CN109523859A - A kind of track traffic synthetic monitoring mixing Training Simulation System and method - Google Patents
A kind of track traffic synthetic monitoring mixing Training Simulation System and method Download PDFInfo
- Publication number
- CN109523859A CN109523859A CN201811553636.3A CN201811553636A CN109523859A CN 109523859 A CN109523859 A CN 109523859A CN 201811553636 A CN201811553636 A CN 201811553636A CN 109523859 A CN109523859 A CN 109523859A
- Authority
- CN
- China
- Prior art keywords
- subsystem
- simulation
- monitoring
- training
- track traffic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention discloses a kind of track traffic synthetics to monitor mixing Training Simulation System and method, including being connected respectively with the simulation management with calculating analyzing subsystem and monitoring center simulation subsystem across live synchronization subsystem, simulation management and calculating analyzing subsystem, monitoring center simulation subsystem and gathering simulation subsystem, the output end across live synchronization subsystem;Gathering simulation subsystem is set to monitoring center simulation subsystem and simulation management and calculates between analyzing subsystem, after monitoring center simulation subsystem receives student's operational order, simulation management is then handed down to by gathering simulation subsystem and calculates analyzing subsystem, simulation management manages entire training process based on operational order, emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center picture received with calculating analyzing subsystem.The present invention improves track traffic synthetic Training of Monitoring accuracy of simulation, meets the requirement that monitor understands physical equipment change procedure, improves monitor's capability in handling accident.
Description
Technical field
The invention belongs to track traffic synthetic monitoring technology fields, and in particular to a kind of track traffic synthetic monitoring mixing training
Instruct analogue system and method.
Background technique
Existing track traffic synthetic Training of Monitoring analogue system is the figure to be come based on actual monitored centring system mirror image
Mould library carries out digital modeling and logical simulation to physical equipment, can simulate and emulate practical comprehensive monitoring system and be likely to occur
Various failures, to improve the emergency management ability of comprehensively monitoring personnel.
But there are physics device categories in existing comprehensively monitoring it is various, characteristic is complicated the problems such as, and the equipment having can not
Digital modeling and simulation are carried out, and comprehensively monitoring personnel need the analogue system of a high fidelity, so needing in synthesis
Economic factors are considered in Training of Monitoring analogue system, are carried out minimum configuration according to the physical device at a typical station, are wrapped
The simulation for including station grade comprehensive monitoring system (Integrated Supervision and Control System, ISCS) is set
Electric power monitoring system (Power Supervisory Control And Data Acquisition standby and with regard to ground level
System, PSCADA) analog machine, automatic fire alarm system (Fire Alarm System, analog machine, environment with
Analog machine, the access control system (Access of equipment monitoring system (Building Automation System, BAS)
Control System, ACS) analog machine, broadcast system (Public Address, PA) analog machine, closed-circuit television
The analog machine and passenger information system (Passenger of system (Closed Circuit Television, CCTV)
Information, PIS) analog machine etc., each system has the function of input/output signal amount to simulate with regard to ground level equipment
State.
In addition, the operation characteristic due to some of equipment can not carry out software simulation using current techniques, so needing
Configuration actual physical device is simulated, but actual physical device infusion of financial resources is larger, so the physical characteristic of most equipment
Still it needs to be simulated with software, hybrid simulation is exactly respectively to take the two advantage, improves the authenticity and economy of emulation.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes that a kind of track traffic synthetic monitoring mixes Training Simulation System and method, it is comprehensive
It closes and considers economy and accuracy, digital modeling is carried out to whole station equipments, while carrying out to the equipment at a typical station
Physical modeling can individually use the station of physical modeling to give emulation training as data source, also can be used alone number and build
All stations of mould give emulation or the two combination hybrid simulation mode training, enhance result of training.
It realizes above-mentioned technical purpose, reaches above-mentioned technical effect, the invention is realized by the following technical scheme:
In a first aspect, the present invention provides a kind of track traffic synthetics to monitor mixing Training Simulation System, comprising:
It is described to be used for across live synchronization subsystem and be located at comprehensively monitoring control centre scene across live synchronization subsystem
Comprehensive monitoring system real time communication obtains emulation profile data, comprehensive monitoring system model and comprehensively monitoring center picture;
Simulation management and calculate analyzing subsystem, the simulation management with calculate analyzing subsystem with described across live synchronous
Subsystem is connected, and receives emulation profile data, comprehensive monitoring system model and the comprehensively monitoring sent across live synchronization subsystem
Center picture;
Monitoring center simulation subsystem, the monitoring center simulation subsystem is for analog synthesis monitoring control centre scene
Comprehensively monitoring center function, be connected with described across live synchronization subsystem, receive across live synchronization subsystem sends imitate
True profile data, comprehensive monitoring system model and comprehensively monitoring center picture, and respond student's operational order;
Gathering simulation subsystem, the gathering simulation subsystem include analog acquisition channel, are set to the monitoring center
Between simulation subsystem and simulation management and calculating analyzing subsystem, refer to when monitoring center simulation subsystem receives student's operation
After order, then the operational order is handed down to simulation management by the analog acquisition channel and calculates analyzing subsystem, it is described
Simulation management and calculate analyzing subsystem based on receive operational order, emulation profile data, comprehensive monitoring system model and
Comprehensively monitoring center picture manages entire training process.
