CN110104034A - A kind of across field data comparative approach of track traffic synthetic monitoring system - Google Patents

A kind of across field data comparative approach of track traffic synthetic monitoring system Download PDF

Info

Publication number
CN110104034A
CN110104034A CN201910353444.6A CN201910353444A CN110104034A CN 110104034 A CN110104034 A CN 110104034A CN 201910353444 A CN201910353444 A CN 201910353444A CN 110104034 A CN110104034 A CN 110104034A
Authority
CN
China
Prior art keywords
field
data
scene
field data
physical library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910353444.6A
Other languages
Chinese (zh)
Other versions
CN110104034B (en
Inventor
张伟
解凯
陶洪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Changzhou NR Electric Power Electronics Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201910353444.6A priority Critical patent/CN110104034B/en
Publication of CN110104034A publication Critical patent/CN110104034A/en
Application granted granted Critical
Publication of CN110104034B publication Critical patent/CN110104034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor

Abstract

The present invention discloses a kind of across field data comparative approach of track traffic synthetic monitoring system, including step 1, initialization connect this scene and more site physical libraries, show this scene and more field operational datas;Step 2 manually selects connection and specifies more site physical libraries, and more field operational datas are specified in display;Step 3, switching display this field operational data measuring point, link more field operational data measuring point synchronism switchings;Step 4 selects measuring point domain to be compared, carries out operation measuring point data and compares, display interface and more live display interfaces while marked difference data at this scene;Step 5, refresh data, interface difference label disappear.The present invention can satisfy Different field user and check to real-time running data, user, which can according to need, compares monitoring data difference for this spot database model and physical library operation data and target field, improves comprehensive monitoring system operation accuracy and convenience.

