-in-situ box girder skew web plate mould bases integral construction method |
CN109736211A (en) * | 2019-03-08 | 2019-05-10 | 中铁十九局集团第三工程有限公司 | The one-piece casting template and erection method of T-type beam side walk slab and sound barrier pedestal |
CN110158479A (en) * | 2019-05-31 | 2019-08-23 | 陕西路桥集团有限公司 | A kind of arc bracket gang form and its erection method for cast-in-situ box girder |
CN110164409A (en) * | 2019-06-14 | 2019-08-23 | 苏州中车建设工程有限公司 | Easy-to-detach protective sleeve of silencing module, array type silencer and mounting and dismounting method |
Non-Patent Citations (1)
Title |
---|
张金秋3: "《U型梁施工工艺》", 30 June 2018 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113373808A (en) * | 2021-06-10 | 2021-09-10 | 中铁隧道局集团建设有限公司 | Steel guardrail base and bridge deck integrated prefabricated slab, prefabricated formwork and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN110565529B (en) | 2021-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107245934A (en) | A kind of assembled steel profiled sheet concrete combined board small box girder | |
CN103924505B (en) | Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate | |
CN201339250Y (en) | Stiffness structure framework beam preformed steel reinforcement framework structure | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
CN108222347A (en) | A kind of big module welding overlapping beam slab of the assembled with plane girder temporary support | |
CN108301545A (en) | A kind of big module overlapping contignation of the assembled with space truss temporary support | |
CN105143570A (en) | Building structure and construction method for same | |
CN201835518U (en) | Seamless combination formwork | |
CN110565529B (en) | Sound barrier basis and case roof beam integration template of pouring | |
CN112281663B (en) | Construction method for widening connection of upper structures of new and old bridges | |
CN211735002U (en) | Steel-concrete combined beam bridge capable of being installed quickly | |
CN202099699U (en) | Elastic supporting vibration isolation component ballast bed | |
CN210086022U (en) | Assembled single-box multi-chamber corrugated steel web box girder | |
CN110863417A (en) | Steel-concrete combined beam bridge capable of being installed quickly and construction method thereof | |
CN110983992A (en) | Cantilever assembling construction process for double-U-box type composite variable-section assembled continuous beam bridge | |
CN215979399U (en) | Middle hole method mid-partition wall lining construction rack | |
CN103669193A (en) | Laterally spliced combination T beam with wavy steel webs and construction method thereof | |
CN211947883U (en) | Integrally-assembled large-span steel truss overbridge | |
WO2022083380A1 (en) | Overhead cover structure system applicable in operational railway line and implementation method for system | |
CN203795293U (en) | Transverse-assembly corrugated steel web combination box beam with few supports | |
CN202200393U (en) | Combined steel structure base and modules thereof | |
CN206571049U (en) | Precast block formula secondary prestress Wavelike steel webplate combination beam | |
CN206570675U (en) | The pretensioned prestressing corrugated steel web plate composite box girder of precast block | |
CN203668808U (en) | Transverse assembled corrugated steel web composite T beam | |
CN213233147U (en) | Prefabricated segment beam assembling temporary quick-dismantling movable support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 214104 room 301-218, block a, Xidong chuangrong building, No. 78, Danshan Road, anzhen street, Xishan District, Wuxi City, Jiangsu Province Patentee after: Jiangsu CRRC Urban Development Co.,Ltd. Patentee after: CRRC CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 215000 NO.115 Yinsheng Road, Shengpu Town, Suzhou Industrial Park, Jiangsu Province Patentee before: SUZHOU CHINA VEHICLE CONSTRUCTION ENGINEERING Co.,Ltd. Patentee before: CRRC CONSTRUCTION ENGINEERING Co.,Ltd. |
|
CP03 | Change of name, title or address |