Preferably, monitoring center simulation subsystem and emulation pipe are realized using shared drive method in the analog acquisition channel
Data interaction between reason and calculating analyzing subsystem.
Preferably, the track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem,
The physical equipment analog subsystem is the physical equipment similar with practical typical case station configured based on minimization principle, is used for
Simulate the state in actual physical device operational process;
The gathering simulation subsystem further includes physics acquisition channel, and the physics acquisition channel is set to the monitoring center
Between simulation subsystem and physical equipment analog subsystem.
Preferably, it when the track traffic synthetic, which monitors mixing Training Simulation System, to be emulated, only enables simulation and adopts
Collect channel, realizes pure digi-tal analog simulation;
Alternatively, only enabling physics acquisition when the track traffic synthetic monitors mixing Training Simulation System and emulated
Pure physical simulation is realized in channel;
Alternatively, when the track traffic synthetic monitors mixing Training Simulation System and emulated, the typical station of setting
Physics acquisition channel is enabled, other stations enable analog acquisition channel, realize hybrid analog-digital simulation emulation.
Preferably, the simulation management includes: with analyzing subsystem is calculated
Section management module, the section management module for the emulation profile data received is increased, is deleted,
Modification and taking-up processing;
Fault management module, the fault management module are used for based on emulation profile data, comprehensive monitoring system model
With comprehensively monitoring center picture obtain simulated fault information increased, delete and modification processing;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to customize input/output signal according to physical equipment operation characteristic
Between correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include religion for teacher
Member's operation information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, temporary
Stop training and terminating training control operation;
Computation analysis module, the computation analysis module be used for based on emulation profile data, comprehensive monitoring system model and
Comprehensively monitoring center picture calculates equipment operation logic, and analytical equipment operating status counts equipment operating index.
Second aspect, the present invention provides a kind of track traffic synthetics to monitor mixing Simulated training method, comprising:
Establish the monitoring mixing Training Simulation System of track traffic synthetic described in claim 1;
It is imitative using being obtained from the comprehensive monitoring system for being located at comprehensively monitoring control centre scene across live synchronization subsystem
True profile data, comprehensive monitoring system model and comprehensively monitoring center picture, and be sent respectively to simulation management and calculate analyze
Subsystem and monitoring center simulation subsystem;
After monitoring center simulation subsystem receives student's operational order, then the operational order is passed through into the acquisition
Analog acquisition channel in simulation subsystem is handed down to simulation management and calculates analyzing subsystem, the simulation management and calculating point
Analysis subsystem is based on operational order, emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center picture received
Manage entire training process.
Preferably, monitoring center simulation subsystem and emulation pipe are realized using shared drive method in the analog acquisition channel
Data interaction between reason and calculating analyzing subsystem.
Preferably, the track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem,
The physical equipment analog subsystem is based on minimization principle and configures physical equipment similar with practical typical case station, for simulating
State in actual physical device operational process;
The gathering simulation subsystem further includes physics acquisition channel, and the physics acquisition channel is set to the monitoring center
Between simulation subsystem and physical equipment analog subsystem.
Preferably, it when the track traffic synthetic, which monitors mixing Training Simulation System, to be emulated, only enables simulation and adopts
Collect channel, realizes pure digi-tal analog simulation;
Alternatively, only enabling physics acquisition when the track traffic synthetic monitors mixing Training Simulation System and emulated
Pure physical simulation is realized in channel;
Alternatively, when the track traffic synthetic monitors mixing Training Simulation System and emulated, the typical station of setting
Physics acquisition channel is enabled, other stations enable analog acquisition channel, realize hybrid analog-digital simulation emulation.
Preferably, the simulation management includes: with analyzing subsystem is calculated
Section management module, the section management module for the emulation profile data received is increased, is deleted,
Modification and taking-up processing;
Fault management module, the fault management module are used to be based on the emulation profile data, comprehensive monitoring system mould
Type and comprehensively monitoring center picture handle the increase, deletion and modification of simulated fault information;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to customize input/output signal according to physical equipment operation characteristic
Between correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include religion for teacher
Member's operation information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, temporary
Stop training and terminating training control operation;
Computation analysis module, the computation analysis module are used to be based on the emulation profile data, comprehensive monitoring system mould
Type and comprehensively monitoring center picture calculate equipment operation logic, and analytical equipment operating status counts equipment operating index.