Description

A kind of across field data comparative approach of track traffic synthetic monitoring system
Technical field
A kind of data comparing method the present invention relates to track transportation industry comprehensive monitoring system across scene.
Background technique
With the raising of national economy level, Construction of Urban Rail Traffic is rapidly developed, comprehensive monitoring system conduct The important component of urban rail transit construction, real time review and correction judgement to system monitoring data propose higher want It asks.
Comprehensive monitoring system uses hierarchical distributed networks framework, and all station scenes are connected logical by fiber backbone network Letter, comprehensive monitoring system are divided into centre grade and vehicle substation supervision system, and centre grade comprehensive monitoring system summarizes all station data, When difference occur in center and station operation data, operations staff cannot note abnormalities scene in time, at the same also lead to system therefore Barrier cannot be handled in time.
In existing comprehensive monitoring system, there is not relation technological researching also, when there is abnormal signal, needs operation maintenance personnel Center comprehensive monitoring system is arrived respectively and station comprehensive monitoring system physical library checks data, for real-time refresh data, artificially Verification is unsatisfactory for requirement of real-time, can need to expend a large amount of manpowers with greatly uncertainty and the time carrys out positioning system event Hinder position, causes greatly to perplex to maintenance personnel, influence user experience.
Summary of the invention
Based on the above issues, the purpose of the present invention is to provide a kind of across the field data ratios of track traffic synthetic monitoring system Compared with method, meet the comparison in difference to center and station field operational data and database model, in real time monitoring simultaneously.
To realize above-mentioned technical purpose and the technique effect, the invention is realized by the following technical scheme:
A kind of across field data comparative approach of track traffic synthetic monitoring system, it is characterised in that the following steps are included:
Step 1, initialization connection this site physical library and more site physical libraries show that how existing this is live and simultaneously in man-machine interface Field operation data:
At center scene, this field module and more field modules initialize connection center physical library, this field data viewing area Display centre field operational data is initialized with more field data viewing areas;
When live AT STATION, the initialization of this field module connects local physical library, and more field modules initialize connection center physics Library, the initialization of this field data viewing area show this station operation data, and more field data viewing area initialization display centres are existing Field operation data;
Man-machine interface is set to each scene (including center scene and station scene), and the man-machine interface at each scene is wrapped Include this field data viewing area and more field data viewing areas.This field data viewing area is for showing that this field module is connected Physical library data, more field data viewing areas are used to show the data of physical library that more field modules are connected.Each Scene is respectively provided with this field module and more field modules.
Step 2, at center scene, more site physical libraries can be specified (to manually select mostly live by manually selecting connection The physical library of the physical library of module connection, more field module connections can be the physical library at specific one or more stations, can also For center site physical library), more field operational datas are specified in display;At center scene in use, this field module physical library Connectivity option (selection for referring to the physical library that this field module is connected) not can be switched, more field module physical library connectivity options (referring to selecting for the physical library that more field modules are connected) can arbitrarily switch connection Different field (can be existing for station, center ) physical library;
But scene is in use, the connection of this field module physical library option and more field module physical library connectivity options are equal AT STATION It cannot switch;I.e. live AT STATION, this field module connects local physical library always, and more field modules connect center physics always Library;
Step 3, this scene (can for station scene, center scene), switching display this field operational data measuring point, link it is more Field operational data measuring point synchronism switching:
This field module is operated, the action signal that program meeting this field module of automatic Memory operation generates, and this is believed Number more field modules are sent to, trigger the variation synchronous with this field data viewing area of more field data viewing areas, more field modules The operation not synchronous variation in this field data of linkage viewing area;
Operation is carried out to this field module to refer in this on-site manual switching display this field operational data measuring point (since one existing The data of field have very much, and needing to manually select needs data to be shown, are shown by this field data viewing area), this field module That is this field regions, more field modules, that is, more field regions, trigger more field data viewing areas and this field data viewing area is same Step variation refers to that the more field data viewing areas for triggering this scene are shown with this field operational data measuring point (i.e. by this field data This field operational data measuring point that viewing area is shown) corresponding data (trigger more field modules and transfer more field modules connections More site physical libraries in the local physical library with this scene in the corresponding data of operation data measuring point);
The synchronous variation in this scene of linkage does not refer to when in the more scene operation numbers of this on-site manual switching display for more field module operations When according to measuring point (being shown by more field data viewing areas), this field data viewing area will not be shown and more field operational data measuring points Corresponding data.
When this scene is station scene, switching display this field operational data measuring point in this on-site manual, (it is existing at this In the local physical library of field module connection), then more field modules at this scene are transferred in the center physical library that it is connected Corresponding data (since centre grade comprehensive monitoring system monitors and summarize all station data, therefore exists and corresponds to the operation of this scene The data of data measuring point) and it is shown in more field data viewing areas at station scene.
When live centered on this scene, switching display this field operational data measuring point in this on-site manual, (it is existing at this In the local physical library of module connection, i.e. center physical library), it specified is connected then more field modules at this scene transfer its Specific live (such as some station) physical library in corresponding data (since centre grade comprehensive monitoring system monitors and summarizes All station data, therefore there are the data corresponding to this field operational data measuring point in specific site physical library) and be shown in More field data viewing areas at heart scene.