Compared with prior art, beneficial effects of the present invention:
A kind of track traffic synthetic monitoring mixing Training Simulation System of the invention and method, comprehensively consider economy and standard
True property carries out digital modeling to whole station equipments, while carrying out physical modeling to the equipment at a typical station, can be independent
The station of physical modeling is used to give emulation training as data source, all stations that also can be used alone digital modeling are trained
Instruction emulation or the two combination hybrid simulation mode, not only increase track traffic synthetic Training of Monitoring accuracy of simulation, meet
Monitor understands the requirement of physical equipment change procedure, and also achieves and improve monitor capability in handling accident.
Detailed description of the invention
Fig. 1 is the track traffic synthetic monitoring mixing Training Simulation System structural schematic diagram of an embodiment of the present invention;
Fig. 2 is a kind of flow chart of track traffic synthetic monitoring mixing Simulated training method of an embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Application principle of the invention is explained in detail with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1, the embodiment of the invention provides a kind of track traffic synthetics to monitor mixing Training Simulation System, packet
It includes: across live synchronization subsystem, simulation management and calculating analyzing subsystem, monitoring center simulation subsystem and gathering simulation subsystem
System;
It is described across live synchronization subsystem be used for be located at comprehensively monitoring control centre scene comprehensive monitoring system it is real-time
Communication obtains emulation profile data, comprehensive monitoring system model and comprehensively monitoring center picture;The comprehensively monitoring control centre
Belong to scene one, the track traffic synthetic monitoring mixing Training Simulation System belongs to scene two, and scene one and scene two pass through
Realize that emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center at scene two are arrived in scene one across live simultaneous techniques
Picture synchronization;
Emulation profile data described in the embodiment of the present invention refers to a certain moment, collected in comprehensive monitoring system
Equipment running status data, for example, the running position of the start-stop of air-conditioning, the start-stop of elevator, train, train the speed of service, whether
There are alarm of fire, gate operating status, flow of the people etc. multidate information, for for simulation management and calculating analyzing subsystem conduct
Then the system initial state of training can simulate one fire of setting on this basis, then simulate train obstruction, the stream of people
Evacuation, elevator deactivate situations such as fire-fighting starting, this belongs to the prior art, which data specifically included in the emulation profile data
Determine according to the actual situation;
What is recorded in the comprehensive monitoring system model is how many seat coach station of system, how many air-conditioning of each station,
The static informations such as how many elevator, how many shield door are recorded on emulation section number above-mentioned as the operating status of these equipment
In.In simulated environment, the emulation profile data that is synchronized by using real system, comprehensive monitoring system model and
Comprehensively monitoring center picture, it is consistent by being only of seeing of start-up and real system height.
The simulation management is connected with calculating analyzing subsystem with described across live synchronization subsystem, receives synchronous across scene
Emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center picture that subsystem is sent;In the embodiment of the present invention
In a kind of specific embodiment, the simulation management is specifically included with analyzing subsystem is calculated:
Section management module, the section management module for the emulation profile data received is increased, is deleted,
Modification and taking-up processing;
Fault management module, the fault management module are used for based on emulation profile data, comprehensive monitoring system model
Increase, deletion and the modification processing of the simulated fault information obtained with comprehensively monitoring center picture;The fault message record
Be the fault message at equipment or station, for example when fire occurs, this fire information is wanted certainly in correlation model
Station etc., after fire occurs, the closing of shield door, the obstruction of vehicle, and preservation and observation are realized by picture;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to customize input/output signal according to physical equipment operation characteristic
Between correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include religion for teacher
Member's operation information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, temporary
Stop training and terminating training control operation;
Computation analysis module, the computation analysis module be used for based on emulation profile data, comprehensive monitoring system model and
Comprehensively monitoring center picture calculates equipment operation logic, and analytical equipment operating status counts equipment operating index;It is supervised due to comprehensive
What is recorded in control system model is the logical relation between equipment, such as how many station of line, how many screen of this station
Door, how many elevator, how many gate etc. are covered, after having chain logic, such as generation fire between these equipment, train should be prohibited
Only enter the station, elevator should be automatically opened and be stopped transport etc., these logical relations need to go to simulate with software, and are finally reflected comprehensive
It closes on monitoring center picture.