Step 4, at this scene, select measuring point domain to be compared, carry out operation measuring point data compare, at this scene at this scene Display field and more field data viewing areas while marked difference data;
The static attribute domain and/or dynamic attribute domain that can customize selection each record are compared, discrepant thresholding meeting Red background colour code note is carried out simultaneously in this field data viewing area and more field data viewing areas;Described is recorded as measuring point fortune Row data;
Step 5, refresh data, interface difference label disappear:
After comparing difference, Refresh Data, this field data viewing area and more field data viewing areas difference are carried out at this scene Operation data is re-read from this site physical library and more site physical libraries;When heavy from this site physical library and more site physical libraries The operation data newly read is identical, can eliminate display field differences red background colour code note.
When this scene be station scene, then more site physical libraries of the station joint connection in site be center physical library, in Heart physical library contains the monitoring data at all stations, and the data moment of comprehensive monitoring system acquisition is all changing, refreshing be exactly from Physical library re-reads data.
It is live centered on this scene, then more site physical libraries of center joint connection in site are specified more site physicals Library (such as the physical library at some station), center physical library contain the monitoring data at all stations, comprehensive monitoring system acquisition The data moment is all changing, and refreshing is exactly to re-read data from physical library.
In steps of 5, by the customized setting of man-machine interface, it can be achieved that it is automatic refresh and refresh after automatic comparing function; Automatically compare the process as step 4 after refreshing;It is automatic to refresh the process for referring to step 5.
The particular content of the step 1 is: during initialization, if the connection failure of more site physical libraries, only shows Show this field data, while more field data viewing areas hide automatically;It, can be automatically to this if more site physical library connections are normal The thresholding of the initialization display data of field data viewing area and more field data viewing areas carries out comparison in difference.
The particular content of the step 2 is: more field modules can manually select connection traffic route when the operation of center scene All site physical libraries hide more field data viewing areas if manually selecting the connection failure of more site physical libraries, only at this Center field operational data in the display centre physical library of field data viewing area;More field modules are not when the operation of scene AT STATION It can be carried out more site physical libraries and manually select connection, center site physical library (i.e. center physical library) can only be fixedly connected with.
The particular content of the step 3 is: operating more field module simultaneously operatings that can link in this field module, but how existing Field module operates this field module operation that cannot link;By selecting [refreshing is compared] function choosing-item in man-machine interface, it can be achieved that Data information table of data information table of every switching or refreshing carries out a data automatically and compares.
The particular content of the step 4 is: data compare only in this field data viewing area and more field data viewing areas It could be executed when showing the data information table of same type;The number that this field data viewing area and more field data viewing areas are shown Different according to the type of information table, data, which compare, can not execute and can be prompted in man-machine interface, the data information table packet Include RTU information table, facility information table, telemetry intelligence (TELINT) table, remote signalling information table, remote pulse information table;Default is to each when data compare Whole thresholdings of item record are compared, and comparative static Attribute domain and/or dynamic attribute domain can also be arranged by public area, there is difference Different thresholding can carry out simultaneously red background color marker in this field data viewing area and more field data viewing areas;Static attribute When domain is compared, memory shared by this site physical library and all static attribute domains of more site physical library data to be compared is first determined whether Whether space is equal, and static attribute domain does not have difference if equal, otherwise needs to compare all static attribute thresholdings one by one, It finds out difference and is shown visualizing man-machine Interface Mark.
The particular content of the step 5 is: after comparing difference, can eliminate differences red background by Refresh Data Colour code note, by selecting [refreshing is compared] function choosing-item in man-machine interface, it can be achieved that comparing function automatically after automatic refreshing and refreshing Can, automatic refresh time is settable, and the shortest time is 1 second.
After adopting the above scheme, the invention has the following beneficial effects:
(1) can central monitoring position and station field operational data in real time, find differences in time, be convenient for fault location;
(2) station and center signal can be checked simultaneously during debugging in the early stage, it is convenient and efficient, save manpower consumption;
(3) facilitate center operations staff to check the real-time running data at completely all scenes at any time, be not necessarily to artificial Telnet.
Detailed description of the invention
Fig. 1 is visualization interface tools interfaces schematic diagram in the present invention;
Fig. 2 is that data compare operational flowchart in the present invention;
Fig. 3 is that control centre's field data compares operational flowchart in the present invention;
Fig. 4 is that station field data compares operational flowchart in the present invention.
Specific embodiment
Technical solution of the present invention is described in further detail with specific embodiment with reference to the accompanying drawing, so that ability The technical staff in domain can better understand the present invention and can be practiced, but illustrated embodiment is not as to limit of the invention It is fixed.
1, initialization connects this scene and more site physical libraries, shows this scene and more field operational datas;
At center scene, this field module and more field module default connections center physical library, initialization display stop list Information;When live AT STATION, this field module default connection local physical library, more field module default connections center physical library, Initialization display RTU information.
During initialization, if the connection failure of more site physical libraries, this field data is only shown, while mostly live Data monitoring region (i.e. more field data viewing areas) hides automatically;It, can be automatically to this if more site physical library connections are normal The initialization of field data viewing area and more field data viewing areas shows that data carry out comparison in difference.
2, it manually selects connection and specifies more site physical libraries, more field operational datas are specified in display;