Comprehensively monitoring center function of the monitoring center simulation subsystem for analog synthesis monitoring control centre scene,
It is connected with described across live synchronization subsystem, receives emulation profile data, the comprehensively monitoring sent across live synchronization subsystem
System model and comprehensively monitoring center picture, and student's operational order is responded, in monitoring center simulation subsystem, described is imitative
True profile data is used as the original state of emulation, and the comprehensive monitoring system model is plus emulation profile data and comprehensively monitoring
Center picture just can guarantee that the system that the sum seen in simulated environment uses is consistent with real system height;The synthesis
Monitoring control centre is the Departmental organization mechanism using comprehensive monitoring system, and monitoring center simulation subsystem simulates this department
Staff monitors each equipment of entire track circuit by comprehensive monitoring system, controls, accident treatment etc.;
The gathering simulation subsystem includes analog acquisition channel, is set to the monitoring center simulation subsystem and emulation
Between management and calculating analyzing subsystem, after monitoring center simulation subsystem receives student's operational order, then by the behaviour
Work instruction is handed down to simulation management by the analog acquisition channel and calculates analyzing subsystem, the simulation management and calculating point
Analysis subsystem is based on operational order, emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center picture received
Entire training process is managed, the operational order refers to the operation that monitor carries out equipment using comprehensive monitoring system,
Such as starting air-conditioning etc..In the preferred embodiment of the embodiment of the present invention, the analog acquisition channel is real using shared drive method
Data interaction between existing monitoring center simulation subsystem and simulation management and calculating analyzing subsystem.
Embodiment 2
Based on inventive concept same as Example 1, the embodiment of the present invention the difference from embodiment 1 is that:
The track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem, the physics
Equipment simulating subsystem is based on minimization principle configuration physical equipment similar with practical typical station, that is, consider economy because
Element only selects a typical station, configures physical equipment similar with practical station by minimization principle to simulate physical device
State in operational process;For example actual conditions are two air-conditionings to be equipped on car, and physical equipment analog subsystem can be with
An air-conditioning is only configured, to realize reduction capital investment, is carried out from economy point if letter matches, is exactly no matter scene is practical
There are several equipment, every kind of equipment only configures 1;The specific works logic of physical equipment analog subsystem is exactly to receive control life
It enables, and switches corresponding operating status;
The gathering simulation subsystem includes physics acquisition channel, and the physics acquisition channel is imitative set on the monitoring center
Between true subsystem and physical equipment analog subsystem, in the preferred embodiment of the embodiment of the present invention, the physics acquisition
Channel can select 104 specifications to realize that the data between monitoring center simulation subsystem and physical equipment analog subsystem are handed over
Mutually;
When the track traffic synthetic, which monitors mixing Training Simulation System, to be emulated, it can choose only to enable to simulate and adopt
Collect channel, realizes pure digi-tal analog simulation;
Alternatively, can choose and only enable when the track traffic synthetic monitors mixing Training Simulation System and emulated
Physics acquisition channel realizes pure physical simulation;
Alternatively, when the track traffic synthetic monitors mixing Training Simulation System and emulated, the typical case that can set
Station enables physics acquisition channel, and other stations enable analog acquisition channel, realizes hybrid analog-digital simulation emulation.The typical case of the setting
Station is gone to design according to the actual situation, which can be understood in conjunction with following citing, for example assume a railway line
There are ten stations on road, and using emulation profile data, a remaining station uses to press and minimize the operating status of preceding nine station equipments
The data sent on the typical station of principle configuration, when control command is sent to preceding nine stations, because without actual physical device,
The operating status variation of equipment is software calculating simulation certainly, if the tenth station is sent to, because there is actual physics to set
Standby, this when, there is no need to software calculating simulations, after actual physical equipment receives control command, it is assumed that are that shield door is opened
Order is opened, shield door may turn on, and shielding door state is sent on simulation monitoring center: open.It is briefly exactly that a part is set
Standby state is software calculating simulation, and a part is sent on physical device.
Embodiment 3
Based on inventive concept identical with Examples 1 and 2, a kind of track traffic synthetic prison is provided in the embodiment of the present invention
Control mixing Simulated training method, as shown in Fig. 2, specifically includes the following steps:
Track traffic synthetic monitoring mixing Training Simulation System in constitution and implementation example 1;
It is imitative using being obtained from the comprehensive monitoring system for being located at comprehensively monitoring control centre scene across live synchronization subsystem
True profile data, comprehensive monitoring system model and comprehensively monitoring center picture, and be sent respectively to simulation management and calculate analyze
Subsystem and monitoring center simulation subsystem;
After monitoring center simulation subsystem receives student's operational order, then the operational order is passed through into the acquisition
Analog acquisition channel in simulation subsystem is handed down to simulation management and calculates analyzing subsystem, the simulation management and calculating point
Analysis subsystem is based on operational order, emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center picture received
Manage entire training process;In the preferred embodiment of the embodiment of the present invention, the analog acquisition channel uses shared drive
Method realizes monitoring center simulation subsystem and simulation management and calculates the data interaction between analyzing subsystem.