At center scene, this field module physical library connectivity option not can be switched, and more field module physical library connectivity options can Connect Different field with random switching, but it is live AT STATION when, this field module connectivity option connects choosing with more field modules Item cannot switch, and more field modules can only be fixedly connected with center site physical library.
If center on-site manual selects the connection failure of more site physical libraries, more field data viewing areas are hidden, it is only aobvious Show center field operational data, if manually selecting the successful connection of more site physical libraries, shows more field datas.
3, at this scene, switching display this field operational data measuring point, link more field operational data measuring point synchronism switchings;
By operating to this field regions, the variation synchronous with this field regions of more field regions, more scene areas can be triggered The domain operation not synchronous variation in this field regions of linkage.
Only identical data measuring point table (i.e. data information is shown in this field data viewing area and more field data viewing areas Table) when, it is (i.e. how existing that this scene functional areas (i.e. this field regions namely this field module) operates more field regions that can just link Field module) simultaneously operating, if this scene shows that data measuring point table is different with more field regions, functional areas operation is mutually indepedent, Linkage is not will do it.
By select [refreshing is compared] function choosing-item in man-machine interface, it can be achieved that one data information table of every switching automatically into Data of row compare.
4, at this scene, measuring point domain to be compared is selected, operation measuring point data is carried out and compares, display interface is (i.e. at this scene Display field) and more live display interface (i.e. display field) marked difference data simultaneously;
It can customize static attribute domain, dynamic attribute domain and all information (the static attribute domain, dynamic category of selection each record Property domain) it is compared, discrepant thresholding can carry out simultaneously in this field data runnable interface and more field data runnable interfaces Red background colour code note, comparison procedure are prompted by progress bar.
Data compare the only ability when this field data viewing area and more field data viewing areas show identical data information table It can execute, if both sides show that data information table is different, data can not be executed and compare and will do it prompt;Default when data compare Whole thresholdings of each record are compared, specific comparative static Attribute domain can also be set by public area and dynamic belongs to Property domain;Data compare support and compare manually and relatively, can be configured automatically in public domain.
5, refresh data, interface difference label disappear.
After comparing difference, Refresh Data is carried out, differences red background can be eliminated, by the customized setting in interface, Automatic comparing function after automatic refreshing can be achieved and refresh, automatic refresh time is settable, and most short refresh time is 1 second.
The data at center scene and station scene are acquired by independently of the synthesis other than data comparing method of the invention Monitoring system (prior art) is completed.Comprehensive monitoring system (prior art) is divided into centre grade and vehicle substation supervision system, center Grade comprehensive monitoring system summarizes all station data, and vehicle substation supervision system monitors and acquire this station data, centre grade and vehicle The monitoring data of substation supervision system will appear inconsistent situation in abnormal cases.
The present invention is used for City Rail Transit System, and a normal route has multiple stations and a control centre, if Software systems (i.e. comparative approach) of the invention run on control centre, then " this scene " just refers to center, " more scenes " refers to All stations, each station are exactly a scene;Similarly, if software of the invention operates in some station, it is assumed that It is station m, then " this scene " is exactly station m, " more scenes " is exactly to refer to control centre and the other stations other than the m of station, institute It is concept opposite on a geographic area with " this scene " and " more scenes ".
At runtime, live (i.e. centre grade monitoring system) for center, this field module and more field modules can only connect Connect a physical library, due to this scene only one, more scenes can have it is multiple, so more field modules connection specific scene It can be with manual switching;But when software of the invention is run AT STATION, more field modules only allow connection center physical library, this be by There is no data interaction relationship between different stations.This field module refers to the local physical library of connection and shows this field operational data Module, more field modules refer to the module for connecting more site physical libraries and showing more field operational datas.
For some station scene, the data at this station, the number at all stations in center field monitor all fronts can only be monitored According to the data of each station operation are independent from each other, and center scene is by the data summarization at all stations of route, institute Can be existed simultaneously at some station and center scene with the same data, and we to compare be exactly this data AT STATION and Whether the numerical value of control centre.
When center scene runs software program of the invention, the connection of this field module is exactly center physical library, how existing Module needs management and running personnel to manually select, can be if management and running personnel want to see the data of station m More field modules manually select the physical library of connection station m, and live display interfaces more at this time can show the operation data of station m, So far in this field data viewing area display centre physical library at center scene station m data, more field data viewing areas are aobvious Show station m physical library data.
At center scene, when initialization, can not judge the data that compare which station, so defaulting this field module Center physical library is all connected with more field modules, after the completion of initialization, management and running personnel select to want to see according to their needs Scene, at this time more field modules will connect his it is selected that scene physical library.
Each data have many domains to be used to store the relevant information of the data, some is static attribute domain, in addition A part is dynamic attribute domain, by the correspondence thresholdings of the data to this field data viewing area and more field data viewing areas into Row compares, if thresholding is unequal, then it is assumed that this domain is discrepant.Static attribute reflects database model information, non-reality When acquire, artificially configure;Dynamic attribute reflects data variation information, is transformable based on acquiring in real time.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure made by bright specification and accompanying drawing content perhaps equivalent process transformation or be directly or indirectly used in other correlation Technical field, be included within the scope of the present invention.

Claims (7)

1. a kind of across field data comparative approach of track traffic synthetic monitoring system, it is characterised in that the following steps are included:
Step 1, initialization connection this site physical library and more site physical libraries show that how existing this is live and simultaneously in man-machine interface Field operation data:
At center scene, this field module and more field modules initialize connection center physical library, this field data viewing area Display centre field operational data is initialized with more field data viewing areas;
When live AT STATION, the initialization of this field module connects local physical library, and more field modules initialize connection center physics Library, the initialization of this field data viewing area show this station operation data, and more field data viewing area initialization display centres are existing Field operation data;
Step 2, at center scene, more site physical libraries can be specified by manually selecting connection, show specified more scene operation numbers According to;At center scene in use, this field module physical library connectivity option not can be switched, more field module physical library connectivity options The physical library of connection Different field can arbitrarily be switched;
But scene is in use, this field module physical library connectivity option and more field module physical library connectivity options are equal AT STATION It cannot switch;
Step 3, at this scene, switching display this field operational data measuring point, link more field operational data measuring point synchronism switchings:
This field module is operated, the action signal that program meeting this field module of automatic Memory operation generates, and this is believed Number more field modules are sent to, trigger the variation synchronous with this field data viewing area of more field data viewing areas, more field modules The operation not synchronous variation in this scene of linkage;
Step 4, at this scene, select measuring point domain to be compared, carry out operation measuring point data and compare, in this field data viewing area and More field data viewing areas while marked difference data;
The static attribute domain and/or dynamic attribute domain that can customize selection each record are compared, discrepant thresholding meeting Red background colour code note is carried out simultaneously in this field data viewing area and more field data viewing areas;Described is recorded as measuring point fortune Row data;
Step 5, refresh data, interface difference label disappear:
After comparing difference, Refresh Data is carried out, this field data viewing area and more field data viewing areas are respectively from this scene Physical library and more site physical libraries re-read operation data;When what is re-read from this site physical library and more site physical libraries Operation data is identical, can eliminate display field differences red background colour code note.
2. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, which is characterized in that In steps of 5, by the customized setting of man-machine interface, it can be achieved that it is automatic refresh and refresh after automatic comparing function;After refreshing certainly Dynamic is relatively the process of step 4;It is automatic to refresh the process for referring to step 5.
3. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, it is characterised in that The particular content of the step 1 is: during initialization, if the connection failure of more site physical libraries, only shows this scene Data, while more field data viewing areas hide automatically;If more site physical library connections are normal, can be automatically to this field data The thresholding of the initialization display data of viewing area and more field data viewing areas carries out comparison in difference.
4. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, it is characterised in that The particular content of the step 2 is: more field modules can manually select the connection all scenes in traffic route when the operation of center scene Physical library hides more field data viewing areas if manually selecting the connection failure of more site physical libraries, display centre scene Operation data;More field modules not can be carried out more site physical libraries and manually select connection when the operation of scene AT STATION, can only fix Connection center physical library.
5. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, it is characterised in that The particular content of the step 3 is: operating more field module simultaneously operatings that can link in this field module, but more field modules are grasped Make this field module operation that cannot link;By selecting [refreshing is compared] function choosing-item in man-machine interface, it can be achieved that every switching one Data information table of secondary data information table or refreshing carries out a data automatically and compares.
6. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, it is characterised in that The particular content of the step 4 is: data compare only shown in this field data viewing area and more field data viewing areas it is identical It could be executed when the data information table of type;When the data information that this field data viewing area and more field data viewing areas are shown The type of table is different, and data, which compare, can not execute and can be prompted in man-machine interface, and the data information table includes RTU letter Cease table, facility information table, telemetry intelligence (TELINT) table, remote signalling information table, remote pulse information table;Default records each when data compare Whole thresholdings are compared, can also be by the way that comparative static Attribute domain and/or dynamic attribute domain is arranged, and discrepant thresholding can be at this Field data viewing area and more field data viewing areas carry out red background color marker simultaneously;When static attribute domain is compared, first Judge whether memory headroom shared by this site physical library and all static attribute domains of more site physical library data to be compared is equal, Static attribute domain does not have difference if equal, otherwise needs to compare all static attribute thresholdings one by one, find out difference and Man-machine interface label display.
7. a kind of across field data comparative approach of track traffic synthetic monitoring system as described in claim 1, it is characterised in that The particular content of the step 5 is: after comparing difference, differences red background colour code note can be eliminated by Refresh Data, Automatic refresh time is settable, and the shortest time is 1 second.
CN201910353444.6A 2019-04-29 2019-04-29 Cross-site data comparison method for rail transit comprehensive monitoring system Active CN110104034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910353444.6A CN110104034B (en) 2019-04-29 2019-04-29 Cross-site data comparison method for rail transit comprehensive monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910353444.6A CN110104034B (en) 2019-04-29 2019-04-29 Cross-site data comparison method for rail transit comprehensive monitoring system