The track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem, the physics
Equipment simulating subsystem is the physical equipment similar with practical typical case station configured by minimization principle, for simulating reality
State in physical equipment operational process, the specific works logic of physical equipment analog subsystem be exactly receive control command, and
Switch corresponding operating status;
The gathering simulation subsystem further includes physics acquisition channel, and the physics acquisition channel is set to the monitoring center
Between simulation subsystem and physical equipment analog subsystem.
When the track traffic synthetic, which monitors mixing Training Simulation System, to be emulated, analog acquisition channel is only enabled,
Realize pure digi-tal analog simulation;
Alternatively, only enabling physics acquisition when the track traffic synthetic monitors mixing Training Simulation System and emulated
Pure physical simulation is realized in channel;
Alternatively, when the track traffic synthetic monitors mixing Training Simulation System and emulated, the typical station of setting
Physics acquisition channel is enabled, other stations enable analog acquisition channel, realize hybrid analog-digital simulation emulation;Physical equipment simulation, simulation
Be physical device in station, the simulation of monitoring center simulation subsystem is prison after the operating status for collecting these equipment
Depending on and control operation;
The preferably described simulation management with calculate analyzing subsystem include:
Section management module, the section management module for the emulation profile data received is increased, is deleted,
Modification and taking-up processing;
Fault management module, the fault management module are used for based on emulation profile data, comprehensive monitoring system model
Increase, deletion and the modification processing of the simulated fault information obtained with comprehensively monitoring center picture;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to customize input/output signal according to physical equipment operation characteristic
Between correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include religion for teacher
Member's operation information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, temporary
Stop training and terminating training control operation;
Computation analysis module, the computation analysis module are used to be based on the emulation profile data, comprehensive monitoring system mould
Type and comprehensively monitoring center picture calculate equipment operation logic, and analytical equipment operating status counts equipment operating index, this is based on
Emulation profile data, comprehensive monitoring system model and comprehensively monitoring center picture calculate, analysis and the process counted can adopt
It goes to realize with the prior art, and is that how specifically to be calculated, analyzed and counted be to go determination according to actual demand, because
This, does not do excessive repeat in the present invention.
In summary: the present invention proposes that a kind of track traffic synthetic monitoring mixes Training Simulation System and method, and synthesis is examined
Consider economy and accuracy, digital modeling is carried out to whole station equipments, while physics is carried out to the equipment at a typical station
Modeling, can individually use the station of physical modeling to give emulation training as data source, also can be used alone digital modeling
All stations give emulation or the two combination hybrid simulation mode training, enhance result of training.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (10)
1. a kind of track traffic synthetic monitoring mixing Training Simulation System characterized by comprising
It is described to be used for and the synthesis positioned at comprehensively monitoring control centre scene across live synchronization subsystem across live synchronization subsystem
Monitoring system real time communication obtains emulation profile data, comprehensive monitoring system model and comprehensively monitoring center picture;
Simulation management and calculate analyzing subsystem, the simulation management with calculate analyzing subsystem and described across live synchronous subsystem
System is connected, and receives emulation profile data, comprehensive monitoring system model and the comprehensively monitoring center sent across live synchronization subsystem
Picture;
Monitoring center simulation subsystem, the monitoring center simulation subsystem are comprehensive for analog synthesis monitoring control centre scene
Monitoring center function is closed, is connected with described across live synchronization subsystem, it is disconnected to receive the emulation sent across live synchronization subsystem
Face data, comprehensive monitoring system model and comprehensively monitoring center picture, and respond student's operational order;
Gathering simulation subsystem, the gathering simulation subsystem include analog acquisition channel, are set to the monitoring center and emulate
Between subsystem and simulation management and calculating analyzing subsystem, when monitoring center simulation subsystem receives student's operational order
Afterwards, then the operational order is handed down to simulation management by the analog acquisition channel and calculates analyzing subsystem, it is described imitative
True management with calculate analyzing subsystem based on the operational order received, emulate profile data, comprehensive monitoring system model and comprehensive
It closes monitoring center picture and manages entire training process.
2. a kind of track traffic synthetic monitoring mixing Training Simulation System according to claim 1, it is characterised in that: described
Monitoring center simulation subsystem and simulation management are realized using shared drive method and calculates analyzing subsystem in analog acquisition channel
Between data interaction.
3. a kind of track traffic synthetic monitoring mixing Training Simulation System according to claim 1, it is characterised in that: described
Track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem, and the physical equipment simulates subsystem
System is the physical equipment similar with practical typical case station configured based on minimization principle, is run for simulating actual physical device
State in the process;
The gathering simulation subsystem further includes physics acquisition channel, and the physics acquisition channel is emulated set on the monitoring center
Between subsystem and physical equipment analog subsystem.