Publications (2)

Publication Number Publication Date
CN110104034A true CN110104034A (en) 2019-08-09
CN110104034B CN110104034B (en) 2021-04-20

Family

ID=67487342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910353444.6A Active CN110104034B (en) 2019-04-29 2019-04-29 Cross-site data comparison method for rail transit comprehensive monitoring system

Country Status (1)

Country Link
CN (1) CN110104034B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519078A (en) * 2009-03-13 2009-09-02 国电南瑞科技股份有限公司 Method for synchronizing multi-region data of comprehensive monitoring system
CN103241269A (en) * 2013-05-21 2013-08-14 南京轨道交通系统工程有限公司 Comprehensive dispatching and control system of modern trams
EP2821314A2 (en) * 2013-07-03 2015-01-07 Hitachi Ltd. Train operation control system, train operation simulation device, and train operation simulation method
KR20150106605A (en) * 2014-03-12 2015-09-22 네오트랜스 주식회사 Real-time monitoring system of station control apparatus and monitoring method thereof
CN206537292U (en) * 2017-02-27 2017-10-03 中国铁路设计集团有限公司 Carry urban track traffic dispatch control and run the cloud platform of automated system
CN206900395U (en) * 2017-04-14 2018-01-19 卡斯柯信号有限公司 Realize the train complex automatic system that automatic train monitoring and comprehensively monitoring integrate
CN107985350A (en) * 2017-11-10 2018-05-04 青岛海信网络科技股份有限公司 A kind of inter-linked controlling method and correlating center at Metro Network center
CN108063829A (en) * 2017-12-29 2018-05-22 中国铁路设计集团有限公司 A kind of new gauze urban track traffic comprehensive monitoring system
CN108657237A (en) * 2018-05-17 2018-10-16 青岛海信网络科技股份有限公司 A kind of ISCS integrates the method and device of ATS systems
CN109523859A (en) * 2018-12-19 2019-03-26 南京南瑞继保电气有限公司 A kind of track traffic synthetic monitoring mixing Training Simulation System and method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519078A (en) * 2009-03-13 2009-09-02 国电南瑞科技股份有限公司 Method for synchronizing multi-region data of comprehensive monitoring system
CN103241269A (en) * 2013-05-21 2013-08-14 南京轨道交通系统工程有限公司 Comprehensive dispatching and control system of modern trams
EP2821314A2 (en) * 2013-07-03 2015-01-07 Hitachi Ltd. Train operation control system, train operation simulation device, and train operation simulation method
KR20150106605A (en) * 2014-03-12 2015-09-22 네오트랜스 주식회사 Real-time monitoring system of station control apparatus and monitoring method thereof
CN206537292U (en) * 2017-02-27 2017-10-03 中国铁路设计集团有限公司 Carry urban track traffic dispatch control and run the cloud platform of automated system
CN206900395U (en) * 2017-04-14 2018-01-19 卡斯柯信号有限公司 Realize the train complex automatic system that automatic train monitoring and comprehensively monitoring integrate
CN107985350A (en) * 2017-11-10 2018-05-04 青岛海信网络科技股份有限公司 A kind of inter-linked controlling method and correlating center at Metro Network center
CN108063829A (en) * 2017-12-29 2018-05-22 中国铁路设计集团有限公司 A kind of new gauze urban track traffic comprehensive monitoring system
CN108657237A (en) * 2018-05-17 2018-10-16 青岛海信网络科技股份有限公司 A kind of ISCS integrates the method and device of ATS systems
CN109523859A (en) * 2018-12-19 2019-03-26 南京南瑞继保电气有限公司 A kind of track traffic synthetic monitoring mixing Training Simulation System and method