4. a kind of track traffic synthetic monitoring mixing Training Simulation System according to claim 3, it is characterised in that: work as institute
Track traffic synthetic monitoring mixing Training Simulation System is stated when being emulated, analog acquisition channel is only enabled, realizes cardinar number type matrix
Quasi- emulation;
Alternatively, physics acquisition channel is only enabled when the track traffic synthetic monitors mixing Training Simulation System and emulated,
Realize pure physical simulation;
Alternatively, the typical station of setting enables when the track traffic synthetic monitors mixing Training Simulation System and emulated
Physics acquisition channel, other stations enable analog acquisition channel, realize hybrid analog-digital simulation emulation.
5. a kind of track traffic synthetic monitoring mixing Training Simulation System according to claim 1, it is characterised in that: described
Simulation management with calculate analyzing subsystem include:
Section management module, the section management module is for increasing the emulation profile data received, being deleted, being modified
It is handled with taking-up;
Fault management module, the fault management module are used for based on emulation profile data, comprehensive monitoring system model and comprehensive
Close monitoring center picture obtain simulated fault information increased, delete and modification processing;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to be customized between input/output signal according to physical equipment operation characteristic
Correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include teacher behaviour for teacher
Make information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, pause training
Instruction and end training control operation;
Computation analysis module, the computation analysis module are used for based on emulation profile data, comprehensive monitoring system model and synthesis
Monitoring center picture calculates equipment operation logic, and analytical equipment operating status counts equipment operating index.
6. a kind of track traffic synthetic monitoring mixing Simulated training method characterized by comprising
Establish the monitoring mixing Training Simulation System of track traffic synthetic described in claim 1;
It is disconnected using emulation is obtained from the comprehensive monitoring system for being located at comprehensively monitoring control centre scene across live synchronization subsystem
Face data, comprehensive monitoring system model and comprehensively monitoring center picture, and be sent respectively to simulation management and calculate analysis subsystem
System and monitoring center simulation subsystem;
After monitoring center simulation subsystem receives student's operational order, then the operational order is passed through into the gathering simulation
Analog acquisition channel in subsystem is handed down to simulation management and calculates analyzing subsystem, the simulation management and calculating analysis
System is based on operational order, emulation profile data, comprehensive monitoring system model and the picture management of comprehensively monitoring center received
Entire training process.
7. a kind of track traffic synthetic monitoring mixing Simulated training method according to claim 6, it is characterised in that: described
Monitoring center simulation subsystem and simulation management are realized using shared drive method and calculates analyzing subsystem in analog acquisition channel
Between data interaction.
8. a kind of track traffic synthetic monitoring mixing Simulated training method according to claim 6, it is characterised in that: described
Track traffic synthetic monitoring mixing Training Simulation System further includes physical equipment analog subsystem, and the physical equipment simulates subsystem
System is based on minimization principle configuration physical equipment similar with practical typical case station, for simulating actual physical device operational process
In state;
The gathering simulation subsystem further includes physics acquisition channel, and the physics acquisition channel is emulated set on the monitoring center
Between subsystem and physical equipment analog subsystem.
9. a kind of track traffic synthetic monitoring mixing Simulated training method according to claim 8, it is characterised in that: work as institute
Track traffic synthetic monitoring mixing Training Simulation System is stated when being emulated, analog acquisition channel is only enabled, realizes cardinar number type matrix
Quasi- emulation;
Alternatively, physics acquisition channel is only enabled when the track traffic synthetic monitors mixing Training Simulation System and emulated,
Realize pure physical simulation;
Alternatively, the typical station of setting enables when the track traffic synthetic monitors mixing Training Simulation System and emulated
Physics acquisition channel, other stations enable analog acquisition channel, realize hybrid analog-digital simulation emulation.
10. a kind of track traffic synthetic monitoring mixing Simulated training method according to claim 6, it is characterised in that: institute
Simulation management, which is stated, with analyzing subsystem is calculated includes:
Section management module, the section management module is for increasing the emulation profile data received, being deleted, being modified
It is handled with taking-up;
Fault management module, the fault management module be used for based on the emulation profile data, comprehensive monitoring system model and
Comprehensively monitoring center picture handles the increase, deletion and modification of simulated fault information;
Teaching notes management module, the teaching notes management module are used for the increase to training teaching notes information, deletion and modification and handle;
Logic custom module, the logic custom module are used to be customized between input/output signal according to physical equipment operation characteristic
Correlation logic;
Monitoring module is trained, the training monitoring module monitors that entire training process, monitoring information include teacher behaviour for teacher
Make information, student's operation information and equipment operation information;
Control module is trained, the training control module controls entire training process for teacher, including starts training, pause training
Instruction and end training control operation;
Computation analysis module, the computation analysis module be used for based on the emulation profile data, comprehensive monitoring system model and
Comprehensively monitoring center picture calculates equipment operation logic, and analytical equipment operating status counts equipment operating index.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811553636.3A CN109523859B (en) | 2018-12-19 | 2018-12-19 | Track traffic comprehensive monitoring hybrid training simulation system and method |
PCT/CN2019/092683 WO2020124974A1 (en) | 2018-12-19 | 2019-06-25 | Integrated railway transit supervision control and training simulation system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811553636.3A CN109523859B (en) | 2018-12-19 | 2018-12-19 | Track traffic comprehensive monitoring hybrid training simulation system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109523859A true CN109523859A (en) | 2019-03-26 |
CN109523859B CN109523859B (en) | 2021-08-27 |
Family
ID=65796364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811553636.3A Active CN109523859B (en) | 2018-12-19 | 2018-12-19 | Track traffic comprehensive monitoring hybrid training simulation system and method |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN109523859B (en) |
WO (1) | WO2020124974A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110104034A (en) * | 2019-04-29 | 2019-08-09 | 南京南瑞继保电气有限公司 | A kind of across field data comparative approach of track traffic synthetic monitoring system |
WO2020124974A1 (en) * | 2018-12-19 | 2020-06-25 | 南京南瑞继保电气有限公司 | Integrated railway transit supervision control and training simulation system and method |
CN112208587A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
CN112446148A (en) * | 2020-11-24 | 2021-03-05 | 南京轨道交通系统工程有限公司 | Data simulation system and method based on urban rail comprehensive monitoring |
CN112631144A (en) * | 2020-11-20 | 2021-04-09 | 国网山东省电力公司电力科学研究院 | Comprehensive energy real-time digital physical hybrid simulation system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1707276A (en) * | 2005-05-24 | 2005-12-14 | 武汉大学 | Real-time emulation method and apparatus for electric system |
US20090325694A1 (en) * | 2008-06-27 | 2009-12-31 | Microsoft Corpration | Macroscopic quantum effects for computer games |
CN102436556A (en) * | 2012-01-09 | 2012-05-02 | 国电南瑞科技股份有限公司 | Track traffic accident inversion system |
CN103123758A (en) * | 2012-11-28 | 2013-05-29 | 大同电力高级技工学校 | Dispatching automation digital physical hybrid simulation training system |
CN103544863A (en) * | 2013-10-22 | 2014-01-29 | 国电南瑞科技股份有限公司 | Track traffic integrated supervision training simulation system data interaction module and working method |
CN104485042A (en) * | 2014-12-02 | 2015-04-01 | 国家电网公司 | Digital-analog hybrid simulation system and method of controllable series compensator |
CN105139712A (en) * | 2015-09-15 | 2015-12-09 | 中国南方电网有限责任公司电网技术研究中心 | On-line dispatcher training simulator based on real-time simulation and method thereof. |
CN106057008A (en) * | 2016-06-28 | 2016-10-26 | 南京南瑞继保电气有限公司 | Dispatcher training simulation system based on real-time simulator and construction method |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103258452A (en) * | 2012-02-21 | 2013-08-21 | 天津市维科车辆技术有限公司 | Virtuality and reality combination urban railway transit analog simulation practical training device and method |
CN103295441B (en) * | 2012-02-29 | 2015-04-01 | 上海工程技术大学 | Fire disaster working condition simulation system for urban railway traffic vehicle station |
WO2017165947A1 (en) * | 2016-03-31 | 2017-10-05 | Cae Inc. | Method and systems for removing the most extraneous data record from a remote repository |
CN105913713B (en) * | 2016-06-14 | 2018-08-21 | 成都运达科技股份有限公司 | Subway scheduling simulation training system and method |
US10712734B2 (en) * | 2017-03-31 | 2020-07-14 | Cae Inc. | Continuous monitoring of a model in an interactive computer simulation station |