Also Published As

Publication number Publication date
CN110104034B (en) 2021-04-20

Similar Documents

Publication Publication Date Title
CN103856774B (en) A kind of video monitoring intelligent checking system and method
US8743121B2 (en) Smart impact views
US5299207A (en) Centralized supervisory system for transmission network elements and method of supervising transmission network elements
CN101894595B (en) Fault detection method applied to nuclear power plant system
CN105718371B (en) A kind of regression testing method, apparatus and system
CN107909131A (en) The automation management-control method of intelligent ODN equipment and fibre core
CN111564905A (en) Automatic simultaneous joint debugging method and system for unattended multiple power distribution terminals of main station
CN109245951A (en) A method of network optimization equipment networking monitoring is realized based on web
CN107710241A (en) Distributed large-scale information processing system is arrived in one-touch debugging and push renewal
CN105575155B (en) Method and apparatus for determining vehicle traveling information
CN108206522B (en) Power equipment state monitoring method and system
CN113534839B (en) Air route intervention guiding method and device for linkage surveying and mapping of unmanned aerial vehicle group
CN104537908A (en) Multi-stage scheduling integrated simulation system based on model sharing and method
CN106100913A (en) Error message alignment system and method
CN103634147A (en) Network topology management method and equipment
CN102840992A (en) Satellite-borne self-testing method based on satellite network
CN101715203B (en) Method and device for automatically positioning fault points
CN104880629A (en) Remote diagnosis method for motion behavior of protection element at dispatching terminal
CN103778589A (en) Monitoring method and system of railway signal system
CN106570781A (en) Intelligent transformer station monitoring information step-by-step checking and accepting method based on three-layer double-network structure
CN110104034A (en) A kind of across field data comparative approach of track traffic synthetic monitoring system
CN105912439A (en) Method, device and system for computer monitoring
CN109471961A (en) A kind of the circuit methods of exhibiting and device of secondary system of intelligent substation
CN110138613A (en) A kind of network test template construction method, electric power networks test method and relevant apparatus
CN109617025B (en) Automatic generation method and device for main wiring diagram of in-place protection management unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240409

Address after: 211102, No. 69, Su Yuan Avenue, Jiangning District, Jiangsu, Nanjing

Patentee after: NR ELECTRIC Co.,Ltd.

Country or region after: China

Patentee after: NR ENGINEERING Co.,Ltd.

Patentee after: NR ELECTRIC POWER ELECTRONICS Co.,Ltd.

Address before: 211102, No. 69, Su Yuan Avenue, Jiangning District, Jiangsu, Nanjing

Patentee before: NR ELECTRIC Co.,Ltd.

Country or region before: China

Patentee before: NR ENGINEERING Co.,Ltd.