CN107123333A (en) * | 2017-07-11 | 2017-09-01 | 河北信成发科技有限公司 | Standardize Platform attendant panorama real training appraisal system |
CN107403580B (en) * | 2017-07-20 | 2023-05-23 | 兰州安信铁路科技有限公司 | Railway signal integrated system experiment platform |
CN109523859B (en) * | 2018-12-19 | 2021-08-27 | 南京南瑞继保电气有限公司 | Track traffic comprehensive monitoring hybrid training simulation system and method |
-
2018
- 2018-12-19 CN CN201811553636.3A patent/CN109523859B/en active Active
-
2019
- 2019-06-25 WO PCT/CN2019/092683 patent/WO2020124974A1/en active Application Filing
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1707276A (en) * | 2005-05-24 | 2005-12-14 | 武汉大学 | Real-time emulation method and apparatus for electric system |
US20090325694A1 (en) * | 2008-06-27 | 2009-12-31 | Microsoft Corpration | Macroscopic quantum effects for computer games |
CN102436556A (en) * | 2012-01-09 | 2012-05-02 | 国电南瑞科技股份有限公司 | Track traffic accident inversion system |
CN103123758A (en) * | 2012-11-28 | 2013-05-29 | 大同电力高级技工学校 | Dispatching automation digital physical hybrid simulation training system |
CN103544863A (en) * | 2013-10-22 | 2014-01-29 | 国电南瑞科技股份有限公司 | Track traffic integrated supervision training simulation system data interaction module and working method |
CN104485042A (en) * | 2014-12-02 | 2015-04-01 | 国家电网公司 | Digital-analog hybrid simulation system and method of controllable series compensator |
CN105139712A (en) * | 2015-09-15 | 2015-12-09 | 中国南方电网有限责任公司电网技术研究中心 | On-line dispatcher training simulator based on real-time simulation and method thereof. |
CN106057008A (en) * | 2016-06-28 | 2016-10-26 | 南京南瑞继保电气有限公司 | Dispatcher training simulation system based on real-time simulator and construction method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020124974A1 (en) * | 2018-12-19 | 2020-06-25 | 南京南瑞继保电气有限公司 | Integrated railway transit supervision control and training simulation system and method |
CN110104034A (en) * | 2019-04-29 | 2019-08-09 | 南京南瑞继保电气有限公司 | A kind of across field data comparative approach of track traffic synthetic monitoring system |
CN112208587A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
CN112208587B (en) * | 2020-09-24 | 2022-06-28 | 交控科技股份有限公司 | Simulation system and simulation method for CBTC non-signal system |
CN112631144A (en) * | 2020-11-20 | 2021-04-09 | 国网山东省电力公司电力科学研究院 | Comprehensive energy real-time digital physical hybrid simulation system |
CN112631144B (en) * | 2020-11-20 | 2023-09-05 | 国网山东省电力公司电力科学研究院 | Comprehensive energy real-time digital physical hybrid simulation system |
CN112446148A (en) * | 2020-11-24 | 2021-03-05 | 南京轨道交通系统工程有限公司 | Data simulation system and method based on urban rail comprehensive monitoring |
CN112446148B (en) * | 2020-11-24 | 2024-04-23 | 南京轨道交通系统工程有限公司 | Data simulation system and method based on urban rail comprehensive monitoring |
Also Published As
Publication number | Publication date |
---|---|
WO2020124974A1 (en) | 2020-06-25 |
CN109523859B (en) | 2021-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109523859A (en) | A kind of track traffic synthetic monitoring mixing Training Simulation System and method | |
WO2019137312A1 (en) | Low current integrated system for rail transport | |
CN106251578A (en) | Artificial abortion's early warning analysis method and system based on probe | |
CN109657003A (en) | A method of hardware data is directly accessed big data platform | |
CN109740831A (en) | Rail transportation operation dispatches system, method and apparatus | |
CN112488520A (en) | Intelligent operation and maintenance system of intelligent station | |
CN113177377A (en) | Intelligent urban rail transit network management system based on digital twins | |
CN107018030A (en) | Mobile network's trouble analysis system based on intelligent terminal | |
CN113651200A (en) | Elevator remote monitoring system | |
CN104899577B (en) | Method for determining number of people in building and crowd evacuation method | |
CN113962060A (en) | Station management and control system | |
Teo et al. | SecureRails: towards an open simulation platform for analyzing cyber-physical attacks in railways | |
CN211184122U (en) | Intelligent video analysis system for linkage of railway operation safety prevention and control and large passenger flow early warning | |
CN113269039A (en) | On-duty personnel behavior identification method and system | |
WO2023272965A1 (en) | Multi-specialty vr environment verification system for smart subway | |
CN109714434B (en) | A kind of operation management method of the Metro AFC system based on Internet of Things | |
CN112949081B (en) | Rail transit network emergency rescue strategy simulation and evaluation system | |
CN112686130B (en) | Wisdom fishing boat supervision decision-making system | |
CN111680402B (en) | Shield door fault visualization method, system, device and storage medium | |
CN113691778A (en) | Panoramic station patrol system for urban rail transit station | |
Gavulová et al. | Technical support of traffic control system of Slovak agglomerations in NaTIS project | |
RU156053U1 (en) | SYSTEM OF SITUATIONAL CONTROL AT RAILWAY TRANSFER | |
CN112333434A (en) | Intelligent video analysis system | |
CN203204332U (en) | Train controlling and monitoring system-based broadcast simulation debugging system | |
CN116128678A (en) | Intelligent campus emergency response system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |